SectionF_Deliverables.pdf
PDF 122 KB Posted
- Solicitation number
- N6945022R0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1_J-0200000-10 ELINsrev3Feb1422.xlsx | XLSX spreadsheet | |
| Response II Pre-Bid Inquiry Form N6945022R0007 21422 FINAL.xls | XLS spreadsheet | |
| AMEND 3.pdf | ||
| Gauge Calibration List.pdf | ||
| AMEND 1.pdf | ||
| Section C_Rev 3.pdf | ||
| Response_II Pre-Bid Inquiry Form N6945022R0007 - Final.xls | XLS spreadsheet | |
| AMEND 2.pdf | ||
| Attachment 1_J-0200000-10 ELINsrev2Feb122.xlsx | XLSX spreadsheet | |
| Site Visit Map FRC.jpg | JPG image | |
| Pre-Bid Proposal Inquiry Form (Template) (1).xls | XLS spreadsheet | |
| Acquisition Attachment 1_J-0200000-10 ELINsrev.xlsx | XLSX spreadsheet | |
| N6945022R0007 HVAC Solicitation.pdf | ||
| AMAG Request Form.xls | XLS spreadsheet | |
| SectionJ_Documents and Attachments.pdf | ||
| WD2015_4536Rev15_20211020.pdf | ||
| Acquisition Attachment 1_J-0200000-10 ELINs.xlsx | XLSX spreadsheet | |
| SectionC_StatementOfWork_rev2.pdf | ||
| N6945022R0007 HVAC Solicitation Final.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F
N69450-18-D-5691
AWARD COPY
Section F Deliveries or Performance
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least three calendar days prior to requested day.
KO and
COR
1 As required
2.3.1 N/A Meeting Minutes As specified KO and
COR
2 As Required
2.3.3 N/A Partnering Report With 15 calendar
days of partnering sessions
KO and
COR
2 Annually
2.3.4
N/A Permits and Licenses
Before work commences and as requested by the KO.
KO and
COR
2 As specified
2.3.5
N/A Written Notice of cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.3.5.1
N/A Certificate of Insurance
Within 15 calendar days prior to contract start.
KO and
COR
2.6.5
N/A Service Interruptions
At least five working days in advance
KO and
COR
1 As required
2.6.6.1 N/A Asset and
Workload Data
First Workday of each month
KO and
COR
2 Monthly
2.6.7.1 N/A Quality
Management Plan
Within 15 calendar days prior to contract start
KO and
COR
2 As Specified
2.6.7.3 N/A Quality Inspection
and Surveillance Report
First Workday of each month
KO and
2 Monthly
2.7.1
N/A List of Key Personnel and Qualifications
Within 15 calendar days prior to contract start
KO and
COR
2.7.1
N/A Organizational Chart
Within 15 calendar days prior to contract start
KO and
COR
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.7.2.7
N/A Proof of Legal Residency
Prior to be admitted to site of work.
KO 1 As
2.7.3
N/A Contractor Labor Hours (eCMRA) Report
No later than 31 October
KO 1 Annually for labor executed during the period of performanc e during each Governmen t fiscal year
(FY)
2.8.1 N/A Employee List Upon request. KO and
COR
2.8.8 N/A Employee Status As Specified KO and
COR
1 As required
2.8.9 N/A Camera Pass 14 days prior to
requirement COR 1 As required
2.9.2
N/A Accident Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
2.9.2
N/A Activity Hazard Analysis
Together with the Accident
Prevention Plan and for changes.
KO and
COR
2.9.4
N/A Compliance Plans, Programs, and Procedures
Together with the Accident
Prevention Plan and for changes.
KO and
COR
2.9.4
N/A NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
2.9.6
N/A Monthly On-Site Labor Report
First work day of each month.
KO and
2 Monthly
2.9.7
N/A OSHA Citations and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and
COR
2.9.8
N/A Contractor safety records
Upon request. KO and
COR
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies
2.9.9
N/A Safety Certifications
Within 15 calendar days prior to contract start and as old certifications expire.
KO and
COR
2.10
N/A EMS Goals and Policy Measurement Information
Upon request. KO and
COR
2.10.2.1
N/A Class I and II ODS Report
Within 24 hours following delivery of refrigerant to
DLA
KO and
COR
2 As required
2.10.2.5 N/A Spill Report As Specified KO and
COR
2 As Specified
2.10.2.6 N/A Emergency
Planning and Community Right- To-Know Act (EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
2 As specified
2.10.2.6 N/A Contractor
Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
2 Annually
2.10.2.10 N/A Asbestos
Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO and
COR
2.10.3
N/A Sustainable Procurement and Practices Plan
Within 15 calendar days prior to contract start and within
15 calendar days after exercised option periods.
KO and
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies
2.10.3
N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period.
KO and
2.10.3.2
N/A Recovered Material Certification
As specified KO and
COR
2 When a product containing recovered materials is equal to or better than the original and could be used.
2.11
N/A Mission Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
2.13.1
N/A Notification to the Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude Estimate
Within two hours of identification
KO and
2 As required
2.13.1
N/A Detailed Scope of Work and Detailed Estimate
Within two work days
KO and
2 As required
2.14
N/A Non-Recurring Work Proposals
Within two working days following receipt of request
KO 1 As required
2.15 N/A Phase out plan Within 90 days
after award
KO and
COR
1 Annually
3.0 N/A Completion
Reports
As specified COR 1 As Required
3.1 N/A Operation and
Maintenance Program for Digital Controls
Within 15 days after award or changed
KO 1 Annual unless changed
3.1 N/A Operation and
Maintenance Schedule for Digital Controls
Within 15 days after award or changed
KO 1 Annual unless changed
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.2 N/A HVAC and DDC First Workday of
each month
KO 1 Annual unless changed
3.3 N/A Calibration and
Commissioning Within 15 days after award or changed
KO 1 Annual unless changed
3.4 N/A Equipment
Calibration Certificates
Within 15 days of calibration
KO 1 Annual unless changed
3.5 N/A TAB reports
Electronic and Hardcopy
Within 10 days of completion
KO 2 Annual unless changed 4 N/A
Non- Recurring Services Program Summary Report
First work day of each month
KO 1 Monthly