SD TIG BIA10(1) Xsections.pdf

PDF 20 MB Posted

Attached to
SD TIG BIA10(1) Lower Brule Route 10
Solicitation number
6982AF20B000025
Issued by

About this file

This document outlines a federal contract opportunity for road reconstruction work on the Lower Brule Sioux Tribe Reservation in South Dakota. The SD TIG BIA10(1) Lower Brule Route 10 project involves reconstructing 13.54 miles of road from mile post 0.0 to the town of Lower Brule. Work will include safety improvements, pulverization, subgrade reconditioning, widening, drainage, paving, and other activities. The contract will use a fixed-price variable scope model, with designated areas receiving full-depth reclamation and variable lengths of widening. The solicitation number is 6982AF20B000025 and is being issued by the Department of Transportation Federal Highway Administration as a full and open competition. The contemplated fixed price for the contract is $16,600,000.

View the file

Other files

File Type Posted
Bid Opening Summary.pdf PDF
A004.pdf PDF
QnA 10.26.2020.pdf PDF
QnA 10.22.2020.pdf PDF
A003.pdf PDF
A002.pdf PDF
QnA 10.20.2020.pdf PDF
QnA 10.19.2020.pdf PDF
QnA 10.16.2020.pdf PDF
A001.pdf PDF
SD TIG BIA 10(1) Lower Brule - V2 tech memo-FINAL.pdf PDF
SD TIG BIA10(1) Supplemental Package and BIA Plans 8-24-2020.pdf PDF
6982AF20B000025.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

0+60.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

1+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

2+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

3+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

4+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

5+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

6+00.00

STA. 0+60.00 TO STA. 6+00.00

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 5:

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 5:

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 182 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

7+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

8+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

8+44.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

9+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

10+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

11+00.00

STA. 7+00.00 TO STA. 11+00.00

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 183 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

12+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

13+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

14+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

15+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

15+60.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

16+00.00

STA. 12+00.00 TO STA. 16+00.00

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 184 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

17+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

18+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

19+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

20+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

21+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

22+00.00

STA. 17+00.00 TO STA. 22+00.00

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-4:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 185 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

23+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

24+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

25+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

26+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

26+50.50

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

27+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

28+00.00

STA. 23+00.00 TO STA. 28+00.00

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 5:

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 5:

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 4:

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 5:

-20:1 -4 :1

-5 :1

-50:1 -50:1 50:1 -50:1

-5:1

-3:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 186 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

29+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

30+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

31+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

32+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

33+00.00

STA. 29+00.00 TO STA. 33+00.00

-20:1 -4 :1

-5 :1

-50:1 -50:1 50:1 -50:1

-3:1

-20:1 -4 :1

-5 :1

-50:1 -50:1 50:1 -50:1

-4 :1

-5 :1

-50:1 -50:1 50:1 -50:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 187 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

34+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

35+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

36+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

37+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

38+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

39+00.00

STA. 34+00.00 TO STA. 39+00.00

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-5:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 188 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

40+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

41+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

42+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

42+68.00

STA. 40+00.00 TO STA. 42+68.00

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 189 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

43+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

44+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

45+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

46+00.00

STA. 43+00.00 TO STA. 46+00.00

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-20:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 190 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

47+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

48+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

49+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

50+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

51+00.00

STA. 47+00.00 TO STA. 51+00.00

3:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 4:

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 191 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

52+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

52+37.86

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

53+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

54+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

55+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

56+00.00

STA. 52+00.00 TO STA. 56+00.00

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-50:1 -50:1 -50:1 -50:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-3 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1-20:1

-3 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 192 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

57+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

58+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

58+58.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

59+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

60+00.00

STA. 57+00.00 TO STA. 60+00.00

-20:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 193 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

61+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

62+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

63+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

64+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

65+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

66+00.00

STA. 61+00.00 TO STA. 66+00.00

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-3 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-3:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 194 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

67+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

68+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

69+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

70+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

70+55.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

71+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

72+00.00

STA. 67+00.00 TO STA. 72+00.00

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 195 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

73+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

74+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

75+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

76+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

77+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

78+00.00

STA. 73+00.00 TO STA. 78+00.00

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 196 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

79+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

80+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

81+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

82+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

83+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

84+00.00

STA. 79+00.00 TO STA. 84+00.00

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

-20:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 197 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

85+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

86+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

87+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

88+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

89+00.00

STA. 85+00.00 TO STA. 89+00.00

-3 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-3 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-3:1

-20:1

-20:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-3:1

-20:1

-4 :1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-3:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-4:1-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 198 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

89+74.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

90+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

91+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

92+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

93+00.00

STA. 89+74.00 TO STA. 93+00.00

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 199 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

94+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

95+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

96+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

97+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

98+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

99+00.00

STA. 94+00.00 TO STA. 99+00.00

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 5:

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 200 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

100+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

101+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

102+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

103+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

104+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

105+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

105+65.00

STA. 100+00.00 TO STA. 105+65.00

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 201 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

105+73.29

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

106+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

107+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

108+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

109+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

110+00.00

STA. 105+73.29 TO STA. 110+00.00

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 4:

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 202 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

111+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

112+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

113+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

114+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

115+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

116+00.00

STA. 111+00.00 TO STA. 116+00.00

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 203 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

117+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

118+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

119+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

120+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

121+00.00

STA. 117+00.00 TO STA. 121+00.00

-3 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-3 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-3 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

-3 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-3 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-3:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 204 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

122+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

123+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

124+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

125+00.00

STA. 122+00.00 TO STA. 125+00.00

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 205 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

126+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

127+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

128+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

129+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

130+00.00

STA. 126+00.00 TO STA. 130+00.00

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 206 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

131+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

131+81.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

132+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

133+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

134+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

135+00.00

STA. 131+00.00 TO STA. 135+00.00

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 207 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

135+55.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

136+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

137+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

138+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

139+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

140+00.00

STA. 135+55.00 TO STA. 140+00.00

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

4:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

4:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 4:

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 208 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

141+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

142+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

143+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

144+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

145+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

146+00.00

STA. 141+00.00 TO STA. 146+00.00

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 209 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

147+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

148+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

148+12.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

149+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

150+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

151+00.00

STA. 147+00.00 TO STA. 151+00.00

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 5:

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

3:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 210 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

152+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

153+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

154+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

155+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

156+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

157+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

158+00.00

STA. 152+00.00 TO STA. 158+00.00

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

-4 :1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 211 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

158+30.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

158+60.76

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

159+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

160+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

161+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

162+00.00

STA. 158+30.00 TO STA. 162+00.00

4:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 4:

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 4:

PAGE OF

DATE: 07/19/19PROJECT NAME: SCALE:

1" = ' VERTICAL

1" = ' HORIZONTALBIA HWY 10 RECONSTRUCTION PROJ.

40 212 343

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

163+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

164+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

164+54.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

165+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

166+00.00

0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200

167+00.00

STA. 163+00.00 TO STA. 167+00.00

5:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1 4:

4:1 -20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

4:1

-20:1

-5 :1

-50:1 -50:1 -50:1 -50:1

-5:1

-20:1

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .