SF241-D024.pdf
Standard Form PDF 46 KB Posted
- Attached to
- 15 SPSS Path to Production Development for Electro-Optical Sensor Scheduling Software Modernization
- Solicitation number
- SF241-D024
- Issued by
-
Department of the Air Force
About this file
This is a Direct-to-Phase-II (D2P2) Small Business Innovation Research (SBIR) topic solicitation for software modernization and development services. The government seeks to develop a DevOps path to production for electro-optical sensor scheduling software supporting the 15 SPSS (Space Surveillance Tracking System) operations. The work encompasses Space Domain Awareness (SDA) operations, research and development, mission partner campaigns, maintenance, and upgrades, with deliverables including a 15 SPSS Portal featuring marketing, scheduling, statusing, optimization, assessment, metrics dashboards, and situational reports.
Since this is a D2P2 topic, no Phase I awards will be issued. To qualify, offerors must demonstrate feasibility through prior Phase I-type efforts not funded under previous SBIR/STTR agreements. The required Phase I-equivalent deliverable is a technical solution for initial software deployment that tracks telescope mount usage requests, scheduled maintenance downtime, sensor usage, and human resources requirements. Phase II requirements include developing a production-ready prototype deployable in both laboratory and operational environments, with Development/Test/Production environments for GEODSS and R&D Operations. Phase III will expand to include site infrastructure software modernization. The technology is restricted under the International Traffic in Arms Regulation (ITAR) and Export Administration Regulation (EAR); offerors must disclose any proposed use of foreign nationals, their countries of origin, visa/work permit types, and assigned SOW tasks. Technology areas include Information Systems, Sensors, and Space Platforms, with modernization priorities spanning Advanced Computing and Software, Directed Energy, Integrated Network Systems-of-Systems, Integrated Sensing and Cyber, and Space Technology. No CMMC requirement is specified, and no technical point of contact is provided.
View the file
Other versions and copies of SF 241
Show all 16
Who attaches SF 241
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SF241-D024: 15 SPSS Path to Production Development for Electro-Optical Sensor Scheduling Software Modernization
PROJECTED CMMC LEVEL REQUIREMENT:
N/A
TECHNOLOGY AREAS:
Information Systems | Sensors | Space Platforms
MODERNIZATION PRIORITIES:
Advanced Computing and Software | Directed Energy (DE) | Integrated Network Systems-of-Systems | Integrated Sensing and Cyber | Space Technology
KEYWORDS:
DevOps; DevSecOps; Path to Prod; SDA; Digital Transformation; Software Modernization; SaaS; IaaS; PaaS; Cloud
ADDITIONAL INFORMATION
N/A
OBJECTIVE:
To optimize telescope mount and sensor usage for contributing Space Domain Awareness (SDA) operations, R&D, mission partner campaigns, maintenance, upgrades and associated personnel. Develop a DevOps path to production for capabilities that support Squadron business functions. Develop a DevOps path to production for mission capabilities to include Development/Test/Production environments for GEODSS and R&D Operations.
Build and deliver a 15 SPSS Portal - marketing/advertising, scheduling, statusing, optimization, assessment, metrics/dashboard, SITREPs/MISREPs.
ITAR:
The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with section 3.5 of the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.
DESCRIPTION:
Host a kickoff meeting with the Government led Product Team, dev team, engineer team and associated stakeholders. Conduct a discovery and findings to address technical and programmatic needs including; re-use of existing tools/code, evaluation of potential platforms and opportunities to deliver new capabilities to the 15 SPSS.
PHASE I:
As this is a Direct-to-Phase-II (D2P2) topic, no Phase I awards will be made as a result of this topic. To qualify for this D2P2 topic, the Government expects the Offeror to demonstrate feasibility by means of a prior “Phase I-type” effort that does not constitute work undertaken as part of a prior or ongoing SBIR/STTR funding agreement.
In order to demonstrate the feasibility that would have otherwise been demonstrated during Phase I performance, the Government expects Offerors to demonstrate a technical solution for an initial software deployment of an app that tracks telescope mount usesage requests, scheduled downtime due to maintenance, sensor usage, and human resources required for all of the above.
PHASE II:
Develop a Path to Production for space sensor resource scheduling prototype. Prototype shall be required to deploy in both laboratory and operational environments.
PHASE III DUAL USE APPLICATIONS:
Phase III will continue to provide the same criterium as Phase II but will include more site infrastructure software modernization.
REFERENCES:
Department of Defense Software Modernization Implementation Plan Summary-March 20231.
TECHNICAL POINT OF CONTACT (TPOC):
None
File details come from the government source that posted it. Updated .