SectionJ_Documents and Attachments.pdf
PDF 255 KB Posted
- Solicitation number
- N6945022R0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1_J-0200000-10 ELINsrev3Feb1422.xlsx | XLSX spreadsheet | |
| Response II Pre-Bid Inquiry Form N6945022R0007 21422 FINAL.xls | XLS spreadsheet | |
| AMEND 3.pdf | ||
| Gauge Calibration List.pdf | ||
| AMEND 1.pdf | ||
| Section C_Rev 3.pdf | ||
| Response_II Pre-Bid Inquiry Form N6945022R0007 - Final.xls | XLS spreadsheet | |
| AMEND 2.pdf | ||
| Attachment 1_J-0200000-10 ELINsrev2Feb122.xlsx | XLSX spreadsheet | |
| Site Visit Map FRC.jpg | JPG image | |
| Pre-Bid Proposal Inquiry Form (Template) (1).xls | XLS spreadsheet | |
| Acquisition Attachment 1_J-0200000-10 ELINsrev.xlsx | XLSX spreadsheet | |
| N6945022R0007 HVAC Solicitation.pdf | ||
| AMAG Request Form.xls | XLS spreadsheet | |
| WD2015_4536Rev15_20211020.pdf | ||
| SectionF_Deliverables.pdf | ||
| Acquisition Attachment 1_J-0200000-10 ELINs.xlsx | XLSX spreadsheet | |
| SectionC_StatementOfWork_rev2.pdf | ||
| N6945022R0007 HVAC Solicitation Final.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
SECTION J
DOCUMENTS and ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT NUMBER ATTACHMENT TITLE
J-0200000-01 DEFINITIONS AND ACRONYMS
J-0200000-02 WAGE DETERMINATION
J-0200000-03 REQUIRED CONFERENCES AND MEETINGS
J-0200000-04 DIRECTIVES, INSTRUCTIONS, AND REFERENCES
J-0200000-05 FORMS
J-0200000-06 GOVERNMENT-FURNISHED PROPERTY
J-0200000-07 SERVICE INFORMATION
J-0200000-08 HVAC DDC SYSTEMS
J-0200000-09 HVAC PRIORITY 1 SENSOR LOCATIONS
J-0200000-10 INSTRUMENT CALIBRATION INVENTORY
J-0200000-11 TEST AND BALANCE CERTIFICATION LOCATIONS
J-0200000-12 NAVY REGION SOUTHEAST INSTRUCTION 4101.1
J-0200000-13 EXHIBIT LINE ITEM NUMBERS
J-0200000-01
DEFINITIIONS AND ACRONYMS
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
DEFINITION DESCRIPTION
COMPETENT PERSON A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.
CONFINED WORK SPACE A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
CONSTRUCTION EQUIPMENT Construction equipment refers to specialized heavy machinery that covers one industry and is specifically designed for executing construction work.
Construction equipment requirements shall include a list of equipment establishing the size, quality, number of units, and unit prices.
Construction equipment prices provided by the Contractor shall be the lowest price available considering the availability of equipment and the time constraints of the job. The direct equipment price shall be adjusted by all discounts and rebates that accrue to the Contractor.
All indirect cost associated with construction equipment, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the equipment price since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included.
CONTRACTING OFFICER (KO) That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
CONTRACTOR That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award.
The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
CONTRACTOR
REPRESENTATIVE
That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
DIRECT LABOR Labor specifically performing work being purchased rather than management, administration or support services.
DIRECT MATERIAL COSTS Material requirements shall include a list of materials establishing the size, quality, number of units, and unit prices. The actual vendor invoice charges for materials used for performance of work under this contract.
Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
All indirect cost associated with performing work, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the direct material cost since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included.
ELECTRONIC OPERATION
AND MAINTENANCE AND
SUPPORT INFORMATION
(EOMSI)
eOMSI is a set of consultant-prepared data manuals that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle. Generally prepared following completion of new construction facility or major facility upgrade. eOMSI’s typically include staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data.
EQUIPMENT Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.
EQUIPMENT, INSTALLED Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
EQUIPMENT, PERSONAL
PROPERTY
Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed after erection or installation without substantial loss of value or damage thereto or to the premises where installed.
FACILITY A building or structure designed and created to serve a particular function.
FACILITY RESPONSE PLAN
(FRP)
The Plan includes procedures for oil spill response and identifies spill drill exercises to ensure effective response and clean-up in the event of an oil spill.
FACILITIES MAINTENANCE
MANAGEMENT
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
FREQUENCY OF SERVICE Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.
Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.
Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.
Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.
Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.
Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.
Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.
Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.
Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.
Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.
Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.
HAZARDOUS MATERIAL
(HM)
A material that because of its quality, concentration, physical, chemical or infectious nature may pose a threat to human health or the environment if released or spilled into the environment or any material designated by the Department of Transportation (DOT) or any materials that require a MSDS/SDS form as posing a potential threat while being transported.
Hazardous materials are listed in 49 CFR Part 172.
HAZARDOUS WASTE (HW) Any discarded solid waste (liquid, semi-solid, solid, or gaseous) that meets the definition of a hazardous waste by USEPA, state authorities, or the Navy. In accordance with RCRA, a solid waste is a listed hazardous waste if it is specifically listed, or it is a characteristic hazardous waste if it exhibits the characteristics of ignitability, corrosivity, reactivity, or toxicity.
