This document contains a self-performance worksheet and details of a federal contract opportunity for renovation work. The self-performance worksheet is for a 100% SDVOSB set-aside contract, requiring the bidder to complete calculations demonstrating at least 50% of the contract costs will be for personnel who are either the bidder's employees or employees of other SDVOSBs. The federal contract opportunity is for renovation work at the VA Greater Los Angeles Healthcare System to renovate space for a mail room and reprographics area. The scope of work includes construction of the mail room and reprographics spaces, bathroom and breakroom remodeling, electrical room updates, exterior painting, and metal panel repairs. The contract completion schedule is 290 calendar days.

View the file

Other files

File Type Posted
Updated TOC Div 27 spec section-r.pdf PDF
36C25821B0011 0004.docx DOCX document
3- 08 71 13 Automatic door operator.pdf PDF
23-IMG_0991.jpg JPG image
FileCab A B297 - Pocket 13 Folder 4 1 thru 5 B297 1948.pdf PDF
4-IT Data Rack.pdf PDF
19-Ceiling-IMG_0956.jpg JPG image
6-Jamb-clarification.pdf PDF
6-Panels D and F- IMG_0972.jpg JPG image
16-Ceiling-IMG_0954.jpg JPG image
8-drawings with clouds-IN60-AF26-AF30.pdf PDF
2-VA.1- No change.pdf PDF
4-Panels A-B and C-IMG_0973.jpg JPG image
17- Ceiling-IMG_0953.jpg JPG image
9-Construction Barrier as noted on SOW.pdf PDF
3-West wall-IMG_0937.jpg JPG image
7-Panels D and F-close-up_0978.jpg JPG image
10-Panel E-IMG_0974.jpg JPG image
8-Panels G and H-IMG_0957.jpg JPG image
18-Ceiling-IMG_0968.jpg JPG image
5-Panels A-B and C-closeup_0979.jpg JPG image
12-Disconnect 1-IMG_0975.jpg JPG image
9-Panels G and H-close-up_0977.jpg JPG image
AF.26 - MAILROOM & REPROGRAPHICS - INTERIOR ELEVATION.pdf PDF
7- 08 71 00 revised-4-15-21.pdf PDF
AF.30- RESTROOM - ENLARGED ELEV.pdf PDF
22-Ceiling-IMG_0955.jpg JPG image
14-Transformer-IMG_0990.jpg JPG image
20-Ceiling.jpeg JPEG file
IN.60 - SCHEDULES_04132021.pdf PDF
1-South wall-IMG_0981.jpg JPG image
2-North and East wall-IMG_0982.jpg JPG image
21-Ceiling-IMG_0967.jpg JPG image
5-B297 - Record drawings and HAZMAT report.pdf PDF
11-Panel E-close-up_0980.jpg JPG image
13-Disconnect 2-IMG_0976.jpg JPG image
15-Pull box-IMG_0965.jpg JPG image
691-20-151-B297 SOW REVISED.docx DOCX document
36C25821B0011 0003.docx DOCX document
S05 Request for Information Log Mail Reprographics Room v1.docx DOCX document
36C25821B0011 0002.docx DOCX document
36C25821B0011 0001.docx DOCX document
Sign-in sheets-691-20-151 29 March Site Walk.pdf PDF
VA Mailroom and Reprographics_Specifications_10-17-2020.pdf PDF
Wage Determination 03192021.pdf PDF
36C25821B0011.docx DOCX document
DRAWINGS- FULL SET- 10-15-20- final.pdf PDF
GLA Construction Safety Requirements and permits forms.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J, Attachment 1

Attachment 1, Self Performance Worksheet

SELF-PERFORMED WORK AND LIMITATIONS ON SUBCONTRACTING

This procurement is a 100% SDVOSB set-aside. FAR 52.219-27 (OCT 2019) and VAAR 852.219-10 (JUL 2019)(DEVIATION) are incorporated into this solicitation and resulting contract. Offeror to complete and submit this worksheet with their bid documents. The period of time used to determine offeror’s compliance with the requirements for self-performance of work and the limitations on subcontracting will be the period the Agency uses to evaluate the bid of this pending Contract.

OFFEROR’S SELF PERFORMANCE WORKSHEET

Offeror’s are required to complete this Worksheet for this Contract.

a) Offeror’s total proposed price $___________

b) Subtract profit or fees $

c) Subtract cost of materials $

d) Offeror’s total estimated cost of contract performance for personnel (a-b-c=d) $____________

e) Offeror’s total estimated self-performed cost of contract performance incurred for personnel who are offeror’s employees or the employees of other SDVOSBC’s $___________

f) Offeror’s percentage of self-performed work (e/d X 100 = %) __________%

List of Proposed Subcontractors for this project /Value of those subcontracts:

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

List of “Self Performed” work activities to be performed by the SDVOSB:

Section J, Attachment 1

Attachment 1, Self Performance Worksheet

At completion of this Contract, the awardee shall complete and submit calculations to the Contracting

Department for the actual results achieved.

a) Offeror’s total proposed price $___________

b) Subtract profit or fees $

c) Subtract cost of materials $

d) Offeror’s total estimated cost of contract performance for personnel (a-b-c=d) $____________

e) Offeror’s total self-performed cost of contract performance incurred for personnel who are offeror’s employees or the employees of other SDVO SBC’s $___________

f) Offeror’s percentage of self-performed work (e/d X 100 = %) __________%

Definitions: (from 13 CFR 125.6)

Cost of the contract. All allowable direct and indirect costs allocable to the contract, excluding profit or fees.

Cost of contract performance incurred for personnel. Direct labor costs and any overhead which has only direct labor as its base, plus the concern's General and Administrative rate multiplied by the labor cost.

Cost of materials. Includes costs of the items purchased, handling and associated shipping costs for the purchased items

(which includes raw materials), off-the-shelf items (and similar proportionately high-cost common supply items requiring additional manufacturing or incorporation to become end items), special tooling, special testing equipment, and construction equipment purchased for and required to perform on the contract. In the case of a supply contract, the acquisition of services or products from outside sources following normal commercial practices within the industry are also included.

Personnel. Individuals who are “employees” under §121.106 of this chapter except for purposes of the HUBZone program, where the definition of “employee” is found in §126.103 of this chapter.

Subcontracting. That portion of the contract performed by a firm, other than the concern awarded the contract, under a second contract, purchase order, or agreement for any parts, supplies, components, or subassemblies which are not available off-the-shelf, and which are manufactured in accordance with drawings, specifications, or designs furnished by the contractor, or by the government as a portion of the solicitation. Raw castings, forgings, and moldings are considered as materials, not as subcontracting costs. Where the prime contractor has been directed by the Government to use any specific source for parts, supplies, components subassemblies or services, the costs associated with those purchases will be considered as part of the cost of materials, not subcontracting costs.