A001.pdf
PDF 2 MB Posted
- Attached to
- SD TIG BIA10(1) Lower Brule Route 10
- Solicitation number
- 6982AF20B000025
About this file
This document provides details for a federal construction contract solicitation. The solicitation is for the SD TIG BIA 10(1) Lower Brule Route 10 project located on the Lower Brule Sioux Tribe reservation in South Dakota. The project involves reconstructing 13.54 miles of an existing route that serves as the primary connection between the reservation and Pierre, South Dakota. Work will include safety improvements, pulverization, subgrade reconditioning or undercut processing, major widening, earthwork, drainage, aggregate base, and hot-asphalt concrete pavement. The solicitation is for a fixed-price variable scope contract with designated areas for full-depth reclamation and variable lengths for no widening/undercut and major widening/undercut. Sealed bids are due by October 27, 2020. The estimated total fixed price for the project is $16,600,000. The solicitation is being conducted as a full and open competition by the Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary.pdf | ||
| A004.pdf | ||
| QnA 10.26.2020.pdf | ||
| QnA 10.22.2020.pdf | ||
| A003.pdf | ||
| A002.pdf | ||
| QnA 10.20.2020.pdf | ||
| QnA 10.19.2020.pdf | ||
| QnA 10.16.2020.pdf | ||
| SD TIG BIA10(1) Xsections.pdf | ||
| SD TIG BIA 10(1) Lower Brule - V2 tech memo-FINAL.pdf | ||
| SD TIG BIA10(1) Supplemental Package and BIA Plans 8-24-2020.pdf | ||
| 6982AF20B000025.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
NOTICE TO BIDDERS
A-vi
NOTICE: NON-MANDATORY PRE-BID SITE VISIT
This pre-bid meeting notice is being given to solicit contractor interest and to orient contractors with the project site prior to the bid opening. Representatives from the Federal Highway
Administration (FHWA) will conduct a meeting on Thursday, October 8, 2020 from 10:00 a.m.
to approximately 1:00 p.m. FHWA will provide a brief project presentation and be available to answer questions for the balance of the time period. Access to the project roadways is restricted to the public and contractors must contact Toni Rouillard, Superintendent of Roads for the Lower Brule Tribe, at 605-208-0797.
Interested parties will meet at the Lower Brule Tribal Administration Building (187 Oyate Circle, Lower Brule, SD 57548) at 10:00 a.m.
The agenda, sign-in sheet, any questions answered and other information from the pre-bid meeting will be posted to https://beta.sam.gov/ shortly after.
If you would like to attend the pre-bid meeting, please email CFLContracts@dot.gov by
Tuesday, October 6, 2020. Access to the site is restricted and coordination is required prior to visitation.
ATTENDANCE AT THE PROJECT PRE-BID MEETING IS NOT MANDATORY TO
BID THE PROJECT.
Amendment A001 http://www.fbo.gov/ mailto:CFLContracts@dot.gov
NOTICE TO BIDDERS
A-iii
My firm did not have a qualifying Federal Contract in 2019 and is therefore exempt from the reporting requirements
This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of
10% to an apparent low bid submitted by a large business when we also receive a bid from a certified HUBZone small business concern (SBC). This factor will apply to the price per 4R Mile located on page A-9. The 10% factor does not apply to apparent low bids submitted by small businesses. See FAR Clause 52.219-4 Notice of price evaluation preference for HUBZone small business concerns.
In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.236-1, Performance of Work by the Contractor does not apply.
A qualified HUBZone SBC receiving a contract under this solicitation for general construction must:
(i) At least 15 percent of the cost of contract performance to be incurred for personnel will be spent on the prime contractor’s employees;
Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart
102.03 of the FP-14. Bid bonds must be originals and have original signatures and corporate seals.
Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.
ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The
Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:
http://osdbuweb.dot.gov.
Accuracy and Completeness of Bid- The Contractor is fully responsible to verify that all data is correct when an offer is submitted. Failure to properly update your data may cause the offer to be rejected.
Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON OCTOBER 20, 2020
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.beta.sam.gov
Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce
(email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The
Amendment A001 http://osdbuweb.dot.gov/ mailto:CFLContracts@dot.gov http://www.beta.sam.gov/
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
6982AF20B000025
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
09/11/2020
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
SD TIG BIA 10(1)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
Ryan Phillips, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14, U.S. CUSTOMARY UNITS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 10/27/20 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA
FAR (48 CFR) 53.236-1(d)
X
X
X
X
X
A-1 Amendment A001
Submitted by:____________________________________ Construction Cost Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:SD TIG BIA 10(1)
Project Name:Lower Brule Highway 10 Reconstruction
$16,600,000.00
Fixed-Price Variable Scope Mileage Breakdown
Full Depth Reclamation
3R Section1 4R Section2 Total Miles3
Price per 4R Mile4
13.54 $
1: Resurfacing, Restoration and Rehabilitation 2: Resurfacing, Restoration, Rehabilitation and Reconstruction 3: Total Miles (13.54) = Full Depth Reclamation + 3R Section + 4R Section 4: Price per 4R Mile formula is $16,600,000.00 / 4R Section
A-9
The westernmost 7.23 miles of the project, between STA 0+00 and STA 381+92.5, is required to include the Full Depth Reclamation (FDR) typical section. The remaining 6.31 miles, between Station 397+98 and STA 731+00, is the variable scope segment of the project. The variable scope segment of the project is based on how many miles within this segment are proposed by the offeror as 4R, per the typical section in the plans. The balance of miles in the variable scope segment, not proposed by the offeror as 4R, will be constructed per the 3R typical section. The proposed 4R segment must be continuous and end at the end of the project at STA 731+00.
Amendment A001
7.23
B-29 receipt from:
Mr. Joseph Wilson
Contracting Officer
Federal Highway Administration
12300 West Dakota Avenue, Suite 360
Lakewood, Colorado 80228
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 Site Visit (Construction). (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting: Toni Rouillard at 605-208-0797. See page A-vi.
(End of provision)
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far
(End of provision)
52.252-3 Alterations in Solicitation. (APR 1984)
Portions of this solicitation are altered as follows:
Included FAR 52.211-6(e)
(End of provision)
Amendment A001 http://www.acquisition.gov/far
| topmostSubform[0]: |
| Page1[0]: |
| ContractIDCode[0]: |
| Page[0]: 1 |
| Pages[0]: 6 |
| AmendmentNo[0]: A001 |
| EffectiveDate[0]: 09/22/2020 |
| ReqNumber[0]: |
| ProjectNo[0]: SD TIG BIA 10(1) |
| IssuedBy[0]: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: RYAN PHILLIPS
| Code[0]: 6905001 |
| AdministeredBy[0]: |
| Code[2]: |
| NameandAddress[0]: |
| Code[1]: |
| FacilityCode[0]: |
| CheckBox9[0]: 1 |
| AmendmentNo[1]: 6982AF20B000025 |
| Dated9B[0]: 9/11/2020 |
| CheckBox10[0]: Off |
| ModificationNo[0]: |
| Dated10B[0]: |
| CheckBox11[0]: 1 |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| Copies[0]: 0* |
| AccountingData[0]: |
| CheckBox13A[0]: Off |
| A13[0]: |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| C13[0]: |
| CheckBox13D[0]: Off |
| D13[0]: |
| IsNot[0]: Off |
| Is[0]: 1 |
| CopiesReturned[0]: *See Item 14 |
| Description[0]: SECTION A |
Remove and replace pages A-iii, A-1 and A-9 with the attached corresponding pages. Add page A-vi.
SECTION B
Remove and replace page B-29 with the attached corresponding page. Add page A-vi.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| NameandTitleSigner[0]: |
| DateSigned[0]: |
| NameandTitleOfficer[0]: |
| DateSigned[1]: |
File details come from the government source that posted it. Updated .