Scope_of_Services_Engineering_Project_1182-2023.pdf

PDF 82 KB Posted

Attached to
NRCS Emergency Watershed Protection Grant
Solicitation number
ITB 25-092
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This is a Scope of Services document for Engineering Project 1182-2023 issued by the City of Fort Myers for an NRCS Emergency Watershed Protection Grant project (ITB 25-092) focused on comprehensive stream debris and sediment removal across multiple waterways in Lee County, Florida. The City solicits bids for Construction Manager services to perform extensive environmental restoration tasks including non-vegetative debris removal, vegetative debris removal, underwater debris removal, sediment removal, sediment transport, and Ballard bank repair across multiple canal systems. The scope is structured as eight bid tasks: non-vegetative debris removal (cubic yards), vegetative debris removal (cubic yards), underwater debris removal (linear feet), sediment removal (cubic yards), sediment transport (mileage), Ballard bank repair (linear feet), inspection reports (weekly basis), and record drawings (lump sum). The solicitation was released on October 15, 2025, with a pre-submittal meeting scheduled for October 22, 2025, and proposals due on November 17, 2025. All bid tasks are listed with Not-to-Exceed (NTE) pricing structures.

Contractors must provide comprehensive documentation supporting all costs, including invoices for materials, records documenting material types and quantities, daily time records with employee names and wage rates, equipment operating records with hourly rates and actual usage hours, weekly construction progress reports with on-site inspection documentation, and Professional Engineer-certified as-built drawings and quantities. All work must comply with OSHA regulations and the Contract Work Hours and Safety Standards Act. The project includes mandatory MBE participation requirements with a standard goal of 5% for both minority and women-owned businesses, and DBE participation is encouraged. Contractors must maintain SAM.gov registration, provide federal and state compliance certifications, and comply with federal regulations including Buy America provisions, Anti-Lobbying certifications, E-Verify requirements, and Davis-Bacon wage standards. The project is structured as a Construction Manager at Risk (CMAR) agreement funded through the NRCS federal grant, with the selected contractor responsible for managing trade contractors, coordinating with city officials, and controlling project costs while adhering to strict environmental protection guidelines.

View the file

Other files

File Type Posted
NRCS_Emergency_Watershed_Protection_Grant.pdf PDF
NRCS_Emergency_Watershed_Protection_Grant.pdf PDF
CM@R_Contract_draft_10-02-25.pdf PDF
Stream_Debris_Removal__Specs_4.pdf PDF
CFM_EWP_-_Set_6-20-25.pdf PDF
CIty_of_Fort_Myers_Technical_Specifications.pdf PDF
Schedule_Milton_-_Helene_Canal_Clean-up_CFM.pdf PDF
Operation_and_Maintenance_Plan_CFM_4.pdf PDF
Schedule_Milton_-_Helene_Canal_Clean-up_CFM.pdf PDF
Operation_and_Maintenance_Plan_CFM_4.pdf PDF
CFM_EWP_-_Set_6-20-25.pdf PDF
Solicitation_General_Terms_and_Conditions_April_2025_NCS-ara2025.07.10.pdf PDF
Solicitation_General_Terms_and_Conditions_April_2025_NCS-ara2025.07.10.pdf PDF
Stream_Debris_Removal__Specs_4.pdf PDF
CIty_of_Fort_Myers_Technical_Specifications.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
Local_Preference_Affidavit.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
375-030-30-TRUTH_IN_NEGOTIATION_CERTIFICATION.pdf PDF
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
Local_Preference_Affidavit.pdf PDF
Notice_of_Award.docx DOCX document
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
375-030-30-TRUTH_IN_NEGOTIATION_CERTIFICATION.pdf PDF
375-030-32-CERTIFICATION_REGARDING_DEBAREMENT,_SUSPENSION,_INELIGIBILITY..._.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
Notice_of_Award.docx DOCX document
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
Scope_of_Services_Engineering_Project_1182-2023.pdf PDF
w37503050_v001.docm DOCM document
375-030-32-CERTIFICATION_REGARDING_DEBAREMENT,_SUSPENSION,_INELIGIBILITY..._.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
w37503083_(3).docx DOCX document
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Services Engineering Project 1182-2023

Provide all labor and materials for the construction and required grant documentation based on the plans, specifications, and other contract documents.

The following documentation is required to support the City of Fort Myers request for reimbursement of:

a. Invoices covering actual costs of materials used in constructing the eligible EWP project measures.

b. Records documenting the type, quality, and quantities of materials actually used in constructing the eligible EWP project measures.

c. Daily time records for each employee showing name, classification, wage rate, hours, and dates actually employed for constructing the eligible EWP project measures.

d. Equipment operating records showing the type and size of equipment, hourly rate, actual hours of operation and dates used to install the eligible EWP project measures. Equipment idle time is not eligible in-kind construction services, even if on the job site, and should not be included in the equipment operating records.

e. Weekly construction progress reports that include on-site inspections of work accomplished for the period, work planned, problems encountered.

d. Provide PE-certified as-built drawings and quantities for the project.

Construction shall adhere to the following federal requirement: Ensure that all contractors and sub-contractors are performing their work in accordance with OSHA regulations and the Contract Work Hours and Safety Standards Act (40 USC 3701-3708) as supplemented by Department of Labor regulations (29 CFR Part 5).

BID TASKS.

TASK UNITS UNIT COST TOTAL COST (NTE)

1. Non-Vegetative Debris Removal Cubic Yards (NTE)

2. Vegetative Debris Removal Cubic Yards (NTE)

3. Underwater Debris Removal Linear Feet (NTE)

4. Sediment Removal Cubic Yards (NTE)

5. Sediment Transport Mileage (NTE)

6. Ballard Bank Repair Linear Feet (NTE)

7. Inspection Reports Weekly (NTE)

8. Record Drawings Lump Sum