CIty_of_Fort_Myers_Technical_Specifications.pdf

PDF 2 MB Posted

Attached to
NRCS Emergency Watershed Protection Grant
Solicitation number
ITB 25-092
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

The document is a set of Technical Specifications for the City of Fort Myers' NRCS Emergency Watershed Protection Project, involving the City of Fort Myers Public Works Department and the Natural Resources Conservation Service (NRCS). The project is identified by City Project #1182-2023 and NRCS #NR254209XXXXC010. These technical specifications cover multiple sections addressing various construction requirements, including site clearing, excavation, backfilling, lawn restoration, groundwater control, and other critical infrastructure implementation tasks.

The technical specifications provide comprehensive guidelines for contractors, detailing specific requirements for materials, equipment, installation methods, quality control, and execution standards. The documents outline precise technical requirements for activities such as soil management, excavation techniques, utility installation, groundwater control, and landscape restoration. While no specific pricing details are explicitly stated, the specifications indicate that the project will follow strict municipal and federal standards, with an emphasis on environmental protection, proper construction practices, and maintaining site conditions throughout the project lifecycle.

View the file

Other files

File Type Posted
NRCS_Emergency_Watershed_Protection_Grant.pdf PDF
NRCS_Emergency_Watershed_Protection_Grant.pdf PDF
CM@R_Contract_draft_10-02-25.pdf PDF
CM@R_Contract_draft_10-02-25.pdf PDF
Solicitation_General_Terms_and_Conditions_April_2025_NCS-ara2025.07.10.pdf PDF
Stream_Debris_Removal__Specs_4.pdf PDF
CIty_of_Fort_Myers_Technical_Specifications.pdf PDF
Stream_Debris_Removal__Specs_4.pdf PDF
Operation_and_Maintenance_Plan_CFM_4.pdf PDF
CFM_EWP_-_Set_6-20-25.pdf PDF
Solicitation_General_Terms_and_Conditions_April_2025_NCS-ara2025.07.10.pdf PDF
CFM_EWP_-_Set_6-20-25.pdf PDF
Schedule_Milton_-_Helene_Canal_Clean-up_CFM.pdf PDF
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
w37503083_(3).docx DOCX document
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
Scope_of_Services_Engineering_Project_1182-2023.pdf PDF
w37503050_v001.docm DOCM document
w37503083_(3).docx DOCX document
Checklist_Solicitation.xlsx XLSX spreadsheet
Local_Preference_Affidavit.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
375-030-30-TRUTH_IN_NEGOTIATION_CERTIFICATION.pdf PDF
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
Local_Preference_Affidavit.pdf PDF
Notice_of_Award.docx DOCX document
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
375-030-30-TRUTH_IN_NEGOTIATION_CERTIFICATION.pdf PDF
375-030-32-CERTIFICATION_REGARDING_DEBAREMENT,_SUSPENSION,_INELIGIBILITY..._.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
Notice_of_Award.docx DOCX document
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
Scope_of_Services_Engineering_Project_1182-2023.pdf PDF
w37503050_v001.docm DOCM document
375-030-32-CERTIFICATION_REGARDING_DEBAREMENT,_SUSPENSION,_INELIGIBILITY..._.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Fort Myers

Technical Specifica�ons

For

NRCS Emergency Watershed Protec�on Project

City Project # 1182-2023

NRCS # NR254209XXXXC010

rthompson Text Box These are additional Specifications for works within the City of Fort Myers. If any conflicts arise between these Specifications and Construction Specification 400, Specification 400 shall take precedence.

CITY OF FORT MYERS

TECHNICAL SPECIFICATIONS

Section 01010

SUMMARY OF WORK

SECTION 01010

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Description of Work

B. CONTRACTOR's Use of Site

C. Work Sequence

D. CITY Occupancy

1.2 DESCRIPTION OF WORK

A. General: The Work to be done under this Contract is shown on the drawings and specified in Contract Documents.

B. The Work includes:

1. Furnishing of all labor, material, superintendence, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, product certifications, inspections, services and other means of construction necessary or proper for performing and completing the Work.

2. Sole responsibility for adequacy of plant and equipment.

3. Maintaining the Work area and site in a clean and acceptable manner.

4. Maintaining existing facilities in service at all times.

5. Protection of finished and unfinished Work.

6. Repair and restoration of Work or existing facilities damaged during construction.

7. Furnishing as necessary a l l proper equipment and machinery, of a sufficient capacity, to facilitate the Work and to handle all emergencies normally encountered in Work of this character.

8. Furnishing, installing, and protecting all necessary guides, track rails, bearing plates, anchor and attachment bolts, and all other appurtenances needed for the installation of the devices included in the equipment specified. Make anchor bolts of appropriate size, strength and material for

Section 01010 the purpose intended. Furnish substantial templates and shop drawings for installation.

C. Implied and Normally Required Work: It is the intent of these Specifications to provide the CITY with complete operable systems, subsystems and other items of Work. Any part or item of Work, which is reasonably implied or normally required to make each installation satisfactorily and completely operable, is deemed to be included in the Work and the Contract Amount. All miscellaneous appurtenances and other items of Work incidental to meeting the intent of these Specifications are included in the Work and the Contract Amount even though these appurtenances may not be specifically called for in these Specifications.

D. Quality of Work: Regard the apparent silence of the Contract Documents as to any detail, or the apparent omission from them of a detailed description concerning any Work to be done and materials to be furnished as meaning that only the best general practice is to prevail and that only materials and workmanship of the best quality are to be used. Interpretation of these specifications will be made upon this basis.

1.3 CONTRACTOR'S USE OF SITE

A. In addition to the requirements of the Supplemental Terms and Conditions, limit use of site and premises for work and storage to allow for the following:

1. Coordination of the Work under this CONTRACT with the work of the other contractors where Work under this CONTRACT encroaches on the Work of other contractors.

