This document package includes an amendment to a federal construction contract solicitation and the original solicitation. The amendment modifies several plan sheets and requires acknowledgement by a designated date and time to avoid bid rejection.
The original solicitation is for the SD TIG BIA 10(1) Lower Brule Route 10 project located on the Lower Brule Sioux Tribe reservation in South Dakota. The project reconstructs 13.54 miles of the primary route between Pierre and Lower Brule, including safety improvements, pulverization, subgrade work, drainage, aggregate base, and hot-mix asphalt pavement. The fixed-price variable scope contract has a value of $16.6 million and will be awarded through full and open competition. Work includes designated full-depth reclamation areas and variable lengths without widening or undercut versus with widening and undercut. The Department of Transportation Federal Highway Administration issued the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary.pdf | ||
| A004.pdf | ||
| QnA 10.26.2020.pdf | ||
| QnA 10.22.2020.pdf | ||
| A003.pdf | ||
| QnA 10.20.2020.pdf | ||
| QnA 10.19.2020.pdf | ||
| QnA 10.16.2020.pdf | ||
| A001.pdf | ||
| SD TIG BIA10(1) Xsections.pdf | ||
| SD TIG BIA 10(1) Lower Brule - V2 tech memo-FINAL.pdf | ||
| SD TIG BIA10(1) Supplemental Package and BIA Plans 8-24-2020.pdf | ||
| 6982AF20B000025.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Sheet and Description
B6 B7 B8-B9 B10-B11 B12-B13 B15-B16 B17 B18 B19
Grading Summary
Surfacing Summary
Drainage Summary
Erosion Control Summaries
Removals Summaries
Fence Summaries
Permanent Sign
Summaries
Lighting Summaries
Miscellaneous Summaries Bid Schedule
A0800 41102-1000 PRIME COAT, METHOD 1 (GRADE NC-70, INTERIM
SURFACING) SQYD 101,111 101,111
A0820 41105-0000 BLOTTER TON 900
A0840 41201-0000 TACK COAT TON 103.0 103.0
A0860 60103-0000 CONCRETE, HEADWALL (FOR 5 FEET SPAN, 7
FEET RISE PRECAST CATTLE UNDERPASS) EACH 2 2
A002 A0880 60201-0600 18-INCH PIPE CULVERT LNFT 3,216 3,216
A0900 60201-0800 24-INCH PIPE CULVERT LNFT 238 238
A0920 60201-0800 24-INCH PIPE CULVERT (RCP) LNFT 1,152 1,152
A0940 60201-0900 30-INCH PIPE CULVERT LNFT 134 134
A0960 60201-0900 30-INCH PIPE CULVERT (RCP) LNFT 222 222
A0980 60201-1000 36-INCH PIPE CULVERT LNFT 702 702
A1000 60201-1000 36-INCH PIPE CULVERT (RCP) LNFT 492 492
A1020 60201-1100 42-INCH PIPE CULVERT LNFT 130 130
A1040 60201-1100 42-INCH PIPE CULVERT (RCP) LNFT 936 936
A1060 60201-1200 48-INCH PIPE CULVERT LNFT 528 528
A1080 60201-1200 48-INCH PIPE CULVERT (RCP) LNFT 288 288
A1100 60201-1300 54-INCH PIPE CULVERT (RCP) LNFT 324 324
A1120 60201-1400 60-INCH PIPE CULVERT (RCP) LNFT 282 282
A1140 60201-1500 66-INCH PIPE CULVERT (RCP) LNFT 108 108
A1160 60202-0500 30-INCH EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT (RCP) LNFT 132 132
A1180 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT (RCP) LNFT 174 174
A002 A1200 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT EACH 110 110
A1220 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 2 2
A1240 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (RCP) EACH 22 22
A1260 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT EACH 2 2
A1280 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT (RCP) EACH 4 4
A1300 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 10 10
A1320 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (RCP) EACH 6 6
A1340 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT EACH 2 2
A1360 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT (RCP) EACH 10 10
A1380 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT EACH 6 6
A1400 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT (RCP) EACH 4 4
A1420 60210-1300 END SECTION FOR 54-INCH PIPE CULVERT (RCP) EACH 6 6
A1440 60210-1400 END SECTION FOR 60-INCH PIPE CULVERT (RCP) EACH 8 8
A1460 60210-1500 END SECTION FOR 66-INCH PIPE CULVERT (RCP) EACH 2 2
-O ct -2
5:
P M
MileStone: 397_95% FDR7.2 PerPlan6.307 Date Completed: In Progress
N
SD
\b ia
(1
R oa dw ay
\C A D
D _S he et s\ A dd en du m
A0
-B 2-
B
B
IA
(1
S O
Q _R
1.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES - EXAMPLE 397A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B3TIG BIA 10(1)
Lower Brule Road Hwy 10SD
SHEET
NUMBER
397+00 to 731+00 per plan
Amendment A002
NOTE: REVISED FROM BIA HWY 10 RECONSTRUCTION PROJECT, CMP QUANTITY SHEET, PAGE 149
B 80+00 to 381+92.5 FDR 397+98 to 731+00 4R Per Plan
EXAMPLE 397A - ESTIMATED QUANTITY SHEET
D R
A
IN
A G
E S
U M
M A
R Y
D E
S C
R
IP
T
IO
N
P R
O J E
C T N
A M
E
P C
A S
D A
T E R
E V
IS
E D
P A
G E
A
B
IA
H
W Y
R
E C
O N
S T
R U
C T
IO
N P
R O J E
C T
/1
/2 and item 60210-0600, END SECTION FOR 18-INCH PIPE CULVERT (SAFETY END) to 110 EACH
Revised total quantity of item 60201-0600, 18-INCH PIPE CULVERT (CMP) to 3216 LNFT
Added access culvert at station 674+55, LT from P&P Sheet 144 to table.
ADDENDUM 002
B25 B26 B27-B28 B29-B30 B31-B32 B34-B35 B36 B37 B38
Grading Summary
Surfacing Summary
Drainage Summary
Erosion Control Summaries
Removals Summaries
Fence Summaries
Permanent Sign
Summaries
Lighting Summaries
Miscellaneous Summaries Bid Schedule
A0820 41102-1000 PRIME COAT, METHOD 1 (GRADE NC-70, INTERIM
SURFACING) SQYD 96,211 96,211
A0840 41105-0000 BLOTTER TON 900 As directed by CO
A0860 41201-0000 TACK COAT TON 92.7 92.7
A0880 60103-0000 CONCRETE, HEADWALL (FOR 5 FEET SPAN, 7
FEET RISE PRECAST CULVERT UNDERPASS) EACH 2 2
A002 A0900 60201-0600 18-INCH PIPE CULVERT LNFT 3,216 3,216
A0920 60201-0800 24-INCH PIPE CULVERT LNFT 238 238
A0940 60201-0800 24-INCH PIPE CULVERT (RCP) LNFT 1,128 1,128
A0960 60201-0900 30-INCH PIPE CULVERT LNFT 134 134
A0980 60201-0900 30-INCH PIPE CULVERT (RCP) LNFT 222 222
A1000 60201-1000 36-INCH PIPE CULVERT LNFT 702 702
A1020 60201-1000 36-INCH PIPE CULVERT (RCP) LNFT 492 492
A1040 60201-1100 42-INCH PIPE CULVERT LNFT 130 130
A1060 60201-1100 42-INCH PIPE CULVERT (RCP) LNFT 900 900
A1080 60201-1200 48-INCH PIPE CULVERT LNFT 528 528
A1100 60201-1200 48-INCH PIPE CULVERT (RCP) LNFT 276 276
A1120 60201-1300 54-INCH PIPE CULVERT (RCP) LNFT 276 276
A1140 60201-1400 60-INCH PIPE CULVERT (RCP) LNFT 282 282
A1160 60201-1500 66-INCH PIPE CULVERT (RCP) LNFT 90 90
A1180 60202-0500 30-INCH EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT (RCP) LNFT 132 132
A1200 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT (RCP) LNFT 174 174
A002 A1220 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT EACH 110 110
A1240 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 2 2
A1260 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (RCP) EACH 22 22
A1280 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT EACH 2 2
A1300 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT (RCP) EACH 4 4
A1320 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 10 10
A1340 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (RCP) EACH 6 6
A1360 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT EACH 2 2
A1380 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT (RCP) EACH 10 10
A1400 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT EACH 6 6
A1420 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT (RCP) EACH 4 4
A1440 60210-1300 END SECTION FOR 54-INCH PIPE CULVERT (RCP) EACH 6 6
A1460 60210-1400 END SECTION FOR 60-INCH PIPE CULVERT (RCP) EACH 8 8
A1480 60210-1500 END SECTION FOR 66-INCH PIPE CULVERT (RCP) EACH 2 2
-O ct -2
5:
P M
MileStone: 540_95% FDR7.2
3RUC2.7
PerPlan3.617
N
SD
\b ia
(1
R oa dw ay
\C A D
D _S he et s\ A dd en du m
A0
-B
-B
B
IA
(1
S O
Q _R
1.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES - EXAMPLE 540A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B22TIG BIA 10(1)
Lower Brule Road Hwy 10SD
SHEET
NUMBER
540+00 to 731+00 per plan
Q U
A N
T
IT
Y S
H E
E T
NOTE: REVISED FROM BIA HWY 10 RECONSTRUCTION PROJECT, CMP QUANTITY SHEET, PAGE 149
0+00 to 381+92.5 FDR 397+98 to 540+00 3R/Undercut 540+00 to 731+00 4R Per Plan
EXAMPLE 540A - ESTIMATED QUANTITY SHEET
B
D E
S C
R
IP
T
IO
N
P R
O J E
C T N
A M
E
P C
A S
D A
T E R
E V
IS
E D
P A
G E
A
B
IA
H
W Y
R
E C
O N
S T
R U
C T
IO
N P
R O J E
C T
/1
/2 and item 60210-0600, END SECTION FOR 18-INCH PIPE CULVERT (SAFETY END) to 110 EACH
Revised total quantity of item 60201-0600, 18-INCH PIPE CULVERT (CMP) to 3216 LNFT
Added access culvert at station 674+55, LT from P&P Sheet 144 to table.
B44 B45 B46-B47 B48-B49 B50-B51 B53-B54 B55 B56 B57
Grading Summary
Surfacing Summary
Drainage Summary
Erosion Control Summaries
Removals Summaries
Fence Summaries
Permanent Sign
Summaries
Lighting Summaries
Miscellaneous Summaries Bid Schedule
A0820 41102-1000 PRIME COAT, METHOD 1 (GRADE NC-70, INTERIM
SURFACING) SQYD 96,210 96,210
A0840 41105-0000 BLOTTER TON 900 900 As directed by CO
A0860 41201-0000 TACK COAT TON 90.0 90.0
A0880 60103-0000 CONCRETE, HEADWALL (FOR 5 FEET SPAN, 7
FEET RISE PRECAST CATTLE UNDERPASS) EACH 2 2
A002 A0900 60201-0600 18-INCH PIPE CULVERT LNFT 3,216 3,216
A0920 60201-0800 24-INCH PIPE CULVERT LNFT 238 238
A0940 60201-0800 24-INCH PIPE CULVERT (RCP) LNFT 1,128 1,128
A0960 60201-0900 30-INCH PIPE CULVERT LNFT 134 134
A0980 60201-0900 30-INCH PIPE CULVERT (RCP) LNFT 222 222
A1000 60201-1000 36-INCH PIPE CULVERT LNFT 702 702
A1020 60201-1000 36-INCH PIPE CULVERT (RCP) LNFT 492 492
A1040 60201-1100 42-INCH PIPE CULVERT LNFT 160 160
A1060 60201-1100 42-INCH PIPE CULVERT (RCP) LNFT 130 130
A1080 60201-1200 48-INCH PIPE CULVERT LNFT 528 528
A1100 60201-1200 48-INCH PIPE CULVERT (RCP) LNFT 276 276
A1120 60201-1300 54-INCH PIPE CULVERT (RCP) LNFT 276 276
A1140 60201-1400 60-INCH PIPE CULVERT (RCP) LNFT 282 282
A1160 60201-1500 66-INCH PIPE CULVERT (RCP) LNFT 90 90
A1180 60202-0500 30-INCH EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT (RCP) LNFT 132 132
A1200 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT (RCP) LNFT 174 174
A002 A1220 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT EACH 110 110
A1240 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (RCP) EACH 22 22
A1260 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 2 2
A1280 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT EACH 2 2
A1300 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT (RCP) EACH 2 2
A1320 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (RCP) EACH 4 4
A1340 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 10 10
A1360 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT EACH 2 2
A1380 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT (RCP) EACH 10 10
A1400 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT EACH 6 6
A1420 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT (RCP) EACH 4 4
A1440 60210-1300 END SECTION FOR 54-INCH PIPE CULVERT (RCP) EACH 6 6
A1460 60210-1400 END SECTION FOR 60-INCH PIPE CULVERT (RCP) EACH 8 8
A1480 60210-1500 END SECTION FOR 66-INCH PIPE CULVERT (RCP) EACH 2 2
-O ct -2
5:
P M
MileStone: 628_95% FDR7.2
3RUC4.4
PerPlan1.932
N
SD
\b ia
(1
R oa dw ay
\C A D
D _S he et s\ A dd en du m
A0
-B
-B
B
IA
(1
S O
Q _R
1.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES - EXAMPLE 628A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B41TIG BIA 10(1)
Lower Brule Road Hwy 10SD
SHEET
NUMBER
628+00 to 731+00 per plan
Q U
A N
T
IT
Y S
H E
E T
NOTE: REVISED FROM BIA HWY 10 RECONSTRUCTION PROJECT, CMP QUANTITY SHEET, PAGE 149
0+00 to 381+92.5 FDR 397+98 to 628+00 3R/Undercut 628+00 to 731+00 4R Per Plan
EXAMPLE 628A - ESTIMATED QUANTITY SHEET
B
D E
S C
R
IP
T
IO
N
P R
O J E
C T N
A M
E
P C
A S
D A
T E R
E V
IS
E D
P A
G E
A
B
IA
H
W Y
R
E C
O N
S T
R U
C T
IO
N P
R O J E
C T
/1
/2 and item 60210-0600, END SECTION FOR 18-INCH PIPE CULVERT (SAFETY END) to 110 EACH
Revised total quantity of item 60201-0600, 18-INCH PIPE CULVERT (CMP) to 3216 LNFT
Added access culvert at station 674+55, LT from P&P Sheet 144 to table.
5/8 INCH REBAR
STA. 235+67.43, 107.27 FT RT
TBM#23, 1698.12
5/8 INCH REBAR
STA. 244+76.04, 137.71 FT RT
TBM#24, 1706.80
SEED AREA = 6.49 ACRE UNDERCUT = 8132 CU YD
TOTAL 19321 CU YD TOTAL 19321 CU YD
+ TOPSOIL 5234 CU YD + TOPSOIL 5234 CU YD
SUBTOTAL 14087 CU YD EXC: 14087 CU YD
+40% 5635 CU YD
EMB: 8452 CU YD
STA. 227+02 TO STA. 246+58
ELEV = 1700.39
Q25 = 45.7 CFS
ELEV = 1689.65
Q25 = 14.8 CFS
OUTLET - 1674.93
INLET - 1687.51
OUTLET - 1677.65
HINGE - 1677.97
HINGE - 1695.01
INLET - 1695.93
CULVERT WITH (1) FLARED END SECTION
X 24.00', 14 GAGE, CMP�INSTALL 24"
CULVERT WITH (2) 10° CMP ELBOWS
X 160.50', 14 GAGE, CMP �INSTALL 24"
RCP TO CMP TRANSITION�INSTALL (1) 24"
RCP CULVERT WITH (1) FLARED END SECTION
(36.00'CLASS III, 90.00' CLASS IV)
X 126.00'�INSTALL 24"
STA. 246+94.50
SKEW NO. 107
CULVERT WITH (1) FLARED END SECTION
INSTALL 30"� X 20.00', 14 GAGE, CMP
CULVERT WITH (2) 20° CMP ELBOWS
INSTALL 30"� X 56.00', 14 GAGE, CMP
INSTALL (1) 30"� RCP TO CMP TRANSITION
RCP CULVERT WITH (1) FLARED END SECTION
INSTALL 30"� X 90.00', CLASS II
STA. 238+63.00
STA. 249+39 - CL - 72" X 65' RC CATTLE PASS
STA. 246+95 - CL - 18" X 240' CMP
STA. 238+62 - CL - 18" X 159' CMP
STA. 236+55 - CL - 18" X 190' CMP
CULVERTS TO BE REMOVED:
C2
0.42 ACRES
TEMP. CONSTRUCTION EASEMENT
.0
F
T R
T
S T
A .0
.0
F
T R
T
75.00' ROW
75.00' ROW
E = 53.48 FT
L = 1559.56 FT
T = 784.63 FT
R = 5729.58 FT
Dc = 1°00'00.00"
DELTA = 15°35'44"
CURVE DATA - C2
A
1.53 ACRES
TEMP. CONSTRUCTION EASEMENT
0.03 ACRES
RIGHT-OF-WAY EASEMENT
0.51 ACRES
RIGHT-OF-WAY EASEMENT
0.30 ACRES
RIGHT-OF-WAY EASEMENT
0.10 ACRES
RIGHT-OF-WAY EASEMENT
.0
F
T L
T
S T
A .0
.0
F
T L
T
S T
A
.0
F
T L
T
S
A .0
.0
F
T
.0
F
T
A .0
.0
F
T L
T
.0
F
T L
T
S T
A .0
.0
F
T L
T
S T
A .0
.0
F
T
A
.0
F
T
.0
F
T R
T S
T A
.0
F
T R
.0
F
T R
T S
T A .0
.0
F
T R
.0
F
T R
T
S T
A
.0
F
T R
T
ELEV = 1672.11
Q25 = 10 CFS
OUTLET - 1648.60
HINGE - 1648.86
HINGE - 1669.12
INLET - 1670.42
GEOTEXTILE, CLASS 2, TYPE A
WIRE GABION & 20.00 SQ YARD
INSTALL 6.00 CU YD ROCK AND
STA. 238+27, 116.00' RT
GEOTEXTILE, CLASS 2, TYPE A
WIRE GABION & 16.00 SQ YARD
INSTALL 4.50 CU YD ROCK AND
STA. 246+84, 176.00' LT
T.107N., R75W., 5TH PM
NE1/4 & S1/2, SECTION 12
LBST
ALLOT# 343 T 4077
TRACT #10(d)
T.107N., R75W., 5TH PM
NE1/4 & S1/2, SECTION 12
LBST
ALLOT# 343 T 4077
TRACT #10(d) ADDENDUM 002
A
A
235+00
240+00 245+00
250+00
P T S ta
.8
A
18001800
18001800
235+00 240+00 245+00 250+00
P V
C
.0
E le v
.9
P V I .0
E le v
.9
-0.41%
L 1000' e -7.28'
SD 609'
K 172
.8
.4
.0
.6
.2
.8
.4
.0
.3
.0
.1
.7
.7
.1
.9
.1
.8
.4
.0
.6
.2
.7
.3
.9
.2
.0
.1
.7
.6
.0
.8
.1
D E
S C
R
IP
T
IO
N
P R
O J E
C T N
A M
E
P C
A S
D A
T E R
E V
IS
E D
O F
P A
G E
A
B
IA
H
W Y
R
E C
O N
S T
R U
C T
IO
N P
R O J E
C T
P
P S
H E
E T
/2
/2
SKEW NO. 87
WITH (2) FLARED END SECTIONS
48.00' - CLASS III
30.00' - CLASS IV
72.00' - CLASS V
24.00' - CLASS IV
30.00' - CLASS III
INLET TO OUTLET:
ø X 204.00' RCP CULVERTINSTALL 24"
STA. 236+54.50
GEOTEXTILE, CLASS 2, TYPE A
WIRE GABION & 16.00 SQ YARD
INSTALL 4.50 CU YD ROCK AND
STA. 236+91, 130.00' RT
CMP
W
W
CMP
W
WCMP
CMP W
W
W
FOC
TEL
TELTEL
TEL
TELTEL
PED
TEL
RCP
RCP
FOC
TEL
W
CMP
W
W
CMP
TBM#23
W
W
TBM#24
W
TEL
FOC
W
W
W
TEL
TEL
W
TEL
FOC
FOC
FOC
W
W
W
WV
W
WV
W W
B A
L A
N C
E P
N T
S T
A
| topmostSubform[0]: |
| Page1[0]: |
| ContractIDCode[0]: |
| Page[0]: 1 |
| Pages[0]: 7 |
| AmendmentNo[0]: A002 |
| EffectiveDate[0]: 10/20/2020 |
| ReqNumber[0]: |
| ProjectNo[0]: SD TIG BIA 10(1) |
| IssuedBy[0]: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: RYAN PHILLIPS
| Code[0]: 6905001 |
| AdministeredBy[0]: |
| Code[2]: |
| NameandAddress[0]: |
| Code[1]: |
| FacilityCode[0]: |
| CheckBox9[0]: 1 |
| AmendmentNo[1]: 6982AF20B000025 |
| Dated9B[0]: 9/11/2020 |
| CheckBox10[0]: Off |
| ModificationNo[0]: |
| Dated10B[0]: |
| CheckBox11[0]: 1 |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| Copies[0]: 0* |
| AccountingData[0]: |
| CheckBox13A[0]: Off |
| A13[0]: |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| C13[0]: |
| CheckBox13D[0]: Off |
| D13[0]: |
| IsNot[0]: Off |
| Is[0]: 1 |
| CopiesReturned[0]: *See Item 14 |
| Description[0]: PLANS |
Remove and replace pages B3, B8, B22, B27, B41, B46 and 113 with the attached corresponding pages.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| NameandTitleSigner[0]: |
| DateSigned[0]: |
| NameandTitleOfficer[0]: |
| DateSigned[1]: |
File details come from the government source that posted it. Updated .