HAZARDOUS WASTE
MANAGEMENT PLAN
In accordance with OPNAVINST 5090.1C, every Navy shore activity that generates HW shall develop and use a HW Management Plan or a HW management component in its P2 Plan and EMS. A HW Management Plan shall:
Identify applicable federal, state, and local regulations pertaining to the generation and management of HW.
Identify training requirements and describe procedures for obtaining training and maintaining training records.
Assign responsibilities for the generation, designation, handling, storage, treatment, disposal, and all documentation.
Describe all HW generation and management procedures.
Include or reference the HW minimization plan and goals.
Include or reference contingency plans and emergency response procedures.
The plan shall be kept up to date to include changes in HW generation and management procedures, as well as changes in applicable federal, state, and local HW regulations. The plan shall include or reference minimization procedures sufficient to achieve DOD minimization goals.
Tenant activities are covered by the host CO's HW Management Plan.
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
HW MANIFEST A HW manifest as defined in 40 CFR 260 is required for the transport of hazardous waste. The installation commanding officer (ICO) or the ICO’s designated representative shall retain signature authority for HW manifests.
INFRASTRUCTURE
CONDITION ASSESMENT
PROGRAM (ICAP)
A comprehensive assessment processes for planning, managing, and executing Navy infrastructure inspections.
INSTALLATION
ENVIRONMENTAL PROGRAM
DIRECTOR (IEPD)
The Government functions on the Installation that has the authority to implement the Navy's environmental policies and decision-making regarding environmental compliance issues as well as environmental operational issues. The IEPD is the primary liaison for all federal, state, and local regulatory agencies and government officials.
INTEGRATED MAINTENANCE
PROGRAM (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service calls will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
LESS-THAN-90-DAY
ACCUMULATION AREAS OR
STORAGE FACILITIES
Temporary HW storage areas where HW may be stored for up to 90 days without a RCRA permit.
MAINTENANCE,
PREVENTIVE
Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.
MANAGEMENT
INFORMATION SYSTEMS-
MAINTENANCE
A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.
MAINTENANCE AND REPAIR The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes.
Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
MONTHLY ON-SITE REPORT A compilation of all Contractor and subcontractor employee-hours involved in delivering contract services on a Government property.
NON-RCRA REGULATED
WASTE
Waste that is not regulated as a hazardous waste under RCRA; however, is waste may be regulated by other federal, state or local regulations including but not limited to TSCA, Clean Air Act, Clean Water Act or other regulations and statues. Examples include Used Oil, Universal Waste, Oily Water, antifreeze, etc.
Non-RCRA regulated waste (while not meeting the definition of a Hazardous Waste) must be managed according to its applicable regulations and may not be discarded into the general trash.
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
NON-REGULATED DOLID
WASTE (DEBRIS & RUBBISH)
Waste not associated with an industrial process such as refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
Non-hazardous construction and demolition wastes such as dimension and non-dimension lumber, plywood, chipboard, and hardboard are included.
PERFORMANCE
ASSESSMENT
A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
PERFORMANCE
ASSESSMENT
REPRESENTATIVE (PAR)
That individual designated to be responsible for the monitoring of Contractor performance.
PRE-EXPENDED BIN
MATERIALS AND SUPPLIES
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less. Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
PROPERTY ADMINISTRATOR An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract
PROPERTY MANAGEMENT
PROGRAM
A Government program established for the purpose of reviewing and approving the Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.
QUALITY CONTROL (QC) A method used by the Contractor to control the quality of goods and services produced.
REGULATED WASTE Any hazardous, non-hazardous, industrial process waste (aka special waste), e-waste, and/or off-specification HM, which because of its physical characteristics, chemical make-up or biological nature requires either special handling procedures and permitting, or poses an unusual threat to human health, equipment, property, or the environment.
Examples include (but are not limited to) liquid sludge, pastes, and/or filter cakes, chemical compounds and/or petroleum products, fine powders or highly dusty materials, spent blast media and/or grit, demolition wastes from industrial facilities, debris and/or residues from spill cleanup work, underground storage tank remediation materials, pollution control wastes, ash from fires, furnaces, boilers or incinerators, off-specification products, other materials that have the potential to be a hazardous waste. All RW may be used or unused excess hazardous materials. Laboratory analysis may be required to verify the waste is not a RCRA-regulated hazardous waste.
RS MEANS A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
RESPONSE TIME The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
REPAIR Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition.
REPLACEMENT Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
RESTORATION Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
SAMPLING PLAN Plan and procedures to conduct sampling, field testing and laboratory analysis for a defined testing objective.
SATELLITE ACCUMULATION
AREA
Designated approved areas, at or near the point of generation and under the control of the operator generating the waste, where no more than 55 gallons (cumulative total) of all types of HW or 1 quart of acutely HW may be accumulated. The 55-gallon limit does not include non RCRA regulated waste, universal waste and used oil etc.
SPILL PREVENTION
CONTROL AND
COUNTERMEASURE (SPCC)
PLAN
The SPCC Plan establishes engineering controls including procedures, methods, equipment and other requirements to prevent the discharge of oil into or upon navigable waters. The Plan includes procedures for oil spill prevention, measures to contain spills and an established spill drill exercises to ensure effective countermeasures in the event of oil spill.
SYSTEM An assemblage of mechanically and/or electrically interlocked parts, equipment and/or components forming a unitary whole.
SUSTAINMENT Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
UNIT PRICED LABOR (UPL)
HOUR
The unit price bid by the Contractor to perform one hour of work-in-place.
With the exception of direct material and construction equipment costs, the unit priced labor hour price shall include all indirect and direct costs associated with performing work, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, wage determinations, union agreements, crew sizes, hand tools, equipment, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
(field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups. Any indirect cost or additional markups not allowed in the definition of direct materials shall be included in the UPL price. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.
UNIVERSAL EQUIPMENT Universal equipment refers to equipment that can cover two or more industries and is commercially employed in execution of operation, maintenance, and repair work, such as: Aerial Work Platforms, Backhoes, Cranes, Dump Trucks, Excavators, Generators, Graders, Lifts, Loaders, Man Lifts, Monitoring and Test Equipment, Pumps, Tractors, Trailers, etc.
UNIVERSAL WASTE (UW)
Universal Waste (UW) (defined in 40 CFR Part 273) means batteries, fluorescent lamps, some pesticides, and mercury-containing equipment formally classified as a HW, but that are now subject to less stringent regulations, when recycled if recycling is available.
UTILITY INFRASTRUCTURE
CONDITION ASSESSMENT
PROGRAM (UICAP)
A comprehensive assessment processes for planning, managing, and executing Navy utility infrastructure inspections.
J-0200000-02 Wage Determination
PLACEHOLDER FOR WAGE DETERMINATION
J-0200000-03 Conferences and Meetings
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
J-0200000-03 Required Conferences and Meetings
Required Conferences and Meetings Frequency Administrative and Coordination Meetings As scheduled by the KO or COR Pre-performance Conference As scheduled by the KO Performance Assessment Board Meetings As scheduled by the KO or COR Partnering Sessions Refer to Section C Spec Item 2.3.3 All Others As scheduled by the KO or COR
J-0200000-04
DIRECTIVES, INSTRUCTIONS, AND REFERENCES
Directives, Instructions, and References
NUMBER TITLE
29 CFR 1910 Labor, Occupational Safety & Health ( General Industry) 29 CFR 1910.1001 Labor, Occupational Safety & Health 29 CFR 1910.120 Labor, Occupational Safety & Health 29 CFR 1910-1200 Labor, Occupational Safety & Health 29 CFR 1926 Labor, Occupational Safety & Health (Construction) 32 CFR 190 National Defense, Personnel, Military & Civilian 33 CFR Navigation and Navigable Waters 40 CFR 112 Protection of Environment, Water Programs 40 CFR 122 Protection of Environment, Water Programs 40 CFR 141 Protection of Environment, Water Programs 40 CFR 261 Protection of Environment, Solid Wastes 40 CFR 262 Protection of Environment, Solid Wastes 40 CFR 264 Protection of Environment, Solid Wastes 40 CFR 266 Protection of Environment, Solid Wastes 40 CFR 268 Protection of Environment, Solid Wastes 40 CFR 273 Standards for Universal Waste 40 CFR 279 Protection of Environment, Solid Wastes 40 CFR 280 Protection of Environment, Solid Wastes
40 CFR 300
Protection of Environment, Superfund, Emergency Planning Community Right-to-Know
40 CFR 302
Protection of Environment, Superfund, Emergency Planning Community Right-to-Know
40 CFR 355
Protection of Environment, Superfund, Emergency Planning Community Right-to-Know
40 CFR 370
Protection of Environment, Superfund, Emergency Planning Community Right-to-Know
40 CFR 372
Protection of Environment, Superfund, Emergency Planning Community Right-to-Know
40 CFR 403
Protection of Environment, Effluent Guidelines & Standards
40 CFR 61 Protection of Environment, Air Programs 40 CFR 761 Protection of Environment, Toxic Substances Control Act 40 CFR 763 Protection of Environment, Toxic Substances Control Act 40 CFR 82 Protection of Environment, Air Programs 41 CFR Public Contracts & Property Management
49 CFR 172
Transportation, Materials Transportation Bureau Hazardous Materials Regulations
50 CFR 10 Wildlife and Fisheries, Fish and Wildlife Service 50 CFR 17 Wildlife and Fisheries, Fish and Wildlife Service American National Safety Institute (ANSI) A17.1 Safety Code for Elevators and Escalators American National Safety Institute (ANSI) A17.1 Interpretation No. 20 Elevators and Escalators American National Safety Institute (ANSI) A17.1 Interpretation No. 21 Elevators and Escalators American Society of Mechanical Engineers (ASME) A17.1 Interpretation No. 22 Elevators and Escalators American National Safety Institute (ANSI) A17.1a Safety Code for Elevators and Escalators American National Safety Institute (ANSI) A17.1b Safety Code for Elevators and Escalators American National Safety Institute (ANSI) A17.1c Safety Code for Elevators and Escalators American National Safety Institute (ANSI) A17.2.1a Inspector's Manual for Electric Elevators American National Safety Institute (ANSI) A17.2.1b Inspector's Manual for Electric Elevators
American National Safety Institute (ANSI) A17.2.2 Inspector's Manual for Hydraulic Elevators American National Safety Institute (ANSI) A17.2.2a Inspector's Manual for Hydraulic Elevators American National Safety Institute (ANSI) A17.2.3 Inspector's Manual for Escalators and Moving Walks American National Safety Institute (ANSI) A17.2.3 Interpretations No. 1 Inspector's Manual for Escalators and Moving Walks American National Safety Institute(ANSI) A17.3 Safety Code for Existing Elevators and Escalators American National Safety Institute (ANSI) A17.3 Interpretation No. 4 Safety Code for Existing Elevators and Escalators
American National Safety Institute (ANSI) B-23 The National Board Inspection Code for Boilers and Pressure Vessel Inspectors
American National Safety Institute (ANSI) B31.1 Power Piping American National Safety Institute (ANSI) B31.1 Interpretation No. 32 Power Piping
American National Safety Institute (ANSI) B153.1 For Automotive Lifts - Safety Requirements for the Construction, Care and Use
American Society of Mechanical Engineers (ASME) Section VI and Section VII Boiler and Pressure Vessel Code
American Society of Mechanical Engineers (ASME) Addenda
Section VI, Recommended Rules for the Care and Operation of Heating Boilers, Section VII, Recommended Guidelines for Care of Power Boilers American Society of Mechanical Engineers (ASME) Section VIII, Boiler & Pressure Vessel Code American Society of Mechanical Engineers (ASME) Addenda
Section VIII, Division 1, Rules for Construction of Pressure Vessels
American Society of Mechanical Engineers (ASME) Interpretation No. 43 Section VIII-I, Boiler & Pressure Vessel Code
American Society of Mechanical Engineers (ASME) Section VIII, Division 2, Boiler and Pressure Vessel Code, Alternative Rules
American Society of Mechanical Engineers (ASME) Section VIII, Division 2, Rules for Construction of Pressure Vessels, Alternative Rules
American Society of Mechanical Engineers (ASME) Interpretation No. 43 Section VIII-II, Boiler & Pressure Vessel Code American Society of Mechanical Engineers (ASME) Interpretation No. 44 Section VIII-II, Boiler & Pressure Vessel Code
American Society of Mechanical Engineers (ASME) Section VIII, Division 3, High Pressure Vessels, Alternative Rules
American Society of Mechanical Engineers (ASME) Section VIII, Division 3, Rules for Construction of Pressure Vessels, Alternative Rules
American Society of Mechanical Engineers (ASME) Interpretation No. 43 Section VIII-III, Boiler and Pressure Vessel Code American Society of Heating, Refrigeration, Air Conditioning Engineering ASHRAE, Most Current Set of Standards (ASHRAE) Standards American Society of Testing & Measuring (ASTM), D877
Dielectric Breakdown Voltage of Insulating Liquids using Disk Electrodes
American Water Works Association (AWWA), M20 Water Chlorination: Principals and Practice Americans with Disabilities (ADA) Act of 1990 Asbestos School Hazard Abatement Reauthorization (ASHARA) US Volume 10, Title 20Code City of Jacksonville, Municipal Code, Chapters 62, and 342 Construction Trades Qualifying Board
DOD 4500.36-R
Military Standard Transportation and Movement Procedure (MILSTAMP) Volume 1 through CH-6
EM 385-1-1
U.S. Army Corps of Engineers Safety and Health Requirements
FAC 17-602
Water and Domestic Wastewater Plants Operator Certification
FAC 17-699 Treatment Plant Classification and Staffing FAC 17-710 Used Oil Management FAC 17-761 Underground Storage Tank Systems FAC 17-762 Above Ground Storage Tank Systems FAC 62-160 Quality Assurance Rule
FA1000, FC1000, FD1000, FM1000, FQ1000, FS1000
through FS8200; FT1000 through FT3000; LD1000, LQ1000, LT7000, BRN1000, LVI1000, SCI1000 FDEP SAMPLING SOPS
FAC 62-257 Asbestos Fee FAC 62-302 Surface Waste Quality Standards FAC 62-330 Environmental Resource Permitting FAC 402C Permitting of Consumptive Uses of Water FAC 62-621 Generic Permits FAC 62-701 Solid Waste Management FAC 62-710 Used Oil Management FAC 62-730 Hazardous Waste FAC 62-737 Mercury Containing Lamps and Devices FAC 62-761 Underground Storage Tank Systems FAC 62-770 Petroleum Contamination Site Cleanup Criteria FEMP Executive Order 13123 Efficient Energy Management FEDSPEC SS-S-1614 Airfield Sealant Repairs FEDSPEC SS-S-1614A Airfield Sealant Repairs FEDSPEC SS-S-1614 Amend 1 Airfield Sealant Repairs FEDSPEC SS-S 1614 Notice 1 Airfield Sealant Repairs FRCSE 5090/62 Request for Environmental Impact Analysis FRCSEINST 5211.1A Privacy Act Program FRCSEINST 5500.5A Physical Security Manual The Joint Commission (TJC) Comprehensive Accredited Manual for Hospitals (CAMH) Military Handbook 1102/7 Concrete Pavement Repair
NAVAIRDEPOTJAXINST 5239.1A
Naval Air Depot Jacksonville Information Assurance (IA) Program Regulation
NASJAXINST 11320.1Q Fire Prevention and Fire Protection Measures NASJAXINST 4100.1 Energy Management Program NASJAXINST 5090.5 Emergency Response Action Plan 7 Facility response Plan NASJAXINST5090.3 Spill prevention Control & Countermeasure Plan.
NASJAXINST 5090.1 Hazardous Waste Management Plan (HWMP) NASJAXINST 5090.2 Universal Waste Management Plan NASJAXINST 5090.4 Stormwater Pollution Prevention Plan (SWPPP) NASJAXINST 5090.5A OPA 90 NAS Jacksonville Facility Response Plan Volumes 1 & 2
NASJAXINST 5090.6
Emergency Planning and Community Right to Know Act (EPCRA) and Pollution Prevention Act (PPA) Compliance
NASJAXINST 5090.7 Solid Waste Management Plan (SWMP) NASJAXINST 5097.1 CH-1 Solid Waste Management Plan (SWMP) NASJAXINST 5090.8 Asbestos Management Program NASJAXINST 5100.8K Occupational Safety & Health Program
NASJAXINST 5530.2 Antiterrorism/Force Protection (AT/FP) Plan NASJAXINST 5530.14 Physical Security Plan
NASJAXINST 5560.8
NAS Jacksonville Airfield Vehicle Operator’s Course (AVOC) Program
NASJAXINST 11450.2 Management of Weight Handling Equipment National Fire Prevention (NFP) Code NFP Code Handbook, includes Life Safety Codes National Board of Boiler Inspectors (NBBI) National Board of Boiler Inspectors National Electric Testing Association (NETA) Maintenance Specifications National Electrical Safety Code (NESC) National Electrical Safety Code National Fire Protection Association (NFPA) for Health Care Facilities NFPA Health Care Facilities Handbook National Fire Protection Association (NFPA), 11 Low Expansion Foam National Fire Protection Association (NFPA), 12 Carbon Dioxide Extinguishing Systems National Fire Protection Association (NFPA), 12A Halon 1301 Fire Extinguishing Systems National Fire Protection Association (NFPA), 13 Installation of Sprinkler Systems National Fire Protection Association (NFPA), 15 Water Spray Fixed System National Fire Protection Association (NFPA), 17 Dry Chemical Extinguishing Systems National Fire Protection Association (NFPA), 17A Wet Chemical Extinguishing Systems National Fire Protection Association (NFPA), 20 Installation of Stationary Pumps for Fire Protection National Fire Protection Association (NFPA), 24 Installation of Private Fire Service Mains
National Fire Protection Association (NFPA), 25 Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems 1998 Edition
National Fire Protection Association (NFPA), 291 Recommended Practice for Fire Flow Testing and Marking of Fire Hydrants
National Fire Protection Association (NFPA), 70 National Electric Code
National Fire Protection Association (NFPA), 70B Recommended Practice for Electrical Equipment and Maintenance
National Fire Protection Association (NFPA), 72 National Fire Alarm Code
National Fire Protection Association (NFPA), 72A National Fire Alarm Code Electrical Equipment Maintenance
National Fire Protection Association (NFPA), 72B
National Fire Alarm Code Installation, Maintenance, and Use of Auxiliary Protective Signaling Systems for Fire Alarm Service
National Fire Protection Association (NFPA), 72C National Fire Alarm Code Installation, Maintenance, and Use of Remote Station Protective Signaling Systems
National Fire Protection Association (NFPA), 72D National Fire Alarm Code Installation, Maintenance, and Use of Proprietary Protective Signaling
National Fire Protection Association (NFPA), 72E National Fire Alarm Code Automatic Fire Detectors
National Fire Protection Association (NFPA), 72G
National Fire Alarm Code Installation, Maintenance, and Use of Notification Appliances for Protective Signaling Systems
National Fire Protection Association (NFPA), 72H National Fire Alarm Code Testing Procedures for Local, Auxiliary, Remote Station, and Proprietary
Protective Signaling Systems
NAVFAC MO-114
Maintenance Operations of Ventilation Systems, Volume
Unified Facilities Criteria UFC 3-600-02 Inspection, Testing, and Maintenance of Fire Protection Systems
NAVFAC MO-118 Inspection of Vertical Transportation Equipment NAVFAC MO-200 Facilities Engineering: Electrical Exterior Facilities NAVFAC MO-201 Operation of Electric Power Distribution Systems
NAVFAC MO-206 Operation and Maintenance of Air Compressor Plants
NAVFAC MO-209
Maintenance of Steam Hot Water & Compressed Air Distribution Systems
Unified Facilities Criteria UFC 3-230-02 Operation and Maintenance: Water Supply Systems
Unified Facilities Criteria UFC-3-240-03N Operation and Maintenance of Domestic and Industrial Waste Systems
NAVFAC MO-221 Utilities Metering NAVFAC MO-225 Industrial Water Treatment NAVFAC MO-322 Inspection of Shore Facilities Vol 1 NAVFAC MO-322 Inspection of Shore Facilities Vol 2
Unified Facilities Criteria UFC-3-550-07 Operation and Maintenance (O&M): Exterior Power Distribution System
Unified Facilities Criteria UFC-3-430-07 Inspection & Certification of Boilers & Unfired Pressure Vessels
Unified Facilities Criteria UFC-3-570-06 Maintenance and Operation of Cathodic Protection Systems
NAVFAC MO-307 Corrosion Control NAVFAC P-300 Management of Transportation Equipment NAVFAC P-307 Weight Handling Inspection
NAVFACINST 11230.1D
Inspection, Certification and Audit of Crane and Railroad Trackage
NAVFACINST 11240.1 Management of Certified Equipment NAVFACINST 11300.37A Energy and Utilities Policy Manual
NAVFACINST 11450.1A
Acquisition and Management of Weight Handling Equipment
NAVFACSEINST 11241.1A Contractor Operated Cranes and Equipment Oversight NAVFACSEINST 11241.1A Enclosure 1 Contractor Crane Operating Permit NAVFACSEINST 11241.1A Enclosure 2 Designation as the Contractor Crane Inspector NAVFACSENOTE 5100 Contract Electrical Energized Work Permits
NAVMED P-5010
Manual of Preventive Medicine Swimming Pools and Bathing Places
NAVSEA SWO23-AH-WHM-010
Handling Ammunition and Explosives with Industrial Materials Handling Equipment (MHE)
NAVSEA C OP-5 Volume I Department of Defense, Policy to Implement the EPA's Military Munitions Rule
NAVSUP 538 Management of Materials Handling Equipment Operations and Maintenance Manual NAS Jacksonville Wastewater Treatment Facility
Operations and Maintenance Manual NAS Jacksonville Water Treatment System Upgrade (On- Site Electrolytic Sodium Hypochlorite Generation System
OPNAVINST 5530.14E Navy Physical Security and Law Enforcement Program
OPNAVINST 11310.3A
Operation and Maintenance Policy for Shore-to-Ship Power
P.L. 91-596 Occupational Safety and Health Act P2 Plan Pollution Prevention Management Plan RS MEANS CO. INC. Building Construction Cost Data RS MEANS CO. INC. Repair and Remodeling Cost Data RS MEANS CO. INC. Facilities Cost Data RS MEANS CO. INC. Interior Cost Data RS MEANS CO. INC. Electrical Cost Data RS MEANS CO. INC. Mechanical Cost Data RS MEANS CO. INC. Plumbing Cost Data
RS MEANS CO. INC. Site work and Landscape Cost Data RS MEANS CO. INC. Facilities Maintenance and Repair Cost Data
SOUTHNAVFACENCOMINST 11014.6E
Responsibilities for Cathodic Protection in the Shore Establishment
SOUTHNAVFACENGCOM Ltr 4200 Implementation of Federal Facility Agreements SWMP Integrated Solid Waste Management Plan Toxic Substance Control Act (TSCA) Guide for Chemical Importers and Exporters Underwriters Laboratories, 1236-84 Battery Chargers Underwriters Laboratories Inc. Fire Resistance Directory Volumes 1 & 2 Uniform Building Code (UBC) UBC Complete, Volumes 1-3 Unified Facilities Criteria UFC 3-230-02 Operation and Maintenance: Water Supply Systems Unified Facilities Criteria UFC 3-401-05 Mechanical Engineering Unified Facilities Criteria UFC 3-410-01 Heating Ventilating and Air Conditioning Systems Unified Facilities Criteria UFC 3-430-08N Central Heating Plants Unified Facilities Criteria UFC 3-431-07 Boiler and UPV Maintenance and Certification Unified Facilities Criteria UFC 3-440-02N Water Conservation Operation and Maintenance Unified Facilities Criteria UFC 3-535-01 Visual Air Navigational Facilities Unified Facilities Criteria UFC 3-560-01 ELECTRICAL SAFETY
Unified Facilities Criteria UFC 3-570-06
OPERATION AND MAINTENANCE: CATHODIC
PROTECTION SYSTEMS.
Unified Facilities Criteria UFC 3-601-02 Operations and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems
Unified Facilities Criteria UFC 4-212-01N Navy Engine Test Cells US Department of Transportation, Federal Aviation Administration, Advisory Circular
AC 150-5340-26 Maintenance of Airport Visual Aid Facilities
J-0200000-02 Wage Determination
J-0200000-05 Forms
Directions for Process Material Log Sheets
Chemical Description:
Material Name - List the brand or generic name of the chemical material.
Manufacturer - List the name of the manufacturer of the product.
Constituents of Concern - List the constituents (ingredients) as listed on the Material Safety Data Sheet
(MSDS).
CAS # - List the Chemical Abstract Service (CAS) Number for each Constituent of Concern listed. This information is found on the MSDS. If no CAS number is listed, state “N/L”.
% - List the concentration of each Constituent of Concern listed. This information is found on the
MSDS. If the concentration is not listed, state “N/L”.
Product Weight - List the weight of material contained in one container of the product. This information is normally listed on the MSDS or can be determined from the density or specific gravity of the product listed on the MSDS.
In addition, check all the boxes that apply to this chemical:
o Pure or Mix - choose only one.
o Solid, Liquid or Gas - choose only one.
o Extremely Hazardous Substance (EHS), Ozone Depleting Substance (ODS), SARA TITLE III
Chemical (SARA III), Air Toxic Chemical (AIR TOX) or Carcinogen (CARC) - based on the information provided by the material’s MSDS. Choose all that apply.
o HM exempt - per EPCRA section 312 and based upon user knowledge, choose this box if the material would normally be exempt from reporting for hazardous material storage.
o Tri exempt - per EPCRA section 313 and based upon user knowledge, choose this box if the material would normally be exempt from reporting for the Toxic Release Inventory (TRI).
Physical and Chemical Hazards:
For each material listed, check all the physical and health hazard boxes that apply. These hazard categories are defined in 40 CFR 370.2.
Fire Hazard - flammable, combustible liquid, pyrophoric, oxidizer.
Sudden Release of Pressure - explosive, compressed gas.
Reactive - unstable reactive, organic peroxide, water reactive.
Immediate (acute) Health Hazard - highly toxic, toxic, irritant, sensitizer, corrosive.
Delayed (chronic) Health Hazard - carcinogens, mutagens, other long-term health hazards.
Storage Description: Storage Code:
List the appropriate storage type, pressure and temperature condition codes for the material based upon the codes listed below. List the storage type in the first box, the applicable pressure code in the second box and the applicable temperature code in the third box. More than one storage code may apply if material is stored in different types of containers.
Storage Type:
A - Above Ground Storage Tank F Can L Cylinder B - Below Ground Storage Tank G Carboy M Glass Bottle or Drum C - Tank Inside Building I Fiber Drum N Plastic Bottle or Drum D - Steel Drum J Bag R Other E - Plastic/Non-metallic Drum K Box
Pressure and Temperature Conditions:
1 - Ambient Pressure 4 Ambient Temperature 2 - Greater than Ambient Pressure 5 Greater than Ambient Temperature 3 - Less than Ambient Pressure 6 Less than Ambient Temperature but not Cryogenic
J-0200000-06
PORPOSED SOLICITATION COPY
7 - Cryogenic Conditions
Inventory in Pounds:
Maximum Amount - List the maximum amount of a material that was on-hand (stored) at any one time.
Amount must be recorded in pounds.
Average Amount - List the average amount of a material that was on-hand during the reporting period.
Amount must be recorded in pounds.
Days on Site - List the number of days during the reporting period each material was on-site. If the material was present for the whole year, record as 365.
Amount Used in Pounds:
List the amount of each material used during the reporting period. Amount must be recorded in pounds.
Amount used is the best estimate based on the contractor material tracking system.
PORPOSED SOLICITATION COPY
Government Furnished Facilities (GFF) - None
J-0200000-07
SERVICE INFORMATION
XXXXXX-XX-X-XXXX
Government-Furnished Property
Facility Number Area (SF) Purpose Additional Information
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
J-0200000-07 Service Information
Description Labor Hours Direct Material Building 797 Welding Shop EF Evaluation 8.50 Building 794 B-Line Evaluaiton 12.50 Building 794 EF-1 Anodized Tank Line Evaluation 7.00 Building 101 Regulator Room Evaluation 8.00 Building 101S Oxygen Shop Controls Cx 7.00 Building 793 Mechanical Evaluation 10.00 Building 101U VAV 2-05 Airflow Evaluation 2.00 System Cross-Draft Velocity Testing 60 fpm 10.75 System Cross-Draft Velocity Testing 80 fpm 10.75 System Cross-Draft Velocity Testing 100 fpm 12.25 Building 101 Fish Bowl Trend Data Procurement 4.50 Building 101 South Admin Restroom Exhaust Evaluation 4.50 Building 101 North/South Restroom Exhasut Airflow Evaluation 1.00 Building 101 Hydraulic Shop Testing 8.00 Building 101 LE Room Mechanical Evaluation 3.25 Building 101 AHU-A OA/Space Δp Evaluation 3.00 Building 101J Condensor Water Flow Testing 5.00 Bldg 6206 AHU-1 Trend Data Procurement / Reporting 9.50 Building 6206 AHU-2 Mechanical Evaluation 1.50 Building 6206 AHU-5 Mechanical Evaluation 6.50 Building 6206 AHU-6 Mechanical Evaluation 7.00 Building 6206 AHU-7 Mechanical Evaluation 7.75 Bldg 6206 AHU-8 13.50 Building 6206 AHU-9 Mechanical Evaluation 2.50 Hangar 124 Training Rm Trend data procurement and reporting 5.50 UV Lighting Administration & Tracking 14.75 UV Light replacement [NAS Jacksonville] 2.00 UV Light replacement [NAS Jacksonville] 2.00 UV Light replacement [NAS Jacksonville] 0.00 UV Light replacement [NAS Jacksonville] 11.50 UV Light replacement [NAS Jacksonville] 1.00 UV Light replacement [NAS Jacksonville] 3.00 UV Light replacement [NAS Jacksonville] 1.00 UV Light replacement [NAS Jacksonville] 1.00 UV Light replacement [NAS Jacksonville] 1.00 UV Light replacement [NAS Jacksonville] 1.00 UV Light replacement [NAS Jacksonville] 2.00 UV Light replacement [NAS Jacksonville] 0.00 UV Light replacement [NAS Jacksonville] 0.00 UV Light replacement [Cecil Field Building 6206] 2.00 UV Light replacement [Cecil Field Building 6206] 2.00 UV Light replacement [Cecil Field Building 6206] 2.00 UV Light replacement [Cecil Field Building 6206] 2.00 UV Light replacement [Cecil Field Building 6206] 2.00 UV Light replacement [Cecil Field Building 6206] 2.00 UV Light replacement [Cecil Field Building 6206] 2.00 UV Light replacement [Cecil Field Building 6206] 2.00 UV Light replacement [Cecil Field Building 6206] 2.00 Bldg 444 Monthly Trend data procurement and reporting 6.00
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
J-0200000-07 Service Information
Description Labor Hours Direct Material Building 794a Water Jet System Evaluation 6.25 Building 873 Mechanical Evaluation 1.00
J-0200000-08
HVAC DDC SYSTEMS
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
Facility # Name/Description Equip Name
Manufacturer
North Admin
Mechanical Room
101 North Admin Office Area 101 North Admin Steam to Hot Water Heat Exchanger 101 South Admin Office Area 101 South Admin Steam to Hot Water Heat Exchanger 101 Mezzanine 8 and 13 Office Areas 101 Admin Area Water-Cooled Chiller Plant 101 Public Affairs Office 101 Wing Shop 101 Electrical Component Shop 101 Video Teleconference Center 101 Cafeteria
BCU
SC
TRANE
Bearing Shop
101 Bearing Shop 101 Bearing Shop Air Cooled Chiller Plant 101 Bearing Shop Steam to Hot Water Heat Exchanger 101 Bearing Store Room 1952 “Silver Monster” Abrasive Blast Booth 101S Paint School Booth 101 Rubber Shop 101D Landing Gear Shop 101N 101 Component Paint Booth 101 Component Paint Staging Area 101 Wing Paint Room 101 Dope Sanding Room 101 EU 113 & 114 Abrasive Blast Rooms
BCU TRANE
Hydraulic Shop
101 Hydraulic Shop Main Shop Area 101 Hydraulic Shop Annex Areas 101 Hydraulic Shop Air-Cooled Chiller Plant 101 Constant Speed Drive Shop 101 Union Office/Respirator Room 101 AMAD Test Stand Enclosure 101 Grind Shop Enclosure 101 Telephone Office 101 CMM Enclosure 101 Fish Bowl Server Room
BCU TRANE
101J Mechanical Room
101J Water-Cooled Chiller Plant 101 Electrical Cable Shop 101 Electrical Cable Shop Air-Cooled Chiller Plant 101 Old Test Cells 1-12 101 Tube and Hose Shop 101 Numerical Control Machine Shop 101 Tool & Die and F-18 Wing Shop Production Areas 101 Mezzanine 1 Office Areas 101 Safety, Environmental, Travel Office Areas
BCU TRANE
101C Mechanical room
101C Composite Process Shop Areas 101C Break Room 101C Air-Cooled Chiller Plant 101C Autoclave Cooling System 101C Abrasive Blast Booth 101C Make-Up AHU 101C Sanding Booth 101W Fiberglass Shop Dust Control Booth 101W Fiberglass Shop Bond-Layup Room 101W Fiberglass Shop Repair Area
BCU
SC
TRANE
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
Facility # Name/Description Equip Name
Manufacturer
101U 101U 2nd Floor Clean Room 101U 1st Floor Clean Room 101U Water-Cooled Chilled Water Plant 101U Steam to Hot Water Heat Exchangers 101U East Section Calibration Lab Areas, 1st and 2nd Floor 101U CASS Test Area Air-Cooled Chiller Plant 101U MTS Laser Test Area 101U West Section Production Areas, 1st and 2nd Floor 101UB Shop Area
BCU TRANE
101V 101V 2nd Floor Office Areas 101V Paint Booth
SC TRANE
101S 101S Oxygen Shop Production Areas SC TRANE 101W
NE IT/IM
101W Computer Room 101W IT/IM Office Areas 101W Mezzanine 24 Office Areas 101W Information Security Office 101W Industrial Hygiene Office 101W Air-Cooled Chiller Plant
BCU
SC
TRANE
124 124 Production and Office Areas 124 Air-Cooled Chiller Plant 124 Natural Gas Infrared Heating System 124 Aircraft Paint Booth
SC TRANE
168 168 1st Floor Production and Office Areas 168 2nd Floor Office Areas 168 Air-Cooled Chiller Plant 168 Natural Gas Boiler 168A Production Areas 168B Production Area
SC TRANE
6F Office areas/Air-Cooled chilled Water Plant BCU
SC
TRANE
6G Office areas/Air-Cooled chilled Water Plant BCU
SC
TRANE
7H Office areas/Air-Cooled chilled Water Plant SC TRANE 793 793 Materials Lab Areas
793 Air-Cooled Chilled Water Plant
BCU
SC
TRANE
794 794 IVD Process Areas 794 Production and Office Areas 794 Break Room 794 Equipment Lay-Down Area 794 Chilled Water Plant 794 Steam to Hot Water Heat Exchanger 794 Industrial Ventilation Systems
Abrasive Blast Shop (3 systems) Plasma Spray Shop Booths 1, 3, 4, 5 Chrome Scrubber
794 Climate Controlled Paint Booths
BCU TRANE
795 795 1st Floor Production and Office Areas 795 2nd Floor Office Area 795 Air-Cooled Chiller Plant 795 Steam to Hot Water Heat Exchanger 791 Aircraft Long-Term Storage
BCU TRANE
797 797 1st Floor Production and Office Areas BCU TRANE
XXXXXX-XX-X-XXXX
PORPOSED SOLICITATION COPY
Facility # Name/Description Equip Name
Manufacturer
797 2nd Floor Cafeteria and Office Areas 797 Office Mezzanines 797 Preservation Area 797 Water-Cooled Chiller Plant 797 Steam to Hot Water Heat Exchanger 797 CMM Enclosure
868 868 Paint Mixing Room 868 Paint Bays
SC TRANE
6201 Cecil Commerce Center
6201 Office Areas 6201 Water-Cooled Chilled Water Plant
BCU TRANE
6206 Cecil Commerce Center
6206 Office Areas 6206 Air-Cooled Chiller Water Plant 6206 CASS Test Room 6206 Gas-Fired Hot Water…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .