This document outlines a federal contract opportunity for road reconstruction work on the Lower Brule Sioux Tribe Reservation in South Dakota. The SD TIG BIA10(1) Lower Brule Route 10 project involves reconstructing 13.54 miles of road from mile post 0.0 to the town of Lower Brule. Work will include safety improvements, pulverization, subgrade reconditioning, widening, drainage, paving, and other activities. The contract will use a fixed-price variable scope model, with designated areas receiving full-depth reclamation and variable lengths of widening. The solicitation number is 6982AF20B000025 and is being issued by the Department of Transportation Federal Highway Administration as a full and open competition. The contemplated fixed price for the contract is $16,600,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary.pdf | ||
| A004.pdf | ||
| QnA 10.26.2020.pdf | ||
| QnA 10.22.2020.pdf | ||
| A003.pdf | ||
| A002.pdf | ||
| QnA 10.20.2020.pdf | ||
| QnA 10.19.2020.pdf | ||
| QnA 10.16.2020.pdf | ||
| A001.pdf | ||
| SD TIG BIA 10(1) Lower Brule - V2 tech memo-FINAL.pdf | ||
| SD TIG BIA10(1) Supplemental Package and BIA Plans 8-24-2020.pdf | ||
| 6982AF20B000025.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
0+60.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
1+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
2+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
3+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
4+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
5+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
6+00.00
STA. 0+60.00 TO STA. 6+00.00
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 5:
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 5:
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 182 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
7+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
8+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
8+44.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
9+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
10+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
11+00.00
STA. 7+00.00 TO STA. 11+00.00
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 183 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
12+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
13+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
14+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
15+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
15+60.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
16+00.00
STA. 12+00.00 TO STA. 16+00.00
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 184 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
17+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
18+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
19+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
20+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
21+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
22+00.00
STA. 17+00.00 TO STA. 22+00.00
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-4:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 185 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
23+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
24+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
25+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
26+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
26+50.50
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
27+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
28+00.00
STA. 23+00.00 TO STA. 28+00.00
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 5:
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 5:
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 4:
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 5:
-20:1 -4 :1
-5 :1
-50:1 -50:1 50:1 -50:1
-5:1
-3:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 186 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
29+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
30+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
31+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
32+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
33+00.00
STA. 29+00.00 TO STA. 33+00.00
-20:1 -4 :1
-5 :1
-50:1 -50:1 50:1 -50:1
-3:1
-20:1 -4 :1
-5 :1
-50:1 -50:1 50:1 -50:1
-4 :1
-5 :1
-50:1 -50:1 50:1 -50:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 187 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
34+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
35+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
36+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
37+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
38+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
39+00.00
STA. 34+00.00 TO STA. 39+00.00
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-5:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 188 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
40+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
41+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
42+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
42+68.00
STA. 40+00.00 TO STA. 42+68.00
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 189 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
43+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
44+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
45+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
46+00.00
STA. 43+00.00 TO STA. 46+00.00
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-20:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 190 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
47+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
48+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
49+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
50+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
51+00.00
STA. 47+00.00 TO STA. 51+00.00
3:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 4:
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 191 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
52+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
52+37.86
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
53+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
54+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
55+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
56+00.00
STA. 52+00.00 TO STA. 56+00.00
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-50:1 -50:1 -50:1 -50:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-3 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1-20:1
-3 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 192 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
57+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
58+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
58+58.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
59+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
60+00.00
STA. 57+00.00 TO STA. 60+00.00
-20:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 193 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
61+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
62+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
63+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
64+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
65+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
66+00.00
STA. 61+00.00 TO STA. 66+00.00
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-3 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-3:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 194 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
67+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
68+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
69+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
70+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
70+55.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
71+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
72+00.00
STA. 67+00.00 TO STA. 72+00.00
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 195 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
73+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
74+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
75+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
76+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
77+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
78+00.00
STA. 73+00.00 TO STA. 78+00.00
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 196 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
79+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
80+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
81+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
82+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
83+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
84+00.00
STA. 79+00.00 TO STA. 84+00.00
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
-20:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 197 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
85+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
86+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
87+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
88+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
89+00.00
STA. 85+00.00 TO STA. 89+00.00
-3 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-3 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-3:1
-20:1
-20:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-3:1
-20:1
-4 :1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-3:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-4:1-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 198 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
89+74.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
90+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
91+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
92+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
93+00.00
STA. 89+74.00 TO STA. 93+00.00
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 199 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
94+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
95+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
96+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
97+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
98+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
99+00.00
STA. 94+00.00 TO STA. 99+00.00
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 5:
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 200 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
100+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
101+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
102+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
103+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
104+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
105+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
105+65.00
STA. 100+00.00 TO STA. 105+65.00
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 201 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
105+73.29
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
106+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
107+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
108+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
109+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
110+00.00
STA. 105+73.29 TO STA. 110+00.00
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 4:
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 202 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
111+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
112+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
113+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
114+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
115+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
116+00.00
STA. 111+00.00 TO STA. 116+00.00
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 203 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
117+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
118+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
119+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
120+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
121+00.00
STA. 117+00.00 TO STA. 121+00.00
-3 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-3 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-3 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
-3 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-3 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-3:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 204 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
122+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
123+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
124+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
125+00.00
STA. 122+00.00 TO STA. 125+00.00
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 205 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
126+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
127+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
128+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
129+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
130+00.00
STA. 126+00.00 TO STA. 130+00.00
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 206 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
131+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
131+81.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
132+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
133+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
134+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
135+00.00
STA. 131+00.00 TO STA. 135+00.00
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 207 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
135+55.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
136+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
137+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
138+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
139+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
140+00.00
STA. 135+55.00 TO STA. 140+00.00
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
4:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
4:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 4:
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 208 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
141+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
142+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
143+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
144+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
145+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
146+00.00
STA. 141+00.00 TO STA. 146+00.00
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 209 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
147+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
148+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
148+12.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
149+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
150+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
151+00.00
STA. 147+00.00 TO STA. 151+00.00
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 5:
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
3:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 210 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
152+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
153+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
154+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
155+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
156+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
157+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
158+00.00
STA. 152+00.00 TO STA. 158+00.00
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
-4 :1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 211 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
158+30.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
158+60.76
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
159+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
160+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
161+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
162+00.00
STA. 158+30.00 TO STA. 162+00.00
4:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 4:
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 4:
PAGE OF
DATE: 07/19/19PROJECT NAME: SCALE:
1" = ' VERTICAL
1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.
40 212 343
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
163+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
164+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
164+54.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
165+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
166+00.00
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
167+00.00
STA. 163+00.00 TO STA. 167+00.00
5:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1 4:
4:1 -20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
4:1
-20:1
-5 :1
-50:1 -50:1 -50:1 -50:1
-5:1
-20:1
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .