26 0930 WDS Ealy CD Drawings.pdf

PDF 9 MB Posted

Attached to
WDS Bond Proposal Phase 1- Ealy, Middle School, Shoreline
Solicitation number
RFP WDS 270000000188 1
Issued by
Michigan

About this file

This is a construction document set consisting of architectural, mechanical, and electrical drawings for an interior renovation project at Ealy Elementary School in Whitehall, Michigan, prepared for the Whitehall District Schools. The project scope includes demolition and replacement of horizontal unit ventilators (HUVs) with associated mechanical and electrical work, selective ceiling and finish replacement in areas impacted by mechanical work, media center finish updates, and carpet replacement in select classrooms. The exterior scope encompasses roof replacement at Roofs 1 and 22 with associated demolition, flashings, penetrations, insulation, and roof drainage work. The project documents indicate compliance with the 2021 Michigan Building Code, 2021 Michigan Rehabilitation Code, 2021 Michigan Energy Code, and 2021 Michigan Plumbing Code, with no changes to building use, occupancy classification, building area, building height, or means of egress. The drawings are issued for construction documents dated September 30, 2026, and include comprehensive floor plans, demolition plans, reflected ceiling plans, finish plans, and mechanical/electrical details organized by building units (A, B, C, and D).

The project includes significant mechanical system replacement featuring new unit ventilators, air handling units, condensing boilers with a combined 2000 MBH capacity, condensing units for cooling, and associated piping and ductwork. New roof construction specifies 60 mil fully adhered single-ply membrane on minimum 5 inches of polyisocyanurate insulation with an initial solar reflectance index of 82. The mechanical equipment schedule details specific manufacturers and models including Trane unit ventilators and condensing units, Fulton condensing hydronic boilers, and Bell & Gossett pumps. The construction documents note that the owner reserves the right to remove or modify scope items prior to commencement of work and may accept base bid or alternate at the time of award. Existing roof conditions may vary from information shown, with additional repairs or modifications potentially required based on field conditions to be coordinated with the owner prior to proceeding.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E a ly E le m e n ta ry

W h it e h a ll D is tr ic t

S c h o o ls

E

S o p h ia S t, W h it e h a ll

M

I

PROJECT NO. 25.147

G001

COVER SHEET

425 E Sophia St, Whitehall, MI 49461

ISSUED FOR: CONSTRUCTION DOCUMENTS

Ealy Elementary Whitehall District Schools

09.30.2026

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E a ly E le m e n ta ry

W h it e h a ll D is tr ic t

S c h o o ls

E

S o p h ia S t, W h it e h a ll

M

I

PROJECT NO. 25.147

G001

COVER SHEET

425 E Sophia St, Whitehall, MI 49461

ISSUED FOR: CONSTRUCTION DOCUMENTS

Ealy Elementary Whitehall District Schools

09.30.2026

SYM DATE ISSUED FORSYM DATE ISSUED FOR

TYPICAL SYMBOLS & REFERENCESLG

ND

REFERENCE CALLOUT SYMBOL

A101

SIM

DETAIL NUMBER

SHEET NUMBER

EXTERIOR ELEVATION

REFERENCE BUBBLE A101

A ELEVATION LETTER

BUILDING SECTION SYMBOL

A101

SIM

SECTION NUMBER

SHEET NUMBER

INTERIOR ELEVATION

REFERENCE BUBBLE

A101

SHEET NUMBER

A

A

A

A

SIMILAR CONDITION

OPP

OPPOSITE CONDITION

ELEVATION LETTER

SIMILAR CONDITION

OPP

OPPOSITE CONDITION VIEW DIRECTION

1. THE OWNER RESERVES THE RIGHT TO REMOVE OR

MODIFY SCOPE ITEMS PRIOR TO COMMENCEMENT OF

CONTRACTED WORK.

2. OWNER MAY ACCEPT BASE BID OR ALTERNATE AT TIME

OF AWARD.

3. ALL EXISTING CONDITIONS SHALL BE FIELD VERIFIED

PRIOR TO COMMENCEMENT OF WORK.

4. EXISTING ROOF CONDITIONS MAY VARY FROM

INFORMATION SHOWN. ADDITIONAL REPAIRS OR

MODIFICATIONS MAY BE REQUIRED BASED ON FIELD

CONDITIONS AND SHALL BE COORDINATED WITH THE

OWNER PRIOR TO PROCEEDING.

5. COORDINATE ROOF WORK WITH ONGOING BUILDING

OPERATIONS.

6. CONTRACTOR SHALL PROTECT EXISTING BUILDING, ROOF

AREAS, AND INTERIOR SPACES FROM WATER INTRUSION

DURING CONSTRUCTION.

GENERAL ARCHITECTURAL NOTESNO

TE

S

NOTE:

MOUNT EQUIPMENT AS SHOWN UNLESS SPECIFIED

OTHERWISE. SWITCHES (LOCATE ON LATCH SIDE, IF

SWITCH OR DEVICE CANNOT BE

LOCATED ON LATCH SIDE, LOCATE

ONE DOOR LEAF WIDTH AWAY ON

HINGE SIDE) STACK UP TO 2 HIGH

DEVICES TO KEEP WITHIN ADA REACH.

DOOR

LOW

DEVICES

RECEPTACLEVOICE/DATA

MASONRY COURSING

(WHERE APPLICABLE)

F.A. PULL STATION

THERMOSTAT

F.A. AUDIO/VISUAL

ALIGNMENT NOTES

• ALIGN AND LOCATE CLOSE TOGETHER ANY DEVICES INSTALLED WITHIN 6' HORIZONTALLY.

• CENTER ALL DEVICES WHERE INDICATED ON COLUMN WRAP OR BUMP OUT; STACK AND ALIGN VERTICALLY.

• INSTALL DEVICES AT HEIGHTS INDICATED IN SYMBOL LEGEND UNLESS STACKING PER THIS DETAIL.

• WHERE HEIGHT IS SPECIFICALLY NOTED ON FLOOR PLANS, USE THAT MOUNTING HEIGHT

• CENTER ON DOORFRAME OR WHITEBOARDS ANY DEVICES INDICATED ABOVE.

F

R O

M F

L O

O R

O R

L A

N D

IN

G

F R

O M

F L

O O

R O

R L

A N

D

IN

G

CARD READER

6' - 0" MIN.

4" MAX

CAMERAS, CLOCKS,

WALL OCCUPANCY

SENSORS

WHITE BOARD (WHERE

APPLICABLE - VERIFY WITH

DETAILS/PLANS PROPER

INSTALL HEIGHT) CENTER ANY

SINGLE DEVICE WITH CENTER

OF WHITE BOARD

ANY DEVICES

SHOWN OVER

DOOR TO BE

CENTERED.

EQ EQ

EQ EQ

F

R O

M F

L O

O R

O R

L A

N D

IN

G

SHORT THROW

PROJECTOR WHERE

APPLICABLE

~12"

MAX TWO DEVICES IN

ONE HIGHER MOUNT

LOCATION, PROVIDE RFI

IF MORE DEVICES ARE

NECESSARY

WHEN DEVICES ARE WITHIN DIMENSION,

STACK HIGH/LOW VERTICALLY AND GROUP

DEVICES AT SAME HEIGHT. UNLESS

DEVICES IS PART OF TECHNOLOGY DETAIL

GROUPING OR SERVING A FURNITURE

GROUP.

CASEWORK, COORDINATE DEVICE

BOTTOM TO BE 2" OVER

BACKSPLASH OR OVER

COUNTERTOP (IF NO BACKSPLASH).

FOR LARGE FORMAT TILE, ALIGN

EDGE OF DEVICE WITH HORIZONTAL

GROUT LINE CLOSEST TO

COUNTERTOP.

COORDINATE OUTLET LOCATIONS

WITH GROUT LINES, EDGE OF

DEVICE ON GROUT LINE IF POSSIBLE.

COORDINATE WITH INTERIOR

DESIGN DRAWINGS.

S

TYPICAL COLUMN

ENCLOSURE, CHASE

OR BUMP-OUT WITH

DEVICES INDICATED

IN PLANS.

EQ EQ

M A

X

4" MAX.

M

IN

PROTRUDING

OBJECTS

REDUCED VERTICAL

CLEARANCE

WATER CLOSET &

LAVATORY CLEARANCE

403.5

CLEAR WIDTH

ACCESSIBLE ROUTE

TRANSFER SHOWER

CLEARANCE

404.2.3.2(A)

FRONT APPROACH PULL SIDE

*IF BOTH CLOSER AND LATCH

ARE PROVIDED

404.2.3.2(B)

FRONT APPROACH PUSH SIDE

*IF BOTH CLOSER AND LATCH

ARE PROVIDED - NEW

BUILDINGS

404.2.3.2(E)

HINGE APPROACH PULL SIDE

404.2.3.2(F)

HINGE APPROACH PUSH SIDE

*48" MIN IF BOTH CLOSER AND

LATCH ARE PROVIDED

404.2.3.2(G)

LATCH APPROACH PULL SIDE

*54" IF CLOSER IS PROVIDED

404.2.3.2(H)

LATCH APPROACH PUSH SIDE

*48" IF CLOSER IS PROVIDED

CHANGES IN LEVEL

NOTE:

INFORMATION SHOWN IS TAKEN FROM THE AMERICAN

NATIONAL STANDARD INSTITUTE (ANSI) AND IS FOR

REFERENCE ONLY AS DESCRIBED IN: ANSI ICC A117.1-2017

M A

X

M

IN

" C L

E A

R

M

IN

CLEAR

60" MIN.

M

IN

MIN.

30"

MIN.

36"

MIN.

32"

M A

X

M

IN

M A

X

S E

A T

W

L

L

BACK

WALL

36"

48"

M

IN

MIN.

18" *

M

IN

MIN.

12" *

M

IN

42" MIN.

M

IN

MIN.

22"

M

IN

MIN.

24"

M

IN

MIN.

24"

1/

M A

X

1/

M A

X

1/

M A

X

1/

M A

X

ACCESSIBLE BUILDING CLEARANCESLG

ND

MIN.

15"

MIN.

16"

M

A X

M

IN

8" MIN

6" MIN 11"

MAX

25"

M

IN

KNEE

CLEARANCE

ø

304.3.1.1

NEW BUILDING

TURNING RADIUS

ø

304.3.1.2

EXISTING BUILDING

TURNING RADIUS

ø

OVERLAP AREA

304.3.2

T-SHAPED TURNING RADIUS

NEW BUILDINGS - OPTION 1

68" MIN.

M

IN

16" MIN. 36" MIN. 16" MIN.

M

IN

M

IN

304.3.2

T-SHAPED TURNING RADIUS

NEW BUILDINGS - OPTION 2

64" MIN.

M

IN

11" MIN. 42" MIN. 11" MIN.

M

IN

M

IN

304.3.2

T-SHAPED TURNING RADIUS

NEW BUILDINGS - OPTION 3

64" MIN.

M

IN

12" MIN. 40" MIN. 12" MIN.

M

IN

M

IN

304.3.2.2

T-SHAPED TURNING RADIUS

EXISTING BUILDINGS

60" MIN.

M

IN

12" MIN. 36" MIN. 12" MIN.

M

IN

M

IN

305.3.1

NEW BUILDING

CLEAR FLOOR SPACE

52" MIN.

M

IN

305.3.2

EXISTING BUILDING

CLEAR FLOOR SPACE

48" MIN.

M

IN

404.2.3.2(C)

FRONT APPROACH PUSH SIDE

*IF BOTH CLOSER AND LATCH

ARE PROVIDED - EXISTING

BUILDINGS

M

IN

MIN.

12" *

404.2.3.2(D)

HINGE APPROACH PULL SIDE

M

IN

36" MIN.

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

G002

DRAWING INDEX,

GENERAL NOTES, AND

ACCESSIBILITY

09.30.2026

SHEET LIST

SHEET # SHEET NAME

GENERAL

G001 COVER SHEET

G002 DRAWING INDEX, GENERAL NOTES, AND ACCESSIBILITY

G101 FIRST FLOOR CODE COMPLIANCE PLANS

DEMOLITION

D101 FIRST FLOOR DEMOLITION PLAN

D101A FIRST FLOOR DEMOLITION PLAN - UNIT A

D101B FIRST FLOOR DEMOLITION PLAN - UNIT B

D101C FIRST FLOOR DEMOLITION PLAN - UNIT C

D101D FIRST FLOOR DEMOLITION PLAN - UNIT D

D102 ROOF DEMOLITION PLAN

D201 FIRST FLOOR CEILING DEMOLITION PLAN

ARCHITECTURAL

A101 FIRST FLOOR PLAN

A101A FIRST FLOOR PLAN - UNIT A

A101B FIRST FLOOR PLAN - UNIT B

A101C FIRST FLOOR PLAN - UNIT C

A101D FIRST FLOOR PLAN - UNIT D

A102 ROOF PLAN

A201 FIRST FLOOR REFLECTED CEILING PLAN

INTERIORS

I101 FIRST FLOOR FINISH PLAN

MECHANICAL DEMOLITION

MD101A MECHANICAL DEMOLITION FIRST FLOOR PLAN - UNIT A

MD101B MECHANICAL DEMOLITION FIRST FLOOR PLAN - UNIT B

MD101C MECHANICAL DEMOLITION FIRST FLOOR PLAN - UNIT C

MD101D MECHANICAL DEMOLITION FIRST FLOOR PLAN - UNIT D

MECHANICAL

M101A MECHANICAL HVAC FIRST FLOOR PLAN - UNIT A

M101B MECHANICAL HVAC FIRST FLOOR PLAN - UNIT B

M101C MECHANICAL HVAC FIRST FLOOR PLAN - UNIT C

M101D MECHANICAL HVAC FIRST FLOOR PLAN - UNIT D

M102A MECHANICAL HVAC ROOF PLAN - UNIT A

M102B MECHANICAL HVAC ROOF PLAN - UNIT B

M102C MECHANICAL HVAC ROOF PLAN - UNIT C

M102D MECHANICAL HVAC ROOF PLAN - UNIT D

M200 MECHANICAL SCHEDULES

M201 MECHANICAL DETAILS

M202 MECHANICAL NOTES & ABBREVIATIONS

M300 MECHANICAL CONTROLS

M301 MECHANICAL CONTROLS

M302 MECHANICAL CONTROLS

ELECTRICAL DEMOLITION

ED101A ELECTRICAL DEMOLITION FIRST FLOOR PLAN - UNIT A

ED101B ELECTRICAL DEMOLITION FIRST FLOOR PLAN - UNIT B

ED101C ELECTRICAL DEMOLITION FIRST FLOOR PLAN - UNIT C

ED101D ELECTRICAL DEMOLITION FIRST FLOOR PLAN - UNIT D

ELECTRICAL

E101 ELECTRICAL POWER FIRST FLOOR PLAN - OVERALL

E101A ELECTRICAL POWER FIRST FLOOR PLAN - UNIT A

E101B ELECTRICAL POWER FIRST FLOOR PLAN - UNIT B

E101C ELECTRICAL POWER FIRST FLOOR PLAN - UNIT C

E101D ELECTRICAL POWER FIRST FLOOR PLAN - UNIT D

E102A ELECTRICAL POWER ROOF PLAN - UNIT A

E102C ELECTRICAL POWER ROOF PLAN - UNIT C

E102D ELECTRICAL POWER ROOF PLAN - UNIT D

E201A ELECTRICAL LIGHTING FIRST FLOOR CEILING PLAN - UNIT A

E300 ELECTRICAL NOTES & SYMBOLS

E301 ELECTRICAL ONE-LINE DIAGRAM

E302 ELECTRICAL DETAILS & SCHEDULES

E303 ELECTRICAL PANEL SCHEDULES

TECHNOLOGY

T101 TECHNOLOGY SYMBOL LEGEND

T102A TECHNOLOGY PLAN - UNIT A

T102B TECHNOLOGY PLAN - UNIT B

NOT TO SCALE

DEVICE ALIGNMENT GUIDELINES

SYM DATE ISSUED FOR

J

J

J

J J

J J

J

J

J

J

J

J

J

J

J

J

J

JJ

J

J

J

J

J

J

F A

C P

J

SD

SD

D

SD

D

CODE COMPLIANCE LEGEND

EGRESS SYMBOLS

EGRESS EXIT NUMBER

FROM ROOM OR SPACE

MAXIMUM NUMBER OF

OCCUPANTS PERMITTED

BY EGRESS WIDTH

EXISTING TRAVEL

DISTANCE TO

EGRESS DOOR

PERMITTED MAXIMUM

TRAVEL DISTANCE

PER CONDITION

DIRECTION OF EGRESS

FIRE SAFETY SYMBOLS

XFE

XFEC

FE

FEC

EXISTING FIRE EXTINGUISHER

EXISTING FIRE EXTINGUISHER CABINET

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

1. LIGHTER LINES SHOWN ABOVE INDICATE EXISTING FIRE RATED

WALLS.

2. ALL PENETRATIONS THROUGH A FIRE OR SMOKE RATED PARTITION

SHOULD BE SEALED WITH AN APPROVED U.L. RATED PRODUCT.

3. THE TOPS OF ALL FIRE RATED PARTITIONS SHALL BE SEALED TO THE

CONTINUOUS STRUCTURE ABOVE WITH A U.L. RATED SYSTEM OR

ASSEMBLY.

4. WOOD BLOCKING IN FIRE-RATED PARTITIONS SHALL BE OF NON-

COMBUSTIBLE TREATED WOOD.

5. REFER TO SPECIFICATION FOR U.L. RATING INFORMATION.

6. FIRE-RATED WALLS ENDING INTO AN ACOUSTICAL DECK MUST HAVE

THE FLUTES FILLED, REFER TO 'TOP OF WALL DETAIL AT ACOUSTIC

DECK' SHOWN ON THIS SHEET.

• FOR MASONRY WALLS THE MASON SHALL FILL VOIDS AND FIRE

SPRAY WITH UL LISTED MATERIAL.

• FOR STUD WALLS USE FIRE SAFING AND FIRE CAULK.

PARTITION SYMBOL PARTITION RATING RATING PRIORITY

3 HOUR 01

2 HOUR FIRE/SMOKE

2 HOUR

1 HOUR FIRE/SMOKE

1HOUR

SMOKE RESISTANT

FIRE-RATING KEYLG

ND

LG

ND

COMMON PATH OF

TRAVEL DISTANCE: 00'-00"

PERMITTED TRAVEL DISTANCE: 00'-00"

1i - Level

150 SF GROSS / 300

Room name

GROSS OCCUPANCY BY SPACE TAG

ROOM NUMBER

ROOM NAME

CALCULATED OCCUPANCY

ACTUAL OCCUPANT LOAD

AREA CALCULATION

150 SF NET

Net Area / ### Net SF Reduction : ##

Room name

NET OCCUPANCY BY SPACE TAG

ROOM NUMBER

ROOM NAME

CALCULATED OCCUPANCY

NET SF REDUCTION

ACTUAL OCCUPANT LOAD

AREA CALCULATION

NUMBER OF OCCUPANTS

EGRESSING FROM SPACE #

# occs

ACTUAL OCCUPANTS

EGRESSING THROUGH EXIT

EXIT: #

# occs

EXISTING TRAVEL

DISTANCE TO

EGRESS DOOR

PERMITTED MAXIMUM

TRAVEL DISTANCE

PER CONDITION

DIRECTION OF EGRESS

EXIT ACCESS

TRAVEL DISTANCE: 00'-00"

PERMITTED TRAVEL DISTANCE: 00'-00"

1i - Level

AED AUTOMATED EXTERNAL DEFIBRILLATOR

CODE SUMMARY

Site Address: 425 E Sophia Street Whitehall, MI 49461

Project Description: Project consists of interior renovation work at the existing Ealy Elementary School including demolition and replacement of horizontal unit ventilators (HUVs) with associated mechanical and electrical work. Selective ceiling and finish replacement will occur in areas impacted by mechanical work. Additional interior scope includes media center finish updates and carpet replacement in select classrooms. Exterior scope includes roof replacement at Roofs 1 and 22 with associated demolition, flashings, penetrations, insulation, and roof drainage work.

There is no change to building use, occupancy classification, building area, building height, or means of egress.

Local Jurisdiction: City of Whitehall, MI - Building Department

Applicable Building Code: 2021 Michigan Building Code (MBC) 2021 Michigan Rehabilitation Code (MRC) 2021 Michigan Energy Code (MEC) 2021 Michigan Plumbing Code (MPC)

ENERGY CODE COMPLIANCE

SYSTEM PRODUCT R-VALUE U-VALUE

ROOF POLYISOCYANURATE

INSULATION

R-32.5 (6.5/IN) 0.030

BASIS OF DESIGN

ROOF MFR'S

STANDARD

1. THIS IS INTENDED TO CONVEY MEETING THE PRESCRIPTIVE ASHRAE 90.1 -

LATEST ADOPTED EDITION REQUIREMENTS

2. ENERGY CODE COMPLIANCE IS LIMITED TO ROOF ASSEMBLIES WITHIN

THE SCOPE OF WORK. NO MODIFICATIONS TO WALLS, FLOORS, SLABS,

OR OPENINGS ARE PROPOSED.

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

G101

FIRST FLOOR CODE

COMPLIANCE PLANS

09.30.2026NR

TH 1/16" = 1'-0"

FIRST FLOOR CODE COMPLIANCE PLAN

Path of Travel Schedule

Mark Length

Permitted

Travel

Distance Level

RECEPTION/WAITING

CONF. ROOM OFFICE

STAFF LOUNGE

MAIL

ART ROOM ART ROOM

CAFETERIA

SERVING KITCHEN

GYM

PERFORMING

ARTS

GYM COMMONS

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

BOYS RR

GIRLS RR

CLASSROOM

CLASSROOM

COMMONS

CLASSROOM

CLASSROOM

CLASSROOM

MEDIA CENTER

LARGE GROUP

INSTRUCTION

CLASSROOM CLASSROOMCLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

CLASSROOMCLASSROOM

CORRIDORCORRIDOR

GIRLS RR

BOYS RR

UPPER MECH

BOYS RR

GIRLS RR

OFFICE

OFFICE

STORAGE

UNIT A

UNIT D

U N

IT A

U N

IT D

UNIT A

UNIT C

U N

IT B

U N

IT C

U N

IT C

U N

IT D

U N

IT

C

U N

IT

D

U N

IT

B U N

IT

A

1 2

1 2

1 2

1 2

1 2

4 4

4 4

Milles has finned tubue removal

Milles has finned tubue removal

No Mech. in this classroom. Has dedicated "RTU" from 2017.

1. CONTRACTORS ARE REQUIRED TO INSPECT/REVIEW THE

EXISTING BUILDING PRIOR TO RELATED DEMOLITION

WORK. UNLESS NOTED OTHERWISE, REMOVAL OF ANY

WALL, FLOOR OR CEILING INCLUDES ALL GENERAL

MECHANICAL AND ELECTRICAL ITEMS WHICH ARE A PART

OF, OR ATTACHED TO IT.

2. CONTRACTOR SHALL VERIFY ALL EXISTING JOB SITE

CONDITIONS AND DIMENSIONS AND BE RESPONSIBLE

FOR THE SAME. ADVISE ARCHITECT OF ANY AND ALL

DISCREPANCIES.

3. PATCH FLOORS, WALLS AND CEILINGS DAMAGED DURING

CONSTRUCTION AND DEMOLITION AS REQUIRED. FINISH

TO MATCH EXISTING.

4. ACCOMMODATE NEW CONSTRUCTION IF NOT INDICATED.

5. PROTECT ALL EXISTING FINISHES THROUGHOUT PROJECT.

6. REFER TO DEMOLITION ELEVATIONS, SECTIONS AND

DETAILS FOR ADDITIONAL INFORMATION.

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND

ELECTRICAL PLANS FOR ADDITIONAL DEMOLITION NOTES.

8. SALVAGE ALL UNISTRUT AND PROTECT FOR RE-USE IN

NEW CONSTRUCTION, IF REQUIRED.

9. AT LOCATIONS OF REMOVED WALLS, ALL ASSOCIATED

ITEMS ATTACHED TO THE WALL ARE TO BE REMOVED.

SUCH AS: DOORS, WINDOWS, FRAMES, MARKERBOARDS,

TACKBOARDS, TACK STRIPS, ETC.

GENERAL DEMOLITION NOTESNO

TE

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

D101

FIRST FLOOR

DEMOLITION PLAN

09.30.2026

DEMOLITION KEYED NOTES

1 REMOVE EXISTING MECHANICAL EQUIPMENT.

CORDINATE WITH MECHANICAL DRAWINGS. PREP FOR

NEW WORK.

2 REMOVE EXISTING WALL LOUVER. COORDINATE WITH

MECHANICAL. PREP FOR NEW WORK

3 REMOVE EXISTING CABINET HEATER CORDINATE WITH

MECHANICAL. PREP FOR NEW WORK.

4 SALVAGE EXISTING CARPET TILE AROUND MECHANICAL

EQUIPMENT FOR PATCH AND REPAIR

5 REMOVE EXISTING COUNTERTOPS AND PANEL

MOLDING. SALVAGE MOLDING FOR REUSE. CASEWORK

TO REMAIN. PREP FOR NEW SOLID SURFACE

COUNTERTOP MATERIAL.

6 REMOVE EXISTING FLOOR AND WALL BASE.

NR

TH 1/16" = 1'-0"

FIRST FLOOR DEMOLITION PLAN

NO

TE

1. CONTRACTORS ARE REQUIRED TO INSPECT/REVIEW THE

EXISTING BUILDING PRIOR TO RELATED DEMOLITION

WORK. UNLESS NOTED OTHERWISE, REMOVAL OF ANY

WALL, FLOOR OR CEILING INCLUDES ALL GENERAL

MECHANICAL AND ELECTRICAL ITEMS WHICH ARE A PART

OF, OR ATTACHED TO IT.

2. CONTRACTOR SHALL VERIFY ALL EXISTING JOB SITE

CONDITIONS AND DIMENSIONS AND BE RESPONSIBLE

FOR THE SAME. ADVISE ARCHITECT OF ANY AND ALL

DISCREPANCIES.

3. PATCH FLOORS, WALLS AND CEILINGS DAMAGED DURING

CONSTRUCTION AND DEMOLITION AS REQUIRED. FINISH

TO MATCH EXISTING.

4. ACCOMMODATE NEW CONSTRUCTION IF NOT INDICATED.

5. PROTECT ALL EXISTING FINISHES THROUGHOUT PROJECT.

6. REFER TO DEMOLITION ELEVATIONS, SECTIONS AND

DETAILS FOR ADDITIONAL INFORMATION.

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND

ELECTRICAL PLANS FOR ADDITIONAL DEMOLITION NOTES.

8. SALVAGE ALL UNISTRUT AND PROTECT FOR RE-USE IN

NEW CONSTRUCTION, IF REQUIRED.

9. AT LOCATIONS OF REMOVED WALLS, ALL ASSOCIATED

ITEMS ATTACHED TO THE WALL ARE TO BE REMOVED.

SUCH AS: DOORS, WINDOWS, FRAMES, MARKERBOARDS,

TACKBOARDS, TACK STRIPS, ETC.

GENERAL DEMOLITION NOTESNO

TE

RECEPTION/WAITING

CONF. ROOM OFFICE

STAFF LOUNGE

MAIL

ART ROOM ART ROOM

CAFETERIA

SERVING KITCHEN

CLASSROOM

CLASSROOM

MEDIA CENTER

LARGE GROUP

INSTRUCTION

CLASSROOM CLASSROOMCLASSROOM

CLASSROOM

BOYS RR

GIRLS RR

4 4

4 4

UNIT A

UNIT D

U N

IT A

U N

IT D

UNIT A

UNIT C

U N

IT

B U N

IT

A

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

D101A

FIRST FLOOR

DEMOLITION PLAN -

UNIT A

09.30.2026

DEMOLITION KEYED NOTES

1 REMOVE EXISTING MECHANICAL EQUIPMENT.

CORDINATE WITH MECHANICAL DRAWINGS. PREP FOR

NEW WORK.

2 REMOVE EXISTING WALL LOUVER. COORDINATE WITH

MECHANICAL. PREP FOR NEW WORK

3 REMOVE EXISTING CABINET HEATER CORDINATE WITH

MECHANICAL. PREP FOR NEW WORK.

4 SALVAGE EXISTING CARPET TILE AROUND MECHANICAL

EQUIPMENT FOR PATCH AND REPAIR

5 REMOVE EXISTING COUNTERTOPS AND PANEL

MOLDING. SALVAGE MOLDING FOR REUSE. CASEWORK

TO REMAIN. PREP FOR NEW SOLID SURFACE

COUNTERTOP MATERIAL.

6 REMOVE EXISTING FLOOR AND WALL BASE.

NO

TE

NR

TH 1/8" = 1'-0"

Dmo

WORK. UNLESS NOTED OTHERWISE, REMOVAL OF ANY

WALL, FLOOR OR CEILING INCLUDES ALL GENERAL

MECHANICAL AND ELECTRICAL ITEMS WHICH ARE A PART

OF, OR ATTACHED TO IT.

2. CONTRACTOR SHALL VERIFY ALL EXISTING JOB SITE

CONDITIONS AND DIMENSIONS AND BE RESPONSIBLE

FOR THE SAME. ADVISE ARCHITECT OF ANY AND ALL

DISCREPANCIES.

3. PATCH FLOORS, WALLS AND CEILINGS DAMAGED DURING

CONSTRUCTION AND DEMOLITION AS REQUIRED. FINISH

TO MATCH EXISTING.

4. ACCOMMODATE NEW CONSTRUCTION IF NOT INDICATED.

5. PROTECT ALL EXISTING FINISHES THROUGHOUT PROJECT.

6. REFER TO DEMOLITION ELEVATIONS, SECTIONS AND

DETAILS FOR ADDITIONAL INFORMATION.

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND

ELECTRICAL PLANS FOR ADDITIONAL DEMOLITION NOTES.

8. SALVAGE ALL UNISTRUT AND PROTECT FOR RE-USE IN

NEW CONSTRUCTION, IF REQUIRED.

9. AT LOCATIONS OF REMOVED WALLS, ALL ASSOCIATED

ITEMS ATTACHED TO THE WALL ARE TO BE REMOVED.

SUCH AS: DOORS, WINDOWS, FRAMES, MARKERBOARDS,

TACKBOARDS, TACK STRIPS, ETC.

GENERAL DEMOLITION NOTESNO

TE

GYM

PERFORMING

ARTS

GYM COMMONS

CLASSROOM

GIRLS RR

BOYS RR

UPPER MECH

1 2

U N

IT B

U N

IT C

U N

IT

B U N

IT

A

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

D101B

FIRST FLOOR

DEMOLITION PLAN -

UNIT B

09.30.2026

DEMOLITION KEYED NOTES

1 REMOVE EXISTING MECHANICAL EQUIPMENT.

CORDINATE WITH MECHANICAL DRAWINGS. PREP FOR

NEW WORK.

2 REMOVE EXISTING WALL LOUVER. COORDINATE WITH

MECHANICAL. PREP FOR NEW WORK

3 REMOVE EXISTING CABINET HEATER CORDINATE WITH

MECHANICAL. PREP FOR NEW WORK.

4 SALVAGE EXISTING CARPET TILE AROUND MECHANICAL

EQUIPMENT FOR PATCH AND REPAIR

5 REMOVE EXISTING COUNTERTOPS AND PANEL

MOLDING. SALVAGE MOLDING FOR REUSE. CASEWORK

TO REMAIN. PREP FOR NEW SOLID SURFACE

COUNTERTOP MATERIAL.

6 REMOVE EXISTING FLOOR AND WALL BASE.

NO

TE

NR

TH 1/8" = 1'-0"

UNIT B DEMOLITION PLAN

WORK. UNLESS NOTED OTHERWISE, REMOVAL OF ANY

WALL, FLOOR OR CEILING INCLUDES ALL GENERAL

MECHANICAL AND ELECTRICAL ITEMS WHICH ARE A PART

OF, OR ATTACHED TO IT.

2. CONTRACTOR SHALL VERIFY ALL EXISTING JOB SITE

CONDITIONS AND DIMENSIONS AND BE RESPONSIBLE

FOR THE SAME. ADVISE ARCHITECT OF ANY AND ALL

DISCREPANCIES.

3. PATCH FLOORS, WALLS AND CEILINGS DAMAGED DURING

CONSTRUCTION AND DEMOLITION AS REQUIRED. FINISH

TO MATCH EXISTING.

4. ACCOMMODATE NEW CONSTRUCTION IF NOT INDICATED.

5. PROTECT ALL EXISTING FINISHES THROUGHOUT PROJECT.

6. REFER TO DEMOLITION ELEVATIONS, SECTIONS AND

DETAILS FOR ADDITIONAL INFORMATION.

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND

ELECTRICAL PLANS FOR ADDITIONAL DEMOLITION NOTES.

8. SALVAGE ALL UNISTRUT AND PROTECT FOR RE-USE IN

NEW CONSTRUCTION, IF REQUIRED.

9. AT LOCATIONS OF REMOVED WALLS, ALL ASSOCIATED

ITEMS ATTACHED TO THE WALL ARE TO BE REMOVED.

SUCH AS: DOORS, WINDOWS, FRAMES, MARKERBOARDS,

TACKBOARDS, TACK STRIPS, ETC.

GENERAL DEMOLITION NOTESNO

TE

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

BOYS RR

GIRLS RR

CLASSROOM

CLASSROOM

COMMONS

CLASSROOM

CLASSROOM

CORRIDOR

1 2

1 2

1 2

1 2

1 2

UNIT A

UNIT C

U N

IT B

U N

IT C

U N

IT C

U N

IT D

U N

IT

C

U N

IT

D

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

D101C

FIRST FLOOR

DEMOLITION PLAN -

UNIT C

09.30.2026

DEMOLITION KEYED NOTES

1 REMOVE EXISTING MECHANICAL EQUIPMENT.

CORDINATE WITH MECHANICAL DRAWINGS. PREP FOR

NEW WORK.

2 REMOVE EXISTING WALL LOUVER. COORDINATE WITH

MECHANICAL. PREP FOR NEW WORK

3 REMOVE EXISTING CABINET HEATER CORDINATE WITH

MECHANICAL. PREP FOR NEW WORK.

4 SALVAGE EXISTING CARPET TILE AROUND MECHANICAL

EQUIPMENT FOR PATCH AND REPAIR

5 REMOVE EXISTING COUNTERTOPS AND PANEL

MOLDING. SALVAGE MOLDING FOR REUSE. CASEWORK

TO REMAIN. PREP FOR NEW SOLID SURFACE

COUNTERTOP MATERIAL.

6 REMOVE EXISTING FLOOR AND WALL BASE.

NO

TE

NR

TH 1/8" = 1'-0"

UNIT C DEMOLITION PLAN

WORK. UNLESS NOTED OTHERWISE, REMOVAL OF ANY

WALL, FLOOR OR CEILING INCLUDES ALL GENERAL

MECHANICAL AND ELECTRICAL ITEMS WHICH ARE A PART

OF, OR ATTACHED TO IT.

2. CONTRACTOR SHALL VERIFY ALL EXISTING JOB SITE

CONDITIONS AND DIMENSIONS AND BE RESPONSIBLE

FOR THE SAME. ADVISE ARCHITECT OF ANY AND ALL

DISCREPANCIES.

3. PATCH FLOORS, WALLS AND CEILINGS DAMAGED DURING

CONSTRUCTION AND DEMOLITION AS REQUIRED. FINISH

TO MATCH EXISTING.

4. ACCOMMODATE NEW CONSTRUCTION IF NOT INDICATED.

5. PROTECT ALL EXISTING FINISHES THROUGHOUT PROJECT.

6. REFER TO DEMOLITION ELEVATIONS, SECTIONS AND

DETAILS FOR ADDITIONAL INFORMATION.

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND

ELECTRICAL PLANS FOR ADDITIONAL DEMOLITION NOTES.

8. SALVAGE ALL UNISTRUT AND PROTECT FOR RE-USE IN

NEW CONSTRUCTION, IF REQUIRED.

9. AT LOCATIONS OF REMOVED WALLS, ALL ASSOCIATED

ITEMS ATTACHED TO THE WALL ARE TO BE REMOVED.

SUCH AS: DOORS, WINDOWS, FRAMES, MARKERBOARDS,

TACKBOARDS, TACK STRIPS, ETC.

GENERAL DEMOLITION NOTESNO

TE

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDOR

BOYS RR

GIRLS RR

OFFICE

OFFICE

STORAGE

UNIT A

UNIT D

U N

IT A

U N

IT D

U N

IT C

U N

IT D

U N

IT

C

U N

IT

D

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

D101D

FIRST FLOOR

DEMOLITION PLAN -

UNIT D

09.30.2026

DEMOLITION KEYED NOTES

1 REMOVE EXISTING MECHANICAL EQUIPMENT.

CORDINATE WITH MECHANICAL DRAWINGS. PREP FOR

NEW WORK.

2 REMOVE EXISTING WALL LOUVER. COORDINATE WITH

MECHANICAL. PREP FOR NEW WORK

3 REMOVE EXISTING CABINET HEATER CORDINATE WITH

MECHANICAL. PREP FOR NEW WORK.

4 SALVAGE EXISTING CARPET TILE AROUND MECHANICAL

EQUIPMENT FOR PATCH AND REPAIR

5 REMOVE EXISTING COUNTERTOPS AND PANEL

MOLDING. SALVAGE MOLDING FOR REUSE. CASEWORK

TO REMAIN. PREP FOR NEW SOLID SURFACE

COUNTERTOP MATERIAL.

6 REMOVE EXISTING FLOOR AND WALL BASE.

NO

TE

NR

TH 1/8" = 1'-0"

UNIT D DEMOLITION PLAN

R.D.

AHU OR RTU

ROOF DRAIN - TO REMAIN

ROOF TOP UNIT - TO REMAIN

1. EXISTING ROOF MEMBRANES WITHIN DEMOLITION AREAS

ARE AT OR NEAR END OF SERVICE LIFE WITH OBSERVED

DETERIORATION AT FLASHINGS, FASTENERS, AND

PENETRATIONS.

2. EXISTING ROOF SYSTEMS CONSIST OF EPDM AND

MODIFIED BITUMEN ASSEMBLIES OF VARYING AGE AND

CONDITION.

3. EXISTING ROOF INSULATION THICKNESS AND CONDITION

VARY; PERIMETER AND EDGE CONDITIONS TO BE FIELD

VERIFIED.

4. EXISTING ROOF DRAINS OBSERVED WITHIN DEMOLITION

AND RENOVATION AREAS; CONDITION AND ELEVATION

VARY.

5. EXISTING ROOF SYSTEM INFORMATION IS BASED ON

AVAILABLE ROOF ASSET DATA AND SELECTIVE

INVESTIGATION; SEE CONSULTANT REPORTS FOR

ADDITIONAL INFORMATION.

DEMOLITION PLAN LEGEND

ROOF DEMOLITION NOTES

EXISTING TO REMAIN

LG

ND

NO

TE

AREAS TO BE DEMOLISHED - SEE NOTES

E.F.

ACCU

EXHAUST FAN / HOOD - TO REMAIN

CONDENSING UNIT - TO REMAIN

M.C. MECHANICAL ROOF CURB - TO REMAIN

ROOF SLOPE

ROOF 1

ROOF 22: REMOVE AND REPLACE

REMOVE EXISTING ROOF MEMBRANE, INSULATION

(INCLUDING ANY WET OR SATURATED INSULATION),

FLASHINGS, AND ASSOCIATED COMPONENTS DOWN TO

EXISTING STRUCTURAL DECK WITHIN DEMOLITION AREA.

PREPARE SUBSTRATE FOR NEW ROOF CONSTRUCTION.

EXISTING STRUCTURAL DECK TO REMAIN.

REFER TO A102 FOR NEW WORK.

ROOF 1: REMOVE AND REPLACE

REMOVE EXISTING ROOF MEMBRANE, INSULATION

(INCLUDING ANY WET OR SATURATED INSULATION),

FLASHINGS, AND ASSOCIATED COMPONENTS DOWN TO

EXISTING STRUCTURAL DECK WITHIN DEMOLITION AREA.

PREPARE SUBSTRATE FOR NEW ROOF CONSTRUCTION.

EXISTING STRUCTURAL DECK TO REMAIN.

REFER TO A102 FOR NEW WORK.

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

D102

ROOF DEMOLITION

PLAN

09.30.2026

NR

TH 1/16" = 1'-0"

ROOF DEMOLITION PLAN

D

A D

RECEPTION/WAITING

PRINCIPAL

CONF. ROOMMAIL OFFICE

STAFF LOUNGE

ART ROOM ART ROOM

CAFETERIA

SERVING KITCHEN

GYM COMMONS

GIRLS RR

BOYS RR

UPPER MECH GYM

PERFORMING

ARTS

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM CLASSROOM

CLASSROOM

COMMONS

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

GIRLS RR

BOYS RR

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

CLASSROOM

CORRIDOR CORRIDOR

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

LARGE GROUP

INSTRUCTION

BOYS RR

GIRLS RR

OFFICE

OFFICE

CLASSROOM CLASSROOM

MEDIA CENTER

UNIT A

UNIT D

U N

IT A

U N

IT D

UNIT A

UNIT C

U N

IT B

U N

IT C

U N

IT C

U N

IT D

U N

IT

C

U N

IT

D

U N

IT

B U N

IT

A

CEILING TO BE REMOVED

1. CEILINGS WITH HATCH BELOW ARE TO BE REMOVED IN ITS

ENTIRETY

2. REFER TO MECHANICAL, PLUMBING, ELECTRICAL OR

TECHNOLOGY DRAWINGS FOR REMOVAL OF EXISTING

DEVICES, DIFFUSERS, LIGHTINGS, ETC. AND OTHER WORK

RELATED TO DEMOLITION.

REFLECTED CEILING DEMOLITION LEGENDLG

ND

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

D201

FIRST FLOOR CEILING

DEMOLITION PLAN

09.30.2026

NR

TH 1/16" = 1'-0"

FIRST FLOOR REFLECTED CEILING PLAN

RECEPTION/WAITING

STAFF LOUNGE

VESTIBULE

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

OFFICE

OFFICE

GIRLS RR

BOYS RR

FLEX

INSTRUCTIONAL

CLASSROOM

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

INTERIOR

COURTYARD

MEDIA CENTER

LARGE GROUP

INSTRUCTION

CLASSROOM

CLASSROOM

ART ROOM

ART ROOM

CAFETERIA

SERVING KITCHEN

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

GIRLS RR

BOYS RR

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

GYM COMMONS

GYM

PERFORMING

ARTS

GIRLS RR

BOYS RR

UNIT A

UNIT D

U N

IT A

U N

IT D

UNIT A

UNIT C

U N

IT B

U N

IT C

U N

IT C

U N

IT D

U N

IT

C

U N

IT

D

U N

IT

B U N

IT

A

RR

JC

A101

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

11'

/1

NOT IN SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

1X

EXP.

Room name

LG

ND

FLOOR PLAN LEGEND

ROOM TAG

ROOM NUMBER

ROOM NAME

EXPOSED CEILING

DOOR TAG

DOOR TAG NUMBER

CORRESPONDS TO THE

ROOM IN WHICH IT IS USED

THE DECIMAL NUMBER

REFERS TO DIFFERENT

DOORS IN THE SAME ROOM

WALL TAG

WALL TYPE

WALL FIRE RATING

NO

TE

FLOOR PLAN NOTES

1. REFER TO FINISH PLANS FOR FINISH INTENT.

2. REFER TO CODE COMPLIANCE PLANS FOR WALL RATINGS.

TOILET ACCESSORY TAG

ACCESSORY TYPE 1t

CLASSROOM

716 SF

Break metal pipe chase

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

A101

FIRST FLOOR PLAN

09.30.2026

NR

TH 1/16" = 1'-0"

FIRST FLOOR PLAN

FLOOR PLAN KEYED NOTES

1 COUNTERTOP, NEW SOLID SURFACE. CASEWORK

TO REMAIN

2 SALVAGE EXISTING CARPET TILE FOR PATCH AND

REPAIR AROUND NEW HUV UNIT

3 NEW HORIZONTAL UNIT VENTILATOR.

COORDINATE WITH MECHANICAL DRAWINGS.

4 NEW WALL LOUVER IN EXISTING OPENING.

COORDINATE WITH MECHANICAL DRAWINGS.

NO

TE

1/4" = 1'-0"1 TYPICAL CLASSROOM

1X

EXP.

Room name

LG

ND

FLOOR PLAN LEGEND

ROOM TAG

ROOM NUMBER

ROOM NAME

EXPOSED CEILING

DOOR TAG

DOOR TAG NUMBER

CORRESPONDS TO THE

ROOM IN WHICH IT IS USED

THE DECIMAL NUMBER

REFERS TO DIFFERENT

DOORS IN THE SAME ROOM

WALL TAG

WALL TYPE

WALL FIRE RATING

NO

TE

FLOOR PLAN NOTES

1. REFER TO FINISH PLANS FOR FINISH INTENT.

2. REFER TO CODE COMPLIANCE PLANS FOR WALL RATINGS.

TOILET ACCESSORY TAG

ACCESSORY TYPE 1t

UNIT A

UNIT D

U N

IT A

U N

IT D

UNIT A

UNIT C

RECEPTION/WAITING

878 SF

RR

47 SF

VESTIBULE

153 SF

MAIL

109 SF

PRINCIPAL

184 SF

OFFICE

146 SF

FILE

65 SF

RR

37 SF

CONF. ROOM

205 SF

OFFICE

112 SF

STAFF LOUNGE

436 SF

ART ROOM

1149 SF

ART ROOM

Redundant Room

KILN

86 SF

CAFETERIA

2261 SF

SERVING

302 SF

KITCHEN

402 SF

DISHES

93 SF

COOLER

41 SF

STORAGE

65 SF

CLASSROOM

686 SF

LARGE GROUP

INSTRUCTION

1354 SF

MEDIA CENTER

1812 SF

CLASSROOM

647 SF

CLASSROOM

676 SF

OFFICE

132 SF COPY

115 SF

STAIR

58 SF

JC

128 SF

IT

79 SF

RR

50 SF

SAFE ROOM

44 SF

BROADCAST

95 SF

WORK ROOM

121 SF

AV STORAGE

117 SF130

CLASSROOM

705 SF

BOYS RR

187 SF

GIRLS RR

206 SF

CLASSROOM

676 SF

CLASSROOM

661 SF

U N

IT

B U N

IT

A

4 3

NOT IN SCOPE

2 2

2 2

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

A101A

FIRST FLOOR PLAN -

UNIT A

09.30.2026

FLOOR PLAN KEYED NOTES

1 COUNTERTOP, NEW SOLID SURFACE. CASEWORK

TO REMAIN

2 SALVAGE EXISTING CARPET TILE FOR PATCH AND

REPAIR AROUND NEW HUV UNIT

3 NEW HORIZONTAL UNIT VENTILATOR.

COORDINATE WITH MECHANICAL DRAWINGS.

4 NEW WALL LOUVER IN EXISTING OPENING.

COORDINATE WITH MECHANICAL DRAWINGS.

NO

TE

NR

TH 1/8" = 1'-0"

UNIT A FLOOR PLAN

UNIT A

KEY PLAN

N.T.S.

EXP.

Room name

LG

ND

FLOOR PLAN LEGEND

ROOM TAG

ROOM NUMBER

ROOM NAME

EXPOSED CEILING

DOOR TAG

DOOR TAG NUMBER

CORRESPONDS TO THE

ROOM IN WHICH IT IS USED

THE DECIMAL NUMBER

REFERS TO DIFFERENT

DOORS IN THE SAME ROOM

WALL TAG

WALL TYPE

WALL FIRE RATING

NO

TE

FLOOR PLAN NOTES

1. REFER TO FINISH PLANS FOR FINISH INTENT.

2. REFER TO CODE COMPLIANCE PLANS FOR WALL RATINGS.

TOILET ACCESSORY TAG

ACCESSORY TYPE 1t

U N

IT B

U N

IT C

CLASSROOM

912 SF

UPPER MECH

398 SF

BOYS RR

249 SF

GIRLS RR

237 SF

GYM COMMONS

1812 SF

GYM STOR.

134 SF

GYM

5029 SF 85

CHOIR STOR.

128 SF

OFFICE

129 SF

PRACTICE

67 SF

PRACTICE

79 SF

PERFORMING

ARTS

1135 SF

PRACTICE

130 SF

MUSIC STORAGE

222 SF

RR

51 SF

JC

54 SF

NOT IN SCOPE

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

A101B

FIRST FLOOR PLAN -

UNIT B

09.30.2026

FLOOR PLAN KEYED NOTES

1 COUNTERTOP, NEW SOLID SURFACE. CASEWORK

TO REMAIN

2 SALVAGE EXISTING CARPET TILE FOR PATCH AND

REPAIR AROUND NEW HUV UNIT

3 NEW HORIZONTAL UNIT VENTILATOR.

COORDINATE WITH MECHANICAL DRAWINGS.

4 NEW WALL LOUVER IN EXISTING OPENING.

COORDINATE WITH MECHANICAL DRAWINGS.

NO

TE

NR

TH 1/8" = 1'-0"

UNIT B FLOOR PLAN

UNIT B

KEY PLAN

EXP.

Room name

LG

ND

FLOOR PLAN LEGEND

ROOM TAG

ROOM NUMBER

ROOM NAME

EXPOSED CEILING

DOOR TAG

DOOR TAG NUMBER

CORRESPONDS TO THE

ROOM IN WHICH IT IS USED

THE DECIMAL NUMBER

REFERS TO DIFFERENT

DOORS IN THE SAME ROOM

WALL TAG

WALL TYPE

WALL FIRE RATING

NO

TE

FLOOR PLAN NOTES

1. REFER TO FINISH PLANS FOR FINISH INTENT.

2. REFER TO CODE COMPLIANCE PLANS FOR WALL RATINGS.

TOILET ACCESSORY TAG

ACCESSORY TYPE 1t

UNIT A

UNIT C

U N

IT B

U N

IT C

U N

IT C

U N

IT D

CLASSROOM

661 SF

CLASSROOM

673 SF

COMMONS

661 SF

CLASSROOM

661 SF

CLASSROOM

716 SF

GIRLS RR

270 SF

BOYS RR

273 SF

RR

52 SF

JC

66 SF

CLASSROOM

710 SF

CLASSROOM

705 SF

CLASSROOM

835 SF

CLASSROOM

861 SF

BREAK OUT

166 SF

BREAK OUT

124 SF

RR

87 SF

CLASSROOM

723 SF

CLASSROOM

912 SF

CORRIDOR

822 SF

U N

IT

C

U N

IT

D

NOT IN SCOPE

NOT IN SCOPE

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

A101C

FIRST FLOOR PLAN -

UNIT C

09.30.2026

FLOOR PLAN KEYED NOTES

1 COUNTERTOP, NEW SOLID SURFACE. CASEWORK

TO REMAIN

2 SALVAGE EXISTING CARPET TILE FOR PATCH AND

REPAIR AROUND NEW HUV UNIT

3 NEW HORIZONTAL UNIT VENTILATOR.

COORDINATE WITH MECHANICAL DRAWINGS.

4 NEW WALL LOUVER IN EXISTING OPENING.

COORDINATE WITH MECHANICAL DRAWINGS.

NO

TE

NR

TH 1/8" = 1'-0"

FIRST FLOOR PLAN

UNIT C

KEY PLAN

EXP.

Room name

LG

ND

FLOOR PLAN LEGEND

ROOM TAG

ROOM NUMBER

ROOM NAME

EXPOSED CEILING

DOOR TAG

DOOR TAG NUMBER

CORRESPONDS TO THE

ROOM IN WHICH IT IS USED

THE DECIMAL NUMBER

REFERS TO DIFFERENT

DOORS IN THE SAME ROOM

WALL TAG

WALL TYPE

WALL FIRE RATING

NO

TE

FLOOR PLAN NOTES

1. REFER TO FINISH PLANS FOR FINISH INTENT.

2. REFER TO CODE COMPLIANCE PLANS FOR WALL RATINGS.

TOILET ACCESSORY TAG

ACCESSORY TYPE 1t

UNIT A

UNIT D

U N

IT A

U N

IT D

U N

IT C

U N

IT D

AV STORAGE

117 SF130

CLASSROOM

705 SF

BOYS RR

187 SF

GIRLS RR

206 SF

OFFICE

147 SF

CLASSROOM

704 SF

CLASSROOM

705 SF

CLASSROOM

701 SF

CLASSROOM

725 SF

OFFICE

180 SF

STORAGE

136 SF

CLASSROOM

766 SF

CLASSROOM

841 SF

FLEX

INSTRUCTIONAL

CLASSROOM

769 SF

CLASSROOM

735 SF

RAMP

194 SF

WORK AREA

61 SF

J.C.

75 SF

FLEX

INSTRUCTIONAL

CLASSROOM

1140 SF

FLEX

INSTRUCTIONAL

CLASSROOM

1184 SF

RR

32 SF

COAT ROOM

121 SF

U N

IT

C

U N

IT

D

3 4

CLASSROOM

704 SF

NOT IN SCOPE

2 2

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

A101D

FIRST FLOOR PLAN -

UNIT D

09.30.2026

FLOOR PLAN KEYED NOTES

1 COUNTERTOP, NEW SOLID SURFACE. CASEWORK

TO REMAIN

2 SALVAGE EXISTING CARPET TILE FOR PATCH AND

REPAIR AROUND NEW HUV UNIT

3 NEW HORIZONTAL UNIT VENTILATOR.

COORDINATE WITH MECHANICAL DRAWINGS.

4 NEW WALL LOUVER IN EXISTING OPENING.

COORDINATE WITH MECHANICAL DRAWINGS.

NO

TE

NR

TH 1/8" = 1'-0"

UNIT D FLOOR PLAN

UNIT D

KEY PLAN

R.D.

AHU OR RTU

ROOF DRAIN - TO REMAIN

ROOF TOP UNIT - TO REMAIN

1. ROOF WORK IS LIMITED TO AREAS INDICATED ON THE

DRAWINGS.

2. EXISTING ROOF AREAS NOT INDICATED FOR WORK SHALL

REMAIN.

3. TYPICAL ROOF SLOPE 1/4" / 1'-0" UNLESS NOTED

OTHERWISE.

4. PROVIDE ROOFING MANUFACTURER'S STANDARD

ROOFING TERMINATION DETAILS AT ALL PARAPETS, PRE-

MANUFACTURED ROOF EDGE SYSTEMS, CURBS, PIPE

PENETRATIONS, ETC.

5. PROVIDE CRICKETS AS REQUIRED AT MECHANICAL UNITS,

VENTS, AND SIMILAR PROJECTIONS TO PROMOTE POSITIVE

DRAINAGE.

6. ROOF DETAILS SHOWN ARE TYPICAL AND INTENDED TO

ILLUSTRATE GENERAL ROOF ASSEMBLY AND FLASHING

CONDITIONS. FINAL ROOF SYSTEM COMPONENTS AND

CONFIGURATIONS SHALL BE COORDINATED WITH

MANUFACTURER REQUIREMENTS AND FIELD CONDITIONS.

7. PROVIDE ROOF CURBS, FLASHINGS, AND SUPPORTS AS

REQUIRED FOR ROOFTOP EQUIPMENT AFFECTED BY ROOF

WORK.

8. ALL EXISTING ROOF PENETRATIONS REMOVED AS PART OF

THE WORK SHALL BE PATCHED AND MADE WATERTIGHT

TO MATCH ADJACENT ROOF CONDITIONS.

9. SLOPE AND DRAINAGE PATTERNS SHOWN ARE

DIAGRAMMATIC AND INTENDED TO ILLUSTRATE DESIGN

INTENT. FINAL TAPERED INSULATION LAYOUT SHALL BE BY

ROOFING CONTRACTOR.

ROOF PLAN LEGEND

ROOF GENERAL NOTES

60 MIL, FULLY ADHERED, SINGLE PLY

ROOF MEMBRANE ON MIN 5"

POLYISOCYANURATE ROOF INSULATION.

INITIAL SRI : 82

EXISTING TO REMAIN

LG

ND

NO

TE

FLUID-APPLIED ROOF

RESTORATION SYSTEM

E.F.

ACCU

EXHAUST FAN / HOOD - TO REMAIN

CONDENSING UNIT - TO REMAIN

M.C. MECHANICAL ROOF CURB - TO REMAIN

R.C. ROUND CURB PENETRATION - TO REMAIN

ROOF SLOPE

ROOF 1: REMOVE AND REPLACE

INSTALL NEW ROOF ASSEMBLY INCLUDING CONTINUOUS INSULATION, ROOF MEMBRANE,

FLASHINGS, AND ACCESSORIES AS REQUIRED FOR A COMPLETE AND WARRANTABLE ROOF

SYSTEM. ROOF ASSEMBLY SHALL BE DESIGNED TO MEET APPLICABLE ENERGY CODE AND

DRAINAGE REQUIREMENTS.

VERIFY ROOF DRAIN LOCATIONS, PARAPET HEIGHTS, AND EDGE METAL COMPATIBILITY WITH

FINAL ROOF ASSEMBLY THICKNESS AND DRAINAGE CONDITIONS. MODIFY OR EXTEND AS

REQUIRED FOR CODE COMPLIANCE AND MANUFACTURER REQUIREMENTS.ROOF 1

R.D.

RTU

ROOF 22: REMOVE AND REPLACE

INSTALL NEW ROOF ASSEMBLY INCLUDING CONTINUOUS INSULATION, ROOF MEMBRANE,

FLASHINGS, AND ACCESSORIES AS REQUIRED FOR A COMPLETE AND WARRANTABLE ROOF

SYSTEM. ROOF ASSEMBLY SHALL BE DESIGNED TO MEET APPLICABLE ENERGY CODE AND

DRAINAGE REQUIREMENTS.

VERIFY ROOF DRAIN LOCATIONS, PARAPET HEIGHTS, AND EDGE METAL COMPATIBILITY WITH

FINAL ROOF ASSEMBLY THICKNESS AND DRAINAGE CONDITIONS. MODIFY OR EXTEND AS

REQUIRED FOR CODE COMPLIANCE AND MANUFACTURER REQUIREMENTS.

A102

Sim

A102

Sim

A102

Sim

R.D.

RTU

A102

Sim

UNIT A

UNIT C

U N

IT

C

U N

IT

D

U N

IT C

U N

IT D

U N

IT A

U N

IT D

UNIT A

UNIT D

U N

IT

A

U N

IT

B

U N

IT B

U N

IT C

A102

Sim

A102

Sim

A102

Sim

ROOF DECK

ROOF

INSULATION

FLASHING PER ROOF

MANUFACTURERS

STANDARD DETAILS

VENT PIPE

CONTINOUS SEALANT

SINGLE PLY ROOFING

STAINLESS STEEL FLASHING AND

COUNTER FLASHING - TURN UP AND

SECURE TO MASONRY WALL @ 12"

O.C. - PROVIDE CONTINUOUS SEALANT

@ TOP EDGE

MEMBRANE ROOF SYSTEM OVER

COVER BOARD ON 2 LAYERS OF 2 1/2"

RIGID INSULATION (STAGGER JOINTS)

1" CAVITY FILLER NET MATERIAL

EXISTING STEEL ROOF DECK

EXISTING STRUCTURE

EXIST. WALL

MEMBRANE

CONTINUES

INTO ROOF

DRAIN

ROOF DRAIN

14 GAGE COATED

STEEL BEARING PAN

FURNISHED WITH

ROOF DRAIN

CLAMPING RING FURNISHED

WITH ROOF DRAIN

1 1/2" METAL DECK

REINFORCED AT OPENING

WITH 3"x3"x1/4" STEEL ANGLES

MEMBRANE ROOFING ON RIGID

INSULATION, TAPER TO DRAIN

/2

CENTER LINE OF VALLEY

OF FINISHED ROOF

1" THICK

INSULATION

PIPE INSULATION ON

DRAIN LEADERS

ROOF STRUCTURE (REFER

TO STRUCTURAL)

TREATED NAILERS AS REQUIRED

ROOF DECK

CANT STRIP

11/2" RIGID INSULATION

PREFAB ROOF CURB

COUNTER FLASHING WITH

APPROVED SEALING

WASHER AND FASTENER

@ 6" O.C.

ROOF MOUNTED EQUIPMENT

TREATED 2"x4" NAILER

M

IN

LAP SEALANT

MEMBRANE ROOF

EXISTING ROOF DECK

TREATED NAILERS AS

REQUIRED FOR ATTACHMENT

EXISTING ROOF DECK

EXISTING WALL

EXISTING WALL CONSTRUCTION

EXISTING INSULATION

EXISTING ROOF MEMBRANE

RIGID POLYISO INSULATION

COVER BOARD

ROOF MEMBRANE

PREFINISHED METAL COPING

SYSTEM SIZE FOR NEW ROOF

ASSEMBLY THICKNESS

NEW PREFABRICATED INSULATED

METAL ROOF CURB

FASTEN TO STRUCTURAL DECK PER

ENGINEER / MFR REQUIREMENTS

P.T Blocking 2x12

P.T Blocking 2x4

ALUMINUM DRIP EDGE TO

MATCH EXISTING PROFILE

RIGID POLYISO INSULATION

(BASE & TAPERED) OVER

EXISTING ROOF DECK.

ROOF MEMBRANE

EXTEND MEMBRANE PER

MFR. REQUIREMENTS

NEW 1/2" COVER BOARD

(HIGH DENSITY RIGID INSUL.)

OVER TAPERED INSULATION

EXISTING WALL

EXISTING ROOF DECK

P.T Blocking 2x12

P.T Blocking 2x4

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

A102

ROOF PLAN

09.30.2026

NR

TH 1/16" = 1'-0"

ROOF PLAN

1 1/2" = 1'-0"5 TYPICAL ROOF PENETRATION

1 1/2" = 1'-0"1 ROOF TO WALL DETAIL

1 1/2" = 1'-0"2 ROOF DRAIN DETAIL

1 1/2" = 1'-0"6 TYPICAL ROOF CURB DETAIL

1 1/2" = 1'-0"4 ROOF CURB DETAIL AT EPDM TRANSITION

1 1/2" = 1'-0"3 PARAPET CAP MEMBRANE DETAIL

UNIT A

UNIT D

U N

IT A

U N

IT D

UNIT A

UNIT C

U N

IT B

U N

IT C

U N

IT C

U N

IT D

U N

IT

C

U N

IT

D

U N

IT

B U N

IT

A

FLEX

INSTRUCTIONAL

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

FLEX

INSTRUCTIONAL

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDOR CORRIDOR COMMONS

CLASSROOM

CLASSROOM

GIRLS RR

BOYS RR

CLASSROOM

CLASSROOM

CLASSROOM

BREAK OUT

CLASSROOM

BREAK OUTRR

CLASSROOMCLASSROOM

CLASSROOMCLASSROOM

CLASSROOM

UPPER MECH

GYM COMMONS

GYM

PERFORMING

ARTS

OFFICE

GIRLS RR

BOYS RR

COPYOFFICE

JCJC

CLASSROOMCLASSROOM

KITCHEN

SERVING

CAFETERIA

ART ROOM

ART ROOMSTAFF LOUNGE

RECEPTION/WAITING

CONF. ROOMMAIL OFFICE

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

STORAGE

OFFICE

CLASSROOM CLASSROOM

BOYS RR

GIRLS RR

OFFICE

MEDIA CENTERLARGE GROUP

INSTRUCTION

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

GYPSUM BOARD

ACP01: 24' x 24' LAY-IN ACOUSTICAL

TILE GRID

1. REFER TO MATERIAL SELECTION SCHEDULE FOR CEILING

SELECTIONS.

