Self-Performed and Subcontracted Worksheet.docx

DOCX document 20 KB Posted

Attached to
Z2DA--666-26-121_(C) Gillette Small Upgrade Project (VA-26-00006671)
Solicitation number
36C25926R0016
Issued by

About this file

The document is a Self-Performed and Subcontracted Worksheet for a federal construction contract, specifically for the Gillette Small Upgrade Project at the Sheridan, Wyoming Veterans Affairs Healthcare System. The worksheet requires offerors (specifically for NAICS code 236220 General Construction) to demonstrate that at least 15% of contract performance costs for personnel will be spent on their own employees or service-disabled veteran-owned small business (SDVOSB) employees.

The worksheet provides a detailed template for contractors to break down personnel and material costs by specification division, with sections to calculate self-performed work percentage. Contractors must itemize costs for each project division, add overhead, profit, and bond costs, and certify the accuracy of their representation. The associated federal contract opportunity involves a 45-calendar day project to upgrade the Gillette VA Clinic, including addressing drainage issues, replacing an exterior door, and remodeling casework and finishes in three clinic locations, with the Department of Veterans Affairs Veterans Health Administration as the sponsoring agency.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division and name
SDVOSB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$
Sub Total (Personnel Costs, Material/Equipment Costs)
$
Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $_________________

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________

3. Remainder is ‘Total amount of work to be self-performed under the

Contract’:$__________________
4. Self-performed work = Line 3/Line 1 x 100 =________________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

___________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .