Section C_Rev 3.pdf
PDF 342 KB Posted
- Solicitation number
- N6945022R0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1_J-0200000-10 ELINsrev3Feb1422.xlsx | XLSX spreadsheet | |
| Response II Pre-Bid Inquiry Form N6945022R0007 21422 FINAL.xls | XLS spreadsheet | |
| AMEND 3.pdf | ||
| Gauge Calibration List.pdf | ||
| AMEND 1.pdf | ||
| Response_II Pre-Bid Inquiry Form N6945022R0007 - Final.xls | XLS spreadsheet | |
| AMEND 2.pdf | ||
| Attachment 1_J-0200000-10 ELINsrev2Feb122.xlsx | XLSX spreadsheet | |
| Site Visit Map FRC.jpg | JPG image | |
| Pre-Bid Proposal Inquiry Form (Template) (1).xls | XLS spreadsheet | |
| Acquisition Attachment 1_J-0200000-10 ELINsrev.xlsx | XLSX spreadsheet | |
| N6945022R0007 HVAC Solicitation.pdf | ||
| AMAG Request Form.xls | XLS spreadsheet | |
| SectionJ_Documents and Attachments.pdf | ||
| WD2015_4536Rev15_20211020.pdf | ||
| SectionF_Deliverables.pdf | ||
| Acquisition Attachment 1_J-0200000-10 ELINs.xlsx | XLSX spreadsheet | |
| SectionC_StatementOfWork_rev2.pdf | ||
| N6945022R0007 HVAC Solicitation Final.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C
XXXXXX-XX-D-XXXX
PROPOSED SOLICITATION COPY
Spec Item Title 1 General Information
1.1 Outline of Services
1.2 Project Location
1.3 Acquisition of Additional Work
1.4 Background Information
1.5 Verification of Workload and Conditions
1.6 Climate Patterns
1.7 Related Information
1.8 Navy Approach to Service Contracting
1.8.1 Partnering Philosophy
1.8.2 Contractor's Knowledge
1.8.3 Industry Best Practices
1.9 Standard Template
1.10 Navy PBSA Approach
1.11 Technical Proposal Certification
2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Formal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.7 Directives, Instructions, and References
2.3.8 Invoicing Procedures
2.3.9 Forms
2.4 Government-Furnished Property, Materials and Services
2.4.1 Government-Furnished Facilities (GFF)
2.4.2 Government-Furnished Utilities
2.4.3 Government-Furnished Material
2.4.4 Government-Furnished Equipment
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Work Reception
2.6.2 Work Control
2.6.3 Work Schedule
2.6.4 Deliverables
2.6.5 Service Interruptions
2.6.6 System Access
2.6.6.1 Asset and Workload Data
2.6.7 Quality Management System (QMS)
2.6.7.1 Quality Management (QM) Plan
2.6.7.2 Quality Inspection and Surveillance
2.6.7.3 Quality Inspection and Surveillance Report
2.6.8 Property Management Plan
2.6.8.1 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.2.1 Quality Control Personnel
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.1.1 Indoctrination and Environmental Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.7 Proof of Legal Residency
2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.3.1 Access to Installation
2.8.3.2 DBIDS Program
2.8.3.3 DBIDS Credentials
2.8.3.4 DBIDS Paper Passes
2.8.4 Access to Buildings
2.8.5 Access Arrangements
2.8.5.1 Escort Arrangement for Secured Areas
2.8.5.2 Airfield Vehicle Operations
2.8.6 Security Clearances
2.8.7 Access to Sensitive Unclassified Information
2.8.8 Employee Status
2.8.9 Cameras and Recording Devices
2.8.10 Access to Navy Marine Corp Intranet (NMCI)
2.9 Contractor Safety Program
2.9.1 Subcontractor Safety Requirements
2.9.1.1 Experience Modification Rate (EMR)
2.9.1.2 OSHA Days Away From Work, Restricted Duty, or Job Transfer (DART) Rate
2.9.2 Accident Prevention Plan (APP)
2.9.3 Crane Operations
2.9.3.1 Crane Inspections
2.9.3.2 Rigging Gear
2.9.3.3 Crane Operators
2.9.4 Accident and Damage Reporting
2.9.4.1 Accident Reporting and Notification Criteria
2.9.5 Fire Protection
2.9.6 Monthly On-Site Labor Report
2.9.7 OSHA Citations and Violations
2.9.8 Safety Inspections and Monitoring
2.9.9 Safety Certification
2.9.10 Safety Apparel on Jobsites
2.9.11 Emergency Medical Treatment
2.9.12 Excavations
2.10 Environmental Management and Sustainability
2.10.1 Energy Management Program
2.10.1.1 Water Conservation Plan
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 ODS Requirements for Refrigerant Recycling
2.10.2.2 Non-RCRA Regulated Waste Disposal
2.10.2.3 Regulated Waste Disposal
2.10.2.4 Universal Waste
2.10.2.5 Spill Prevention, Containment, and Clean-up
2.10.2.6 Hazardous Material Management
2.10.2.7 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.8 Noise Control
2.10.2.9 Salvage
2.10.2.10 Asbestos Containing Material (ACM)
2.10.2.11 Protection of Cultural Resources
2.10.2.12 Storm Water Pollution Prevention
2.10.2.13 Fuel Storage Tanks
2.10.2.14 Clean Air Act (CAA)
2.10.2.15 Dewatering
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Bio-based Products
2.11 Disaster Preparedness and Recovery
2.12 Warranty Management
2.13 Recurring Work Procedures
2.13.1 Notification to the Government for Work Above the Recurring Work Limitations
2.13.2 Recurring Work Exhibit Line Item Numbers (ELINs)
2.14 Non-Recurring Work
2.14.1 Unit Priced Labor (UPL)Work (Negotiated)
2.14.1.1 Non-Recurring Work Preparation of Proposals
2.14.1.1.1 Labor Requirements
2.14.1.1.2 Material and Equipment Requirements
2.14.1.2 Issuance of Final Task Order
2.14.2 Non-Recurring Work ELINS
2.15 Phase-out Plan
3 Recurring Work
3.1 Service Orders
3.2 HVAC and Refrigeration Systems Digital Control (DDC) System
3.3 HVAC Priority 1 Sensor Location
3.4 Instrument Calibration Inventory
3.5 Test and Balance Certification
4 Non-Recurring Work
Spec Item Title Description 1 General
Information The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Facility Investment services for Heating Ventilation and Air Conditioning (HVAC) controls, Direct Digital Control (DDC) Systems and to provide Test and Balance (TAB) services on existing HVAC and Industrial Ventilation systems to ensure proper airflow, water flow, operation and control within limits of design capability. This work may involve interfacing, manipulating, and programming software which is proprietary to the Trane Company.
These tasks include repair and replacements; however, all such repair and replacements over the limit of liability must be approved by Contracting Officer prior to Contractor accomplishing work. Contractor shall use pre negotiated unit priced labor and material rates.
1.1 Outline of
Services
The PWS is organized into annexes. Annex 1 is "General Information".
Annex 2 contains the on-site project management and administration requirements. Annex 15 contain the technical requirements. The annex numbers are identified as 15 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff N/A Annex 4 Public Safety N/A Annex 5 Air Operations N/A Annex 6 Port Operations N/A Annex 7 Ordnance N/A Annex 8 Range Operations N/A Annex 9 Health Care Support N/A Annex 10 Supply N/A Annex 11 Personnel Support N/A Annex 12 Morale, Welfare and Recreation Support N/A Annex 13 Galley N/A Annex 14 Housing N/A Annex 15 Facilities Support 1502000 Facility Investment Annex 16 Utilities N/A Annex 17 Base Support Vehicles and Equipment N/A Annex 18 Environmental N/A
1.2 Project
Location
The work shall be performed at NAS Jacksonville, NS Mayport and Cecil Commerce Center.
1.3 Acquisition of
Additional Work
The Government reserves the right to acquire additional services at additional locations in addition to the services and locations identified in the Firm-Fixed Price requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the indefinite delivery indefinite quantity provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.4 Background
Information
Naval Air Station Jacksonville is one of the Navy’s finest and fastest growing installations and is the recipient of the 2012 Presidential Excellence Award and 2013 Commander, Navy Installations Command Excellence Award. The Naval Air Station occupies 3,896 acres and is the largest Navy base in the Southeast Region and third largest in the nation. As a master air and industrial base, Naval Air Station Jacksonville supports U.S. and allied forces specializing in anti-submarine warfare and training of the best aviators in the world. Fleet Readiness Center Southeast (FRCSE) is the largest tenant command aboard Naval Air Station Jacksonville, Fl. Established in 1940, the facilities at FRCSE have turned out almost every type of Navy aircraft - fighter and attack planes, patrol, antisubmarine, reconnaissance, transport, trainer, special configuration and helicopters. With a workforce of almost 3,000 civilian employees, 1,000 military personnel, and 1,000 contractors, FRCSE is the largest industrial employer in Northeast Florida and Southeast Georgia
1.5 Verification of
Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data; such as: systems descriptions, maps, floor plans, and tables to represent the type, quantity and location of services to be provided. However, offerors are encouraged to visit the project site during the site visit as part of its due diligence to assess the nature of work and conditions under which work is to be performed.
1.6 Climate
Patterns
The climate in northeast Florida is generally temperate. Summers are long and warm with an average relative humidity of about 75 percent. Winters, although punctuated with periodic invasions of cool to occasionally cold air from the north, are mild because of the southern latitude and the proximity to the warm Atlantic Ocean.
The annual average temperature in northeast Florida is 68 °F (degrees Fahrenheit). June, July, and August are the hottest months; with temperatures averaging above 90 °F. December, January, and February are the coolest months, with temperatures averaging near the middle 50s. Temperatures exceed 95 °F during the summer months and evening temperatures are usually comfortable, falling below 75 °F.
The greatest rainfall, mostly in the form of local thunderstorms, occurs during the summer months when measurable amounts can be expected. Summer thunderstorms usually occur before noon along the beaches, while afternoon thunderstorms are the rural inland areas.
The Naval Stations proximity to the Atlantic Ocean and Gulf Stream makes it susceptible to Tropical Cyclones and their effects. The official Tropical Cyclone season begins June 1st and ends November 30th of each year.
Although, Tropical Cyclones have been known to develop as early as May and as late as December. The peak period of Tropical Cyclone is August through October. It is during this period that storm frequency and intensity increases.
1.7 Related
Information
There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.8 Navy Approach
to Service Contracting
The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.
The Navy also supports the following principles:
1.8.1 Partnering
Philosophy
The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion. Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.
1.8.2 Contractor's
Knowledge
The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.8.3 Industry Best
Practices
The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).
1.9 Standard
Template
Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract. Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex.
Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Recurring Work requirements. Specification item 4 will always contain the Non-recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all firm fixed priced specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to 3.1.
All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.
1.10 Navy PBSA
Approach
The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.11 Technical
Proposal Certification
The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.
2 Management and Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General
Information
2.2.1 Government
Regular Working Hours
The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays. Fleet Readiness Center Southeast regular working hours are from 0730-1530, five days per week, Monday through Friday, except observed Federal holidays.
Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.
2.2.1.1 Observed
Federal Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Juneteenth Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to
Contractor Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.
2.2.2 Wage
Determinations
Placeholder for Collective Bargaining Agreements, Service Contract Labor Standards and Wage Rate Requirements wage determinations provided in J- 0200000-02.
2.2.3 Requirements
Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.3 General
Administrative Requirements
2.3.1 Required
Conferences and Meetings
The Contractor shall attend weekly administrative and coordination meetings.
The Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit a copy to the KO, COR and all attendees, within two working days, for review and comments per Section F. Comments received within two working days shall be incorporated into the minutes and a copy of the final revision shall be submitted to the KO, COR and all attendees, within two working days, for concurrence.
The Contractor shall attend meetings as shown in J-0200000-03.
2.3.2 Training for
Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractors teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
Partnering should accomplish three goals:
- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.
- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.
- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.
2.3.3.1 Formal
Partnering
The initial session should be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award. The initial Partnering Meeting will be at least one-half day in duration and held at a neutral location off the installation that is acceptable to the Contractor and to the Government.
Follow-on sessions should be scheduled every three to six months and typically last a half day or less. The frequency, duration, and locations of follow-on sessions should be agreed to by both parties during the initial Partnering Meeting.
The Contractor shall pay all costs associated with the partnering effort including facilitator, meeting room, and other incidental items. Before the partnering session, the Contractor shall coordinate with the facilitator the requirements for incidental items (audio-visual equipment, computer(s), two easels, flipchart paper, colored markers, note paper, pens/pencils, colored flash cards, etc.) and have these items available at the partnering session. The Contractor will provide copies of any documents used for the Partnering Meeting for distribution to all attendees. The facilitator must be acceptable to both the Contractor and the Government. The participants shall pay their own costs for meals, lodging, and transportation associated with partnering meeting. Contractor will provide partnering report per Section F.
2.3.3.2 Contract
Partnering Administration
Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.3.3 Contract
Partnering Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
* President/Vice President
* Project Manager
* Quality Manager
* Site Safety and Health Officer
* Environmental/Energy Manager Sub-contractor Reps
2.3.4 Permits and
Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause
52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION.
This insurance must be maintained during the performance period.
2.3.5.1 Certificate of
Insurance
The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage per Section F. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2 Minimum
Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other as required by state law
2.3.6 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.7 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-04. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract and those superseding these directives, instructions and references.
2.3.8 Invoicing
Procedures
Refer to DFARS Clauses 252.232-7003 titled “Electronic Submission of Payment Request” and 252.232-7006 WIDE AREA WORKFLOW
PAYMENT INSTRUCTIONS (MAY 2013).
2.3.9 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-05.
2.4 Government-
Furnished Property
In accordance with Section H, paragraph H.10 Govt-Furnished Property and the following paragraphs, The Government will furnish or make available to the Contractor certain Government-owned facilities, utilities, materials and equipment for use only in connection with this contract as stated below:
2.4.1 Government-
Furnished Facilities
(GFF)
The Government will not furnish facilities to the Contractor J-0200000-06.
2.4.2 Government-
Furnished Utilities
The Government will furnish electricity, water and wastewater (sewage) at existing outlets required for the work to be performed under the contract at no expense to the Contractor. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work sites. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost.
The Contractor is responsible for the cost of all utilities at all Government-provided facilities and any additional Contractor-owned facilities, at prevailing Naval Station rates. The Contractor will be billed directly for all utilities provided to all Contractor occupied facilities. Utility rates billed to the Contractor will be at the following rates. The quantities will be estimated where meters are not provided based on UFC 3-401-05N.
1. Electrical - the current rate for electrical services is $111.82 MWH
2. Water - the current rate for water is $13.23 per KGAL
3. Wastewater (Sewage) - the current rate for sewage services is $14.06 per
KGAL, based on 100% of the water consumption
Variations in Rates:
Utility rates are subject to change.
Changes in the utility rates shall not be basis for adjustment to the contract price or a claim unless the deviation from the quoted price exceeds 15%.
When the utility rates varies by more than 15%, the contract price will be adjusted to reflect the amount the actual charge exceeds the rate quoted;
however, the Government will only be liable for the amount of cost exceeding 15% of the rate quoted. For example, if a quoted rate increases by 16%, the Government will only be liable for 1% of the rate increase.
Vice versa if the quoted rate decreases by 16%. For example, if a quoted rate increases by 16%, the Government will only be liable for 1% of the rate increase. Vice versa if the quoted rate decreases by 16%.
Historically, electrical and water utility consumption at the Government-
Furnished Facilities has averaged approximately 351 MWH of electricity and 316 KGAL annually. However, historical data associated with contracts prior to this solicitation may present data that may not be representative of the requirements specified in this contract
2.4.3 Government-
Furnished Material
Except where otherwise stated, the Government will not furnish materials.
2.4.4 Government-
Furnished Equipment
Except where otherwise stated, the Government will not furnish equipment.
2.5 Contractor-
Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.
Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records (including updating the AS BUILTS), and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Work
Reception
The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service orders and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.
2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.
2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business.
In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls or operations. The notification shall include, at a minimum, the following:
The date and time work was coordinated The name and phone number of the Government person with whom the work was coordinated
2.6.4 Deliverables Records and reports are specified in Section C, F, H, I, and J. The Contractor shall submit accurate and complete documents within the required timeframes as specified in Sections. The Contractor shall revise/modify records and reports, as directed by the KO, at no additional cost to the Government.
Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format.
Deliverables shall be unprotected and capable of being sorted by work CLIN, order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub-ELIN or clause. Formulas shall be traceable.
Government acceptance of deliverables will not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website. Each deliverable posting on the website and each email notification shall include the title of the deliverable, the annex/sub-annex and spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.
The Contractor shall provide status of deliverables per Section F.
2.6.5 Service
Interruptions
If any utility, equipment, system(s) operation, or other services must be interrupted (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers at least five working days in advance per Section F. If the service interruption is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable and provide the status of repairs daily until normal operation is restored.
Scheduled utility outages and interruptions to equipment, system(s) operation, or other services shall be scheduled after regular hours of operation.
The Contractor shall shut-down, restart, and perform operational checks on all equipment affected by both scheduled and unscheduled utility outages and service interruptions at no additional cost to the Government.
2.6.6 System Access Contractor will need to obtain base access, FRCSE access and flight line access.
2.6.6.1 Asset and
Workload Data
The Contractor shall maintain and keep current all asset data associated with any annex in this contract. The Contractor shall maintain and keep current all workload data, such as: service orders, preventive maintenance, preventive maintenance incidental repairs, integrated maintenance, integrated maintenance repairs, inspection, testing, and certifications, etc. Current and accurate inventories and workload data shall be submitted to the KO per Section F.
2.6.7 Quality
Management System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:
Accurate documentation of work processes, procedures, and output measures.
A systematic procedure for assessing compliance with performance objectives and standards.
Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
2.6.7.1 Quality
Management (QM) Plan
The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance, prior to implementation.
The Contractor’s QM Plan shall include, at a minimum, the following:
Policy and objectives of Quality Management System (QMS) Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications
Approach to assuring quality of services provided and conformance with performance objectives and standards
Methods and procedures for effective planning, operation and control of processes and performance of work
Procedures for inspection and surveillance of services for each spec item:
o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight and acceptance of subcontracted work
Documentation and records management Communication with Government (customers)
2.6.7.2 Quality
Inspection and Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions.
The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract.
2.6.7.3 Quality
Inspection and Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
2.6.8 Property
Management Plan
The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished Property, Materials and Services, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, key control, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property Management Plan shall be submitted per Section F.
2.6.8.1 System and
Equipment Replacement
The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.
2.7 Personnel
Requirements
The Contractor shall comply with the personnel requirements stated below:
2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.
The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the Project Manager, Quality Manager, and Site Safety and Health Officer The organization chart shall be revise as applicable for the contract.
2.7.1.1 Project
Manager (PM)
The Contractor shall provide a PM and designated alternate, as applicable, who has full authority to act for the Contractor on all contract matters relating to this contract. The PM or designated alternate shall be on-site within four hours of request by the Government.
The PM shall have at least five years of experience in managing a workforce providing services on contracts of similar size, scope and complexity. The PM shall not be the same person as the Quality Manager, Site Safety and Health Officer.
2.7.1.2 Quality
Manager
The Contractor shall provide a Quality Manager whose primary duty and responsibility is to prepare and enforce the Contractor’s Quality Management
System on this contract. The Quality Manager or designated alternate shall be shall be on-site during the Government's regular working hours and shall be available on-site within two hours after the Government’s regular working hours. The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project Manager.