2. CITY occupancy and access to operate existing facilities.

3. Coordination of site use with ENGINEER.

4. Responsibility for protection and safekeeping of products under this

CONTRACT.

5. Providing additional off- site storage at no additional cost to the CITY as needed.

1.4 WORK SEQUENCE

A. Construct Work in stages to accommodate the CITY’s use of premises during construction period and in accordance with the limitations on the sequence of construction specified. Coordinate construction schedules and operations with

ENGINEER.

B. Coordinate Work of all subcontractors.

Section 01010

1.5 CITY OCCUPANCY

A. Provide means to permit CITY to occupy premises during entire period of construction if necessary or requested. Cooperate with the CITY's representative in all construction operations to minimize conflict, and to facilitate CITY usage.

B. Conduct operations with the least inconvenience to the general public.

1.6 PROTECTION OF EXISTING UTILITIES

A. In case of damage to existing utilities caused by CONTRACTOR construction activities, contact the owner of the utility or appropriate CITY department immediately. Repair any damage to existing utilities caused by CONTRACTOR construction activities in coordination with or as directed by the owner of the utility and the CITY at the expense of the CONTRACTOR.

PART 2 PRODUCTS – NOT USED

PART 3 EXECUTION

A. Starting Work: Start Work within 10 days following the date stated in the Notice to

Proceed and execute with such progress as may be required to prevent delay to other contractors or to the general completion of the project. Execute Work at such items and in, or on, such parts of the project, and with such forces, material, and equipment, as to complete the Work in the time established by the Contract. At all times, schedule and direct the Work so that it provides an orderly progression to completion within the specified time for completion.

END OF SECTION

Section 01051

LINES AND GRADES

SECTION 01051

A. General

B. Surveys

C. Datum Plane

D. Protection of Survey Data

1.2 GENERAL

A. Construct all work in accordance with the lines and grades shown on the

Drawings. Assume full responsibility for keeping all alignment and grade.

1.3 SURVEYS

A. Reference Points: Base horizontal and vertical control points will be designated by the SURVEYOR and used as datum for the Work. Perform all additional survey, layout, and measurement work.

1. Keep SURVEYOR informed, sufficiently in advance, of the times and places at which work is to be performed so that base horizontal and vertical control points may be established, and any checking deemed necessary by SURVEYOR may be done, with minimum inconvenience to the SURVEYOR and at no delay to CONTRACTOR. It is the intention not to impede the Work for the establishment of control points and the checking of lines and grades set by the CONTRACTOR. However, when necessary, suspend working operations for such reasonable time as the SURVEYOR may require for this purpose. Costs associated with such suspension are deemed to be included in the Contract Price, and no time extension or additional costs will be allowed.

2. Provide an experienced survey crew including an instrument operator, experienced assistants, and any instruments, tools, stakes, and other materials required to complete the survey, layout, and measurement of work performed by the CONTRACTOR.

Section 01051

1.4 DATUM PLANE

A. All elevations indicated or specified refer to the Mean Sea Level Datum Plane, 1929 General Adjustment, of the United States Coast and Geodetic Survey (NGVD 29) or the general adjustment of the North American Vertical Datum of 1988 (NAVD 88) and expressed in feet and decimal parts thereof. The specific Datum shall be clearly identified in the Contract Documents. All CITY projects shall refer to the NAVD 88 Datum.

1.5 HORIZONTAL DATUM

A. All surveys, benchmarks, baselines and record drawings shall refer to the State

Plane Coordinate System (SPCS), in Florida West Zone (FIP0902) North American Datum NAD83 (1990 adjustment) projection.

1.6 PROTECTION OF SURVEY DATA

A. General: Safeguard all points, stakes, grade marks, known property corners, monuments, and benchmarks made or established for the Work. Reestablish them if disturbed, and bear the entire expense of checking reestablished marks and rectifying work improperly installed.

B. Records: Keep neat and legible notes of measurements and calculations made in connection with the layout of the Work. Furnish copies of such data to the ENGINEER for use in checking the CONTRACTOR's layout. Data considered of value to the CITY will be transmitted to the CITY by the SURVEYOR with other records on completion of the Work.

PART 3 EXECUTION – NOT USED

Section 01310

PROGRESS SCHEDULE

SECTION 01310

PROGRESS SCHEDULE (SIMPLE)

A. Form of Schedules

B. Content of Schedules: Submit for approval, a preliminary progress schedule in accordance with the General Conditions.

C. Schedule Revisions

D. Submittal Requirements

1.2 FORM OF SCHEDULES

A. Prepare schedules, using Microsoft Projects, in form of a horizontal bar (GANTT) chart format.

1. Provide separate horizontal bar for each trade or operation.

2. Utilize a horizontal time scale and identify first work day of each week.

3. Utilize scale and spacings to allow space for notations and future revisions.

B. Utilize a listing format which chronologically indicates the order of start of each item of work.

C. Identify each listing by major specification section numbers.

1.3 CONTENT OF SCHEDULES

A. Completion Dates: Show the beginning and ending contract dates stated in documents. Schedules showing completion prior to the contract completion date will be accepted but in no event will they be considered basis for a claim for delay against the CITY by the CONTRACTOR for the period between the early completion date and the completion date provided in the Contract Documents.

B. Show complete sequence of construction by activity.

C. Show dates for beginning and completion of each major element of construction and installation dates for major items of equipment. Elements shall include, but not be limited to, the following:

Section 01310

1. Shop drawing receipt from supplier/manufacturer submitted to ENGINEER, review and return to supplier/manufacturer

2. Material and equipment order, manufacturer, delivery, installation, and checkouts

3. Mobilization

4. Performance tests and supervisory services activity

5. Erosion control installation

6. Construction of various facilities

7. Demolition

8. Excavation, sheeting, shoring, dewatering

9. Concrete placement sequence

10. Structural steel erection

11. Wall and roof construction

12. Piping and equipment installation

13. Electrical work activity

14. Heating, ventilating, and air conditioning work activity

15. Plumbing work activity

16. Sewer installation

17. Stormwater installation

18. Connection to existing sanitary sewer

19. Water main installation

20. Miscellaneous concrete placement

21. Subcontractor's items of work

22. Backfilling, grading, seeding, sodding, landscaping, fence construction, and paving

Section 01310

23. Final cleanup

24. Allowance for inclement weather

25. Coordination with concurrent Work on site

26. As-built drawings completed

27. Final inspection and testing completed

28. De-mobilization

D. Show projected percentage of completion for each item as of first day of each month.

E. Show projected amount of payment for each item as of first day of each month.

1.4 SCHEDULE REVISIONS

A. As a minimum, revise construction schedule every 30 calendar days to reflect changes in progress of Work for duration of Contract.

B. Indicate progress of each activity at date of submittal.

C. Show changes occurring since previous submittal of schedule.

1. Major change in scope

2. Activities modified since previous submittal

3. Revised projections of progress completion and payment

D. Provide a written report as needed to define:

1. Problem areas, anticipated delays, and impact on schedule

2. Corrective action recommended and its effect

3. Effect of changes on schedules of other Contractors

1.5 SUBMITTAL REQUIREMENTS

A. Schedule: Submit final progress schedule in accordance with the General

Conditions.

B. For preliminary and final submittal of construction progress schedule and subsequent revisions thereof furnish three copies to ENGINEER.

Section 01310

PART 2 PRODUCTS

2.1 MICROSOFT PROJECTS

A. All projects schedules are to be prepared using Microsoft Project, unless otherwise directed by the CITY.

3.1 PROVIDE A HARD COPY AND ELECTRONIC COPY WITH EACH PAYMENT

APPLICATION.

Section 01510

PRE-CONSTRUCTION AUDIO-

VIDEO RECORDING

SECTION 01510

PRE-CONSTRUCTION AUDIO-VIDEO RECORDING

1.1 The work specified in this section includes the requirements for pre-construction audio-video recordings necessary to document existing conditions on public and private property.

2.1 The CONTRACTOR shall provide color videos showing pre-construction site conditions of all public and private property within the scope of construction. The videos shall be digital video disc (DVD) format indicating on the beginning and face of each disc, the date, job title and location where the video was taken.

The videos shall be clear and shall thoroughly document all existing structures and landscaping.

2.2 Two copies of the DVD shall be delivered to the CITY for review.

3.1 Construction on private property shall not commence until the CITY has reviewed and approved the audio-video recording.

3.2 The CONTRACTOR may be required to restore private properties to conditions better than existing, at no additional cost to the CITY, if the CONTRACTOR fails to sufficiently document existing conditions.

Section 01570

TRAFFIC REGULATION AND PUBLIC SAFETY

SECTION 01570

1.1 SECTION INCLUDES:

A. General Requirements

B. Traffic Control

C. Public Safety

1.2 RELATED SECTIONS

A. Section 01500 – Construction Facilities and Temporary Controls

B. Section 02230 – Roadway Crossings by Open Cut

C. Section 02575 – Pavement Repair and Restoration

1.3 GENERAL REQUIREMENTS

A. Perform all work within CITY rights-of-way in strict accordance with the CITY’s

Maintenance of Traffic Policy and other applicable statutory requirements to protect the public safety.

B. Be responsible for providing safe and expeditious movement of traffic through construction zones. A construction zone is defined as the immediate areas of actual construction and all abutting areas which are used by the CONTRACTOR and which interfere with the driving or walking public.

C. Remove temporary equipment and facilities when no longer required; Restore grounds to original or specified conditions.

D. The requirements specified herein are in addition to the plan for Maintenance of Traffic as specified in Section 02230.

1.4 TRAFFIC CONTROL

A. Include as necessary precautions, not to be limited to, such items as proper construction warning signs, signals, lighting devices, marking, barricades, channelization, and hand signaling devices. Be responsible for installation and maintenance of all devices and requirements for the duration of the Construction

Section 01570

Period.

B. Provide notice, at least five (5) working days prior to construction to the CITY’s Engineering Department of the necessity to close any portion of a roadway carrying vehicles or pedestrians so that the final approval of such closings can be obtained at least 48 hours in advance. At no time will more than one (1) lane of roadway be closed to vehicles and pedestrians, unless prior approval is given by the CITY in writing. With any such closings make adequate provision for the safe expeditious movement of each.

C. Be responsible for notifying Police, Fire, and other Emergency Departments whenever construction is within roadways and of the alternate routes. Provide monthly status reports to these Departments, as a minimum.

D. Be responsible for removal, relocation, or replacement of any traffic control device in the construction area that exists as part of the normal pre-construction traffic control scheme.

E. Immediately notify the CITY of any vehicular or pedestrian safety or efficiency problems incurred as a result of the construction of the project.

F. Provide notice to the Florida Department of Transportation (FDOT) of the necessity to close any portion of a State roadway in accordance with FDOT requirements and any applicable FDOT permit conditions.

G. Be responsible for notifying all residents of any road construction and limited access at least 72 hours in advance.

1.5 PUBLIC SAFETY (DURING CONSTRUCTION, ALTERATION OR REPAIR)

A. In areas of high vehicular traffic, provide a safe walkway around the work area.

B. Use barricades or other barriers to prevent any possibility of injury to the public caused by the CONTRACTOR's work.

C. Keep walk areas around the work areas clean of sand, stones, and any other material that could cause a pedestrian accident.

D. Barricade work areas left overnight. Install flashing warning lights in areas required by the CITY.

E. Unless an approved detour is provided at any open cut crossings, a minimum of one-way traffic will be maintained during the daylight hours and two-way traffic at night. All traffic detours will be restricted to limits of the Right-of-Way with necessary flagmen and/or marking devices. These detours shall be approved by the CITY. Detour of traffic outside of the Right-of-Way will be considered with the approval of local governmental agencies and private concerns involved.

Section 01570

F. Crossing and Intersections: Do not isolate residences and places of business.

Provide access to all residences and places of business whenever construction interferes with existing means of access. Maintain access at all times. If pavement is disturbed, a cold mix must be applied at the end of the day.

G. Detours

1. Construct and maintain detour facilities wherever it becomes necessary to divert traffic from any existing roadway or bridge, or wherever construction operations block the flow of traffic. The location of all detours will require prior approval of the CITY.

2. Furnishing of Devices and Barriers: Furnish all traffic control devices

(including signs), warning devices and barriers. Costs of such devices shall be incidental to construction and included in unit prices bid.

3. Maintenance of Devices and Barriers: Keep traffic control devices, warning devices and barriers in the correct position, properly directed, clearly visible and clean, at all times. Immediately repair replace or clean damaged, defaced or dirty devices or barriers as necessary.

H. Flagmen: Provide certified flagmen (flaggers) to direct traffic where one-way operation in a single lane is in effect and in other situations as may be required.

Radios may be required if flagmen cannot maintain visual contact with each other.

I. Utilize all necessary signs, flagmen, and other safety devices during construction.

J. Perform all work with the requirements set forth by the Occupational Safety Health

Administration.

PART 3 EXECUTION – NOT USED

Section 01710

CLEANING

SECTION 01710 CLEANING

1.1 SECTION INCLUDES:

A. General Requirements

B. Disposal Requirements

1.2 GENERAL REQUIREMENTS

A. Execute cleaning during progress of the work and at completion of the work.

1.3 DISPOSAL REQUIREMENTS

A. Conduct cleaning and disposal operations to comply with codes, ordinances, regulations, and anti-pollution laws.

3.1 DURING CONSTRUCTION

A. Execute daily cleaning to keep the work, the site, and adjacent properties free from accumulations of waste materials, rubbish, and windblown debris, resulting from construction operations.

B. Provide onsite containers for the collection of waste materials, debris and rubbish. All waste materials including containers, food debris and other miscellaneous materials must be disposed of daily in onsite containers.

C. Remove waste materials, debris and rubbish from the site periodically and dispose of at legal disposal areas away from the site.

D. Control dust by applying water for the alleviation or prevention of dust nuisance originating from earthwork construction operations from within the project construction limits. Perform dust control operations at the time and location and in the amount ordered by the Engineer. Maintain control of the application of water at all times to minimize dust but not to create saturated soil conditions.

3.2 FINAL CLEANING

Section 01710

A. Requirements: At the completion of work and immediately prior to final inspection, clean the entire project as follows:

1. Thoroughly clean, sweep, wash, and polish all work and equipment provided under the Contract, including finishes. Leave the structures and site in a complete and finished condition to the satisfaction of the ENGINEER.

2. Direct all subcontractors to similarly perform, at the same time, an equivalent thorough cleaning of all work and equipment provided under their contracts.

3. Remove all temporary structures and all debris, including dirt, sand, gravel, rubbish and waste material.

4. Should the CONTRACTOR not remove rubbish or debris or not clean the buildings and site as specified above, the CITY reserves the right to have the cleaning done at the expense of the CONTRACTOR.

B. Employ experienced workers, or professional cleaners, for final cleaning.

C. Use only cleaning materials recommended by manufacturer of surface to be cleaned.

D. In preparation for substantial completion or occupancy, conduct final inspection of sight-exposed interior and exterior surfaces, and of concealed spaces.

E. Remove grease, dust, dirt, stains, labels, fingerprints, and other foreign materials from sight-exposed interior and exterior finished surfaces. Polish surfaces so designated to shine finish.

F. Repair, patch, and touch up marred surfaces to specified finish, to match adjacent surfaces.

G. Replace air-handling filters if units were operated during construction.

H. Clean ducts, blowers, and coils, if air-handling units were operated without filters during construction.

I. Vacuum clean all interior spaces, including inside cabinets.

J. Handle materials in a controlled manner with as few handlings as possible. Do not drop or throw materials from heights.

K. Schedule cleaning operations so that dust and other contaminants resulting from cleaning process will not fall on wet, newly-painted surfaces.

L. Clean interior of all panel cabinets, pull boxes, and other equipment enclosures.

M. Wash and wipe clean all lighting fixtures, lamps, and other electrical equipment that may have become soiled during installation.

Section 01710

N. Perform touch-up painting.

O. Broom clean exterior paved surfaces; rake clean other surfaces of the grounds.

P. Remove tools, temporary structures and other materials.

Q. Remove and dispose of all water, dirt, rubbish or any other foreign substances.

3.3 FINAL INSPECTION

A. After cleaning is complete the final inspection may be scheduled. The inspection will be done with the CITY and ENGINEER.

Section 02110

SITE CLEARING

SECTION 02110

1.1 SUMMARY

A. Section Includes: Requirements for clearing of all areas within the Contract limits and other areas shown, including work designated in permits and other agreements, in accordance with the requirements of the General Conditions and Division 1 of these specifications.

1.2 RELATED SECTIONS

A. Section 02050 – Demolition

B. Section 02222 - Excavation - Earth and Rock

C. Section 02223 – Backfilling

D. Section 02275 – NPDES Requirements (More than 1 Acre)

E. Section 02276 - Temporary Erosion Control (Less than 1 acre)

F. Section 02400 - Lawn Restoration

1.3 DEFINITIONS

A. Clearing: Clearing is the removal from the ground surface and disposal, within the designated areas, of trees, brush, shrubs, down timber, decayed wood, other vegetation, rubbish and debris as well as the removal of fences.

B. Grubbing: Grubbing is the removal and disposal of all stumps, buried logs, roots larger than 1-1/2 inches, matted roots and organic materials.

3.1 PROTECTION OF EXISTING UTILITIES

A. Prior to site clearing, locate and mark all existing utilities in coordination with the CITY and other affected utility owners. Protect all existing utilities and

Section 02110 markings from damage. In case of damage to existing utilities caused by construction activities, contact the owner of the utility or the CITY immediately.

Repair any damage to existing utilities or markings caused by construction activities in coordination with or as directed by the CITY or utility owner.

3.2 TREE REMOVAL

A. Tree Removal Within Right-of-Way Limits: Remove trees and shrubs within the right-of-way unless otherwise indicated.

1. Remove trees and shrubs in such a manner as to avoid damage to trees and shrubs designated to remain.

2. Grub and remove tree stumps and shrubs felled within the right-of-way to an authorized disposal site. Fill depressions created by such removal with material suitable for backfill as specified in Section 02223.

B. Tree Removal Outside Right-of-Way (or Designated Work Limits): Do not cut or damage trees outside the right-of-way or des ignated work l im i ts unless plans show trees to be removed or unless written permission has been obtained from the property owner. Furnish three copies of the written permission to the CITY before removal operations commence.

C. If the landowner desires the timber or small trees, cut and neatly pile it in 4 ft.

lengths for removal by the owner; otherwise, dispose of it by hauling it away from the project site. If hauled timber is of merchantable quality, credit shall accrue to the CONTRACTOR.

3.3 TREES AND SHRUBS TO BE SAVED

A. Protection: Protect trees and shrubs within the work limits that are so delineated in the construction documents or are marked in the field to be saved from defacement, injury and destruction.

1. Work within the limits of the tree drip line with extreme care using either hand tools or equipment that will not cause damage to trees.

a. Do not disturb or cut roots unnecessarily. Do not cut roots 1-1/2 inches and larger unless approved.

b. Immediately backfill around tree roots after completion of construction in the vicinity of trees.

c. Do not operate any wheeled or tracked equipment within drip line.

2. Protect vegetation from damage caused by emissions from engine-powered equipment.

Section 02110

3. During working operations, protect the trunk, foliage and root system of all trees to be saved with boards or other guards placed as shown and as required to prevent damage, injury and defacement.

a. Do not pile excavated materials within the drip line or adjacent to the trunk of trees.

b. Do not allow runoff to accumulate around trunk of trees.

c. Do not fasten or attach ropes, cables, or guy wires to trees without permission. When such permission is granted, protect the tree before making fastening or attachments by providing burlap wrapping and softwood cleats.

d. The use of axes or climbing spurs for trimming will not be permitted.

e. Provide climbing ropes during trimming.

4. Remove shrubs to be saved, taking a sufficient earth ball with the roots to maintain the shrub.

a. Temporarily replant if required, and replace at the completion of construction in a condition equaling that which existed prior to removal.

b. Replace in kind if the transplant fails.

5. Have any tree and shrub repair performed by a Certified Arborist properly licensed by the State of Florida and within 24 hours after damage occurred.

3.4 CLEARING AND GRUBBING

A. Clearing: Clear all items specified to the limits shown and remove cleared and grubbed materials from the site.

1. Prior to clearing, install erosion control measures in accordance with the requirements specified in Section 02275 or 02276.

2. Do not start earthwork operations in areas where clearing and grubbing is not complete, except that stumps and large roots may be removed concurrent with excavation.

3. Comply with erosion, sediment control and storm management measures as specified in Division 1.

B. Grubbing: Clear and grub areas to be excavated, areas receiving less than 3 feet of fill and areas upon which structures are to be constructed.

Section 02110

1. Remove stumps and root mats in these areas to a depth of not less than 18 inches below the subgrade of sloped surfaces.

2. Fill all depressions made by the removal of stumps or roots with material suitable for backfill as specified in Section 02223.

C. Limited Clearing: Clear areas receiving more than 3 feet of fill by cutting trees and shrubs as close as practical to the existing ground. Grubbing will not be required.

D. Dispose of all material and debris from the clearing and grubbing operation by hauling such material and debris away to an approved dump. The cost of disposal (including hauling) of cleared and grubbed material and debris shall be considered a subsidiary obligation of the CONTRACTOR; include the cost in the bid for the various classes of work.

3.5 TOPSOIL

A. Stripping: Strip existing topsoil from areas that will be excavated or graded prior to commencement of excavating or grading and place in well-drained stockpiles in approved locations.

Section 02222

EXCAVATION – EARTH AND ROCK

SECTION 02222

EXCAVATION - EARTH AND ROCK

A. Section Includes: Requirements for performing open-cut excavations to the widths and depths necessary for constructing structures and pipelines, including excavation of any material necessary for any purpose pertinent to the construction of the Work.

B. Related Work Specified In Other Sections Includes:

1. Section 01560 – Traffic Regulation and Public Safety

2. Section 02110 - Site Clearing

3. Section 02151 - Shoring, Sheeting and Bracing

4. Section 02223 – Backfilling

5. Section 02530 – Groundwater Control for Open Cut Excavation

1.2 DEFINITIONS

A. Earth: "Earth" includes all materials which, in the opinion of the ENGINEER, do not require blasting, hydraulic hammering, barring, wedging or special impact tools for their removal from their original beds, and removal of which can be completed using standard excavating equipment. Specifically excluded are all ledge and bedrock, boulders or pieces of masonry larger than one cubic yard in volume.

B. Rock: "Rock" includes all materials which, in the opinion of the ENGINEER, require blasting, hydraulic hammering, barring, wedging and/or special impact tools such as jack hammers, sledges, chisels, or similar devices specifically designed for use in cutting or breaking rock for removal from their original beds and which have compressive strengths in their natural undisturbed state in excess of 300 psi. Boulders or masonry larger than one cubic yard in volume are classed as rock excavation.

1.3 SUBMITTALS

A. General: Provide all submittals, including the following, as specified in the

General Conditions.

Section 02222

B. Submit a detailed schedule of operations for approval to the CITY, with copy to the

ENGINEER, a minimum of fourteen (14) days prior to beginning work. This includes, but is not limited to, type and extent of temporary paving, and drawings and lists describing materials and traffic control methods to be used. Approval does not relieve the CONTRACTOR of his obligation to provide a safe and proper crossing.

C. Engage the services of a Professional Engineer who is registered in the State of

Florida to design all cofferdam and sheeting and bracing systems which the CONTRACTOR feels necessary for the execution of his work. Submit to the ENGINEER a signed statement that he has been employed by the CONTRACTOR to design all sheeting and bracing systems. After the systems have been installed, furnish to the ENGINEER an additional signed statement that the cofferdams and sheeting and bracing systems have been installed in accordance with his design.

D. If a detour is required, submit a traffic control plan for approval to the CITY and/or the Florida or Lee County Department of Transportation as described in Section 01570.

E. Dewatering Excavation Plan: Develop an excavation dewatering plan that considers site ground and groundwater conditions, the type and arrangement of the equipment to be used and the proper method of groundwater disposal.

Prepare the dewatering plan before beginning excavations below groundwater.

Maintain one copy of the dewatering plan at the project site to be available for inspection while all dewatering operations are underway. Obtain necessary State and Local permits necessary to withdraw and dispose of groundwater and comply with applicable permit conditions.

1.4 SITE CONDITIONS

A. Geotechnical Investigation: A geotechnical investigation may have been prepared by the CITY and ENGINEER in preparing the Contract Documents.

1. The geotechnical investigation report may be examined for whatever value it may be considered to be worth. However, this information is not guaranteed as to its accuracy or completeness.

2. The geotechnical investigation report is not part of the Contract Documents.

B. Actual Conditions: Make any geotechnical investigations deemed necessary to determine actual site conditions. The CONTRACTOR must comply with all provisions of the Florida Statute 556, the Underground Facility Damage Prevention and Safety Act.

C. Underground Utilities: Locate and identify all existing underground utilities prior to the commencement of Work.

Section 02222

D. Quality and Quantity: Make any other investigations and determinations necessary to determine the quality and quantities of earth and rock and the methods to be used to excavate these materials.

3.1 GENERAL

A. Clearing: Clear open-cut excavation sites of obstructions prior to excavation.

Clearing in accordance with Section 02110, includes removal and disposal of vegetation, trees, stumps, roots and bushes, except those specified to be protected during trench excavation.

B. Banks: Shore or slope banks to the angle of repose to prevent slides or cave-ins in accordance with Section 02151.

C. Safety: Whenever an excavation site or trench is left unattended by the CONTRACTOR or when an area is not within 100 feet of observation by the CONTRACTOR, the excavation site or trench shall be filled and/or, at the CITY’s discretion, protected by other means to prevent accidental or unauthorized entry.

Include barricades and other protection devices requested by the ENGINEER or CITY, including temporary fencing, snow fencing, or temporary "structure" tape.

Such safety items shall not relieve the CONTRACTOR of any site safety requirements or liabilities established by Federal, State and local laws and agencies, including OSHA, but is intended as additional safety measures to protect the general public.

D. Hazardous Materials: If encountered, take care of hazardous materials not specifically shown or noted in accordance with Section 01500.

E. During excavation and any site work, take stormwater pollution prevention measures to ensure that water quality criteria are not violated in the receiving water body and all state and local regulatory requirements are met. Any dewatering shall be as specified in the Dewatering Plan and as specified in Section 02530.

3.2 STRUCTURE EXCAVATION

A. Excavation Size: Provide excavations of sufficient size and only of sufficient size to permit the Work to be economically and properly constructed in the manner and of the size specified.

B. Excavation Shape: Shape and dimension the bottom of the excavation in earth or rock to the shape and dimensions of the underside of the structure or drainage blanket wherever the nature of the excavated material permits.

C. Compaction: Before placing foundation slabs, footings or backfill, proof roll the

Section 02222 bottom of the excavations to detect soft spots.

1. For accessible areas, proof roll with a ten wheel tandem axle dump truck loaded to at least 15 tons or similarly loaded construction equipment.

2. For small areas, proof roll with a smooth-faced steel roller filled with water or sand, or compact with a mechanical tamper.

3. Make one complete coverage, with overlap, of the area.

4. Over-excavate soft zones and replace with compacted select fill.

3.3 TRENCH EXCAVATION

A. Preparation: Properly brace and protect trees, shrubs, poles and other structures which are to be preserved. Unless shown or specified otherwise, preserve all trees and large shrubs. Hold damage to the root structure to a minimum. Small shrubs may be preserved or replaced with equivalent specimens.

B. Adequate Space: Keep the width of trenches to a minimum, however provide adequate space for workers to place, joint and backfill the pipe properly.

1. The minimum width of the trench shall be equal to at least 3.5 feet or the outside diameter of the pipe at the joint plus 8-inches for un-sheeted trench or 12 inches for sheeted trench, whichever is greater. Conform the trench walls to OSHA Regulations.

2. In sheeted trenches, measure the clear width of the trench at the level of the top of the pipe to the inside of the sheeting.

C. Depth:

1. Excavate trenches to a minimum depth of 6 inches, but not more than 12 inches, below the bottom of the pipe so that bedding material can be placed in the bottom of the trench and shaped to provide a continuous, firm bearing for pipe barrels and bells.

2. Standard trench grade shall be defined as the bottom surface of the utility to be constructed or placed within the trench. Trench grade for utilities in rock or other non-cushioning material shall be defined as additional undercuts backfilled with #57 stone compacted in 6-inch lifts, below the standard 6-inches minimum trench undercut. Backfill excavation below trench grade not ordered in writing by the ENGINEER with acceptable Class I, II or III embedment material, as defined in Section 02223, to trench grade and compact to density equal to native soil.

D. Unstable or Unsuitable Materials: If unstable or unsuitable material is exposed at the level of the bottom of the trench excavation, excavate the material in accordance with the subsection headed "Authorized Additional Excavation".

Section 02222

1. Remove material for the full width of the trench and to the depth required to reach suitable foundation material.

2. When in the judgment of the ENGINEER the unstable or unsuitable material extends to an excessive depth, the ENGINEER may advise, in writing, the need for stabilization of the trench bottom with additional select fill material, crushed stone, washed shell, gravel mat or the need to provide firm support for the pipe or electrical duct by other suitable methods.

3. Crushed stone, washed shell and gravel shall be as specified in Section 02223.

4. Payment for such trench stabilization will be made under the appropriate

Contract Items or where no such items exist, as a change in the Work.

E. Length of Excavation: Keep the open excavated trench preceding the pipe laying operation and the unfilled trench, with pipe in place, to a minimum length which causes the least disturbance. Provide ladders for a means of exit from the trench as required by applicable safety and health regulations.

F. Excavated Material: Neatly deposit excavated material to be used for backfill at the sides of the trenches where space is available. Where stockpiling of excavated material is required, obtain the sites to be used and maintain operations to provide for natural drainage and not present an unsightly appearance.

G. Water: Allow no water to rise in the trench excavation until sufficient backfill has been placed to prevent pipe flotation. Provide dewatering in accordance with Section 02530 and the approved Dewatering Plan.

3.4 EXCAVATION FOR JACKING AND AUGERING

A. Jacking and Augering Requirements: Allow adequate length in jacking pits to provide room for the jacking frame, the jacking head, the reaction blocks, the jacks, auger rig, and the jacking pipe. Provide sufficient pit width to allow ample working space on each side of the jacking frame. Allow sufficient pit depth such that the invert of the pipe, when placed on the guide frame, will be at the elevation desired for the completed line. Tightly sheet the pit and keep it dry at all times.

3.5 ROCK EXCAVATION

A. Rock Excavation: Excavate rock within the boundary lines and grades as shown, specified or required.

1. Rock removed from the excavation becomes the property of the CONTRACTOR. Transport and dispose of excavated rock at a suitable offsite disposal location.

Section 02222

2. Remove all shattered rock and loose pieces.

B. Structure Depths: For cast-in-place structures, excavate the rock only to the bottom of the structure, foundation slab, or drainage blanket.

C. Trench Width: Maintain a minimum clear width of the trench at the level of the top of the pipe of the outside diameter of the pipe barrel plus 2 feet, unless otherwise approved.

D. Trench Depth: For trench excavation in which pipelines are to be placed, excavate the rock to a minimum depth of 8 inches below the bottom of the pipe or duct encasement. Provide a cushion of sand or suitable crushed rock. Refill the excavated space with pipe bedding material in accordance with Section 02223.

Include placing, compacting and shaping pipe bedding material in the appropriate Contract Items.

E. Manhole Depths: For manhole excavation, excavate the rock to a minimum depth of 8 inches below the bottom of the manhole base for pipelines 24 inches in diameter and larger and 6 inches below the bottom manhole base for pipelines less than 24 inches in diameter. Refill the excavated space with pipe bedding material in accordance with Section 02223. Include placing, compacting and shaping pipe bedding material for manhole bases in the appropriate Contract Items.

F. Over-excavated Space: Refill the excavated space in rock below structures, pipelines, conduits and manholes, which exceeds the specified depths with 2,500 psi concrete, crushed stone, washed shell, or other material as directed. Include refilling of over-excavated space in rock as part of the rock excavation.

G. Other Requirements: Follow, where applicable, the requirements of the subsections on "Trench Excavation" and "Structure Excavation".

H. Payment: Rock excavation, including placing, compacting and shaping of the select fill material, will be paid for under the appropriate Contract Items or where no such items exist, as a change in the Work.

3.6 FINISHED EXCAVATION

A. Finish: Provide a reasonably smooth finished surface for all excavations, which is uniformly compacted and free from irregular surface changes.

B. Finish Methods: Provide a degree of finish that is ordinarily obtainable from blade-grade operations and in accordance with Section 02223.

3.7 PROTECTION

A. Traffic and Erosion: Protect newly graded areas from traffic and from erosion.

Section 02222

B. Repair: Repair any settlement or washing away that may occur from any cause, prior to acceptance. Re-establish grades to the required elevations and slopes.

C. It shall be the CONTRACTOR’s responsibility to acquaint himself with all existing conditions and to locate all existing structures and utilities along the proposed utility alignment in order to avoid conflicts. Where actual conflicts are unavoidable, coordinate work with the facility owner and perform work so as to cause as little interference as possible with the service rendered by the facility disturbed in accordance with Section 01046. Repair and/or replace facilities or structures damaged in the prosecution of the work immediately, in conformance with current standard practices of the industry, or according to the direction of the owner of such facility, at the CONTRACTOR’s expense.

D. Other Requirements: Conduct all Work in accordance with the environmental protection requirements specified in Division 1 and Sections 02275 and 02276.

3.8 AUTHORIZED ADDITIONAL EXCAVATION

A. Additional Excavation: Carry the excavation to such additional depth and width as authorized in writing, for the following reasons:

1. In case the materials encountered at the elevations shown are not suitable.

2. In case it is found desirable or necessary to go to an additional depth and/or width.

B. Refill Materials: Refill such excavated space with either authorized 2500 psi concrete or compacted select fill material, in compliance with the applicable provisions of Section 02223.

C. Compaction: Compact fill materials to avoid future settlement in compliance with the applicable provisions of Section 02223.

D. Payment: Additional earth excavations so authorized and concrete or select fill materials authorized for filling such additional excavation and compaction of select fill materials will be paid for under the appropriate Contract Items or where no such items exist, as a change in the Work.

3.9 UNAUTHORIZED EXCAVATION

A. Stability: Refill any excavation carried beyond or below the lines and grades shown, except as specified in the subsection headed "Authorized Additional Excavation", with such material and in such manner as may be approved in order to provide for the stability of the various structures.

B. Refill Materials: Refill spaces beneath all manholes, structures, pipelines, or conduits excavated without authority with 2500 psi concrete or compacted select fill material, as approved.

Section 02222

3.10 Payment: Refill for unauthorized excavation will not be measured and no payment will be made therefor.

3.11 SEGREGATION STORAGE AND DISPOSAL OF MATERIAL

A. Stockpiling Suitable Materials: Stockpile topsoil suitable for final grading and landscaping and excavated material suitable for backfilling or embankments separately on the site in approved locations.

B. Stockpile Locations: Store excavated and other material a sufficient distance away from the edge of any excavation to prevent its falling or sliding back into the excavation and to prevent collapse of the wall of the excavation. Provide not less than 2 feet clear space between the toe of slope of any stockpile and other material and the edge of any excavation.

C. Excess Materials: Be responsible for transport and disposal of surplus excavated material and excavated material unsuitable for backfilling or embankments at an offsite disposal location secured by the CONTRACTOR.

3.12 REMOVAL OF WATER

A. Water Removal: At all times during the excavation period and until completion and acceptance of the WORK at final inspection, provide ample means and equipment with which to remove promptly and dispose of properly all water entering any excavation or other parts of the WORK. All dewatering shall be in conformance with Section 02530.

B. Dry Excavations: Keep the excavation dry.

C. Water Contact: Allow no water to rise over or come in contact with masonry and concrete until the concrete and mortar have attained a set and, in any event, not sooner than 12 hours after placing the masonry or concrete.

D. Discharge of Water: Dispose of water pumped or drained from the Work in a safe and suitable manner without damage to adjacent property or streets or to other work under construction.

E. Protection: Provide adequate protection for water discharged onto streets. Protect the street surface at the point of discharge.

F. Sanitary Sewers: Discharge no water into sanitary sewers.

G. Storm Sewers: Discharge no water containing settleable solids into storm sewers.

H. Repair: Promptly repair any and all damage caused by dewatering the Work.

Section 02222

Section 02223

BACKFILLING

SECTION 02223

A. General Requirements: Backfill all excavation to the original surface of the ground or to such other grades as may be shown or required. For areas to be covered by topsoil, leave or stop backfill (12) inches below the finished grade. Obtain approval for the time elapsing before backfilling against masonry structures.

Remove from all backfill, any compressible, putrescible, or destructible rubbish and refuse and all lumber and braces from the excavated space before backfilling is started. Leave sheeting and bracing in place or remove as the work progresses.

B. Equipment Limitations: Do not permit construction equipment used to backfill to travel against and over cast-in-place concrete structures until the specified concrete strength has been obtained, as verified by concrete test cylinders. In special cases where conditions warrant, the above restriction may be modified providing the concrete has gained sufficient strength, as determined from test cylinders, to satisfy design requirements for the removal of forms and the application of load.

C. Related Work Specified In Other Sections Includes:

1. Section 02110 - Site Clearing

2. Section 02222 – Excavation – Earth and Rock

1.2 REFERENCES

A. Codes and standards referred to in this Section are:

1. ASTM D 1557 - Standard Test Methods for Moisture-Density Relations of Soil and Soil-Aggregate Mixtures Using 10 lb Rammer and 18 in Drop

2. ASTM D2487 - Standard Classification of Soils for Engineering Purposes

(Unified Soil Classification System, USCS)

3. FDOT - FDOT Standard Specifications for Road and Bridge Construction (Latest Edition)

Section 02223

2.1 BACKFILL MATERIAL - GENERAL

A. General: Backfill with sound materials, free from waste, organic matter, rubbish, boggy or other unsuitable materials.

B. General Materials Requirements: Conform materials used for backfilling to the requirements specified. Follow common fill requirements whenever drainage or select fill is not specified. Determine and obtain the approval of the appropriate test method where more than one compaction test method is specified.

C. Classification of Approved Embedment Materials: Embedment materials listed here include a number of processed materials plus the soil types defined according to the Unified Soil Classification System (USCS) in ASTM D2487.

These materials are grouped into 5 broad categories according to their suitability for this application.

1. Class I: Angular, 0.25 inch to 1.5 inch (6 to 40 mm) graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed shells and crushed stone. (Note: The size range and resulting high void ratio of Class I material makes it suitable for use to dewater trenches during pipe installation. This permeable characteristic dictates that its use be limited to locations where pipe support will not be lost by migration of fine grained natural material from the trench walls and bottom or migration of other embedment materials into the Class I material.

When such migration is possible, the material's minimum size range should be reduced to finer than 0.25 inch (6 mm) and the gradation properly designed to limit the size of the voids. An alternative to modifying the gradation is to use a geotextile fabric as a barrier to migration to fines.)

2. Class II: Coarse sands and gravels with maximum particle size of 1.5 inches (40 mm), including variously graded sands and gravels containing small percentages of fines, generally granular and non-cohesive, either wet or dry. Soil Types GW, GP, SW and SP are included in this class. (Note:

Sands and gravels, which are clean or borderline between clean and with fines, should be included.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .