525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf
PDF 30 KB Posted
- Attached to
- NRCS Emergency Watershed Protection Grant
- Solicitation number
- ITB 25-092
- Issued by
- Lee County, Fort Lauderdale City, Florida
About this file
This document is a Florida Department of Transportation (FDOT) Program Management Local Agency Program (LAP) Certification of Current Capacity form designed for pre-qualified FDOT contractors. The two-page form is confidential under Chapter 337.14(1) of Florida Statutes and requires contractors to certify their current contract capacity for a specific letting date. The form instructs contractors to complete a detailed "Status of Contracts on Hand" report reflecting their uncompleted work as of the 15th day of the month preceding the letting date, including all prime and subcontracts in progress or awarded but not yet begun.
The document provides specific guidelines for preparing the certification, such as including new contracts awarded within five days of the letting date and charging them against the contractor's total rating. The "Status of Contracts on Hand" section requires contractors to list detailed project information including owner, location, description, contract amounts, amounts sublet to others, balance of contract, and uncompleted work to be done as a prime or subcontractor. The form allows contractors to consolidate smaller contracts that individually do not exceed 3% of the total and collectively amount to less than 20% of the total. At the time of this document, all totals are shown as $0.00, indicating it is a blank template form ready to be filled out by a contractor.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
525-010-46
09/20
STATE OF FLOR DA DEPARTMENT OF TRANSPORTATION
PROGRAM MANAGEMENT LAP CERTIFICATION OF CURRENT CAPACITY
CONFIDENTIAL per Ch 337.14(1) F.S.
Fill in your FDOT Vendor Number For bids to be received on
(Letting Date) VF
(Only applicable to FDOT pre-qualified contractors)
CERTIFICATE
I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).
The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $
I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:
1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.
2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.
3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.
I certify that the information above is correct. NAME OF FIRM
Sworn to and subscribed this of , 20 day By:
Title
525-010-46
PROGRAM MANAGEMENT
STATUS OF CONTRACTS ON HAND 09/20
(Furnish complete information about all your contracts, whether prime or subcontracts;
whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)
1 2 3 4 5 6
PROJECTS
OWNER, LOCATION AND DESCRIPTION
CONTRACT (OR
SUBCONTRACT)
AMOUNT
AMOUNT
SUBLET
TO OTHERS
BALANCE OF
CONTRACT
AMOUNT
UNCOMPLETED AMOUNT TO BE DONE
BY YOU
AS PRIME
CONTRACTOR
AS
SUBCONTRACTOR
NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.
TOTALS $0.00 $0.00
TOTAL UNCOMPLETED WORK ON
HAND TO BE DONE BY YOU
(TOTAL COLUMNS 5 AND 6)
$0.00
File details come from the government source that posted it. Updated .