The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:
The Quality Manager shall have at least five years of supervisory experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager shall not be the same person as the Project Manager, Site Safety and Health Officer, Environmental/Energy Manager.
2.7.1.2.1 Quality Control
Personnel
The Contractor may provide additional Quality Control personnel whose primary duty and responsibility is to enforce the Contractor’s Quality Management System on this contract. The Quality Control personnel must report directly to the Quality Manager and shall not report directly to the Project Manager.
Quality Control personnel shall meet or exceed the qualifications, technical knowledge and experience requirements of personnel performing the work which they will be inspecting..
2.7.1.3 Site Safety and
Health Officer
(SSHO)
The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.
A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.
The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:
The SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three years’ experience if he possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour construction safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO may be the same person as the Quality Manager, Environmental/Energy Manager.
2.7.2 Employee
Requirements The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.
2.7.2.1 Employee
Certification and Training
The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within 4 hours of request. Contractor team members approved to accomplish work on this contract shall be full-time employees of their respective agencies. No other personnel shall be allowed to do TAB work on this contract.
CONTRACTOR QUALIFICATIONS
a. Contractor must be trained by the DDC Manufacturer (Trane) in the Operation, Maintenance and Configuration of the Trane Tracer Ensemble Version 5.9 Building Automation System, including the Trane Tracer Software, Rover Software and TGP (Trane Graphical Programming).
b. Contractor shall provide documentation of a minimum of (5) five years’ experience with the Operation, Maintenance and Configuration the Trane Tracer Ensemble Version 5.9 Building Automation System similar to the applications at FRCSE operations (i.e. Clean Rooms, Calibration Labs, Engine Assembly Facilities, Explosion Proof Applications, Air and Water Cooled Chilled Water Systems, Industrial Ventilation systems, etc.)
demonstrating skills and tools required to address the Building Controller level, the Custom/Application Specific Controller level, and End Devices (such as sensor calibration) of each Trane Tracer Ensemble Version 5.9 DDC installation.
c. Contractor shall provide documentation of a minimum of (5) five years’ experience in the testing of Industrial Ventilation Systems similar to the applications at FRCSE operations (i.e. Open Surface Chrome and Cleaning Tanks, Abrasive Blast Booths, Dust Collectors, Paint Booths, HEPA Filter Banks, etc.)
d. Contractor shall be certified by the Association of Energy Engineers (AEE), National Environmental Balancing Bureau (NEBB), or National Balancing Council (NBC). The certification must be maintained for the entire duration of this contract. TAB duties must be performed (at a minimum) in accordance with the requirements of the standard under which the TAB firm’s qualifications are approved.
2.7.2.1.1 Indoctrination
and Environmental Training
The Contractor shall provide initial and follow up environmental awareness training for all employees in addition to training required by all applicable Federal, state, and local laws, regulations, and executive orders, and with base-wide instructions, standards, and permit requirements. Indoctrination and environmental awareness training shall include topics such as: HM and regulate/non-regulated waste management, recycling, solid waste disposal, storm water BMPs, general housekeeping procedures, fueling procedures, spill prevention and response, natural resources, cultural resources, etc.
2.7.2.2 Employee
Appearance The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.
2.7.2.3 Employee
Conduct
Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.
2.7.2.4 Identification
as Contractor Employee
Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
2.7.2.5 Removal of
Employees
The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.
2.7.2.7 Proof of Legal
Residency
No employee or representative of the Contractor will be admitted to the site of work unless satisfactory proof of U.S. citizenship is furnished per Section F.
2.7.3 Enterprise-wide
Contractor Manpower Reporting Application (eCMRA)
The following manpower reporting is required by NMCARS 5237.102.
The Contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:
https://doncmra.nmci.navy.mil.
Per Section F, reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.
2.8 Security
Requirements
The Contractor shall comply with all Federal, state, and…