SBK80017Q0001_A005_PackingandShipping.pdf

PDF 903 KB Posted

Attached to
Packing, Crating and Freight Transportation Services Federal contract opportunity
Solicitation number
SBK80017Q0001
Issued by
Department of State US Embassy Sarajevo

About this file

Amendment 005

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. CONTRACT ID CODE I PA~E OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I 16

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO. (if applicable)

AOO5 February 27, 2017 PR6011423

6. ISSUED BY CODE 7. ADMINISTERED BY (if other than item 6) CODE I The Embassy of the United States of America See block 6 Procurement & Contracting Office Roberta C. Frasurea 71000 Sarajevo Bosnia and Herzegovina

8. NAME AND ADDRESS OF THE CONTRACTOR (No., street, country, State and ZIP Code) ~ 9A. AMENDMENT OF SOLICITATION NO.

C8J

SBKBOO17QOOO1

9B. DATED (SEE ITEM 11)

February 01,2017

10A. MODIFICATION OF CONTRACT ORDER

D 10B. DATED (SEE ITEM 13) ,

CODE I FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[;gI The above numbers solicitation is amended as set fourth in item 14. The hour and date specified for receipt of Offers0 is extended, [;gI is not extended. Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By cornoletinc Items 8 and 15, and returninq TWO copies of the amendment: (b) By acknowledqino receipt of this amendment on each COpyof the offer Submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (If required)

13. THIS ITEM APPLIES ONLY TO THE MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FOURTH IN ITEM 14ARE MADE IN THE

0 CONTRACT ORDER NO. IN ITEM 10A.

0 B. THE ABOVE NUMBERED CONTRACT ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as change in paying office, Appropriation data, etc.). SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b)

0 C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

0 D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor0 is not,0 is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Purpose of this Amendment A005 is to include additional CLIN line to the Base and all Option years in Section 1 of the REQUEST FOR QUOTATlON, as required by Federal Acquisition Regulation clause 52.228-3 Workers' Compensation Insurance (Defense Base Act). All prospective offerorslquoters shall DISCARD pages 4 through 18 from the RFQ SBK80017Q0001, and REPLACE with enclosed pages.

This Amendment does not extend the date for submission of proposals (date and time) specified in the Request For Quotation (RFQ) SBK80017Q0001 and subsequent changes issued throughout previous amendments, and remains unchanged: March 16, 2017 by 5:00 p.m. (loca/ time).

Except as provided herein, all other terms and conditions of the document referenced in item 9A or tDA, as heretofore changed, remains unchanged and in full force and effect.

15A. NAMEAND TITLE OF SIGNER (Type or print) 16A. NAMEAND TITLE OF SIGNER (Type or print)

John Gage 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16;';;;!J.Ji::;!!t~~A 16C.DATE

)-Y "(Si~liatureoT~~~r) ~~/l(Siiil1aiure oiPerson auihoriiedio sign)

NSN 7540-01-152-9070 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA r-A_ '''''' _r-,..., ,..,.."'

4. BASE PERIOD PRICES

The Contractor shall provide shipping and packing services shown below for the BASE PERIOD of the contract, starting on date stated on the Notice to Proceed and continuing for period of 12consecutive months.

19. ITEM ~PRICE

LINENO. 20. .•.••. li:;.1 22. 23a~~RVI 23bSCHEDULEOF SUPPLIES/SERVICES(CLIN) ? ... COSTS .

(A)Outgoing -Packing & Transportation (A.1.) IllIE NOTE:. All kg units of measure refer to Net weight. 10 days Storage in Transit (SIT) is included in the rate A.I.a. Packing 50,000 kg A.1.b. Transport Post IELSO-Antwerp 50,000 kg

(A.2.) UAB

NOTE:. All k5!.units of measure refer to Gross weig_ht._ThisGross weight includes boxes,packing material, tripleply cardboard box, and waterproofpap(!r.

A.2.a. Packing 6,000 kg A.2.b. Transport Post/Wash. DC 2,000 kg A.2.c. Transport PostINYCity 2,000 k_g (A.3.) POV (without boxinz)

A.3.a. Picking up from designated point in Sarajevo and transport 20TO: PostlELSO-Antwerp ea.

A.3.b. Picking up from designated point in Banja Luka and 2transport TO: PostlELSO-Antwerp ea

(B) Incoming - Delivery & Unpacking (B.l.) IllIE NOTE:. All kg units of measure refer to Net weight. 10 days Storage in transit (SIT) is included in the rate B.1.a. Receiving from customs house including 10days storage at contractor's bonded warehouse, delivery to residence and 50,000 kgunpacking

(B.2.}UAB

NOTE:. All k~ units of measure refer to Gross weight.This Gross weight includes boxes, packing material, triple pi cardboard box, and waterproof paper.

B.2.a. Receiving from airport warehouse including 10days storage at contractor's bonded warehouse, delivery to 6,000 kg residence, unpacking Note: Airport handling charges will bepaid directly by the Embassy

Page 4 of93

19. ITEM 23. UNIT PRICE

20. 21. Est.

LINE NO. SCHEDULE OF SUPPLIES/SERVICES QTY* 22. Unit 23a. SERVICE 23b. VAT (17%)

24. AMOUNT

(CLIN) COSTS

(8.3.) POV

B.3.a. Receiving from the customs house, delivery to contractor's bonded warehouse including 10days storage, homologation process and delivery within Sarajevo city 20 ea limits NOTE: The POVwill be delivered on truck

(B.4.) General Cargo B.4.a Receiving from customs house including 10days storage at 70,000 kgcontractor's bonded warehouse B.4.b. Transport from contractors' warehouse to Embassy warehouse 70,000 kg NOTE: The Contractor to state the minimum transport chargesfor delivery service

(C) Customs clearance per shipment c.1. Incoming& Outgoing -charge per shipment 250 ea

(D) In-country transportation of Goods including pick up and unloading D.1. Sarajevo (25 km radius) 2,000 kg D.2. Distant Locations - city: Banja Luka 15,000 kg

(E) Long Term Storage E.1. Long term storage of goods

NOTE: Long term storage is storagefor the period of 1 to 180 days. The m3/daycharge starts on the day 11after the goods have been delivered to 1,000

Contractor's bonded warehouse. Long term storage is to be pre-approved by the COR

(F) Internal move F.1. Packing in current residence and delivery and kgunpacking in new residence within Sarajevo area 9,000

(G) Special (additional) HandlinglDelivery charges G.1. Handling/Delivery of HHE articles whose weight is 20greater or equal to 150kg ea

G.2. Handling/Delivery of HHE andlor VAB shipment on/above the second floor in the buildings without 10 ea elevator (per shipment)

19. ITEM

2ll. UNIT PRICE

LINE NO. 20. 21. Est. 22. Unit 23a. SERVICE 24.AMOVNT (CLIN) SCHEDULEOF SUPPLIES/SERVICES QTY* COSTS 23b. VAT (17%)

(H) Transport charges (UAB and HHE Export Shipping) H.1. HHE Surface shipments to global destinations other than ELSO/ Antwerp.

Total value of this item line SHALL NOT EXCEED an estimate of BAM 30,000 per year.

Estimated number of shipments per year 20.

NOTE: The Government will request each contractor to perform, AT NO COST TO THEGOVERNMENT, apre-shipment survey after which the contractor will present an estimate to the Government. The estimate/pricequote will be obtained on a case by case basis.

H.2. UAB - Air shipments other than Post/Washington, DC Post/New York, NY. Transportation charges will be billed as per actual AWB costs

Total value of this item line SHALL NOT EXCEED an estimate of BAM 40,000 per year.

Estimated number of shipments per year 40.

H.2.a. Flat rate brokerage/agent's fee for handling UAB 40to destination other than Washington, DCINY City ea

(I) DEFENSE BASE ACT (DBA) INSURANCE as required by FAR 52.228-3 I.1. DBA insurance policy (annual) 1 AL

TOTAL ITEMLINE (VAT Excluded) TOTAL ITEM LINE 17%VAT only

TOTAL AMOUNT (BASE YEAR)

The Offeror shall include Defense Base Act (DBA) insurance premium costs covering employees. The offeror may obtain DBA insurance directly from any Department of Labor approved providers at the DOL website at http://www.dol.gov/owcpldlhwcllscarrier.htm

* NOTE 1. This estimated quantity is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task orders(s) to any single contractor will be less than the quantity shown

Page 60'93

4.A. FIRST OPTION YEAR PRICES

The Contractor shall provide shipping and packing services shown below for the OPTION YEARONE of the contract, starting one year after the date stated on the Notice of Proceed and continuing for period of 12consecutive months.

19. ITEM 23. UNIT PRICE

LINENO. 20. 21. Est. 22. Unit 23a. SERVICE 24. AMOUNT (CLIN) SCHEDULEOF SUPPLIES/SERVICES QTY* COSTS 23b. VAT (17%)

(B)Outgoing -Packing & Transportation (A.l.} HHE NOTE:. All k&units of measure refer to Net weight. 10 days Storage in transit (SIT) is included in the rate A.l.a. Packing 50,000 kg A.1.b. Transport Post IELSO-Antwerp 50,000 kg

(A.2.}UAB

NOTE:. All kfi.units of measure refer to Gross weight. This Gross weight includes boxes. packing material. triple pi) cardboard box. and waterproof paper.

A.2.a. Packing 6,000 kg A.2.b. Transport Post/Wash. DC 2,000 kg A.2.c. Transport PostINYCity 2,000 kg (A.3.) POV (without boxina)

A.3.a. Picking up from designated point in Sarajevo and transport 20TO: PostlELSO-Antwerp ea.

A.3.b. Picking up from designated point in Banja Luka and 2transport TO: Post/ELSO-Antwerp ea

(B) Incoming - Delivery & Unpacking (B.t.} HHE NOTE:. All kf!,units of measure refer to Net weight. 10days Storage in transit (SIT) is included in the rate B.1.a. Receiving from customs house including 10days storage at contractor's bonded warehouse, delivery to residence and 50,000 kgunpacking

(B.2.}UAB

NOTE:. All kf!,units of measure refer to Gross weight.This Gross weight includes boxes.packing material. triplepi cardboard box. and waterproofpaper.

B.2.a. Receiving from airport warehouse including 10days storage at contractor's bonded warehouse, delivery to 6,000 kg residence, unpacking Note: Airport handling charges will bepaid directly by the Embassy

Page 70'93

It........ ·~PruCE SCHEDULE OF snp~~' m.3.) POV B.3.a. Receiving from the customs house, delivery to contractor's bonded warehouse including 10days storage, homologation process and delivery within Sarajevo city 20 ea limits NOTE: The POVwill be delivered on truck

(B.4SGeneral Cargo BAa Receiving from customs house including 10 days storage at

70,000 kgcontractor's bondedwarehouse BA.b. Transport from contractors' warehouse to Embassy warehouse 70,000 kgNOTE: The Contractor to state the minimum transport chargesfor delivery service

(C) Customs clearance per shipment c.1. Incoming& Outgoing -charge per shipment 250 ea

(D) In-country transportation of Goods including pick UP and unloading

0.1. Sarajevo (25 km radius) 2,000 kg I

D.2. Distant Locations - city: Bania Luka 15,000 kg

{F)Long Term Storage E.l. Long term storage of goods

NOTE: Long term storage is storagefor theperiod of 1 to 180 days. The m3/daycharge starts on the day 11after the goods have been delivered to 1,000

Contractor's bonded warehouse. Long term storage is to bepre-approved by the COR

~F) Internal move F.l. Packing in current residence and delivery and kgunpacking in new residence within Sarajevo area 9,000

(G) Special (additional) Handling/Delivery charges G.1. Handling/Delivery of HHE articles whose weight is greater or equal to 150kg 20 ea

G.2. Handling/Delivery ofHHE and/or UAB shipment on/above the second floor in the buildings without 10 ea

Page 8 of93

LINE NO.

20. 21. Est. 22. Unit 23a. SERVICE 24. AMOUNT

(CLIN) SCHEDULE OF SUPPLIES/SERVICES QTY*

COSTS

23b. VAT (l7%)

(H) Transport charges (UAB and HHE Export Shipping) H.!. HHE Surface shipments to global destinations other than ELSO/ Antwerp.

Total value of this item line SHALL NOT EXCEED an estimate of BAM 30,000 per year.

Estimated number of shipments per year 20.

NOTE: The Governmentwill request each contractor to perform. AT NO COST TO THEGOVERNMENT, apre-shipment survey after which the contractor willpresent an estimate to the Government. The estimate/price quote will be obtained on a case by case basis.

H.2. UAB - Air shipments other than Post/Washington, DC PostlNew York, NY. Transportation charges will be billed as per actual AWB costs

Total value ofthis item line SHALL NOT EXCEED an estimate of BAM 40,000 per year.

Estimated number of shipments per year 40.

H.2.a. Flat rate brokerage/agent's fee for handling UAB to destination other than Washington, DCINY City 40 ea

(1) DEFENSE BASE ACT (DBA) INSURANCE as requiredby FAR52.228-3

1.1. DBA insurance policy (annual) 1 AL

TOTAL ITEM LINE (VAT Excluded) TOTAL ITEM LINE 17%VAT only

TOTAL AMOUNT (OPTION YEAR ONE)

TheOfferor shall includeDefense Base Act (DBA) insurancepremium costs covering employees. The offeror may obtain DBA insurance directlyfrom any Department of Labor approvedproviders at the DOL website at http://www.dol.govlowcpldlhwcllscarrier.htm

* NOTE 1. This estimated quantity is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task orders(s) to any single contractor will be less than the quantity shown.

Page 9 0'93

4.B. SECOND OPTION YEAR PRICES

The Contractor shall provide shipping and packing services shown below for the OPTION YEAR TWO of the contract, starting two years after the date stated on the Notice to Proceed and continuing for period of 12consecutive months.

19. ITEM 23.UNITPRICE

LINE NO. Nt ;Hl'cl}(Tf,l'!! 'v...... 1ES; Icc. Unitiii 23.ICE AM()lTN 23b.

•••••••••(CLIN)

(CjOutaeinz -Packlnz & Transportation

(A.I.} HHE

NOTE:. All kf!,units of measure refer to Net weight. 10 days Storage in transit (SIT) is included in the rate A.I.a. Packing 50,000 kg A.l.b. Transport Post /ELSO-Antwerp 50,000 kg

(A.2.}VAB

NOTE:. All kg units of measure refer to Gross weight.This Gross weight includes boxes, packing material. triple vi cardboard box. and waterproof paper.

A.2.a. Packing 6,000 kg A.2.b. Transport PostlWash. DC 2,000 kg A.2.c. Transport PostlNY City 2,000 kg (A.3.) POV (without boxinz)

A.3.a. Picking up from designated point in Sarajevo and transport 20TO: PostlELSO-Antwerp ea.

A.3.b. Picking up from designated point in Banja Luka and 2transport TO: PostlELSO-Antwerp ea

(B) Incoming - Delivery& Unpacking

(B.1.}HHE

NOTE:. All kf!,units of measure refer to Net weight. 10 days Storage in transit (SIT) is included in the rate B.l.a. Receiving from customs house including 10days storage at contractor's bondedwarehouse, delivery to residence and 50,000 kgunpacking

(B.2.}VAB

NOTE:. All k&units of measure refer to Gross weight.This Gross weight includes boxes, packing material. triple olv cardboard box, and waterproof paper.

B.2.a. Receiving from airport warehouse including 10days storage at contractor's bonded warehouse, delivery to 6,000 kg residence, unpacking Note: A irport handling charges will be paid directly by the Embassy

23. UNIT PRICE

20. 21. Est.

LINE NO. SCHEDULE OF SUPPLIES/SERVICES QTY* 22. Unit 23a. SERVICE 24. AMOUNT

(CLIN) COSTS

(B.3.) POV

B.3.a. Receiving from the customs house, delivery to contractor's bonded warehouse including 10days storage, homologation process and delivery within Sarajevo city 20 ea limits NOTE: The POVwill be delivered on truck

(B.4.) General Cargo B.4.a Receiving from customs house including 10 days storage at 70,000 kgcontractor's bonded warehouse BA.h. Transport from contractors' warehouse to Embassy warehouse 70,000 kg NOTE: The Contractor to state the minimum transport chargesfor delivery service

(C) Customs clearance per shipment c.1. Incoming& Outgoing -charge per shipment 250 ea

(D) In-country transportation of Goods including pick up and unloading D.1. Sarajevo (25 km radius) 2,000 kg D.2. Distant Locations - city: Bania Luka 15,000 kg

(G) Long Term Storaze E.1. Long term storage of goods

NOTE: Long term storage is storagefor the period of 1 to 180 days. The m3/daycharge starts on the day 11 after the goods have been delivered to 1,000

Contractor's bonded warehouse. Long term storage is to bepre-approved by the COR

(F) Internal move F.!. Packing in current residence and delivery and 9,000 kg unpacking in new residence within Sarajevo area

(G) Special (additional) HandlinglDelivery charges

G.!. Handling/Delivery ofHHE articles whose weight is 20 greater or equal to 150kg ea

G.2. Handling/Delivery ofHHE and/or UAB shipment on/above the second floor in the buildings without 10 ea

Page 11of93 l!9'.ITEM 23. UNITPIUCE

20. 21. Est.LINENO. SCHEDULEOF SUPPLIES/SERVICES QTY* 22. Unit 23a. SERVICE 23b. VAT (17%) 24. AMOUNT

(CLIN) COSTS

(H) Transport charges (UAB and HHE Export Shipping) H.I. HHE Surface shipments to global destinations other than ELSO/ Antwerp.

Total value of this item line SHALL NOT EXCEED an estimate of BAM 30,000 per year.

Estimated number of shipments per year 20.

NOTE: The Government will request each contractor to perform. AT NO COST TO THEGOVERNMENT, a pre-shipment survey after which the contractor will present an estimate to the Government. The estimate/price quote will be obtained on a case bycase basis.

H.2. UAB - Air shipments other than Post/Washington, DC PostlNew York, NY. Transportation charges will be billed as per actual AWB costs

Total value of this item line SHALL NOT EXCEED an estimate of BAM 40,000 per year.

Estimated number of shipments per year 40.

H.2.a. Flat rate brokerage/agent's fee for handling UAB 40to destination other than Washington, DC/NY City ea

(I) DEFENSE BASE ACT (DBA) INSURANCE as requiredby FAR52.228-3 I.1. DBA insurance policy (annual) I AL

TOTAL ITEM LINE (VAT Excluded) TOTAL ITEM LINE 17%VAT only

TOTAL AMOUNT (OPTION YEAR TWO)

The Offeror shall include Defense Base Act (DBA) insurancepremium costs covering employees. The offeror may obtain DBA insurance directlyfrom any Department of Labor approvedproviders at the DOL website at http://www.dol.gov/owcp/dlhwcllscarrier.htm

* NOTE 1. This estimated quantity is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of

Page 12 of93

4.C. THIRD OPTION YEAR PRICES

The Contractor shall provide shipping and packing services shown below for the OPTION YEAR THREE of the contract, starting three years after the date stated on the Notice to Proceed and continuing for period of 12consecutive months.

19. ITEM 23. UNIT PRICE

LINENO. 20. 21. Est. 22. Unit 23a SERVICE 24. AMOUNT (eLIN) SCHEDULEOF SUPPLIES/SERVICES

COSTS 23b. VAT (17%)

(D)Outgoing -Packing & Transportation

(A.I.} HHE

NOTE:. All kf. units of measure refer to Net weight. 10 days Storage in transit (SIT) is included in the rate A.1.a. Packing 50,000 kg A.1.b. Transport Post IELSO-Antwerp 50,000 kg

(A.2.}VAB

NOTE:. All k~ units of measure refer to Gross weight.This Gross weight includes boxes. packing material. triple plJ cardboard box. and waterproof oaoer.

A.2.a. Packing 6,000 kg A.2.b. Transport Post/Wash. DC 2,000 kg A.2.c. Transport PostlNY City 2,000 kg (A.3.) POV (without boxinz)

A.3.a. Picking up from designated point in Sarajevo and transport 20TO: PostlELSO-Antwerp ea.

A.3.b. Picking up from designated point in Banja Luka and 2transport TO: PostlELSO-Antwerp ea

(B) Incoming - Delivery & Unpacking

(B.1.}HHE

NOTE:. All ks units of measure refer to Net weight. 10 days Storage in transit (SIT) is included in the rate B.1.a. Receiving from customs house including 10days storage at contractor's bonded warehouse, delivery to residence and 50,000 kgunpacking

(B.2.}VAB

NOTE:. All kf. units of measure refer to Gross weight.This Gross weight includes boxes.packing material. tripleply cardboard box. and waterproof paper.

B.2.a. Receiving from airport warehouse including 10days storage at contractor's bonded warehouse, delivery to 6,000 kgresidence, unpacking Note: Airport handling charges will be paid directly by the Embassy

Page 13 of93

LINE NO. 20. 21. Est. 22. Unit 23a. SERVICE 24. AMOUNT

(CLIN) SCHEDULE OF SUPPLIES/SERVICES QTY*

COSTS

23b. VAT (17%)

(B.3.)POV

B.3.a. Receiving from the customs house, delivery to contractor's bonded warehouse including 10 days storage, homologation process and delivery within Sarajevo city 20 ea limits NOTE: The POV will be delivered on truck

(B.4.) General Cargo B.4.a Receiving from customs house including 10days storage at 70,000 kgcontractor's bondedwarehouse B.4.b. Transport from contractors' warehouse to Embassy warehouse 70,000 kg NOTE: The Contractor to state the minimum transport chargesfor delivery service

(C) Customs clearance per shipment C.l. Incoming& Outgoing -charge per shipment 250 ea

(D) In-country transportation of Goods including pick up and unloading

0.1. Sarajevo (25 km radius) 2,000 kg

0.2. Distant Locations - city: Banja Luka 15,000 kg

(H) Long Term Storage E.l. Long term storage of goods

NOTE: Long term storage is storagefor the period of J to 180 days. The m3/daycharge starts on the day 11 after the goods have been delivered to 1,000

Contractor's bonded warehouse. Long term storage is to bepre-approved by the COR

F) Internal move F.l. Packing in current residence and delivery and unpacking in new residence within Sarajevo area 9,000 kg

(G) Special (additional) Handling/Delivery charges G.l. Handling/Delivery of HHE articles whose weight is greater or equal to 150kg 20 ea

G.2. Handling/Delivery ofHHE and/or UAB shipment on/above the second floor in the buildings without 10 ea

Page 140'93

23. UNIT PRICE

20. 2L Est.

LINE NO. SCHEDULE OF SUPPLIES/SERVICES QTY* 23a. SERVICE 23b. VAT (17%) 24. AMOUNT

(CLIN) COSTS

(H) Transport charges (UAB and HHE Export Shipping) H.1. HHE Surface shipments to global destinations other than ELSO/ Antwerp.

Total value of this item line SHALL NOT EXCEED an estimate of BAM 30,000 per year.

Estimated number of shipments per year 20.

NOTE: The Governmentwill request each contractor to perform, AT NO COST TO THEGOVERNMENT, a pre-shipment survey after which the contractor will present an estimate to the Government. The estimate/price quote will be obtained on a case by case basis.

H.2. UAB - Air shipments other than Post/Washington, DC PostlNew York, NY. Transportation charges will be billed as per actual AWB costs

Total value of this item line SHALL NOT EXCEED an estimate of BAM 40,000 per year.

Estimated number of shipments per year 40, H.2.a. Flat rate brokerage/agent's fee for handling UAB to destination other than Washington, DCINY City 40 ea

(I) DEFENSE BASE ACT (DBA) INSURANCE as requiredbyFAR 52.228-3

1.1. DBA insurance policy (annual) 1 AL

TOTAL ITEM LINE (VAT Excluded) TOTAL ITEM LINE 17%VAT only

TOTAL AMOUNT (OPTION YEAR THREE)

The Offeror shall includeDefense Base Act (DBA) insurancepremium costs covering employees. The offeror may obtain DBA insurance directlyfrom any Department of Labor approvedproviders at the DOL website at http://www.dol.gov/owcp/dlhwcllscarrier.htm

* NOTE 1. This estimated quantity is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of

Page 15 of93

4.D. FOURTH OPTION YEAR PRICES

The Contractor shall provide shipping and packing services shown below for the OPTION YEAR FOUR of the contract, starting four years after the date stated on the Notice to Proceed and continuing for period of 12 consecutive months.

and

B.1.a. Receiving from customs house including 10 days storage at contractor's bonded warehouse, delivery to residence and unpacking kg50,000

NOTE:. All Receiving from airport warehouse including 10 days storage at contractor's bonded warehouse, delivery to residence, unpacking Note: .

B.2.a.

kg6,000

Page 160'93

19. ITEM 23. UNITPRICE

20. 21. Est.LINE NO.

SCHEDULE OF SUPPLIES/SERVICES QTY* 22. Unit 23a. SERVICE 23b. VAT (17%) 24. AMOUNT

(CLIN) COSTS

(B.3.)POV

B.3.a. Receiving from the customs house, delivery to contractor's bonded warehouse including 10 days storage, homologation process and delivery within Sarajevo city 20 ea limits NOTE: The POVwil/ be delivered on truck

(B.4.)-General Cargo B.4.a Receiving from customs house including 10 days storage at 70,000 kgcontractor's bondedwarehouse B.4.b. Transport from contractors' warehouse to Embassy warehouse 70,000 kg NOTE: The Contractor to state the minimum transport chargesfor delivery service

(C) Customs clearance per shipment C.1. Incoming& Outgoing -charge per shipment 250 ea

(D) In-country transportation of Goods including pick up and unloadina

0.1. Sarajevo (25 km radius) 2,000 kg

0.2. Distant Locations - city: Banja Luka 15,000 kg

(I) Long Term Storage E.1. Long term storage of goods

NOTE: Long term storage is storagefor the period of I to 180 days. The m3/daycharge starts on the day II after the goods have been delivered to 1,000

Contractor's bonded warehouse. Long term storage is to bepre-approved by the COR

IF) Internal move F.1. Packing in current residence and delivery and 9,000 kgunpacking in new residence within Sarajevo area

(G) Special (additional) HandlinglDelivery charges G.1. Handling/Delivery ofHHE articles whose weight is 20greater or equal to 150kg ea

G.2. Handling/Delivery ofHHE and/or DAB shipment on/above the second floor in the buildings without 10 ea

Page 170'93

H.I. HHE Surface shipments to global destinations other than ELSO/ Antwerp.

Total value of this item line SHALL NOT EXCEED an estimate of BAM 30,000 per year.

Estimated number of shipments per year 20.

NOTE: The Governmentwill request each contractor toperform, AT NO COST TO THEGOVERNMENT,a pre-shipment survey after which the contractor will present an estimate to the Government. The will be obtained on a case case basis.

H.2. DAB - Air shipments other than Post/Washington, DC

Post/New York, NY. Transportation charges will be billed as per actual AWB costs

Total value of this item line SHALLNOT EXCEED an estimate of BAM 40,000 per year.

H.2.a. Flat rate brokerage/agent's fee for handling DAB to destination other than W DCINY 40

24. AMOUNT

ea

I.1.

TOTAL ITEM LINE (VAT Excluded) ~--------------------~TOTAL ITEM LINE I7%VAT only r---------------------~TOTAL AMOUNT (OPTION YEAR FOUR) L-- ___.

The Offeror shall include Defense Base Act (DBA) insurancepremium costs covering employees. The offeror may obtain DBA insurance directlyfrom any Department of Labor approvedproviders at the DOL website at http://www.dol.gov/owcp/dlhwcllscarrier.htm

* NOTE 1. This estimated quantity is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of

Page 18 of93

File details come from the government source that posted it. Updated .