Response II Pre-Bid Inquiry Form N6945022R0007 21422 FINAL.xls
XLS spreadsheet 46 KB Posted
- Solicitation number
- N6945022R0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1_J-0200000-10 ELINsrev3Feb1422.xlsx | XLSX spreadsheet | |
| AMEND 3.pdf | ||
| Gauge Calibration List.pdf | ||
| AMEND 1.pdf | ||
| Section C_Rev 3.pdf | ||
| Response_II Pre-Bid Inquiry Form N6945022R0007 - Final.xls | XLS spreadsheet | |
| AMEND 2.pdf | ||
| Attachment 1_J-0200000-10 ELINsrev2Feb122.xlsx | XLSX spreadsheet | |
| Site Visit Map FRC.jpg | JPG image | |
| Pre-Bid Proposal Inquiry Form (Template) (1).xls | XLS spreadsheet | |
| Acquisition Attachment 1_J-0200000-10 ELINsrev.xlsx | XLSX spreadsheet | |
| N6945022R0007 HVAC Solicitation.pdf | ||
| AMAG Request Form.xls | XLS spreadsheet | |
| SectionJ_Documents and Attachments.pdf | ||
| WD2015_4536Rev15_20211020.pdf | ||
| SectionF_Deliverables.pdf | ||
| Acquisition Attachment 1_J-0200000-10 ELINs.xlsx | XLSX spreadsheet | |
| SectionC_StatementOfWork_rev2.pdf | ||
| N6945022R0007 HVAC Solicitation Final.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question No. | Date Received | REFERENCE | QUESTION | GOVERNMENT RESPONSE | Posted on Amend No. | |||
| Page | Section | Para. | ||||||
| 1 | 2/8/22 | 2 | Attachmnet J - TAB "Non-Recurring Work Base Period" | A702 | This is a further clarification of the Question/Response to PPI #34 asked on 1/26/2022. Input from the incumbent subs and prime explained that the Direct Material calculation comes from the original author at FRCSE for the DDC & TAB SOW. He wanted to include a max budget of $50,000 of material in non-recurring work. Based on input from the current DDC and TAB companies, all of the non-recurring material is HVAC-DDC related. The unit cost of a DDC sensor, unit controller board, actuators, VFD's, communication wire, building controllers, and software can vary from a few dollars to thousands. The estimated quantity was originally intended to be dollars. All requested proposals were then reviewed and approved by the KO using the negotiated contract rates and markups. Its understood that the previous negotiated contracts included a $1 Unit Price in the Direct Material formula. A total maximum of $50,000 worth of material was realistic for each CLIN period. Since it is not possible to give a unit price for every possible non-recurring item, should the Unit Price be based on $1 so that the bidder would show it as $1.15 if there was a 15% markup on direct material? Please clarify. | The Unit Price is the variable the Contractor is to provide pricing on. Therefore, each initial proposal must contain the Offeror’s best pricing in response to the solicitation and provide the best possible service to the Government. | 3 | |
| 2 | 2/8/22 | 2.2.22 | Please clarify the response to PPI #32. Response regarding CLINS 0009 and 0010 for Option FAR 52.217-8 states "The estimated quanitities should be based off of the previous option period CLINs 0007/0008 pricing for a 6 month duration see revised ATTACHMENT J-0200000-10." Does this mean that bidders should take the exact values they provide in CLINS 0007 and 0008 and cut them in half, since CLINS 0007 and 0008 are based off of 12 months? Is there the bidder's option to provide an inflation increase for additional 6 months of contract extension? | Please see FAR clause 52.217-8. The FAR clause 52.217-8 is a 6 month extension option of the previous option period. "The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months." | 3 | |||
| 3 | 2/8/22 | 2.2.22 | Please clarify the response to PPI #32. Response regarding CLINS 0009 and 0010 for Option FAR 52.217-8 states "The estimated quanitities should be based off of the previous option period CLINs 0007/0008 pricing for a 6 month duration see revised ATTACHMENT J-0200000-10." Should the spreadsheet for CLINS 0009 and 0010 be revised to show a Quantity of "75 EA" for 3.1 Service Calls, and "6 MO" for 3.2 HVAC DDC Systems, 3.3 Sensor Calibration and Commissioning, 3.4 Equipment Calibration, and 3.5 Test and Balance | Please see revised ATTACHMENT J-0200000-10 ELINsrev3Feb822 with adjusted calculations for a six month period. | 3 | |||
| 4 | 2/8/22 | Will DFARS clause 252.223-7999 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (DEVIATION 2021-O0009) be included in this contract? | No | 3 | ||||
| 5 | Security | Other than the initial background checks for obtaining access to the installations listed within the Statement of work, will other more stringent background checks be required to obtain additional security clearance(s) for accessing specific areas requiring work within the scope of this contract? If so, what areas require additional security clearances? | After gaining access to NAS Jacksonville, an additional FRCSE badge access form must be completed for each individual. The badge approval process can be acommodated within 5 days. Additionally, some of the areas within the scope of this contract are located on the flight line. | 3 | ||||
| 6 | Training | Is there any specific training which may be required to obtain access for operations associated with this contract? If so, what training and what is the process for scheduling the training and the duration of the training courses? | Flight line access requires ramp stamp training. | 3 | ||||
| 7 | Is the Environmental Compliance Assessment, Training, and Tracking System (ECATTS) required for all of the facilities associated with this contract? | Yes | 3 | |||||
| 8 | Experience | What is the minimum experience requirement associated with the testing of industrial ventilation systems? | Per Section C (Statement of Work) 2.7.2.1.c "Contractor shall provide documentation of a minimum of (5) five years’ experience in the testing of Industrial Ventilation Systems similar to the applications at FRCSE operations (i.e. Open Surface Chrome and Cleaning Tanks, Abrasive Blast Booths, Dust Collectors, Paint Booths, HEPA Filter Banks, etc.)" | 3 | ||||
| 9 | Access | What are the requirements for accessing the areas in vehicles when scheduled to conduct the necessary operations associated with this contract? | Vehicle pass must be obtained through security when getting FRCSE badges to access areas within FRCSE fence line. To drive on the flight line where several locations are located, ramp stamp training and flight line access are required. | 3 | ||||
| 10 | Computer Access | Are there special permission requirments for the use of laptop computer devices for connectivity to the installed Direct Digital Controls (DDC) Systems? If so, please explain the process. | Yes, a computer pass is required. Contractor shall provide the model/serial# to FRCSE POC and will have to keep computer access form with computer at all times. | 3 | ||||
| 11 | CLIN 0001 3.1 Service Calls | Are the 150 Service Orders for the controls contractor or the Test and Balance Contractor? | Test and Balance | 3 | ||||
| 12 | CLIN 0001 3.3 Sensor Calibration and Commissing | Is the Test and Balance contractor required to conduct the independent comparative calibration of the DDC system sensors? | Yes | 3 | ||||
| 13 | Is the controls contractor required to assist the Test and Balance contractor with the manipulation(s) of the DDC systems? | Yes, when necessary. | 3 | |||||
| 14 | Is the Test and Balance Contractor required to independently procure all of the necessary software to connect and communicate with the DDC Program(s)? | Yes | 3 | |||||
| 15 | CLIN 0 01 3.4 Firm Fixed - Equipment Calibration | Is the FRCSE owned equipment required to be calibrated using a NIST Traceable 3 point calibration method? | Yes | 3 | ||||
| 16 | J-0200000-03 Conferences and Meetings: | Required Conferences and Meetings: What is the typical frequency (and durations) of the Administrative and Coordingation meetings? | Weekly DDC/controls status meeting discussing PM's, repairs, etc… (30 min - 1 hour), Weekly Test and Balance status meeting discussing service orders, quarterly tests, etc… (30 min - 1 hour) | 3 | ||||
| 17 | Required Conferences and Meetings: What is the typical type, frequency, and duration of the "All Others"? Weekly, Monthly, Etc? | Only when necessary (i.e. pre work meeting for a repair) | 3 | |||||
| 18 | J-0200000-07 Service Information | There appears to be a number of the items listed with no labor hours designated. Is this typical of the Service Orders or is this a single section of a larger document which may not be a true representation of actual time requirements? | Those that show 0 | 3 | ||||
| 19 | J-0200000-09 HVAC Priority 1 Sensor Locations | How many Direct Digital Control (DDC) sensors are associated with the Priority 1 Sensor locations? | 939 | 3 | ||||
| 20 | Should Building 168B be Building 168A? There is no Building 168B located on the Base map. | Correct. | 3 | |||||
| 21 | Is there only one AHU in Building 168B (168A)? | There is only one DX AHU in the Building 168A extension. There are 3 DX units and 1 CHW unit located in the original 168. | 3 | |||||
| 22 | Section J-0200000-11 Test and Balance Locations | Are the digital and/or pneumatic photohelic/magnehelic/differential pressure gauges referenced within Section J-0200000-11 required to be calibrated as part of this contract? If so, are there any special requirements for documentation? | Yes, provide initial comparative calibration data with variance and final comparative calibration data that shows no variance. Provide documentation for each gauge and add sticker to each gague showing calibration date. | 3 | ||||
| 23 | There are ninty-seven (97) Magnehelic/Photohelic gauges referenced. Are there any additional gauges which are not referenced but intended? If so, how many differnetial pressure sensors require calibration in associated with this contract? Please specify quantity, type, and locations? | There are 211 gauges that require calibration. | 3 | |||||
| 24 | What is the frequency of testing for the Industrial Ventilation Systems listed within this section? Annual, Quarterly, Monthly? | Per Section C (Statement of Work) 3.5 "The Contractor shall provide quarterly test and balance certifications of dust | ||||||
| collectors and industrial ventilation systems." | 3 | |||||||
| 25 | Section F Deliverables 3.3 Calibration and Commissioning | The Date of submission is listed as "within 15 days after award or changed" Shoud this be within 15 days of calibration? | Within 15 days of calibration | 3 |
&LSOLICITATION NO. N69450-21-Q-0012
PROJECT TITLE/LOCATION: VITAL Level HVAC &CPre-Bid Inquiry Form &LJuly 2016