COVER PAGE
SECTION L, ATTACHMENT J
Small Business Contract Dollars & Percentages
Y-12 & PX SB Goals FY22-31
| Y-12 National Security Complex/Pantex Sites |
| Small Business Contract Dollars & Percentages |
| CATEGORY | Period of Performance | Forecasted Budget | Total Subcontract Base | Total SB | Small Disad. Bus | Woman-Owned SB | Hub-Zone SB | Veteran-Owned SB | Service Disabled Vet. SB |
| FY 2022 Dollars Goal (projected) | Base Period (Year 1) | $2,482,700,000 | | | | | | | |
| FY 2022 % Goal | | | | | | | | | |
| FY 2023 Dollars Goal (projected) | Base Period (Year 2) | $2,524,000,000 |
| FY 2023 % Goal | | |
| FY 2024 Dollars Goal (projected) | Base Period (Year 3) | $2,605,300,000 |
| FY 2024 % Goal | | |
| FY 2025 Dollars Goal (projected) | Base Period (Year 4) | $2,636,700,000 |
| FY 2025 % Goal | | |
| FY 2026 Dollars Goal (projected) | Base Period (Year 5) | $2,598,100,000 |
| FY 2026 % Goal | | |
| FY 2027 Dollars Goal (projected) | Option Period 1 (Year 6) | $2,639,500,000 |
| FY 2027 % Goal | | |
| FY 2028 Dollars Goal (projected) | Option Period 2 (Year 7) | $2,691,000,000 |
| FY 2028 % Goal | | |
| FY 2029 Dollars Goal (projected) | Option Period 3 (Year 8) | $2,722,500,000 |
| FY 2029 % Goal | | |
| FY 2030 Dollars Goal (projected) | Option Period 4 (Year 9) | $2,694,000,000 |
| FY 2030 % Goal | | |
| FY 2031 Dollars Goal (projected) | Option Period 5 (Year 10) | $2,755,600,000 |
| FY 2031 % Goal | | |
| Notes: | | |
| The Offeror shall utilize the "Forecasted Budget" as a basis of estimate for Total Subcontract Base (large and small businesses) and Small Business FY Dollar and % Goals projected in this spreadsheet. | | |
| The "Forecasted Budget" column is represented by the sum of the Forcasted Budget for CLIN 0002 (M&O) and CLIN 0003 (SPP) under Sec L Attachment H - Price and Fee Spreadsheet. | | |
| Offerors are only required to fill in cells highlighted in yellow | | |
BWXT PANTEX
| | | | BWXT PANTEX | | | |
| | | | FISCAL YEARS 2003 THRU 2014 SMALL BUSINESS PROGRAM RESULTS | | | |
| CATEGORY | Total Procurement | Total SB | Small Disad. Bus | Woman-Owned SB | Hub-Zone SB | Veteran-Owned SB | Service Disabled Vet. SB |
| FY 2003 Dollars Goal | $83,832,650 | $50,299,590 | $4,610,796 | $4,610,796 | $150,899 | $0 | $0 |
| FY 2003 Dollars Accomplished | $102,705,715 | $74,018,228 | $12,190,504 | $13,977,439 | $2,426,895 | $0 | $0 |
| FY 2003 % Goal | | 60.00% | 5.50% | 5.50% | 0.18% | 0.00% | 0.00% |
| FY 2003 % Accomplishment | | 74.60% | 12.29% | 14.09% | 2.45% | 0.00% | 0.00% |