2. WHERE CEILING TILE IS LESS THAN 3" AT PERIMETER OF

ROOM PROVIDE A CUT 2x4 TILE IN LIEU OF FULL 2x2 TILE AND SMALL PIECE OF TILE OR DOUBLE GRID - MATCH 2x2

FOR STYLE AND COLOR.

3. AT AREAS OF EXPOSED CEILING PAINT ALL STRUCTURE,

DUCTWORK, PIPING, CONDUIT, HANGERS ETC.,

COORDINATE WITH MECHANICAL, ELECTRICAL AND

PLUMBING SPECIFICATIONS. REFER TO THE REFLECTED

CEILING PLANS FOR PAINT COLORS.

REFLECTED CEILING LEGEND

GENERAL NOTES - REFLECTED CEILINGS

ACP02: 24' x 48' LAY-IN ACOUSTICAL

TILE GRID

1t Y X 1'-0"

CEILING HEIGHT ABOVE

FINISHED FLOOR

CEILING FINISH TYPE

CEILING FINISH INSTANCE

LG

ND

NO

TE

INFILL WITH NEW CEILING TILES AND GRID TO

MATCH EXISTING ADJACENT TILES

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

A201

FIRST FLOOR

REFLECTED CEILING

PLAN

09.30.2026

NR

TH 1/16" = 1'-0"

FIRST FLOOR REFLECTED CEILING PLAN

BULKHEAD TO BE

PAINTED, P03. IN MEDIA

CENTER PAINT BAND TO

CONTINUE AROUND

WALL PERIMETER AT

CEILING REPLACING

"HUNTER GREEN"

VCT-0 CPT-0

WALL FINISH

FLOOR BASE

FLOOR FINISH

COUNTER FINISH

CABINET FINISH (BASE AND UPPER)

INDICATES EXTENT OF ATYPICAL FINISH

INDICATES FLOOR MATERIAL TRANSITION

NOTE - REFER TO MATERIAL SELECTION

SCHEDULE REMARKS FOR FLOOR

TRANSITION TYPE

REFER TO MATERIAL

SELECTION SCHEDULE FOR

FINISH INFORMATION

PL0#

P0#

PTB0#

CPTL0#

P0#

INDICATES MULTIPLE MATERIAL TYPES ON A

SURFACE. REFER TO DETAIL OR ELEVATIONS.

INDICATES MATERIAL PATTERN. REFER TO

DETAILS

MULTI

- P

FINISH PLAN LEGENDLG

ND

MANUAL ROLLER SHADE, PEARL/LINEN,

E SCREEN 3% OPEN

WT0#

INDICATES MATERIAL PATTERN DIRECTION

ETR CPT

ETR CPT

CPT ETR

C P

T E

TR

P-P

RB01

CPT02

WP01

SSM01

WP01

COVER FACE OF BUILT-IN

BENCH ONLY

EXISTING MOLDING TO BE

SALVAGED, STAINED WS01, AND

REINSTALLED. SOME PATCH AND

REPAIR REQUIRED

P-P

RB01

CPT02

P-P

RB01

CPT02

EXISTING SHELVING TO

REMAIN AS IS. PROTECT

IN PLACE.

ETR

ETR

ETR

RB01

CPT03

P

NO PAINT SCOPE. OWNER

RESPONSIBLE FOR MATERIAL

AND LABOR TO THIS AREA

PATCH IN ATTIC STOCK

AND WALL BASE

WT01

CARPET TILE TO SEALED OR POLISHED

CONCRETE (CPT - SC - PC)

CARPET TILE

JOHNSONITE REDUCER, FINISH: COOL METAL VL4

_______SEALED OR POLISHED

CONCRETE

1. REFER TO SHEET I001 FOR ADDITIONAL INFORMATION ON

INTERIOR MATERIALS.

2. REFER TO REFLECTED CEILING PLANS FOR CEILING FINISH AND

HEIGHTS.

3. REFER TO DOOR SCHEDULE FOR FINISH ON DOORS AND FRAMES.

4. FINISH TAGS APPLY TO LIKE MATERIALS IN ENTIRE ROOM. I.E.

CASEWORK TAG MAY ONLY CALLOUT ONE RUN OF CASEWORK,

BUT ALL CASEWORK IN ROOM RECEIVE THE SAME FINISHES,

UNLESS TAGGED DIFFERENTLY.

5. CASEWORK FINISH TAGS DO NOT APPLY TO CUSTOM MILLWORK

PIECES. REFER TO ENLARGED MILLWORK DETAILS FOR FINISH

MATERIALS.

6. WALL MOUNTED DIFFUSERS, GRILLES, ACCESS PANELS,

ELECTRICAL PANELS, ETC. ARE TO BE PAINTED WITH AN OIL-BASED

PAINT TO MATCH THE ADJACENT WALL FINISH.

7. CEILING ACCESS PANELS ARE TO BE PAINTED TO MATCH

ADJACENT CEILING FINISH.

8. ALL FLOORING TRANSITIONS TO OCCUR CENTERED UNDERNEATH

FLOOR LEAF.

9. REFER TO SHEET I101 FOR MATERIAL TRANSITIONS.

10. REFER TO SPECIFICATION FOR MORE INFORMATION.

11. REFER TO FLOOR PLANS, EXTERIOR ELEVATIONS AND FRAME

TYPES FOR HEIGHT AND WIDTH OF OPENINGS.

12. VERIFY ALL DIMENSIONS IN FIELD PRIOR TO FABRICATION.

GENERAL NOTES - INTERIORSNO

TE

3" = 1'-0"3 TYPICAL FLOOR TRANSITION DETAILS

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

E al y E le m en ta ry W h it eh al l D is tr ic t S ch o o ls

E

S o p h ia S t, W h it e h a ll

, M I

PROJECT NO. 25.147

I101

FIRST FLOOR FINISH

PLAN

09.30.2026

NR

TH 1/8" = 1'-0"1 FIRST FLOOR FINISH PLAN

NR

TH 1/8" = 1'-0"2 FIRST FLOOR FINISH PLAN TYP CLASSROOM

MATERIAL SELECTION SCHEDULE

ABBREV ITEM MANUFACTURER PATTERN COLOR PRODUCT NO. SIZE REMARKS PRODUCT REP.

ACP01 ACOUSTIC CEILING PANEL ARMSTRONG CORTEGA ANGLED TEGULAR EDGE WHITE 704A 24" X 24" BUILDING STANDARD, 15/16" GRID

ACP02 ACOUSTIC CEILING PANEL USG CEILINGS RADAR SQUARE EDGE WHITE 2410 24" X 48" BUILDING STANDARD

CPT02 CARPET TILE SHAW CONTRACT HEX LINEAR SHIFT CHARCOAL TWEED 5T056 24" X 24" PATTERN DISCONTINUED, ORDER MINIMUM REQUIRED. ASHLAR

INSTALL. SEE FINISH PLAN FOR LOCATION

ASHLEY HAZEL, SHAW CONTRACT //

ashley.hazel@shawcontract.com, 616-980-7391

CPT03 CARPET TILE INTERFACE HAPPENING TOTAL RECALL

1463202500 24" X 24' PATTERN DISCONTINUED, ORDER MINIMUM REQUIRED. ATTIC

STOCK TO BE USED FIRST FOR PATCH AND REPAIR AROUND HUV

INSTALLATION. MATCH EXISTING INSTALL PATTERN

SHELBE OGBURN, INTERFACE //

Shelbe.Ogburn@interface.com, 616-370-6087

ETR EXISITING TO REMAIN -- -- -- -- -- PROTECT IN PLACE

P01 EPOXY PAINT (FIELD) SHERWIN WILLIAMS PRO INDUSTRIAL HIGH PERFORMANCE EPOXY MINDFUL GRAY SW 7016 -- SHEEN: SATIN

P02 EPOXY PAINT (FIELD) SHERWIN WILLIAMS PRO INDUSTRIAL HIGH PERFORMANCE EPOXY SNOWBOUND SW 7004 -- SHEEN: SATIN

P03 EPOXY PAINT (ACCENT) SHERWIN WILLIAMS PRO INDUSTRIAL HIGH PERFORMANCE EPOXY POSITIVE RED SW 6871 -- SHEEN: SATIN

P04 EPOXY PAINT (ACCENT) SHERWIN WILLIAMS PRO INDUSTRIAL HIGH PERFORMANCE EPOXY GRIZZLE GRAY SW 7068 -- SHEEN: SATIN

P-P PAINT PATTERN SHERWIN WILLIAMS BASE PAINT TO BE P01, 6" BAND OF P03 AT TOP

OF WALL, 4" BAND OF P04 RIGHT BELOW

VARIES -- --

RB01 RUBBER BASE JOHNSONITE BASEWORKS THERMOSET RUBBER (TYPE TS) COOL METAL VL4 -- 4"H

SSM01 SOLID SURFACE MATERIAL CORIAN EASED EDGE SILVER BIRCH DS95602X2SV

WP01 WALL PROTECTION 3M DI-NOC

ARCHITECTURAL

FINISHES

WOOD GRAIN PALETTE OAK STRAIGHT

GRAIN

WG-2442 48" X 54 YDS MATERIAL APPLIED TO EXISTING VENEER CASEWORK,

INSTALLER TO PREP SURFACE ACCORDING TO MANUFACTURER

RECOMMEDATION

WS01 WOOD STAIN BOD: SHERWIN

WILLIAMS MINWAX

-- HABITAT MW427 -- STAIN APPLIED TO MOLDING AT RESOURCE DESK ONLY.

