This is an Invitation to Bid (ITB) 25-092 for the NRCS Emergency Watershed Protection Grant issued by the City of Fort Myers, Florida, seeking a Construction Manager to perform watershed protection and stream debris removal services. The project involves various tasks including non-vegetative and vegetative debris removal, underwater debris removal, sediment removal and transport, Ballard bank repair, inspection reports, and record drawings. The solicitation was released on October 15, 2025, with a pre-submittal meeting scheduled for October 22, 2025, and proposals due on November 17, 2025. The City anticipates City Council approval on December 1, 2025. The contract will be funded through a federal grant and is subject to comprehensive federal, state, and local regulations, including FEMA and FDOT requirements.
The solicitation requires comprehensive documentation from bidders, including SAM.gov registration, various federal and state compliance certifications (such as Buy America, Anti-Lobbying, and E-Verify), and proof of business standing. Bidders must demonstrate financial capacity, provide detailed company information, and comply with multiple administrative requirements. While specific pricing details are not explicitly stated, the Schedule of Values includes line items for different types of debris and sediment removal with units of measure like cubic yards and linear feet. The project emphasizes environmental compliance, domestic preference for materials and equipment, and adherence to labor standards, with potential for complex federal oversight and reporting requirements.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 25-092
NRCS Emergency Watershed Protection Grant
The City of Fort Myers Procurement Services utilizes an electronic bidding system to streamline the solicitation process.
City of Fort Myers Procurement Services Website https://procurement.opengov.com/portal/cityftmyers
NRCS Emergency Watershed Protection Grant, ITB 25-092
TABLE OF CONTENTS
1. INTRODUCTION
2. PROJECT DETAILS / SCOPE OF WORK
3. INSTRUCTIONS
4. FEDERAL SUPPLEMENTAL CONDITIONS
5. INSURANCE
6. DEFINITIONS
7. SUBMISSION QUESTIONNAIRE
8. SCHEDULE OF VALUES
1. INTRODUCTION
1.1. Summary
The City of Fort Myers (City) requests submittals from interested and qualified Respondents to provide:
All labor and materials for the construction and required grant documentation based on the plans, specifications, and other contract documents.
1.2. Background
The City of Fort Myers (the “City”), established in 1886, is located on the southern west coast of
Florida. It is the cultural and trade center for Lee County and the surrounding area. The City was built on the site of Fort Harvie and was named for Colonel Abraham Charles Myers, then
Chief Quartermaster of Florida. The City has approximately 1,000 employees serving a population of approximately 96,755 full time permanent residents with a population growth of
12% between 2020 and 2022. According to the Lee County Visitor & Convention Bureau, nearly 4.5 million people visit Fort Myers each year and spend over $4 billion dollars while in the area. Fort Myers has experienced unprecedented growth in its tax base, as the past (3), year-over-year percentage increases, were double digit. The City added a total of $5.0 billion to its tax base over the past five years, or 75.6%.
The City is situated between Tampa and Miami along scenic U.S. Highway 41, also known as
Tamiami Trail. Recent accolades for the City of Fort Myers include top ranking for best places to live, to retire, and to start a new business, safest cities in America, #4 college town in
Florida, and most recently the fastest growing place by U.S News and World Report (2024).
The City of Fort Myers is committed to providing exceptional municipal services to residents, businesses and visitors in a fiscally responsible manner while preserving the City’s rich history, diverse culture, and charming lifestyle.
1.3. Advertisement
ITB 25-092 NRCS Emergency Watershed Protection Grant
The City of Fort Myers is seeking submittals for ITB 25-092 NRCS Emergency Watershed
Protection Grant. Submissions must be received electronically on or before Monday, November
17, 2025 at 2:00 pm. Interested participants are encouraged to download the solicitation documents. For more details visit https://procurement.opengov.com/portal/cityftmyers
CITY OF FORT MYERS
Marty K. Lawing, City Manager Legal Ad: News-Press/OpenGov
Mary Hagemann, City Clerk RUN DATES: Wednesday, October 15,
1.4. Contact Information
Direct inquiries to the following:
Procurement Representative Name
Kirk Zimmerman, NIGP-CPP, CPPB, Senior Procurement Specialist
2200 Second Street
Fort Myers, FL 33901
Email: kzimmerman@fortmyers.gov
Phone: (239) 321-7241
Requesting Department:
Engineering (Public Works)
1.5. OpenGov Portal
The City uses OpenGov (https://procurement.opengov.com/portal/cityftmyers) to administer the competitive solicitation process, including but not limited to soliciting responses, issuing addenda, posting results and issuing notification of an intended decision. There is no charge to register and download the solicitation from OpenGov. Construction Manager is strongly encouraged to read the various Guides and Tutorials available in OpenGov well in advance of their intention of submitting a response to ensure familiarity with the use of OpenGov. The City shall not be responsible for a Construction Manager’s inability to submit a response by the end date and time for any reason, including issues arising from the use of OpenGov.
1.6. Pre-Submittal Meeting
The purpose of a Pre-Submittal Meeting is to review and discuss the solicitation and any addenda as published. A representative from Procurement Services and a representative from the requesting department will be present to discuss the solicitation. The date, time, and location can be found above.
1.7. Timeline
The Proposed timeline for this solicitation (which is subject to change) is:
Solicitation Release Date: October 15, 2025
Pre-Submittal Meeting (Non-Mandatory): October 22, 2025, 2:00pm
Non-Mandatory.
Fort Myers City Hall - Procurement
Conference Room
2200 Second Street, Fort Myers, FL 33901 or Virtually https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2MwMWQyNzMtZDMz
YS00MTlhLWJlZmUtYjdiZWU0ZDQ0OGFh%4
0thread.v2/0?context=%7b%22Tid%22%3 a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%
2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d
Meeting ID: 221 115 225 803 9
Passcode: Sb2Qx94e
Dial in by phone
+1 239-205-3327,45193726# United
States, Cape Coral
Question Submission Deadline: October 29, 2025, 4:00pm https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2MwMWQyNzMtZDMzYS00MTlhLWJlZmUtYjdiZWU0ZDQ0OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2MwMWQyNzMtZDMzYS00MTlhLWJlZmUtYjdiZWU0ZDQ0OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2MwMWQyNzMtZDMzYS00MTlhLWJlZmUtYjdiZWU0ZDQ0OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2MwMWQyNzMtZDMzYS00MTlhLWJlZmUtYjdiZWU0ZDQ0OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2MwMWQyNzMtZDMzYS00MTlhLWJlZmUtYjdiZWU0ZDQ0OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2MwMWQyNzMtZDMzYS00MTlhLWJlZmUtYjdiZWU0ZDQ0OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2MwMWQyNzMtZDMzYS00MTlhLWJlZmUtYjdiZWU0ZDQ0OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2MwMWQyNzMtZDMzYS00MTlhLWJlZmUtYjdiZWU0ZDQ0OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d
Submission Deadline: November 17, 2025, 2:00pm
Fort Myers City Hall - Procurement
Conference Room
2200 Second Street, Fort Myers, FL 33901 or Virtually https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2NkMjM2NTUtYmEzYi
00MTk5LWFkNWItM2NjYTA4MzA5OGFh%4
0thread.v2/0?context=%7b%22Tid%22%3 a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%
2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d
Meeting ID: 264 417 527 293 9
Passcode: uq9YW7by
Dial in by phone
+1 239-205-3327,,793369041# United
States, Cape Coral
Proposed City Council Approval Date: December 1, 2025 https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2NkMjM2NTUtYmEzYi00MTk5LWFkNWItM2NjYTA4MzA5OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2NkMjM2NTUtYmEzYi00MTk5LWFkNWItM2NjYTA4MzA5OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2NkMjM2NTUtYmEzYi00MTk5LWFkNWItM2NjYTA4MzA5OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2NkMjM2NTUtYmEzYi00MTk5LWFkNWItM2NjYTA4MzA5OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2NkMjM2NTUtYmEzYi00MTk5LWFkNWItM2NjYTA4MzA5OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2NkMjM2NTUtYmEzYi00MTk5LWFkNWItM2NjYTA4MzA5OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2NkMjM2NTUtYmEzYi00MTk5LWFkNWItM2NjYTA4MzA5OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2NkMjM2NTUtYmEzYi00MTk5LWFkNWItM2NjYTA4MzA5OGFh%40thread.v2/0?context=%7b%22Tid%22%3a%2235ab3971-4a9a-45d4-8ad1-ac170528b885%22%2c%22Oid%22%3a%2283ef1c43-5533-4d59-a153-a3a170fcb6e1%22%7d
2. PROJECT DETAILS / SCOPE OF WORK
2.1. Mandatory Minimum Qualifications
2.1.1. The Construction Manager(s) shall hold any necessary license(s) authorizing them to do business in the State of Florida.
2.1.2. Construction Manager(s) shall have been in business under the current company/firm name for a minimum of three (3) consecutive years.
2.1.3. Neither Construction Manager nor any principal, officer, or stockholder shall be in arrears or in default of any debt or contract involving the City, (as a party to a contract, or otherwise) or failed to perform faithfully on any previous contract with the City.
2.1.4. Construction Manager is required to inform the City of any relevant legal or ethical issues.
Specifically, they need to disclose:
2.1.4.1. Judgments: Any court decisions against them.
2.1.4.2. Pending Lawsuits: Any legal actions that are currently underway.
2.1.4.3. Criminal Activities: Any criminal conduct, particularly involving moral turpitude
(i.e., actions deemed morally reprehensible).
Construction Manager will be given a chance to explain or provide additional information regarding these issues if applicable. This allows them to clarify any concerns and provide context.
To demonstrate qualifications to perform the Work, each Construction Manager must be prepared to submit within five (5) days of City’s request written evidence, such as financial data, previous experience, present commitments, and other such data as may be called for.
Each Solicitation must contain evidence of the Construction Manager’s qualifications to do business in the State of Florida, or covenant to obtain such qualification, prior to award of the contract.
The Construction Manager will be required to maintain the Minimum Qualifications
Requirements, as presented during selection, if selected and awarded the contract, during the term of the Contract and any contract renewals.
2.2. Scope of Work
Provide all labor, materials, and grant documentation required for the construction project based on the plans, specifications, and other contract documents.
The following documentation is required to support the City of Fort Myers request for reimbursement of:
2.2.1. Invoices covering actual costs of materials used in constructing the eligible EWP project measures.
2.2.2. Records documenting the type, quality, and quantities of materials actually used in constructing the eligible EWP project measures.
2.2.3. Daily time records for each employee showing name, classification, wage rate, hours, and dates actually employed for constructing the eligible EWP project measures.
2.2.4. Equipment operating records showing the type and size of equipment, hourly rate, actual hours of operation and dates used to install the eligible EWP project measures. Equipment idle time is not eligible as in-kind construction services, even if on the job site, and should not be included in the equipment operating records.
2.2.5. Weekly construction progress reports that include on-site inspections of work accomplished for the period, work planned, problems encountered.
2.2.6. Provide PE-certified as-built drawings and quantities for the project.
Construction shall adhere to the following federal requirement: Ensure that all Contractors and sub-contractors are performing their work in accordance with OSHA regulations and the
Contract Work Hours and Safety Standards Act (40 USC 3701-3708) as supplemented by
Department of Labor regulations (29 CFR Part 5).
3. INSTRUCTIONS
3.0.1. Procurement Information
Procurement Services is the official source for obtaining information regarding City of Fort Myers solicitations. It is the responsibility of Construction Manager to monitor and obtain solicitation updates and current award information both prior to and after the scheduled opening date.
Information is updated as it becomes available. The City reserves the right to issue an award or a recommendation of award at any time following the scheduled solicitation opening date.
Applicable Laws and Appeals
This solicitation is issued in accordance with, and governed by, the provisions and procedures outlined in Chapter 38, Articles III and IV of the City of Fort Myers Code of Ordinances. These provisions can be accessed online at:
City of Fort Myers Code of Ordinances - Procurement
Alternatively, contact Procurement Services for further assistance.
Any appeals related to this solicitation must comply with the requirements specified in the City’s
Code of Ordinances and procurement policies.
3.0.2. Americans With Disabilities Act
Persons with disabilities requiring special accommodations to participate in this solicitation process should contact Procurement Services at least seven (7) days before the required accommodation.
Contact Information:
Procurement Services
2200 Second Street, Fort Myers, FL 33901
Email: ProcurementServices@fortmyers.gov
Phone: (239) 321-7240
3.0.3. Solicitation Submission Guidelines
3.0.3.1. Official Submission Portal
All submissions must be made electronically through the City’s Bid Portal in OpenGov. The portal will keep all files locked until the solicitation officially closes.
3.0.3.2. Official Time
The time clock in OpenGov will serve as the “Official Time” for determining the actual closing time of the solicitation. Submissions received after the specified date and time will not be accepted.
3.0.3.3. Responsibilities
3.0.3.3.1. Construction Manager is solely responsible for ensuring timely electronic submissions.
https://library.municode.com/fl/fort_myers/codes/code_of_ordinances?nodeId=SPAADCO_CH38FI_ARTIIIPU
3.0.3.3.2. The City is not responsible for the distribution of addenda or other solicitation-related information to Construction Manager who fail to register in
OpenGov.
3.0.3.4. Addenda Distribution
All addenda and updates will be made available exclusively via OpenGov. Construction
Manager is advised to regularly check the portal for any updates related to this solicitation.
3.1. Introduction
To be considered, electronic submissions must be completed in accordance with the instructions outlined in this solicitation and submitted within the specified timeframe. The portal will keep all files locked until the solicitation officially closes.
The City reserves the right to accept or reject any or all submissions and to waive irregularities or technicalities, as deemed in the best interest of the City. All decisions made by the City regarding these matters shall be final and binding.
3.2. Solicitation Documents
Visit the City of Fort Myers Procurement Services Website and follow the link to Active
Solicitations to access solicitation information. It is the responsibility of the Construction
Manager to ensure correct registration information is provided. The City is not liable for any issues arising from incorrect or incomplete contact information.
1. Use of Official Solicitation Documents
All submittals must be prepared using the solicitation documents provided by the City. The City assumes no responsibility for errors or misinterpretations resulting from the use of incomplete or unofficial solicitation documents.
2. Purpose of Solicitation Documents
Solicitation documents are provided solely to facilitate the preparation and submission of responses.
3. Right to Cancel
The City reserves the right to cancel any solicitation at any time without obligation.
3.3. Responsibilities of the Construction Manager
Each Construction Manager is responsible for the following actions before submitting an offer:
1. Download Official Solicitation Documents
Obtain solicitation documents exclusively from OpenGov. Documents sourced from other platforms or sources are not guaranteed to be accurate.
2. Thoroughly Review Documents
Examine all solicitation documents to fully understand the requirements. If additional clarification is needed, submit questions through the OpenGov Q&A module.
https://www.cityftmyers.com/1171/Procurement-Services
3. Consider Applicable Laws and Regulations
Evaluate all Federal, State, and Local laws, ordinances, codes, and regulations that could impact the cost, progress, performance, or execution of the work.
4. Correlate Observations with the Solicitation Documents
Study and carefully align observations with the solicitation documents to ensure consistency.
5. Report Conflicts or Discrepancies
Notify the Procurement Services Department by email to procurementservices@fortmyers.gov and submit a question through the E-Procurement Q&A tab of any conflicts, errors, or discrepancies in the solicitation documents.
5.1. Response Timeline Questions related to document format or processes will be addressed within two (2) business days or the solicitation may be placed on hold. This timeline does not apply to project-specific questions that require input from project managers or subject matter experts.
6. Review the Draft Contract
The draft contract intended for award is included with this solicitation for reference.
6.1. This draft contains standard legal language and may be modified.
6.2. Any exceptions to the standard contract should be submitted as a question in the
Q&A module before the question deadline. If the question deadline has passed, exceptions should be clearly noted in the Submission Questionnaire.
• Note: Exceptions to the draft contract may impact the evaluation of the submittal.
7. City's Right to Modify Contract
The City reserves the right to make modifications to the draft contract for specific solicitations before execution.
3.4. Questions and Addenda Guidelines
1. Submission of Questions
All questions regarding the meaning or intent of the solicitation documents must be submitted through the OpenGov Portal. Only questions received before the deadline specified in the solicitation timeline will be considered. Responses to questions will only be binding if provided in writing via addenda or the "Questions & Answers" feature in OpenGov. Oral or other informal interpretations or clarifications will have no legal effect. Any addenda issued electronically during the solicitation period shall become part of the solicitation and will be incorporated into the resulting contract.
2. Authority of Addenda and Revisions
Revisions to the solicitation and responses provided via the "Questions & Answers" feature are authoritative and shall be considered addenda to the solicitation. All information provided in mailto:procurementservices@fortmyers.gov this solicitation, including addenda and answers to questions, will be incorporated into the solicitation and any resulting contract. It is the responsibility of the Construction Manager to review all addenda, revisions, and published answers to questions. Requests for interpretations must be submitted through the OpenGov Portal. Failure to review and comply with the latest addenda or interpretations will not relieve the Construction Manager of their obligations under the solicitation or the resulting contract. No oral interpretations will be provided. All official interpretations will be issued as written addenda and made available via OpenGov.
3. Modification of Solicitation Documents
The City reserves the right to issue addenda to modify the solicitation documents as necessary. Construction Manager(s) are strongly encouraged to attend any pre-submittal meetings to gain clarity on the solicitation requirements.
3.5. Interpretation of Solicitation and Addenda
The absence of details or the omission of specific descriptions within the Solicitation or any addenda shall be interpreted as requiring adherence to the highest standards of best commercial practices. All interpretations and clarifications of this Solicitation shall be governed by the terms and conditions set forth in this Contract.
3.6. Incorporation of Procurement Policy and Ordinance
The City’s Procurement Policy and Ordinance (38-61 thru 68) are hereby incorporated by reference into this solicitation and any contract awarded as a result of this solicitation. By participating in this solicitation, Construction Manager agrees to be bound by the City’s
Procurement Ordinance and Policy in all matters related to this solicitation and any subsequent contract.
3.7. Submittal Preparation
1. Preparation of Response
Construction Manager must prepare their responses in a clear and concise manner, ensuring that all required content is complete. Special attention should be given to the specific information, instructions, and requirements outlined in the solicitation document to ensure responsiveness. Incomplete responses or those lacking key information may be rejected. To facilitate the review process, each section or tab of the response should be properly labeled to correspond with the solicitation requirements.
2. Incurred Expenses
The City is not responsible for any expenses incurred by Construction Manager in the preparation and submission of their proposals, including costs associated with presentations or other activities related to the solicitation process.
3. Proprietary Information
3.1. City’s Judgment on Disclosure The City reserves the right to exercise its own judgment regarding the disclosure of records. The City may take any actions it deems https://fortmyers.gov/DocumentCenter/View/14396/City-of-Fort-Myers-Procurement-Policy-PDF https://fortmyers.gov/DocumentCenter/View/14396/City-of-Fort-Myers-Procurement-Policy-PDF necessary, including filing a declaratory action, to comply with Federal or Florida public records laws.
3.2. Ownership of Submittals All submittals received in response to this solicitation will become the property of the City and will not be returned to the Construction Manager.
3.8. Submission Requirements for Invitation to Bids
1. Submission Requirements and Instructions
Construction Manager is responsible for uploading their submittals directly into the OpenGov portal. The representative authorized to bind the Construction Manager to the submittal must sign the qualification statement. A submittal is considered timely only if received through the
OpenGov portal by the precise date and time stated in the solicitation timeline. The OpenGov portal time clock serves as the official time for determining timeliness. Submittals will not be accepted after the deadline.
Except as provided under the Americans with Disabilities Act (ADA) for individuals requiring special accommodations, all proposals for this solicitation must be submitted electronically.
Paper responses will be deemed non-responsive.
2. Instructions for Uploading Submissions
2.1. Submission Process Log into your OpenGov account and navigate to the solicitation for which you wish to submit a response. Click on “Draft Response”, complete the required information, upload your submission along with all required attachments, and submit your response.
2.2. Responsibility for Timely Submission The Construction Manager is solely responsible for ensuring their submittals are complete, uploaded, and submitted via the e-
Procurement Portal before the specified due date and time. The City is not responsible for any delays or failures in submission caused by any occurrence.
3. Mandatory Minimum Qualification Documentation
Construction Manager must provide clear and specific documentation to verify that all mandatory minimum qualifications, as outlined in the section titled "Mandatory Minimum
Qualifications," have been met.
4. Required Documents
See the "Submission Questionnaire" section for a detailed list of required documents.
5. Corporate Submittals
5.1. Must be executed in the corporate name by the President, Vice-President, or another corporate officer with evidence of signing authority.
5.2. The corporate seal must be affixed and attested by the Secretary or Assistant
Secretary.
5.3. The corporate address and state of incorporation must be included below the signature.
6. Partnership Submittals
Must be executed in the partnership name and signed by a partner. The title of the signing partner must appear under the signature, and the official address of the partnership must be included below the signature.
7. Litigation History
The Construction Manager must disclose whether they are involved in any current litigation or have any outstanding judgments over the past 5 years. Include relevant details in the submittal.
8. Proprietary Information
8.1. Public Records and Confidentiality
In accordance with Chapter 119 of the Florida Statutes (Public Records Law) and unless otherwise exempt by applicable law:
8.1.1. Solicitation documents and responses are public records and will be made available upon notice of award or 30 days after the solicitation closing date, whichever occurs first.
8.1.2. Construction Manager must clearly identify any information in their responses they consider confidential or proprietary, citing the specific legal exemption.
Generic notations such as "confidential" are not sufficient.
8.1.3. Failure to provide a detailed explanation with statutory citations may result in the entire response being subject to disclosure under Chapter 119.
8.2. Redacted Copy Requirement
Provide a redacted copy of your submittal, suitable for public disclosure, in electronic format. Redact only information exempt under applicable law and include the exemption citation.
8.3. City’s Judgment on Disclosure
The City reserves the right to exercise its judgment regarding the disclosure of records and may take any necessary actions to comply with federal or state public records laws.
8.4. Ownership of Submittals
All submittals received in response to this solicitation become the property of the City of
Fort Myers and will not be returned.
9. Electronic Pricing Form Instructions
All submittals must be completed through the OpenGov portal. Paper responses will be deemed non-responsive, except as provided under the Americans with Disabilities Act.
9.1. Pricing Instructions
9.1.1. Submission Process
Log into your OpenGov account, navigate to the relevant solicitation, click
“Draft Response,” complete the requested information, upload required attachments, and submit.
9.1.2. Unit and Extended Prices
Enter unit prices for each item, if applicable. In case of discrepancies between unit prices and extended prices, the unit prices will prevail.
9.1.3. Inclusive Pricing
Prices quoted must include all associated costs such as shipping, delivery, unpacking, setup, installation, testing, cleanup, training, and travel. No additional charges beyond those listed on the price sheets will be accepted.
10. Binding Submissions
All submissions shall remain binding for a period of one hundred eighty (180) calendar days following the opening date.
11. Late Submissions
Late submissions will not be accepted under any circumstances. Construction Manager assumes full responsibility for the timely upload of their responses.
3.9. Conformance to Solicitation
1. Compliance with Mandatory Requirements
All submissions must conform to the material and mandatory requirements outlined in this
Solicitation. However, the City reserves the right to waive irregularities at its discretion without prior notice or the issuance of a written addendum.
If a Construction Manager wishes to submit an Offer that would require the City to waive, alter, or omit a material or mandatory requirement, the Construction Manager must first submit a written request to the City to amend the Solicitation. Such requests must follow the process outlined in the “Interpretations of Solicitation and Addenda” section of this Solicitation.
If the City agrees, at its sole discretion, to amend, alter, or waive the requirement, the City will issue a written addendum to notify all prospective participants of the change.
2. Submitting Requests for Waivers or Amendments
Requests to waive, alter, or amend a mandatory requirement must be submitted as a written question that can be addressed in an addendum issued to all participants.
Important Note:
This process does not require participants to submit their complete Proposal prior to the due date. Instead, it is a mechanism for requesting a waiver or amendment to a mandatory requirement that is necessary to enable submission of the intended Proposal.
3.10. Modification and Withdrawal of Submissions
1. Modifying or Withdrawing Submissions
Submissions may be modified or withdrawn by the Construction Manager through the OpenGov portal at any time before the opening of the Solicitations.
2. Withdrawal Due to Material Mistake
If, within twenty-four (24) hours after Submissions are opened, a Construction Manager files a duly signed written notice with the City and promptly demonstrates to the City's reasonable satisfaction that a material and substantial mistake occurred in the preparation of its
Submission, the Construction Manager may withdraw its Submission. In such cases:
2.1. The Submission security, if applicable, will be returned.
2.2. The Construction Manager will thereafter be disqualified from further participation in the Work to be provided under the Contract.
3.11. Opening Submissions for Non-Construction
Non-construction-related submittals will be opened privately. Results will be posted in accordance with Florida Statute 119.07(1) and Article I, Section 24(a) of the Florida State
Constitution.
3.12. Irrevocable Offer
By submitting a response to this Solicitation, the Construction Manager agrees that their submission constitutes an irrevocable offer to the City after the opening date. This offer shall remain valid for a period of one hundred eighty (180) calendar days from the date of the opening. The Construction Manager agrees to provide the goods and services described in this
Solicitation under the terms, conditions, and pricing outlined in their submission.
The City, at its sole discretion, reserves the right to release any submission from this commitment during the validity period.
3.13. Evaluation and Award Process for Invitation to Bids
1. Initial Review of Submissions
Procurement Services will conduct an initial review of all submittals to ensure preliminary qualification and compliance with documentation requirements. This review may include but is not limited to
1.1. Verification of answers to required questions.
1.2. Confirmation of professional licensing.
1.3. Evaluation of references.
1.4. Review of bonding documents, if required.
1.5. Assessment of other relevant criteria.
2. Departmental Analysis
Procurement staff will provide an overview of the submissions to the Department
Representative for further analysis. This analysis will focus on scope requirements and price evaluations.
3. Optional Discussions
At the City’s discretion and in its best interest, the City may engage in discussions with the
Construction Manager to clarify their submissions.
4. Recommendation and Notice of Intent to Award
The Department Representative will email their recommendation to the Procurement
Representative, which will serve as the basis for issuing a Notice of Intent to Award.
Note: A Notice of Intent to Award does not constitute a contract. Final approval and authorization rest with the City Council.
5. Evaluation of Construction Manager's Capabilities
The City reserves the right to evaluate the following aspects of each Construction Manager prior to making an award:
5.1. Financial capability,
5.2. Reputation and integrity,
5.3. Skill and business experience,
5.4. Quality of performance on similar projects.
6. Additional Research
The City may conduct any necessary research to assist in evaluating submissions and determining the responsibility, qualifications, and financial capability of 1) Construction
Manager, 2) Proposed Subcontractor and Supplier. 3) Other relevant persons or organizations.
This evaluation will ensure all parties are able to perform the work outlined in the Contract
Documents to the City’s satisfaction within the prescribed timeline.
3.14. Reserved Rights
1. Request for Additional Information
The City reserves the right to request additional information from the Construction Manager after the closing date. This may include but is not limited to
1.1. Information necessary to evaluate, clarify, or substantiate any aspect of the submittal.
1.2. Evidence of financial resources and the ability to provide and maintain the required system and/or services. Additionally, the City may conduct investigations into the qualifications of any Construction Manager, which may include background checks performed by the Fort Myers Police Department.
2. Flexible Award Options
The City reserves the right to
2.1. Make awards based on individual items, groups of items, all-or-none, or a combination thereof, potentially involving one or more suppliers.
2.2. Reject any or all submittals or waive informalities or technicalities in the submittals received.
3. Rejection of Submittals
The City reserves the right to
3.1. Reject any and all Submissions;
3.2. Waive any and all informalities;
3.3. Negotiate contract terms with the Successful Construction Manager;
3.4. Disregard nonconforming, non-responsive, unbalanced, or conditional submittals;
3.5. Reject any submittal if it is determined that awarding to the Construction Manager is not in the City’s best interest, including cases where a) The Solicitation is not responsive;
b) The Construction Manager is unqualified or has questionable financial ability;
c) The Construction Manager fails to meet any other relevant standards or criteria established by the City.
3.15. Protest Procedure
The City’s protest policy and procedure are outlined in the City of Fort Myers Procurement
Policy, which can be accessed at the following link:
City of Fort Myers Procurement Policy (PDF)
For details, refer to Page 20, Item F of the policy document.
3.16. Award of Contract for Invitation to Bids
1. Purchase Order
The Purchase Order (PO) issued by the City to the selected Construction Manager within the time specified for acceptance, in conjunction with the contract, establishes a binding contract without further action by either party. The contract will include this Solicitation, any addenda, the Construction Manager’s submittal, and the established Purchase Order. This Contract shall be governed by and construed in accordance with the laws of the State of Florida. Venue for any legal action arising out of or relating to this contract shall be in a court of competent jurisdiction located in Lee County, Florida.
2. Formal Award
2.1. General Provisions. Contracts will be awarded in accordance with the City’s
Procurement Code, Section 38-61 of the City of Fort Myers Code of Ordinances.
https://www.cityftmyers.com/DocumentCenter/View/14396/City-of-Fort-Myers-Procurement-Policy-PDF
2.2. Invitations to Bid. The contract will be awarded to the responsive and responsible Construction Manager with the lowest overall cost, including any alternates, if applicable, following final approval by the City Council.
3. Multiple Awards
The City reserves the right, at its sole discretion, to award the work described herein to more than one responsive and responsible Construction Manager. In cases of multiple awards, the
City will apportion work among the selected Construction Manager as it deems appropriate. No minimum amount or proportion of work is guaranteed to any single Construction Manager or class of Construction Manager.
3.17. Form of Contract
The City’s intended format for the awarded Contract is incorporated into this solicitation. However, any exceptions to the terms of this standard Contract must be clearly indicated in the Construction Manager’s submittal. The Construction Manager acknowledges that exceptions may affect the evaluation of their submittal.
1. Formatting Adjustments
The final executed Contract may differ in pagination or numbering from the draft provided.
2. City’s Right to Modify Contract Language
The City reserves the right to revise or alter the language of the Draft Contract after responses are received and prior to execution. Revisions may be made to address the specific requirements or circumstances of the solicitation.
3.18. Execution of Contract from a Formal Award
The successful Construction Manager shall, within fifteen (15) calendar days after the issuance of a Notice of Award and receipt of the Contract from the City of Fort Myers Procurement
Services, sign and enter into a Contract with the City. Simultaneously, the Construction Manager must provide:
1) Any required bonds;
2) Indemnities; and
3) Updated insurance certificates as specified in the Solicitation.
Failure to meet the established deadline for submitting the required documents may result in cancellation of the award at the City’s discretion.
3.19. Debriefing of Proposers
Not later than thirty (30) days after City Council approval of a selection or shortlist, a proposer may submit a written request to the applicable contracting agent for a debriefing on the evaluation of their proposal. The contracting agent will schedule a meeting with the Proposer for the debriefing. However, at the Proposer’s request, the debriefing may be conducted via telephone conference. The debriefing shall include the following minimum information:
1. Key requirements of the solicitation.
2. The overall ranking of all proposals.
3. The significant weaknesses or deficiencies in the proposal in response to the requirements of the solicitation.
4. If requested, an explanation of the score received for each evaluation criteria will be provided, including costs, if applicable.
5. If applicable, a summary of the rationale for award.
6. Responses to any relevant questions of the Proposer.
Untimely debriefing requests will also be considered.
3.20. Prohibition Against Considering Social, Political, or Ideological Interests
In accordance with Florida Statute Section 287.05701, an awarding body is prohibited from:
1. Requesting documentation of or considering a Construction Manager’s social, political, or ideological interests when determining whether the Construction Manager is responsible.
2. Giving preference to a Construction Manager based on their social, political, or ideological interests.
This ensures that all evaluations and awards are conducted solely on the basis of objective criteria and the best interests of the City.
3.21. Identification of Variances
The Construction Manager must clearly identify any variances from the Solicitation requirements, no matter how minor. Any exceptions to the scope of work must be specifically noted and thoroughly explained in the Construction Manager’s questionnaire. If no variances are identified in the submittal, the City will assume that:
1. The materials, equipment, or services offered fully comply with the Solicitation specifications.
2. The Construction Manager agrees to all terms and conditions outlined in the attached Draft
Contract.
Failure to disclose variances may result in the Construction Manager being held to full compliance of the Solicitation requirements.
3.22. Cone of Silence
A Construction Manager submitting a response to this Solicitation, or individuals acting on their behalf, are prohibited from contacting any employee, elected or appointed official or officer of the City concerning any aspect of this Solicitation from the time of its release until the end of the 72-hour period (excluding Saturdays, Sundays, and legal holidays) following the City’s posting of the notice of intended award.
Exceptions
1. Written communications directed to the Procurement Officer.
2. As explicitly provided in the Solicitation documents.
Violation
Failure to adhere to this provision may result in the rejection of the Construction Manager’s response in accordance with Section 287.057(25), Florida Statutes.
4. FEDERAL SUPPLEMENTAL CONDITIONS
Priority of Federal Provisions
To ensure acceptance of the Solicitation, Construction Manager must adhere to the following instructions. In the event of a conflict between the Instructions, General Conditions, Special
Conditions, or the Special Conditions for Federal Contracts, the Special Conditions for Federal
Contracts shall take precedence.
Purpose of Federal Contract Provisions
As a recipient of funding from the Federal Emergency Management Agency (FEMA), the City of
Fort Myers (“City”) is required to include specific provisions in contracts funded in whole or in part with federal financial assistance, as applicable under relevant federal regulations and guidance.
These provisions apply to all contracts, purchase orders, work orders, and similar agreements
(collectively referred to as “Contracts”) that may be utilized in response to a federally declared disaster. Such contracts may be funded in whole or in part by FEMA Federal Public Assistance funding.
Note: Funding provided under other federal programs may require additional or different provisions.
Acceptance of Federal Provisions
By submitting an offer/response, the Construction Manager agrees to: Incorporate the following provisions into any resulting Contract or Agreement and Include these provisions in any additional Contract or Agreement to which this section is physically attached or incorporated by reference when executed.
4.1. Access to Records 2 C.F.R. § 200.337
Right of Access
The following access to records requirements apply to this Contract:
4.1.1. The Contractor agrees to provide The City of Fort Myers, Lee County, the FEMA
Administrator, the Comptroller General of the United States, or any of their authorized representatives access to any books, documents, papers, and records of the Contractor which are directly pertinent to this Contract for the purposes of making audits, examinations, excerpts, and transcriptions.
4.1.2. The Contractor agrees to permit any of the foregoing parties to reproduce by any means whatsoever or to copy excerpts and transcriptions as reasonably needed.
4.1.3. The Contractor agrees to provide the FEMA Administrator or his or her authorized representatives access to construction or other work sites pertaining to the work being completed under the Contract.
4.1.4. In compliance with the Disaster Recovery Act of 2018, the City and the Contractor acknowledge and agree that no provision in this contract is intended to limit audits or internal reviews by the FEMA Administrator or the Comptroller General of the United States.
4.2. Buy America, Build America (BABA) for Infrastructure Projects
Contractors and their subcontractors who apply or bid for an award for an infrastructure project subject to the domestic preference requirement in the Build America, Buy America Act shall file the required certification to the City with each bid or offer for an infrastructure project, unless a domestic preference requirement is waived by FEMA. Contractors and subcontractors certify that no federal financial assistance funding for infrastructure projects will be provided unless all the iron, steel, manufactured projects, and construction materials used in the project are produced in the United States. BABAA, Pub. L. No. 117-58, §§ 70901-52. Contractors and subcontractors shall also disclose any use of federal financial assistance for infrastructure projects that does not ensure compliance with BABAA domestic preference requirements. Such disclosures shall be forwarded to the recipient who, in turn, will forward the disclosures to
FEMA, the federal agency; subrecipients will forward disclosures to the passthrough entity, who will, in turn, forward the disclosures to FEMA.
BABAA certification form is required and included in the questionnaire section of the solicitation.
4.3. Buy Clean
City encourages the use of environmentally friendly construction practices in the performance of this Contract. In particular, City encourages that the performance of this Contract includes considering the use of low-carbon materials which have substantially lower levels of embodied greenhouse-gas emissions associated with all relevant stages of production, use, and disposal, as compared to estimated industry averages of similar materials or products as demonstrated by their environmental product declaration.
4.4. Byrd Anti-Lobbying Amendment Provisions, 31 U.S.C. 1352 (as amended)
Contractors who apply or bid for an award of $100,000 or more shall file the required certification found at APPENDIX A, 44 C.F.R. PART 18. Each tier certifies to the tier above that it will not and has not used federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a Member of
Congress, officer or employee of Congress, or an employee of a Member of Congress in connection with obtaining any federal contract, grant, or any other award covered by 31 U.S.C.
§ 1352. Each tier shall also disclose any lobbying with non-federal funds that takes place in connection with obtaining any federal award. Such disclosures are forwarded from tier to tier up to the recipient who in turn will forward the certification(s) to the federal agency.
4.5. Changes
Any changes to the scope of work, price, or schedule shall be made in writing and signed by an authorized representative of each party.
4.6. Clean Air & Clean Water Act Compliance
Required for all contracts and subcontracts in excess of $150,000.
4.6.1. Clean Air Act
4.6.1.1. The Contractor agrees to comply with all applicable standards, orders, or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. § 7401 et seq.
4.6.1.2. The Contractor agrees to report each violation to the City and understands and agrees that the City will, in turn, report each violation as required to assure notification to the Federal Emergency Management Agency and the appropriate Environmental
Protection Agency Regional Office.
4.6.1.3. The Contractor agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with federal assistance provided by
FEMA.
4.6.2. Federal Water Pollution Control Act
4.6.2.1. The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Federal Water Pollution Control Act, as amended, 33
U.S.C. § 1251 et seq.
4.6.2.2. The Contractor agrees to report each violation to the City and understands and agrees that the City will, in turn, report each violation as required to assure notification to the Federal Emergency Management Agency and the appropriate Environmental
Protection Agency Regional Office.
4.6.2.3. The Contractor agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with federal assistance provided by
FEMA.
4.7. Contract Work Hours and Safety Standards Act (CWHSSA)
Compliance with the Contract Work Hours and Safety Standards Act.
4.7.1. Applicability
This provision applies to any contract in excess of $100,000 that may require or involve the employment of laborers or mechanics. This includes construction contracts and certain service contracts subject to the Service Contract Labor Standards.
4.7.2. Compliance Requirements
Under the Contract Work Hours and Safety Standards Act (40 U.S.C. §§ 3701 et. seq.), the following shall apply:
• Overtime Compensation: Contractors and subcontractors shall not require or permit any laborer or mechanic to work more than forty (40) hours in any workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half (1.5) times the basic rate of pay for all hours worked over forty (40).
• Violation and Liability: In the event of a violation, the contractor or subcontractor is liable to each affected employee for unpaid wages and to the federal government for liquidated damages. The amount of liquidated damages shall be computed at the rate specified in the applicable regulation (currently $33 per day per employee).
4.7.3. Enforcement
The contracting officer shall withhold or cause to be withheld from any monies payable on account of work performed by the contractor or subcontractor, the amount of wages required to be paid and the amount of liquidated damages due.
4.7.4. Subcontracts
The contractor shall insert the substance of this clause in all subcontracts in excess of
$100,000. The contractor shall be responsible for compliance by any subcontractor or lower-tier subcontractor with the requirements set forth herein.
4.7.5. Dispute Resolution
Any disputes arising under this provision shall be resolved in accordance with the Disputes clause of this contract.
4.8. Copyright
The Construction Manager grants to the City, a paid-up, royalty-free, nonexclusive, irrevocable, worldwide license in data first produced in the performance of this contract to reproduce, publish, or otherwise use, including prepare derivative works, distribute copies to the public, and perform publicly and display publicly such data.