| FY 2004 Dollars Goal | $148,442,375 | $89,065,425 | $8,906,542 | $10,390,966 | $1,484,424 | $222,664 | $148,442 |
| FY 2004 Dollars Accomplished | $99,359,856 | $81,684,527 | $14,543,852 | $13,271,503 | $4,200,289 | $13,054,763 | $2,121,633 |
| FY 2004 % Goal | | 60.00% | 6.00% | 7.00% | 1.00% | 0.15% | 0.01% |
| FY 2004 % Accomplishment | | 82.20% | 14.60% | 13.40% | 4.23% | 13.14% | 2.14% |
| FY 2005 Dollars Goal | 160,000,000 | 80,000,000 | 9,600,000 | 11,200,000 | 3,200,000 | 4,800,000 | 1,600,000 |
| FY 2005 Dollars Accomplished | | 107,402,778 | 16,558,665 | 21,347,663 | 5,481,406 | 15,802,107 | 5,097,942 |
| FY 2005 % Goal | | 61.00% | 6.50% | 7.00% | 2.00% | 3.00% | 1.00% |
| FY 2005 % Accomplishment | | 74.20% | 11.40% | 14.80% | 3.80% | 10.90% | 3.50% |
| FY 2006 Dollars Goal | $150,676,000 | $67,050,820 | $6,780,420 | $7,533,800 | $2,260,140 | $6,027,040 | $3,013,520 |
| FY 2006 Dollars Accomplished | | 94,645,754 | 20,414,265 | 23,548,128 | 7,224,788 | 13,585,432 | 2,349,048 |
| FY 2006 % Goal | | 44.5% | 4.5% | 5.0% | 1.5% | 4.0% | 2.0% |
| FY 2006 % Accomplishment | | 79.6% | 17.2% | 19.8% | 6.1% | 11.4% | 2.0% |
| FY 2007 Dollars Goal (projected) | $139,601,000 | $84,458,605 | $9,074,065 | $9,772,070 | $2,792,020 | $4,886,035 | $2,792,020 |
| FY 2007 Dollars Accomplished | $114,612,841 | $75,803,154 | $10,738,219 | $13,343,284 | $3,618,281 | $10,834,072 | $1,350,751 |
| FY 2007 % Goal | | 60.5% | 6.5% | 7.0% | 2.0% | 3.5% | 2.0% |
| FY 2007 % Accomplishment | | 66.10% | 9.40% | 11.60% | 3.20% | 9.50% | 1.20% |
| FY 2008 Dollars Goal (projected) | $133,755,000 | $81,590,550 | $10,700,400 | $12,037,950 | $4,012,650 | $4,012,650 | $4,012,650 |
| FY 2008 Dollars Accomplished | $111,112,976 | $88,788,620 | $12,167,781 | $13,163,565 | $4,645,047 | $12,708,041 | $1,329,280 |
| FY 2008 % Goal | | 61.0% | 8.0% | 9.0% | 3.0% | 4.0% | 3.0% |
| FY 2008 % Accomplishment | | 79.90% | 11.00% | 11.80% | 4.20% | 11.40% | 1.20% |
| FY 2009 Dollars Goal (projected) | $133,755,000 | $81,590,550 | $9,362,850 | $9,362,850 | $4,012,650 | $5,350,200 | $4,012,650 |
| FY 2009 Dollars Accomplished | $109,097,261 | $82,816,605 | $12,712,403 | $15,634,083 | $4,586,423 | $6,348,386 | $589,670 |
| FY 2009 % Goal | | 61.00% | 8.00% | 9.00% | 3.00% | 4.00% | 3.00% |
| FY 2009 % Accomplishment | | 75.90% | 11.70% | 14.30% | 4.20% | 5.80% | 0.50% |
| FY 2010 Dollars Goal (projected) | $125,800,000 | $76,738,000 | $10,064,000 | $11,322,000 | $3,774,000 | $5,032,000 | $3,774,000 |
| FY 2010 Dollars Accomplished | $121,607,247 | $95,060,467 | $20,544,467 | $21,015,368 | $6,413,759 | $5,469,567 | $1,649,463 |
| FY 2010 % Goal | | 61.00% | 8.00% | 9.00% | 3.00% | 4.00% | 3.00% |
| FY 2010 % Accomplishment | | 78.20% | 16.90% | 17.30% | 5.30% | 4.50% | 1.40% |
| FY 2011 Dollars Goal (projected) | $125,800,000 | $76,738,000 | $10,064,000 | $11,322,000 | $3,774,000 | $5,032,000 | $3,774,000 |
| FY 2011 Dollars Accomplished | $111,931,005 | $74,260,072 | $17,945,847 | $19,897,944 | $5,955,338 | $5,697,728 | $1,284,486 |
| FY 2011 % Goal | | 61.00% | 8.00% | 9.00% | 3.00% | 4.00% | 3.00% |
| FY 2011 % Accomplishment | | 66.30% | 16.00% | 17.80% | 5.30% | 5.10% | 1.10% |
| FY 2012 Dollars Goal (projected) | $100,000,000 | $61,000,000 | $8,000,000 | $9,000,000 | $3,000,000 | $4,000,000 | $3,000,000 |
| FY 2012 Dollars Accomplished | $111,413,461 | $82,273,464 | $21,499,039 | $14,837,124 | $9,728,951 | $7,185,210 | $1,760,040 |
| FY 2012 % Goal | | 61.00% | 8.00% | 9.00% | 3.00% | 4.00% | 3.00% |
| FY 2012 % Accomplishment | | 73.85% | 19.30% | 13.32% | 8.73% | 6.45% | 1.58% |
| FY 2013 Dollars Goal (projected) | $100,000,000 | $61,000,000 | $8,000,000 | $9,000,000 | $3,000,000 | $4,000,000 | $3,000,000 |
| FY 2013 Dollars Accomplished | $98,577,179 | $75,727,166 | $21,377,031 | $14,783,051 | $6,643,949 | $6,298,672 | $2,508,058 |
| FY 2013 % Goal | | 61.00% | 8.00% | 9.00% | 3.00% | 4.00% | 3.00% |
| FY 2013 % Accomplishment | | 76.80% | 21.70% | 15.00% | 6.70% | 6.40% | 2.50% |
| FY 2014 Dollars Goal (projected) | $100,000,000 | $65,000,000 | $8,000,000 | $9,000,000 | $3,000,000 | $4,000,000 | $3,000,000 |
| FY 2014 Dollars Accomplished | $59,897,893 | $47,154,889 | $9,004,008 | $11,728,484 | $4,103,316 | $4,828,991 | $1,782,208 |
| FY 2014 % Goal | | 65.00% | 8.00% | 9.00% | 3.00% | 4.00% | 3.00% |
| FY 2014 % Accomplishment | | 78.73% | 15.03% | 19.58% | 6.85% | 8.06% | 2.98% |
SAVANNAH RIVER
| | | | SAVANNAH RIVER PLANT | | | |
| | | | FISCAL YEARS 2003 THRU 2012 SMALL BUSINESS PROGRAM RESULTS & FORECAST | | | |
| CATEGORY | Total Procurement | Total SB | Small Disad. Bus | Woman-Owned SB | Hub-Zone SB | Veteran-Owned SB | Service Disabled Vet. SB |
| FY 2003 Dollars Goal | | | | | | | |
| FY 2003 Dollars Accomplished | | | | | | | |
| FY 2003 % Goal | | | | | | | |
| FY 2003 % Accomplishment | | | | | | | |
| FY 2004 Dollars Goal |
| FY 2004 Dollars Accomplished |
| FY 2004 % Goal |
| FY 2004 % Accomplishment |
| FY 2005 Dollars Goal |
| FY 2005 Dollars Accomplished |
| FY 2005 % Goal |
| FY 2005 % Accomplishment |
| FY 2006 Dollars Goal |
| FY 2006 Dollars Accomplished |
| FY 2006 % Goal |
| FY 2006 % Accomplishment |
| FY 2007 Dollars Goal (projected) |
| FY 2007 Dollars Accomplished |
| FY 2007 % Goal |
| FY 2007 % Accomplishment |
| FY 2012 Dollars Goal (projected) |
| FY 2012 Dollars Accomplished |
| FY 2012 % Goal |
| FY 2012 % Accomplishment |
BWXT-Y12
| BWXT - Y12 |
| FISCAL YEARS 2003 THRU 2012 SMALL BUSINESS PROGRAM RESULTS & FORECAST |
| CATEGORY | Total Procurement | Total SB | Small Disad. Bus | Woman-Owned SB | Hub-Zone SB | Veteran-Owned SB | Service Disabled Vet. SB |
| FY 2003 Dollars Goal | $ 140,172,000.00 | $ 70,086,000.00 | $ 14,017,200.00 | $ 12,615,480.00 | $ 700,860.00 | | |
| FY 2003 Dollars Accomplished | $ 140,627,195.17 | $ 87,048,233.81 | $ 18,000,280.98 | $ 24,047,250.37 | $ 4,921,951.83 | | |
| FY 2003 % Goal | | 50.0% | 10.0% | 9.0% | 0.5% | | |
| FY 2003 % Accomplishment | | 61.9% | 12.8% | 17.1% | 3.5% | | |
| FY 2004 Dollars Goal | $ 226,000,000.00 | $ 142,380,000.00 | $ 29,380,000.00 | $ 39,550,000.00 | $ 9,040,000.00 |
| FY 2004 Dollars Accomplished | $ 171,568,241.23 | $ 114,436,016.90 | $ 26,078,372.67 | $ 28,823,464.53 | $ 9,436,253.27 |
| FY 2004 % Goal | | 63.0% | 13.0% | 17.5% | 4.0% |
| FY 2004 % Accomplishment | | 66.7% | 15.2% | 16.8% | 5.5% |
| FY 2005 Dollars Goal | $ 173,147,055.00 | $ 109,082,644.65 | $ 22,509,117.15 | $ 30,300,734.62 | $ 6,925,882.20 | | |
| FY 2005 Dollars Accomplished | 285,870,951 | 151,921,451 | 33,896,369 | 47,109,695 | 16,801,157 | 5,794,411 | 1,099,080 |
| FY 2005 % Goal | | 63.0% | 13.0% | 17.5% | 4.0% | | |
| FY 2005 % Accomplishment | | 53.1% | 11.9% | 16.5% | 6.9% | 2.00% | 2.00% |
| FY 2006 Dollars Goal | $247,000,000 | $108,680,000 | $24,700,000 | $24,700,000 | $7,410,000 | $7,410,000 | $4,940,000 |
| FY 2006 Dollars Accomplished | $223,878,581 | $121,903,762 | $29,091,373 | $36,016,730 | $10,468,831 | $4,545,249 | $776,278 |
| FY 2006 % Goal | | 44% | 10% | 10% | 3% | 3% | 2% |
| FY 2006 % Accomplishment | | 54.50% | 13% | 16.10% | 4.70% | 2% | 0.30% |
| FY 2007 Dollars Goal (projected) | $277,000,000 | $111,000,000 | $27,700,000 | $27,700,000 | $11,100,000 | $5,540,000 | $4,155,000 |
| FY 2007 Dollars Accomplished | $288,190,296 | $127,760,793 | $30,555,561 | $39,662,177 | $14,135,154 | $5,703,436 | $1,645,854 |
| FY 2007 % Goal | | 40.1% | 10.0% | 10.0% | 4.0% | 2.0% | 1.5% |
| FY 2007 % Accomplishment | | 44.3% | 10.6% | 13.8% | 4.9% | 2.0% | 0.6% |
| FY 2008 Dollars Goal (projected) | $278,000,000 | $125,100,000 | $27,800,000 | $27,800,000 | $11,120,000 | $8,340,000 | $5,560,000 |
| FY 2008 Dollars Accomplished | $299,088,358 | $150,013,298 | $30,738,956 | $40,075,810 | $20,309,661 | $8,670,938 | $3,481,723 |
| FY 2008 % Goal | | 45.00% | 10.00% | 10.00% | 4.00% | 3.00% | 2.00% |
| FY 2008 % Accomplishment | | 50.20% | 10.30% | 13.40% | 6.80% | 2.90% | 1.20% |
| FY 2009 Dollars Goal (projected) | $289,000,000 | $130,050,000 | $28,900,000 | $28,900,000 | $11,560,000 | $8,670,000 | $5,780,000 |
| FY 2009 Dollars Accomplished | $321,827,481 | $173,225,110 | $41,316,932 | $44,966,388 | $16,553,638 | $17,588,921 | $3,321,904 |
| FY 2009 % Goal | | 45.00% | 10.00% | 10.00% | 4.00% | 3.00% | 2.00% |
| FY 2009 % Accomplishment | | 53.80% | 12.80% | 14.00% | 5.10% | 5.50% | 1.00% |
| FY 2010 Dollars Goal (projected) | $325,000,000 | $146,250,000 | $32,500,000 | $32,500,000 | $13,000,000 | $8,125,000 | $3,250,000 |
| FY 2010 Dollars Accomplished | $407,755,839 | $254,979,127 | $44,741,528 | $41,449,155 | $9,974,642 | $10,006,836 | $4,260,270 |
| FY 2010 % Goal | | 45.00% | 10.00% | 10.00% | 4.00% | 2.50% | 1.00% |
| FY 2010 % Accomplishment | | 62.50% | 11.00% | 10.20% | 2.40% | 2.50% | 1.00% |
| FY 2011 Dollars Goal (projected) | $325,000,000 | $146,250,000 | $32,500,000 | $32,500,000 | $13,000,000 | $8,125,000 | $3,250,000 |
| FY 2011 Dollars Accomplished | $346,391,438 | $167,079,415 | $44,256,607 | $38,877,257 | $9,946,960 | $9,361,354 | $5,045,702 |
| FY 2011 % Goal | | 45.00% | 10.00% | 10.00% | 4.00% | 2.50% | 1.00% |
| FY 2011 % Accomplishment | | 48.20% | 12.80% | 11.20% | 2.90% | 2.70% | 1.50% |
| FY 2012 Dollars Goal (projected) | $325,000,000 | $146,250,000 | $35,750,000 | $35,750,000 | $9,750,000 | $6,500,000 | $4,870,000 |
| FY 2012 Dollars Accomplished | $325,736,633 | $146,578,254 | $42,808,864 | $44,244,563 | $6,238,131 | $6,495,274 | $2,887,671 |
| FY 2012 % Goal | | 45.00% | 11.00% | 11.00% | 3.00% | 2.00% | 1.50% |
| FY 2012 % Accomplishment | | 45.00% | 13.14% | 13.58% | 1.92% | 1.99% | 0.89% |
| FY 2013 Dollars Goal (projected) | $325,000,000 | $146,250,000 | $35,750,000 | $35,750,000 | $9,750,000 | $6,500,000 | $4,870,000 |
| FY 2013 Dollars Accomplished | $339,165,720 | $147,422,457 | $47,136,571 | $47,565,427 | $6,614,515 | $12,164,363 | $2,918,772 |
| FY 2013 % Goal | | 45.00% | 11.00% | 11.00% | 3.00% | 2.00% | 1.50% |
| FY 2013 % Accomplishment | | 43.47% | 13.90% | 14.02% | 1.95% | 3.59% | 0.86% |
| FY 2014 Dollars Goal (projected) | $325,000,000 | $146,250,000 | $35,750,000 | $35,750,000 | $9,750,000 | $6,500,000 | $4,870,000 |
| FY 2014 Dollars Accomplished | $191,162,027 | $68,692,890 | $33,191,934 | $31,722,536 | $3,852,830 | $9,522,487 | $3,514,686 |
| FY 2014 % Goal | | 45.00% | 11.00% | 11.00% | 3.00% | 2.00% | 1.50% |
| FY 2014 % Accomplishment | | 35.93% | 17.36% | 16.59% | 2.02% | 4.98% | 1.84% |
BAPL
| BETTIS ATOMIC POWER LABORATORY |
| FISCAL YEARS 2003 THRU 2011 SMALL BUSINESS PROGRAM RESULTS & FORECAST |
| CATEGORY | Total Procurement | Total SB | Small Disad. Bus | Woman-Owned SB | Hub-Zone SB | Veteran-Owned SB | Service Disabled Vet. SB |
| FY 2003 Dollars Goal | $135,949,919 | | | | | | |
| FY 2003 Dollars Accomplished | | $55,542,807 | $3,137,729 | $5,393,019 | $1,080,779 | $1,930,173 | |
| FY 2003 % Goal | | 30% | 1.20% | 1.40% | 0.00% | 0.00% | |
| FY 2003 % Accomplishment | | 40.86%* | 2.30% | 3.97% | 0.80% | 1.40% | |
| FY 2004 Dollars Goal | $147,357,272 | | | | | |
| FY 2004 Dollars Accomplished | | $51,830,510 | $3,242,245 | $6,182,452 | $2,145,468 | $1,455,604 |
| FY 2004 % Goal | | 35% | 1.50% | 1.50% | 0.50% | 1.00% |
| FY 2004 % Accomplishment | | 35.8%* | 2.40% | 4.50% | 1.56% | 1.10% |
| FY 2005 Dollars Goal | $209,000,000 | $73,150,000 | $3,135,000 | $3,135,000 | $1,045,000 | $2,090,000 | $104,500 |
| FY 2005 Dollars Accomplished | $212,082,964 | $86,709,500 | $7,503,370 | $10,107,903 | $6,406,570 | $4,005,094 | $170,093 |
| FY 2005 % Goal | | 35% | 1.50% | 1.50% | 0.50% | 1.00% | 0.05% |
| FY 2005 % Accomplishment | | 40.90% | 3.50% | 4.80% | 3.00% | 1.90% | 0.10% |
| FY 2006 Dollars Goal | $170,000,000 | $59,500,000 | $2,720,000 | $2,890,000 | $1,020,000 | $1,870,000 | $85,000 |
| FY 2006 Dollars Accomplished | $158,809,206 | $53,997,128 | $2,071,615 | $9,943,638 | $1,814,520 | $3,121,231 | $192,059 |
| FY 2006 % Goal | | 35.00% | 1.60% | 1.70% | 0.60% | 1.10% | 0.05% |
| FY 2006 % Accomplishment | | 34.00% | 1.30% | 6.30% | 1.10% | 2.00% | 0.10% |
| FY 2007 Dollars Goal (projected) | $131,400,000 | $42,048,000 | $1,445,400 | $2,628,000 | $788,400 | $1,445,400 | $65,700 |
| FY 2007 Dollars Accomplished | $164,241,375 | $56,731,817 | $7,192,787 | $9,817,238 | $6,057,712 | $2,496,624 | $636,543 |
| FY 2007 % Goal | | 32.0% | 1.1% | 2.0% | 0.6% | 1.1% | 0.0% |
| FY 2007 % Accomplishment | | 34.50% | 4.40% | 6.00% | 3.70% | 1.50% | 0.40% |
| FY 2008 Dollars Goal (projected) | $135,500,000 | $44,850,500 | $4,268,250 | $6,775,000 | $1,490,500 | $149,050 | $1,693,750 |
| FY 2008 Dollars Accomplished | $175,305,149 | $63,985,809 | $7,331,175 | $11,485,836 | $6,041,860 | $2,993,445 | $140,772 |
| FY 2008 % Goal | | 33.10% | 3.15% | 5.00% | 1.10% | 0.11% | 1.25% |
| FY 2008 % Accomplishment | | 36.50% | 4.20% | 6.60% | 3.40% | 1.70% | 0.10% |
| FY 2009 Dollars Goal (projected) | $155,700,000 | $51,536,700 | $4,904,550 | $7,785,000 | $1,712,700 | $171,270 | $1,946,250 |
| FY 2009 Dollars Accomplished | | | | | | | |
| FY 2009 % Goal | | 33.10% | 3.15% | 5.00% | 1.10% | 0.11% | 1.25% |
| FY 2009 % Accomplishment | | | | | | | |
| NNSA Objective | | | | | | | |
| Final Negotiated Goals | | | | | | | |
| *FY'02, '03 & '04 Accomplishments include credit card spend | | | | | | | |
| *VOSB includes Service Disabled Veteran-Owned Small Business (SDVOSB) spend. In FY'05, SDVOSB will be reported separately | | | | | | | |
KAPL
| | | | KAPL | | | |
| | | | FISCAL YEAR 2006-2009 SMALL BUSINESS PROGRAM FORECAST | | | |
| CATEGORY | Total Procurement | Total SB | Small Disad. Bus | Woman-Owned SB | Hub-Zone SB | Veteran-Owned SB | SD Vet. SB |
| FY 2006 Dollars Goal | $204,000,000 | $53,100,000 | $7,200,000 | $10,400,000 | $5,300,000 | $3,000,000 | $650,000 |
| FY 2006 Dollars Accomplished | $124,224,909 | $38,133,227 | $7,613,306 | $9,196,247 | $4,815,642 | $1,809,428 | $544,346 |
| FY 2006 % Goal | | $0 | $0 | $0 | $0 | $0 | $0 |
| FY 2006 % Accomplishment | | $0 | $0 | $0 | $0 | $0 | $0 |
| FY 2007 Dollars Goal (projected) | $107,466,488 | $32,239,946 | $3,223,995 | $5,373,324 | $3,223,995 | $1,504,531 | $429,866 |
| FY 2007 Dollars Accomplished | $142,805,176 | $42,814,953 | $3,216,494 | $12,846,319 | $3,109,060 | $2,909,286 | $321,463 |
| FY 2007 % Goal | | 30.00% | 3.00% | 5.00% | 3.00% | 1.40% | 0.40% |
| FY 2007 % Accomplishment | | 30.00% | 2.30% | 9.00% | 2.20% | 2.00% | 0.20% |
| FY 2008 Dollars Goal (projected) | $133,300,000 | $39,990,000 | $6,665,000 | $9,331,000 | $3,999,000 | $533,200 | $1,866,200 |
| FY 2008 Dollars Accomplished | $120,908,057 | $36,735,532 | $3,368,413 | $8,687,138 | $3,396,821 | $1,632,071 | $170,920 |
| FY 2008 % Goal | | 30.00% | 5.00% | 7.00% | 3.00% | 0.40% | 1.40% |
| FY 2008 % Accomplishment | | 30.40% | 2.80% | 7.20% | 2.80% | 1.30% | 0.10% |
| FY 2009 Dollars Goal (projected) | $130,800,000 | $39,240,000 | $6,540,000 | $9,156,000 | $3,924,000 | $523,200 | $1,831,200 |
| FY 2009 Dollars Accomplished | $35,379,377 | $12,259,321 | $2,048,071 | $1,061,582 | $361,657 | $353,364 | $820 |
| FY 2009 % Goal | | 30.00% | 5.00% | 7.00% | 3.00% | 0.40% | 1.40% |
| FY 2009 % Accomplishment | | 34.70% | 5.80% | 3.00% | 1.00% | 1.00% | 0.00% |
| NNSA Objective | | | | | | | |
| Final Negotiated Goals | | | | | | | |