This document provides a Work Breakdown Structure (WBS) for the management and operation of the Y-12 National Security Complex and Pantex Plant. It outlines the program in detailed hierarchical levels from the Secretary of Energy down to specific work packages. Key activities include systems engineering, testing, production, and program management. The WBS identifies budgets and milestones for ongoing life extension programs for warhead systems like the B61, W76, W88, and W80. It also covers ongoing surveillance, maintenance, and certification of the stockpile. The level of detail in the WBS provides contractors and the National Nuclear Security Administration visibility into resource requirements and work scope for operating the Y-12 and Pantex facilities over the fiscal year.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY20 NA10 FI Template 20190903
| Defense Programs (NA-10) |
| FY 2020 FI Template 20191004 |
| By the 7th workday of every month, contractors shall transmit a flatfile with data populated for each WBS-BNR Code-Program Value combination. In many cases, there should be multiple rows for each combination to capture each cost element associated with that combination. In cases where the Cost Element is not "Direct Labor and Fringe," the M&O contractor should identify the type of labor associated with that Cost Element, if asked to do so by the Program Office. |
FY Month Site Contractor Reporting Entity CID Fund Value BNR Code Program Value WBS Labor Category Cost Element Hours Dollar ($) - Cost Encumbrances ($)
COVER PAGE
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J, APPENDIX P
WORK BREAKDOWN STRUCTURE
Note: The WBS may be changed by NNSA at any time via unilaterial administrative contract modification.
FY2021 NA10 CR WBS (CO)
FV B&R
Subtask Code PV FY2021 NA-10
CR WBS (CO)
2020 October 01 (Rev 0.3 20200925) Name FY2021
CR
WBS
| Level | Comments | Execution | Inactivate | STAT Table | GPRA | Control level | Formulation | Cost Plan | Fed WBS | |||||
| n/a | n/a | n/a | EA | Secretary of the Department of Energy | 1 | |||||||||
| n/a | n/a | n/a | EB | NNSA - Under Secretary for Nuclear Security | 1 | |||||||||
| n/a | n/a | n/a | OEB.001 | Weapons Activities | 2 | |||||||||
| n/a | n/a | n/a | OEB.001.001 | Directed Stockpile Work | 3 | X | ||||||||
| n/a | MB0100000 | n/a | OEB.001.001.001 | Life Extension Programs & Major Alterations | 4 | X | ||||||||
| 00900 | MB0101000 | 9002868 | OEB.001.001.001.001 | B61 LEP | 5 | X | X | |||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.300 | B61 LEP | 6 | X | X | X | ||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.400 | B61 LEP | 6 | X | X | X | ||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.600 | B61 LEP | 6 | X | X | X | ||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.001 | Systems Engineering & Integration | 6 | X | X | |||||||
| n/a | n/a | n/a | OEB.001.001.001.001.001.001 | Systems Integration & Requirements Management | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.001.001.001 | Systems Integration & Requirements Management | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.001.001.002 | Systems Integration & Requirements Management | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.001.001.003 | Systems Integration & Requirements Management | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.001.001.004 | Systems Integration & Requirements Management | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.001.001.005 | Systems Integration & Requirements Management | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.001.001.006 | Systems Integration & Requirements Management | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.001.002 | Systems Engineering Design & Modeling | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.001.002.001 | Systems Engineering Design & Modeling | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.001.002.002 | Systems Engineering Design & Modeling | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.001.002.003 | Systems Engineering Design & Modeling | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.001.002.004 | Systems Engineering Design & Modeling | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.001.002.005 | Systems Engineering Design & Modeling | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.001.002.006 | Systems Engineering Design & Modeling | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.001.003 | SE&I/General | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.001.003.001 | SE&I/General | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.001.003.002 | SE&I/General | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.001.003.003 | SE&I/General | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.001.003.004 | SE&I/General | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.001.003.005 | SE&I/General | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.001.003.006 | SE&I/General | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.001.004 | SE&I/Systems Engineering | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.001.004.001 | SE&I/Systems Engineering | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.001.004.002 | SE&I/Systems Engineering | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.001.004.003 | SE&I/Systems Engineering | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.001.004.004 | SE&I/Systems Engineering | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.001.004.005 | SE&I/Systems Engineering | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.001.004.006 | SE&I/Systems Engineering | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.001.005 | SE&I/Systems Support & Hardware | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.001.005.001 | SE&I/Systems Support & Hardware | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.001.005.002 | SE&I/Systems Support & Hardware | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.001.005.003 | SE&I/Systems Support & Hardware | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.001.005.004 | SE&I/Systems Support & Hardware | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.001.005.005 | SE&I/Systems Support & Hardware | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.001.005.006 | SE&I/Systems Support & Hardware | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.001.006 | SE&I/Systems Development Assembly & Testing | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.001.006.001 | SE&I/Systems Development Assembly & Testing | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.001.006.002 | SE&I/Systems Development Assembly & Testing | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.001.006.003 | SE&I/Systems Development Assembly & Testing | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.001.006.004 | SE&I/Systems Development Assembly & Testing | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.001.006.005 | SE&I/Systems Development Assembly & Testing | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.001.006.006 | SE&I/Systems Development Assembly & Testing | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.001.007 | SE&I/Systems Analysis & Support | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.001.007.001 | SE&I/Systems Analysis & Support | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.001.007.002 | SE&I/Systems Analysis & Support | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.001.007.003 | SE&I/Systems Analysis & Support | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.001.007.004 | SE&I/Systems Analysis & Support | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.001.007.005 | SE&I/Systems Analysis & Support | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.001.007.006 | SE&I/Systems Analysis & Support | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.001.008 | Other - Systems Engineering & Integration Activities | 7 | |||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.001.008.001 | Other - Systems Engineering & Integration Activities | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.001.008.002 | Other - Systems Engineering & Integration Activities | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.001.008.003 | Other - Systems Engineering & Integration Activities | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.002 | Systems Test & Qualification | 6 | X | X | |||||||
| n/a | n/a | n/a | OEB.001.001.001.001.002.001 | Systems Development Test | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.002.001.001 | Systems Development Test | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.002.001.002 | Systems Development Test | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.002.001.003 | Systems Development Test | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.002.001.004 | Systems Development Test | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.002.001.005 | Systems Development Test | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.002.001.006 | Systems Development Test | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.002.002 | Systems Qualification Test | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.002.002.001 | Systems Qualification Test | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.002.002.002 | Systems Qualification Test | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.002.002.003 | Systems Qualification Test | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.002.002.004 | Systems Qualification Test | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.002.002.005 | Systems Qualification Test | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.002.002.006 | Systems Qualification Test | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.002.003 | Systems Qualification Integration | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.002.003.001 | Systems Qualification Integration | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.002.003.002 | Systems Qualification Integration | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.002.003.003 | Systems Qualification Integration | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.002.003.004 | Systems Qualification Integration | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.002.003.005 | Systems Qualification Integration | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.002.003.006 | Systems Qualification Integration | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.002.004 | Component Development Support | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.002.004.001 | Component Development Support | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.002.004.002 | Component Development Support | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.002.004.003 | Component Development Support | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.002.004.004 | Component Development Support | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.002.004.005 | Component Development Support | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.002.004.006 | Component Development Support | 8 | X | ||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.002.005 | Other - Systems Test & Qualification Activities | 7 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.002.006 | Other - Systems Test & Qualification Activities | 7 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.002.007 | Other - Systems Test & Qualification Activities | 7 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.002.008 | Other - Systems Test & Qualification Activities | 7 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.002.009 | Other - Systems Test & Qualification Activities | 7 | |||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.002.009.001 | Other - Systems Test & Qualification Activities | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.002.009.002 | Other - Systems Test & Qualification Activities | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.002.009.003 | Other - Systems Test & Qualification Activities | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.003 | Systems Surveillance Development | 6 | X | X | |||||||
| n/a | n/a | n/a | OEB.001.001.001.001.003.001 | Surveillance Test Program Development | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.003.001.001 | Surveillance Test Program Development | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.003.001.002 | Surveillance Test Program Development | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.003.001.003 | Surveillance Test Program Development | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.003.001.004 | Surveillance Test Program Development | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.003.001.005 | Surveillance Test Program Development | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.003.001.006 | Surveillance Test Program Development | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.003.002 | Joint Test Assembly (JTA) Development | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.003.002.001 | Joint Test Assembly (JTA) Development | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.003.002.002 | Joint Test Assembly (JTA) Development | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.003.002.003 | Joint Test Assembly (JTA) Development | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.003.002.004 | Joint Test Assembly (JTA) Development | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.003.002.005 | Joint Test Assembly (JTA) Development | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.003.002.006 | Joint Test Assembly (JTA) Development | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.003.003 | Retrofit Evaluation System Test (REST) | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.003.003.001 | Retrofit Evaluation System Test (REST) | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.003.003.002 | Retrofit Evaluation System Test (REST) | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.003.003.003 | Retrofit Evaluation System Test (REST) | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.003.003.004 | Retrofit Evaluation System Test (REST) | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.003.003.005 | Retrofit Evaluation System Test (REST) | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.003.003.006 | Retrofit Evaluation System Test (REST) | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.003.004 | Surveillance Components | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.003.004.001 | Surveillance Components | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.003.004.002 | Surveillance Components | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.003.004.003 | Surveillance Components | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.003.004.004 | Surveillance Components | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.003.004.005 | Surveillance Components | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.003.004.006 | Surveillance Components | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.003.005 | Other - Systems Surveillance Activities | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.003.005.001 | Other - Systems Surveillance Activities | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.003.005.002 | Other - Systems Surveillance Activities | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.003.005.003 | Other - Systems Surveillance Activities | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.003.005.004 | Other - Systems Surveillance Activities | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.003.005.005 | Other - Systems Surveillance Activities | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.003.005.006 | Other - Systems Surveillance Activities | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.004 | Systems Production | 6 | X | X | |||||||
| n/a | n/a | n/a | OEB.001.001.001.001.004.001 | War Reserve (WR) Assembly | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.004.001.001 | War Reserve (WR) Assembly | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.004.001.002 | War Reserve (WR) Assembly | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.004.001.003 | War Reserve (WR) Assembly | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.004.001.004 | War Reserve (WR) Assembly | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.004.001.005 | War Reserve (WR) Assembly | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.004.001.006 | War Reserve (WR) Assembly | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.004.002 | Trainers & Handling Gear | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.004.002.001 | Trainers & Handling Gear | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.004.002.002 | Trainers & Handling Gear | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.004.002.003 | Trainers & Handling Gear | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.004.002.004 | Trainers & Handling Gear | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.004.002.005 | Trainers & Handling Gear | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.004.002.006 | Trainers & Handling Gear | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.004.003 | Dis-LEP Activities | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.004.003.001 | Dis-LEP Activities | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.004.003.002 | Dis-LEP Activities | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.004.003.003 | Dis-LEP Activities | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.004.003.004 | Dis-LEP Activities | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.004.003.005 | Dis-LEP Activities | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.004.003.006 | Dis-LEP Activities | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.004.004 | Other - Systems Production Activities | 7 | |||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.004.004.001 | Other - Systems Production Activities | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.004.004.002 | Other - Systems Production Activities | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.004.004.003 | Other - Systems Production Activities | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.005 | Nuclear Components | 6 | X | X | |||||||
| n/a | n/a | n/a | OEB.001.001.001.001.005.001 | Primary | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.005.001.001 | Primary | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.005.001.002 | Primary | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.005.001.003 | Primary | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.005.001.004 | Primary | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.005.001.005 | Primary | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.005.001.006 | Primary | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.005.002 | Secondary | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.005.002.001 | Secondary | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.005.002.002 | Secondary | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.005.002.003 | Secondary | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.005.002.004 | Secondary | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.005.002.005 | Secondary | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.005.002.006 | Secondary | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.005.003 | Other Nuclear Explosive Package (NEP) Components | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.005.003.001 | Other Nuclear Explosive Package (NEP) Components | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.005.003.002 | Other Nuclear Explosive Package (NEP) Components | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.005.003.003 | Other Nuclear Explosive Package (NEP) Components | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.005.003.004 | Other Nuclear Explosive Package (NEP) Components | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.005.003.005 | Other Nuclear Explosive Package (NEP) Components | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.005.003.006 | Other Nuclear Explosive Package (NEP) Components | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.005.004 | Gas Transfer System (GTS) | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.005.004.001 | Gas Transfer System (GTS) | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.005.004.002 | Gas Transfer System (GTS) | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.005.004.003 | Gas Transfer System (GTS) | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.005.004.004 | Gas Transfer System (GTS) | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.005.004.005 | Gas Transfer System (GTS) | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.005.004.006 | Gas Transfer System (GTS) | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.005.005 | Gas Transfer System (GTS) PPI Loading | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.005.005.001 | Gas Transfer System (GTS) PPI Loading | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.005.005.002 | Gas Transfer System (GTS) PPI Loading | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.005.005.003 | Gas Transfer System (GTS) PPI Loading | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.005.005.004 | Gas Transfer System (GTS) PPI Loading | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.005.005.005 | Gas Transfer System (GTS) PPI Loading | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.005.005.006 | Gas Transfer System (GTS) PPI Loading | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.005.006 | Other - Nuclear Components Activities | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.005.006.001 | Other - Nuclear Components Activities | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.005.006.002 | Other - Nuclear Components Activities | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.005.006.003 | Other - Nuclear Components Activities | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.005.006.004 | Other - Nuclear Components Activities | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.005.006.005 | Other - Nuclear Components Activities | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.005.006.006 | Other - Nuclear Components Activities | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006 | Non-Nuclear Components | 6 | X | X | |||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.001 | Arming | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.001.001 | Arming | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.001.002 | Arming | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.001.003 | Arming | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.001.004 | Arming | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.001.005 | Arming | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.001.006 | Arming | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.002 | Arming/1-2 Adapters | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.002.001 | Arming/1-2 Adapters | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.002.002 | Arming/1-2 Adapters | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.002.003 | Arming/1-2 Adapters | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.002.004 | Arming/1-2 Adapters | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.002.005 | Arming/1-2 Adapters | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.002.006 | Arming/1-2 Adapters | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.003 | Arming/Junction Box | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.003.001 | Arming/Junction Box | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.003.002 | Arming/Junction Box | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.003.003 | Arming/Junction Box | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.003.004 | Arming/Junction Box | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.003.005 | Arming/Junction Box | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.003.006 | Arming/Junction Box | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.004 | Arming/Pullout Switch Assembly | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.004.001 | Arming/Pullout Switch Assembly | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.004.002 | Arming/Pullout Switch Assembly | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.004.003 | Arming/Pullout Switch Assembly | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.004.004 | Arming/Pullout Switch Assembly | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.004.005 | Arming/Pullout Switch Assembly | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.004.006 | Arming/Pullout Switch Assembly | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.005 | Arming/Weapon Control Unit | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.005.001 | Arming/Weapon Control Unit | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.005.002 | Arming/Weapon Control Unit | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.005.003 | Arming/Weapon Control Unit | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.005.004 | Arming/Weapon Control Unit | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.005.005 | Arming/Weapon Control Unit | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.005.006 | Arming/Weapon Control Unit | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.006 | Fuzing | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.006.001 | Fuzing | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.006.002 | Fuzing | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.006.003 | Fuzing | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.006.004 | Fuzing | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.006.005 | Fuzing | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.006.006 | Fuzing | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.007 | Fuzing/Impact Sensor | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.007.001 | Fuzing/Impact Sensor | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.007.002 | Fuzing/Impact Sensor | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.007.003 | Fuzing/Impact Sensor | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.007.004 | Fuzing/Impact Sensor | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.007.005 | Fuzing/Impact Sensor | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.007.006 | Fuzing/Impact Sensor | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.008 | Fuzing/Nose Bomb Subassembly | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.008.001 | Fuzing/Nose Bomb Subassembly | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.008.002 | Fuzing/Nose Bomb Subassembly | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.008.003 | Fuzing/Nose Bomb Subassembly | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.008.004 | Fuzing/Nose Bomb Subassembly | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.008.005 | Fuzing/Nose Bomb Subassembly | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.008.006 | Fuzing/Nose Bomb Subassembly | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.009 | Fuzing/Preflight Bomb Subassembly | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.009.001 | Fuzing/Preflight Bomb Subassembly | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.009.002 | Fuzing/Preflight Bomb Subassembly | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.009.003 | Fuzing/Preflight Bomb Subassembly | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.009.004 | Fuzing/Preflight Bomb Subassembly | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.009.005 | Fuzing/Preflight Bomb Subassembly | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.009.006 | Fuzing/Preflight Bomb Subassembly | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.010 | Fuzing/Preflight Controller | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.010.001 | Fuzing/Preflight Controller | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.010.002 | Fuzing/Preflight Controller | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.010.003 | Fuzing/Preflight Controller | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.010.004 | Fuzing/Preflight Controller | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.010.005 | Fuzing/Preflight Controller | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.010.006 | Fuzing/Preflight Controller | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.011 | Fuzing/Radar Antenna | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.011.001 | Fuzing/Radar Antenna | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.011.002 | Fuzing/Radar Antenna | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.011.003 | Fuzing/Radar Antenna | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.011.004 | Fuzing/Radar Antenna | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.011.005 | Fuzing/Radar Antenna | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.011.006 | Fuzing/Radar Antenna | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.012 | Fuzing/Radar System | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.012.001 | Fuzing/Radar System | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.012.002 | Fuzing/Radar System | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.012.003 | Fuzing/Radar System | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.012.004 | Fuzing/Radar System | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.012.005 | Fuzing/Radar System | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.012.006 | Fuzing/Radar System | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.013 | Firing | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.013.001 | Firing | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.013.002 | Firing | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.013.003 | Firing | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.013.004 | Firing | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.013.005 | Firing | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.013.006 | Firing | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.014 | Neutron Generator (NG) | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.014.001 | Neutron Generator (NG) | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.014.002 | Neutron Generator (NG) | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.014.003 | Neutron Generator (NG) | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.014.004 | Neutron Generator (NG) | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.014.005 | Neutron Generator (NG) | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.014.006 | Neutron Generator (NG) | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.015 | Safety Components | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.015.001 | Safety Components | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.015.002 | Safety Components | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.015.003 | Safety Components | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.015.004 | Safety Components | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.015.005 | Safety Components | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.015.006 | Safety Components | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.016 | Safety Components/Capacitive Discharge Unit (CDU) Strong Link Intent (ISL) | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.016.001 | Safety Components/Capacitive Discharge Unit (CDU) Strong Link Intent (ISL) | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.016.002 | Safety Components/Capacitive Discharge Unit (CDU) Strong Link Intent (ISL) | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.016.003 | Safety Components/Capacitive Discharge Unit (CDU) Strong Link Intent (ISL) | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.016.004 | Safety Components/Capacitive Discharge Unit (CDU) Strong Link Intent (ISL) | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.016.005 | Safety Components/Capacitive Discharge Unit (CDU) Strong Link Intent (ISL) | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.016.006 | Safety Components/Capacitive Discharge Unit (CDU) Strong Link Intent (ISL) | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.017 | Safety Components/CDU Strong Link - Trajectory (TSL) | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.017.001 | Safety Components/CDU Strong Link - Trajectory (TSL) | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.017.002 | Safety Components/CDU Strong Link - Trajectory (TSL) | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.017.003 | Safety Components/CDU Strong Link - Trajectory (TSL) | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.017.004 | Safety Components/CDU Strong Link - Trajectory (TSL) | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.017.005 | Safety Components/CDU Strong Link - Trajectory (TSL) | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.017.006 | Safety Components/CDU Strong Link - Trajectory (TSL) | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.018 | Safety Components/Electrical Contact Strong Link (ECSL) | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.018.001 | Safety Components/Electrical Contact Strong Link (ECSL) | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.018.002 | Safety Components/Electrical Contact Strong Link (ECSL) | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.018.003 | Safety Components/Electrical Contact Strong Link (ECSL) | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.018.004 | Safety Components/Electrical Contact Strong Link (ECSL) | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.018.005 | Safety Components/Electrical Contact Strong Link (ECSL) | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.018.006 | Safety Components/Electrical Contact Strong Link (ECSL) | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.019 | Safety Components/Magnetically Coupled Strong Link (MCSL) | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.019.001 | Safety Components/Magnetically Coupled Strong Link (MCSL) | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.019.002 | Safety Components/Magnetically Coupled Strong Link (MCSL) | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.019.003 | Safety Components/Magnetically Coupled Strong Link (MCSL) | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.019.004 | Safety Components/Magnetically Coupled Strong Link (MCSL) | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.019.005 | Safety Components/Magnetically Coupled Strong Link (MCSL) | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.019.006 | Safety Components/Magnetically Coupled Strong Link (MCSL) | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.020 | Safety Components/Rolamite Assembly | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.020.001 | Safety Components/Rolamite Assembly | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.020.002 | Safety Components/Rolamite Assembly | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.020.003 | Safety Components/Rolamite Assembly | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.020.004 | Safety Components/Rolamite Assembly | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.020.005 | Safety Components/Rolamite Assembly | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.020.006 | Safety Components/Rolamite Assembly | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.021 | Structural Components | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.021.001 | Structural Components | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.021.002 | Structural Components | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.021.003 | Structural Components | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.021.004 | Structural Components | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.021.005 | Structural Components | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.021.006 | Structural Components | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.022 | Structural Components/Center Case | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.022.001 | Structural Components/Center Case | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.022.002 | Structural Components/Center Case | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.022.003 | Structural Components/Center Case | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.022.004 | Structural Components/Center Case | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.022.005 | Structural Components/Center Case | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.022.006 | Structural Components/Center Case | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.023 | Structural Components/Foam, Pads & Rings | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.023.001 | Structural Components/Foam, Pads & Rings | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.023.002 | Structural Components/Foam, Pads & Rings | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.023.003 | Structural Components/Foam, Pads & Rings | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.023.004 | Structural Components/Foam, Pads & Rings | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.023.005 | Structural Components/Foam, Pads & Rings | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.023.006 | Structural Components/Foam, Pads & Rings | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.024 | Structural Components/System Cables & Lightning Arrestor Connector (LAC) | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.024.001 | Structural Components/System Cables & Lightning Arrestor Connector (LAC) | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.024.002 | Structural Components/System Cables & Lightning Arrestor Connector (LAC) | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.024.003 | Structural Components/System Cables & Lightning Arrestor Connector (LAC) | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.024.004 | Structural Components/System Cables & Lightning Arrestor Connector (LAC) | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.024.005 | Structural Components/System Cables & Lightning Arrestor Connector (LAC) | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.024.006 | Structural Components/System Cables & Lightning Arrestor Connector (LAC) | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.025 | Power Systems | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.025.001 | Power Systems | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.025.002 | Power Systems | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.025.003 | Power Systems | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.025.004 | Power Systems | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.025.005 | Power Systems | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.025.006 | Power Systems | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.026 | Power Systems/Batteries | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.026.001 | Power Systems/Batteries | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.026.002 | Power Systems/Batteries | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.026.003 | Power Systems/Batteries | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.026.004 | Power Systems/Batteries | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.026.005 | Power Systems/Batteries | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.026.006 | Power Systems/Batteries | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.027 | Other Components/General | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.027.001 | Other Components/General | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.027.002 | Other Components/General | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.027.003 | Other Components/General | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.027.004 | Other Components/General | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.027.005 | Other Components/General | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.027.006 | Other Components/General | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.028 | Other Components/Application-Specific Integrated Circuits (ASICs) | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.028.001 | Other Components/Application-Specific Integrated Circuits (ASICs) | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.028.002 | Other Components/Application-Specific Integrated Circuits (ASICs) | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.028.003 | Other Components/Application-Specific Integrated Circuits (ASICs) | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.028.004 | Other Components/Application-Specific Integrated Circuits (ASICs) | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.028.005 | Other Components/Application-Specific Integrated Circuits (ASICs) | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.028.006 | Other Components/Application-Specific Integrated Circuits (ASICs) | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.029 | Other Components/Capacitors | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.029.001 | Other Components/Capacitors | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.029.002 | Other Components/Capacitors | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.029.003 | Other Components/Capacitors | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.029.004 | Other Components/Capacitors | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.029.005 | Other Components/Capacitors | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.029.006 | Other Components/Capacitors | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.030 | Other Components/Coded Switch Assembly | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.030.001 | Other Components/Coded Switch Assembly | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.030.002 | Other Components/Coded Switch Assembly | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.030.003 | Other Components/Coded Switch Assembly | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.030.004 | Other Components/Coded Switch Assembly | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.030.005 | Other Components/Coded Switch Assembly | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.030.006 | Other Components/Coded Switch Assembly | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.031 | Other Components/Critical Function Control Switch (CFCS) | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.031.001 | Other Components/Critical Function Control Switch (CFCS) | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.031.002 | Other Components/Critical Function Control Switch (CFCS) | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.031.003 | Other Components/Critical Function Control Switch (CFCS) | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.031.004 | Other Components/Critical Function Control Switch (CFCS) | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.031.005 | Other Components/Critical Function Control Switch (CFCS) | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.031.006 | Other Components/Critical Function Control Switch (CFCS) | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.032 | Other Components/Electronics Assembly | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.032.001 | Other Components/Electronics Assembly | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.032.002 | Other Components/Electronics Assembly | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.032.003 | Other Components/Electronics Assembly | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.032.004 | Other Components/Electronics Assembly | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.032.005 | Other Components/Electronics Assembly | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.032.006 | Other Components/Electronics Assembly | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.033 | Other Components/Explosives | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.033.001 | Other Components/Explosives | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.033.002 | Other Components/Explosives | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.033.003 | Other Components/Explosives | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.033.004 | Other Components/Explosives | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.033.005 | Other Components/Explosives | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.033.006 | Other Components/Explosives | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.034 | Other Components/Frequency Devices | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.034.001 | Other Components/Frequency Devices | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.034.002 | Other Components/Frequency Devices | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.034.003 | Other Components/Frequency Devices | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.034.004 | Other Components/Frequency Devices | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.034.005 | Other Components/Frequency Devices | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.034.006 | Other Components/Frequency Devices | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.035 | Other Components/Fusilli | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.035.001 | Other Components/Fusilli | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.035.002 | Other Components/Fusilli | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.035.003 | Other Components/Fusilli | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.035.004 | Other Components/Fusilli | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.035.005 | Other Components/Fusilli | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.035.006 | Other Components/Fusilli | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.036 | Other Components/Heterojunction Bi-polar Transistors (HBTs) | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.036.001 | Other Components/Heterojunction Bi-polar Transistors (HBTs) | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.036.002 | Other Components/Heterojunction Bi-polar Transistors (HBTs) | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.036.003 | Other Components/Heterojunction Bi-polar Transistors (HBTs) | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.036.004 | Other Components/Heterojunction Bi-polar Transistors (HBTs) | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.036.005 | Other Components/Heterojunction Bi-polar Transistors (HBTs) | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.036.006 | Other Components/Heterojunction Bi-polar Transistors (HBTs) | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.037 | Other Components/Magnetics | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.037.001 | Other Components/Magnetics | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.037.002 | Other Components/Magnetics | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.037.003 | Other Components/Magnetics | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.037.004 | Other Components/Magnetics | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.037.005 | Other Components/Magnetics | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.037.006 | Other Components/Magnetics | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.038 | Other Components/Permissive Action Link (PAL) Simulator | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.038.001 | Other Components/Permissive Action Link (PAL) Simulator | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.038.002 | Other Components/Permissive Action Link (PAL) Simulator | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.038.003 | Other Components/Permissive Action Link (PAL) Simulator | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.038.004 | Other Components/Permissive Action Link (PAL) Simulator | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.038.005 | Other Components/Permissive Action Link (PAL) Simulator | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.038.006 | Other Components/Permissive Action Link (PAL) Simulator | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.039 | Other Components/Power Sources | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.039.001 | Other Components/Power Sources | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.039.002 | Other Components/Power Sources | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.039.003 | Other Components/Power Sources | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.039.004 | Other Components/Power Sources | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.039.005 | Other Components/Power Sources | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.039.006 | Other Components/Power Sources | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.040 | Other Components/Spin Rocket Motor | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.040.001 | Other Components/Spin Rocket Motor | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.040.002 | Other Components/Spin Rocket Motor | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.040.003 | Other Components/Spin Rocket Motor | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.040.004 | Other Components/Spin Rocket Motor | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.040.005 | Other Components/Spin Rocket Motor | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.040.006 | Other Components/Spin Rocket Motor | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.041 | Other Components/Subsystem A | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.041.001 | Other Components/Subsystem A | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.041.002 | Other Components/Subsystem A | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.041.003 | Other Components/Subsystem A | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.041.004 | Other Components/Subsystem A | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.041.005 | Other Components/Subsystem A | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.041.006 | Other Components/Subsystem A | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.042 | Other Components/Switch Tubes | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.042.001 | Other Components/Switch Tubes | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.042.002 | Other Components/Switch Tubes | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.042.003 | Other Components/Switch Tubes | 8 | X | ||||||||
| 00900 | MB0101030 | 2222765 | OEB.001.001.001.001.006.042.004 | Other Components/Switch Tubes | 8 | X | ||||||||
| 00900 | MB0101040 | 2222766 | OEB.001.001.001.001.006.042.005 | Other Components/Switch Tubes | 8 | X | ||||||||
| 00900 | MB0101060 | 2223167 | OEB.001.001.001.001.006.042.006 | Other Components/Switch Tubes | 8 | X | ||||||||
| n/a | n/a | n/a | OEB.001.001.001.001.006.043 | Other - Non-Nuclear Components Activities | 7 | |||||||||
| 00900 | MB0101020 | 2222764 | OEB.001.001.001.001.006.043.001 | Other - Non-Nuclear Components Activities | 8 | X | ||||||||
| 00900 | MB0101021 | 2222971 | OEB.001.001.001.001.006.043.002 | Other - Non-Nuclear Components Activities | 8 | X | ||||||||
| 00900 | MB0101022 | 2222972 | OEB.001.001.001.001.006.043.003 | Other - Non-Nuclear Components Activities | 8 | X |