File Type Posted
SAQMMA17R0127_Questions_and_Answers_(42-45).pdf PDF
J-3-4,_03-BOG-E_(A005).pdf PDF
J-3-4,_09-NEV-E_(A005).pdf PDF
SAQMMA17R0127_A005.pdf PDF
SAQMMA17R0127_Questions_and_Answers.pdf PDF
SAQMMA17R0127_A004.pdf PDF
SAQMMA17R0127_AutoCAD.zip ZIP file
SAQMMA17R0127_A003.pdf PDF
SAQMMA17R0127_A002.pdf PDF
SAQMMA17R0127_A001.pdf PDF
Schedule_B-M_(A001).pdf PDF
J-2-6_Tax_Exemption_(Exencion_de_Impuesto).doc DOC document
J-2-1,_Material_or_Product_Substitution_Form.docx DOCX document
J-2-2,_Firm_and_Project_Information.docx DOCX document
J-3-4,_06-NEV-A.pdf PDF
SAAMMA17R0127_Schedule_B-M.pdf PDF
J-3-4,_02-BOG-M.pdf PDF
J-2-5,_Deliverables_(Neiva_Specs).xlsx XLSX spreadsheet
J-3-4,_05-NEV-U.pdf PDF
J-3-4,_00-BOG-U.pdf PDF
J-1-1,_Past_Performance_Questionnaire_(PPQ).docx DOCX document
J-3-4,_09-NEV-E.pdf PDF
J-3-4,_08-NEV-M.pdf PDF
J-3-5,_Form_4025-R.pdf PDF
J-3-4,_03-BOG-E.pdf PDF
J-2-7,_Submittal_Register_(Bogota).pdf PDF
J-3-1,_Specs-Bogota.pdf PDF
J-2-4,_Deliverables_(Bogota_Specs).xlsx XLSX spreadsheet
J-3-4,_07-NEV-S.pdf PDF
J-2-9,_SAM_Registration.pdf PDF
J-1-2,_Past_Performance_and_References.xlsx XLSX spreadsheet
J-2-8,_Submittal_Register_(Neiva).pdf PDF
J-3-4,_01-BOG-A.pdf PDF
J-3-4,_10-NEV-T.pdf PDF
SAQMMA17R0127,_SF1442.pdf PDF
J-3-4,_04-BOG-T.pdf PDF
J-3-2,_Specs-Neiva.pdf PDF
J-2-3,_IncidentReports.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gráfico2

#REF! 1 #REF! 1

Operation Rooms

DETAILED BIDDING CHART
PROJECT:Operation Rooms Diran-Neiva
Place:Bogota, Neiva Colombia

BASE BID

EQUIPMENTLABORMATERIAL
ITEMDESCRIPTIONUNITQUANTITYUNIT PRICEUNITQUANTITYUNIT PRICEUNITQUANTITYUNIT PRICETOTAL COSTTOTAL COST BY CHAPTER
A. DIRAN (BOGOTA) OPERATIONS ROOM (CLIN 0001)$ 0.00
01General Requirements$ 0.00
01 11 00Summary of Work$ 0.00
01 14 00Work Restrictions$ 0.00
01 32 16.00 20Construction Progress Documentation$ 0.00
01 33 00Submittal Procedures$ 0.00
01 40 00Quality Requirements$ 0.00
01 42 00Sources for Reference Publications$ 0.00
01 50 00Temporary Facilities and Controls$ 0.00
01 78 00Execution and Closeout Requirements$ 0.00
02Existing Conditions$ 0.00
02 41 00Demolition and Deconstruciton$ 0.00
03Concrete$ 0.00
03 52 16Lightweight Concrete$ 0.00
04Masonry$ 0.00
04 20 00Unit Masonry$ 0.00
05Metals$ 0.00
05 52 00Metal Railings$ 0.00
07Thermal and Moisture Protection$ 0.00
07 11 13Bituminus Dampproofing$ 0.00
07 92 00Joint Seals$ 0.00
08Openings$ 0.00
08 11 13Steel Doors and Frames$ 0.00
08 71 00Door Hardware$ 0.00
08 81 00Glazing$ 0.00
09Finishes$ 0.00
09 23 00Plastering$ 0.00
09 29 00Gypsum Board$ 0.00
09 65 00Resilient Floorings$ 0.00
09 90 00Painting and Coating$ 0.00
12Furnishings$ 0.00
12 24 13Roller Window Shades$ 0.00
12 93 00Site Furnishings$ 0.00
23Heating, Ventilating, and Air Conditioning (HVAC)$ 0.00
23 07 00Thermal Insulation for Mechanical Systems$ 0.00
23 81 00Unitary AirConditioning equipment$ 0.00
26Electrical$ 0.00
26 20 00Interior Low Voltage Electrical Distribution System$ 0.00
26 32 33Uninterruptible Power Supply$ 0.00
26 51 00Inteiror Lighting$ 0.00
27Communications$ 0.00
27 10 00Building Telecomunications Cabling System$ 0.00
27 21 29Data Communications Switches$ 0.00
27 22 19Data Communications Servers$ 0.00
27 22 23Data Communications Servers$ 0.00
27 41 16Integrated Audio-Video Systems and Equipment$ 0.00
28Electronic Safety and Security$ 0.00
28 20 00Electronic Security Systems (ESS)$ 0.00
28 23 23Closed Circuit Television Systems$ 0.00

A1. OVERHEAD $ 0.00

TOTAL DIRECT COSTS (Base bid - CLIN 0001) $ 0.00

Administration%0$ 0.00
Unforenseens%0$ 0.00
Profit%0$ 0.00
VAT(Over the profit value)%0$ 0.00

TOTAL COSTS (Base bid - CLIN 0001) $ 0.00

B. NEIVA OPERATION ROOM (CLIN 0002)$ 0.00
01General Requirements$ 0.00
01 11 00Summary of Work$ 0.00
01 14 00Work Restrictions$ 0.00
01 32 16.00 20Construction Progress Documentation$ 0.00
01 33 00Submittal Procedures$ 0.00
01 40 00Quality Requirements$ 0.00
01 42 00Sources for Reference Publications$ 0.00
01 50 00Temporary Facilities and Controls$ 0.00
01 78 00Execution and Closeout Requirements$ 0.00
03Concrete$ 0.00
03 30 00Cast in Place Concrete$ 0.00
05Metals$ 0.00
05 12 00Structural Steel$ 0.00
07Thermal and Moisture Protection$ 0.00
07 60 00Flashing and Sheet Metal
07 92 00Joint Seals$ 0.00
08Openings$ 0.00
08 71 00Door Hardware$ 0.00
08 81 00Glazing$ 0.00
09Finishes$ 0.00
09 29 00Gypsum Board$ 0.00
09 65 00Resilient Floorings$ 0.00
09 90 00Painting and Coating$ 0.00
12Furnishings$ 0.00
12 93 00Site Furnishings$ 0.00
13Special Construction$ 0.00
13 34 19Special Building Systems$ 0.00
23Heating, Ventilating, and Air Conditioning (HVAC)$ 0.00
23 07 00Thermal Insulation for Mechanical Systems$ 0.00
23 81 00Unitary AirConditioning equipment$ 0.00
26Electrical$ 0.00
26 20 00Interior Low Voltage Electrical Distribution System$ 0.00
26 32 33Uninterruptible Power Supply$ 0.00
26 51 00Inteiror Lighting$ 0.00
27Communications$ 0.00
27 10 00Building Telecomunications Cabling System$ 0.00
27 21 29Data Communications Switches$ 0.00
27 22 19Data Communications Servers$ 0.00
27 22 23Data Communications Servers$ 0.00
27 41 16Integrated Audio-Video Systems and Equipment$ 0.00
28Electronic Safety and Security$ 0.00
28 20 00Electronic Security Systems (ESS)$ 0.00
28 23 23Closed Circuit Television Systems$ 0.00
31Earthwork$ 0.00
31 00 00EarthWork$ 0.00
33Utilities$ 0.00
33 71 01Overhead Transformer$ 0.00
33 71 02Undergroundg Electrical Distribution$ 0.00

B.1. OVERHEAD $ 0.00

TOTAL DIRECT COSTS (Base bid - CLIN 0002) $ 0.00

Administration%0$ 0.00
Unforenseens%0$ 0.00
Profit%0$ 0.00
VAT(Over the profit value)%0$ 0.00

TOTAL COSTS (Base bid - CLIN 0002) $ 0.00

OPTION 1

EQUIPMENTLABORMATERIAL
ITEMDESCRIPTIONUNITQUANTITYUNIT PRICEUNITQUANTITYUNIT PRICEUNITQUANTITYUNIT PRICETOTAL COSTTOTAL COST BY CHAPTER
C. DIRAN OPERATIONS ROOM (CLIN 1001)$ 0.00
28Electronic Safety and Security$ 0.00
28 23 23Closed Circuit Television Systems, 1 year Maintenace$ 0.00

C.1. OVERHEAD $ 0.00

TOTAL DIRECT COSTS (Option 1 - CLIN 1001) $ 0.00

Administration%0$ 0.00
Unforenseens%0$ 0.00
Profit%0$ 0.00
VAT(Over the profit value)%0$ 0.00

TOTAL COSTS (Option 1 - CLIN 1001) $ 0.00

D. NEIVA OPERATION ROOM (CLIN 1002)$ 0.00
28Electronic Safety and Security$ 0.00
28 23 23Closed Circuit Television Systems, 1 year Maintenance$ 0.00

D.1. OVERHEAD $ 0.00

TOTAL DIRECT COSTS (Option 1 - CLIN 1002) $ 0.00

Administration%0$ 0.00
Unforenseens%0$ 0.00
Profit%0$ 0.00
VAT(Over the profit value)%0$ 0.00

TOTAL COSTS (Option 1 - CLIN 1002) $ 0.00

&"Arial Narrow,Regular"Department of State- INL &"Arial Narrow,Regular"Virtual Interview Rooms &"Arial Narrow,Regular"&P of &N

COMPRAS

PRESUPUESTO - CNP MARIQUITA
A&E DESIGN FOR A NEW LODGING BUILDING AT THE CNP AVIATION SCHOOL IN MARIQUITA TOLIMA
COMPRAS - CNP
A&E DESIGN FOR A NEW LODGING BUILDING AT THE CNP AVIATION SCHOOL IN MARIQUITA TOLIMA
4/6/17
ITEMDESCRIPCIÓNU.M.CANT.VR. UNITARIOVR. PARCIALVR. TOTAL
6INSTALACIONES ELÉCTRICASERROR:#REF!
6,5,14Suministro Planta de Emergencia Insonorisada 150KVAUN1.00ERROR:#REF!ERROR:#REF!
8INSTALACIONES AIRE ACONDICIONADOERROR:#REF!
8.1EQUIPOS DE AIRE ACONDICIONADO
8,1,1UCMS-01/UAMS-01: Equipo Mini Split 12,000 Btu/H, R-410, 208-230/1/60UN40.00ERROR:#REF!ERROR:#REF!
14CARPINTERIA DE MADERAERROR:#REF!
14.2Suministro e instalacion de M-1,Closet 2.05 x 2.10 en triplex pizano entamborado para las, divisiones y entrepaños. Sus cajones serán en madera de sajo o equivalente. Los filos de los costados serán marqueteados en sajo o equivalente. Se ubicarán tres bisagras por puerta a las cuales también se les instalará manija metálica y tope de lira. Se instalará bolillo metalico de 1”.UN40.00ERROR:#REF!ERROR:#REF!

TOTAL COSTOS DIRECTOS ERROR:#REF!

Administración%0.03ERROR:#REF!
Imprevistos%0.01ERROR:#REF!
Utilidad%0.03ERROR:#REF!
I.V.A./Utilidad%0.16ERROR:#REF!

TOTAL OBRA ERROR:#REF!

Summary

CLINSection B.2 Value
NumberDescriptionContract TypeQuantityUnitTotalVAT (not included in contract)
0001Operational Room – Diran/BogotaFFP1Lot$0.00$0.00
0002Operational Room –NeivaFFP1Lot$0.00$0.00
1001(optional service) 1-year CCTV Maintenance – BogotaFFP1Lot$0.00$0.00
1002(optional service) 1-year CCTV Maintenance – NeivaFFP1Lot$0.00$0.00
[$USD] 0.00