COORDINATE WITH WP01. SAMPLE TO SUBMITTED TO PURE

ARCHITECTS FOR APPROVAL

WT01-A3 ALTERNATE: WINDOW

TREATMENT - MANUAL

ROLLER SHADE

BOD: MERMET/DRAPER E SCREEN 3% OPEN PEARL/LINEN -- -- PRICE AS ALTERNATE: FACIA TO BE BLACK OR BRONZE, MATCH

IN FIELD TO WINDOW FRAME FINISH

AD AD

T

T

T T

T T

T

T

UNIT A

UNIT D

UNIT AUNIT D

UNIT A

UNIT C

UNIT

BUNIT

A

RECEPTION/WAITING

PRINCIPAL

3 OFFICE

FILE

RR

STAFF LOUNGE

OFFICE

CONF. ROOM

MAIL

RR

CL

VESTIBULE

CLASSROOM

CLASSROOM

CLASSROOM

BOYS RR

GIRLS RR

ART ROOM

ART ROOM

KILN

JC

STAIR

41COPY

IT

SAFE ROOM

OFFICE

RR

CLASSROOM

CLASSROOM

BROADCAST

WORK ROOM

MEDIA CENTER

AV STORAGE

LARGE GROUP

INSTRUCTION

CAFETERIA

SERVING

KITCHEN

COOLER

STORAGE

DISHES

CLASSROOM

CLASSROOM

EX UV EX UV

EX UV

EX UV EX UV

EX UV

REMOVE EX

UV - TYP

1 1

1 1

EX BC

REMOVE EX

BLOWER COIL

REMOVE EX FT

REMOVE EX UH

REMOVE AHU

EX 24"/36"

EX AH

EX S/A DUCTWORK

TO REMAIN - TYP

EX R/A GRILLE

AND ASSOCIATED

DUCTWORK TO

REMAIN

EX O/A LOUVER

AND ASSOCIATED

DUCTWORK TO

REMAIN

EX 12"/12"

R/A

EX 12"/12"

S/A

REMOVE EX SLOT

DIFFUSER - TYP

6 6

REMOVE EX

TRANSFER AIR

GRILLE

EX S/A DIFFUSERS

AND ASSOCIATED

DUCTWORK TO

REMAIN - TYP

EX T/A GRILLES AND

ASSOCIATED

DUCTWORK TO

REMAIN - TYP

EX 30"/12"

EX 24"/20"

EX 16"/12"

L/S L/S

9711 Valparaiso Drive

221 N. LaSalle Street

(219)924-8400

Munster, IN 46321

Chicago, IL 60601 www.milliesengineeringgroup.com

MILLIES

ENGINEERING GROUP

820 Monroe Ave NW Grand Rapids, MI 49503

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

Copyright © 2026 Millies Engineering Group

Ea ly

E le m en ta ry

W hi te ha ll D is tr ic t S ch oo ls

E

S o p h ia S t, W h it eh al l, M

I 4

PROJECT NO. 25.147

MECHANICAL DEMOLITION

FIRST FLOOR PLAN - UNIT

A

09.30.2026

NR

TH 1/8" = 1'-0"

MECHANICAL DEMOLITION FLOOR PLAN - UNIT A

UNIT A

KEY PLAN

N.T.S.

SHEET NOTES

1 REMOVE EXISTING UNIT VENTILATOR AND ASSOCIATED

STEAM/CONDENSATE PIPING, OUTSIDE AIR INTAKE

LOUVER, THERMOSTAT, CONTROLS, ELECTRICAL

CONNECTIONS, ETC. COMPLETE AS REQUIRED. CUT

AND PERMANENTLY CAP PIPING FLUSH WITH OR

BELOW FINISHED FLOOR ELEVATION; ABANDON

REMAINING PIPING IN TUNNELS.

2 REMOVE EXISTING STEAM BLOWER COIL AND

ASSOCIATED THERMOSTAT, STEAM/CONDENSATE PIPE,

SUPPLY AND RETURN DUCT AND DIFFUSERS,

CONTROLS, ELECTRICAL CONNECTIONS, ETC.

COMPLETE AS REQUIRED. CUT AND PERMANENTLY CAP

PIPING FLUSH WITH OR BELOW FINISHED FLOOR

ELEVATION; ABANDON REMAINING PIPING IN TUNNELS.

3 REMOVE EXISTING FIN TUBE AND ASSOCIATED

STEAM/CONDENSATE PIPING, THERMOSTATS AND

CONTROL WIRING COMPLETE AS REQUIRED. CUT AND

PERMANENTLY CAP PIPING FLUSH WITH OR BELOW

FINISHED FLOOR ELEVATION; ABANDON REMAINING

PIPING IN TUNNELS.

4 REMOVE EXISTING UNIT HEATER AND ASSOCIATED

STEAM/CONDENSATE PIPING, THERMOSTAT,

CONTROLS, ELECTRICAL CONNECTIONS, ETC.

COMPLETE AS REQUIRED. CUT AND PERMANENTLY CAP

PIPING FLUSH WITH OR BELOW FINISHED FLOOR

ELEVATION; ABANDON REMAINING PIPING IN TUNNELS.

5 REMOVE EXISTING AIR HANDLING UNIT AND

ASSOCIATED DUCTWORK, STEAM/CONDENSATE PIPING,

THERMOSTAT, CONTROLS, ELECTRICAL CONNECTIONS,

ETC. COMPLETE AS REQUIRED. CUT AND

PERMANENTLY CAP PIPING FLUSH WITH OR BELOW

FINISHED FLOOR ELEVATION; ABANDON REMAINING

PIPING IN TUNNELS.

6 REMOVE EXISTING SLOT SUPPLY AIR DIFFUSER AND

ASSOCIATED DUCTWORK COMPLETE AS REQUIRED.

TEST EXISTING SUPPLY AIR DIFFUSER AIRFLOW

CAPACITY PRIOR TO WORK. SUBMIT TEST REPORT FOR

REVIEW.

7 REMOVE EXISTING TRANSFER AIR GRILLE AND

ASSOCIATED DUCTWORK COMPLETE AS REQUIRED.

UNIT BUNIT C

UNIT

BUNIT

A

STAIR

CLASSROOM

UPPER MECH

BOYS RR

GIRLS RR

GYM

CHOIR STOR.

GYM STOR.

GYM COMMONS

JC

MUSIC STORAGE

PRACTICE

PERFORMING

ARTS

PRACTICE

PRACTICE

OFFICE

RR

EX B EX B

REMOVE EX STEAM

BOILER - TYP

REMOVE EX FT

REMOVE EX BOILER

FLUE -TYP

EX P

REMOVE EX STEAM

CONDENSATE PUMP

EX LPS

EX LPS/LCR PIPE TO

BE ABANDONED IN

TUNNELS - TYP

EX GAS PIPE

REMOVE EXISTING PORTION OF

GAS PIPING REQUIRED FOR

INSTALLATION OF NEW BOILERS

9711 Valparaiso Drive

221 N. LaSalle Street

(219)924-8400

Munster, IN 46321

Chicago, IL 60601 www.milliesengineeringgroup.com

MILLIES

ENGINEERING GROUP

820 Monroe Ave NW Grand Rapids, MI 49503

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

Copyright © 2026 Millies Engineering Group

Ea ly

E le m en ta ry

W hi te ha ll D is tr ic t S ch oo ls

E

S o p h ia S t, W h it eh al l, M

I 4

PROJECT NO. 25.147

MECHANICAL DEMOLITION

FIRST FLOOR PLAN - UNIT

B

09.30.2026

UNIT B

KEY PLAN

N.T.S.

NR

TH 1/8" = 1'-0"

MECHANICAL DEMOLITION FLOOR PLAN - UNIT B

SHEET NOTES

1 REMOVE EXISTING STEAM BOILERS, STEAM AND

CONDENSATE PIPING, BOILER FEED WATER SYSTEM,

DOMESTIC COLD WATER MAKE-UP CONNECTIONS, GAS

PIPE CONNECTIONS, ELECTRICAL CONNECTIONS,

CONTROLS, ETC COMPLETE AS REQUIRED WITHIN

BOILER ROOM. CAP STEAM AND CONDENSATE PIPING

AT WALL PRIOR TO ENTERING CRAWL SPACE. STEAM

AND CONDENSATE PIPING IN CRAWL SPACE SHALL BE

ABANDONED IN PLACE.

2 REMOVE EXISTING FIN TUBE AND ASSOCIATED

STEAM/CONDENSATE PIPING, THERMOSTATS, AND

CONTROL WIRING COMPLETE AS REQUIRED. CUT AND

PERMANENTLY CAP PIPING FLUSH WITH OR BELOW

FINISHED FLOOR ELEVATION; ABANDON REMAINING

PIPING IN TUNNELS.

3 REMOVE EXISTING STEAM CONDENSATE PUMP AND

ASSOCIATED CONDENSATE PIPING, VALVES,

CONTROLS, ELECTRICAL CONNECTIONS, ETC.

COMPLETE AS REQUIRED.

T

T

T

T

T

T

T

T

UNIT A

UNIT C

UNIT BUNIT C

UNIT

CUNIT

D

UNIT CUNIT D

INTERIOR

COURTYARD

CORRIDOR

COMMONS

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

BREAK OUT

CLASSROOM

RR

BREAK OUT

CLASSROOM

CLASSROOM

GIRLS RR

BOYS RR

CLASSROOM

CLASSROOM

RR

JC

EX UV

EX UV

EX UV

EX UV

EX FT

EX FT

EX UV

EX UV

EX UV

EX UV

EX UV

EX UV

REMOVE EX

UV - TYP

REMOVE EX

FT - TYP

EX FT

REMOVE EX AH

EX FT

EX CUH

EX 18"/12"

R/A

EX 12"/10"

S/A

EX S/A & R/A

DUCTWORK TO

REMAIN - TYP

EXISTING GAS METER

AND ASSOCIATED

GAS PIPING TO

REMAIN

REMOVE EX CUH

9711 Valparaiso Drive

221 N. LaSalle Street

(219)924-8400

Munster, IN 46321

Chicago, IL 60601 www.milliesengineeringgroup.com

MILLIES

ENGINEERING GROUP

820 Monroe Ave NW Grand Rapids, MI 49503

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

Copyright © 2026 Millies Engineering Group

Ea ly

E le m en ta ry

W hi te ha ll D is tr ic t S ch oo ls

E

S o p h ia S t, W h it eh al l, M

I 4

PROJECT NO. 25.147

MECHANICAL DEMOLITION

FIRST FLOOR PLAN - UNIT

C

09.30.2026

UNIT C

KEY PLAN

N.T.S.

NR

TH 1/8" = 1'-0"

MECHANICAL DEMOLITION FLOOR PLAN - UNIT C

SHEET NOTES

1 REMOVE EX UNIT VENTILATOR AND ASSOCIATED

STEAM/CONDENSATE PIPING, OUTSIDE AIR INTAKE

LOUVER, THERMOSTAT, CONTROLS, ELECTRICAL

CONNECTIONS, ETC. COMPLETE AS REQUIRED. CUT

AND PERMANENTLY CAP PIPING FLUSH WITH OR

BELOW FINISHED FLOOR ELEVATION; ABANDON

REMAINING PIPING IN TUNNELS.

2 REMOVE EXISTING FIN TUBE AND ASSOCIATED

STEAM/CONDENSATE PIPING, THERMOSTATS, AND

CONTROL WIRING COMPLETE AS REQUIRED. CUT AND

PERMANENTLY CAP PIPING FLUSH WITH OR BELOW

FINISHED FLOOR ELEVATION; ABANDON REMAINING

PIPING IN TUNNELS.

3 REMOVE EXISTING AIR HANDLING UNIT AND

ASSOCIATED DUCTWORK, STEAM PIPING,

THERMOSTAT, ELECTRICAL CONNECTIONS, ETC.

COMPLETE AS REQUIRED. CUT AND PERMANENTLY CAP

PIPING FLUSH WITH OR BELOW FINISHED FLOOR

ELEVATION; ABANDON REMAINING PIPING IN TUNNELS.

4 REMOVE EXISTING CABINET UNIT HEATER AND

ASSOCIATED STEAM/CONDENSATE PIPING,

THERMOSTAT, CONTROLS, ELECTRICAL CONNECTIONS,

ETC. COMPLETE AS…