This is a site logistics plan for the Shoreline Elementary School construction project, part of the WDS Bond Proposal Phase 1 in Michigan, prepared by Clark Construction. The plan establishes operational parameters for the construction phase scheduled from June 7, 2027, through July 23, 2027. The document designates a construction area without temporary fencing at the elementary school site, with traffic cones and barriers deployed as needed to manage site safety and access control. The primary construction entrance and exit are separately identified from public and school traffic routes, which are directed to use the Market Street entrance to minimize disruption to normal school operations. Clark Construction maintains a field office at the White Lake Community Center located at 541 East Slocum Street in Whitehall, Michigan.

The logistics plan includes designated parking areas for contractor personnel and separate parking facilities for WDS staff and visitors to segregate construction activity from school operations. Portable toilets are positioned on the site to support construction workforce needs. The plan reflects standard construction site management practices designed to maintain separation between active construction zones and areas utilized by the school and public, ensuring operational continuity during the seven-week construction period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TomBrennan Polygon

TomBrennan Text Box

CONSTRUCTION AREA

(NO TEMPORARY FENCING)

TomBrennan PolyLine

TomBrennan Callout

TRAFFIC CONES (AS NEEDED)

TomBrennan PolyLine

TomBrennan Switch

TomBrennan Text Box Shoreline Elementary Site Logistics Plan

TomBrennan Text Box

LEGEND

CONSTRUCTION AREA (NOT FENCED)

TRAFFIC CONES/BARRIERS

PORTABLE TOILETS

TomBrennan Rectangle

TomBrennan Switch

TomBrennan Text Box

CONSTRUCTION AREA ENTRANCE/EXIT ONLY

PUBLIC AND SCHOOL TRAFFIC TO USE MARKET STREET ENTRANCE

TomBrennan Text Box

CLARK CONSTRUCTION FIELD OFFICE

White Lake Community Center 541 E. Slocum St., Whitehall, MI 49461

TomBrennan Polygon

TomBrennan Text Box

CONTRACTOR

PARKING

TomBrennan Ellipse

TomBrennan Ellipse

TomBrennan Ellipse

TomBrennan Text Box

KEY DATES

Construction Start Date: 6/7/2027 Construction End Date: 7/23/2027

TomBrennan Polygon

TomBrennan Text Box

WDS STAFF AND VISITOR PARKING