Gráfico2
#REF! 1 #REF! 1
Operation Rooms
| DETAILED BIDDING CHART | |
| PROJECT: | Operation Rooms Diran-Neiva |
| Place: | Bogota, Neiva Colombia |
BASE BID
| EQUIPMENT | LABOR | MATERIAL | ||||||||||
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | UNIT | QUANTITY | UNIT PRICE | UNIT | QUANTITY | UNIT PRICE | TOTAL COST | TOTAL COST BY CHAPTER |
| A. DIRAN (BOGOTA) OPERATIONS ROOM (CLIN 0001) | $ 0.00 | |||||||||||
| 01 | General Requirements | $ 0.00 | ||||||||||
| 01 11 00 | Summary of Work | $ 0.00 | ||||||||||
| 01 14 00 | Work Restrictions | $ 0.00 | ||||||||||
| 01 32 16.00 20 | Construction Progress Documentation | $ 0.00 | ||||||||||
| 01 33 00 | Submittal Procedures | $ 0.00 | ||||||||||
| 01 40 00 | Quality Requirements | $ 0.00 | ||||||||||
| 01 42 00 | Sources for Reference Publications | $ 0.00 | ||||||||||
| 01 50 00 | Temporary Facilities and Controls | $ 0.00 | ||||||||||
| 01 78 00 | Execution and Closeout Requirements | $ 0.00 | ||||||||||
| 02 | Existing Conditions | $ 0.00 | ||||||||||
| 02 41 00 | Demolition and Deconstruciton | $ 0.00 | ||||||||||
| 03 | Concrete | $ 0.00 | ||||||||||
| 03 52 16 | Lightweight Concrete | $ 0.00 | ||||||||||
| 04 | Masonry | $ 0.00 | ||||||||||
| 04 20 00 | Unit Masonry | $ 0.00 | ||||||||||
| 05 | Metals | $ 0.00 | ||||||||||
| 05 52 00 | Metal Railings | $ 0.00 | ||||||||||
| 07 | Thermal and Moisture Protection | $ 0.00 | ||||||||||
| 07 11 13 | Bituminus Dampproofing | $ 0.00 | ||||||||||
| 07 92 00 | Joint Seals | $ 0.00 | ||||||||||
| 08 | Openings | $ 0.00 | ||||||||||
| 08 11 13 | Steel Doors and Frames | $ 0.00 | ||||||||||
| 08 71 00 | Door Hardware | $ 0.00 | ||||||||||
| 08 81 00 | Glazing | $ 0.00 | ||||||||||
| 09 | Finishes | $ 0.00 | ||||||||||
| 09 23 00 | Plastering | $ 0.00 | ||||||||||
| 09 29 00 | Gypsum Board | $ 0.00 | ||||||||||
| 09 65 00 | Resilient Floorings | $ 0.00 | ||||||||||
| 09 90 00 | Painting and Coating | $ 0.00 | ||||||||||
| 12 | Furnishings | $ 0.00 | ||||||||||
| 12 24 13 | Roller Window Shades | $ 0.00 | ||||||||||
| 12 93 00 | Site Furnishings | $ 0.00 | ||||||||||
| 23 | Heating, Ventilating, and Air Conditioning (HVAC) | $ 0.00 | ||||||||||
| 23 07 00 | Thermal Insulation for Mechanical Systems | $ 0.00 | ||||||||||
| 23 81 00 | Unitary AirConditioning equipment | $ 0.00 | ||||||||||
| 26 | Electrical | $ 0.00 | ||||||||||
| 26 20 00 | Interior Low Voltage Electrical Distribution System | $ 0.00 | ||||||||||
| 26 32 33 | Uninterruptible Power Supply | $ 0.00 | ||||||||||
| 26 51 00 | Inteiror Lighting | $ 0.00 | ||||||||||
| 27 | Communications | $ 0.00 | ||||||||||
| 27 10 00 | Building Telecomunications Cabling System | $ 0.00 | ||||||||||
| 27 21 29 | Data Communications Switches | $ 0.00 | ||||||||||
| 27 22 19 | Data Communications Servers | $ 0.00 | ||||||||||
| 27 22 23 | Data Communications Servers | $ 0.00 | ||||||||||
| 27 41 16 | Integrated Audio-Video Systems and Equipment | $ 0.00 | ||||||||||
| 28 | Electronic Safety and Security | $ 0.00 | ||||||||||
| 28 20 00 | Electronic Security Systems (ESS) | $ 0.00 | ||||||||||
| 28 23 23 | Closed Circuit Television Systems | $ 0.00 |
A1. OVERHEAD $ 0.00
TOTAL DIRECT COSTS (Base bid - CLIN 0001) $ 0.00
| Administration | % | 0 | $ 0.00 |
| Unforenseens | % | 0 | $ 0.00 |
| Profit | % | 0 | $ 0.00 |
| VAT(Over the profit value) | % | 0 | $ 0.00 |
TOTAL COSTS (Base bid - CLIN 0001) $ 0.00
| B. NEIVA OPERATION ROOM (CLIN 0002) | $ 0.00 | ||
| 01 | General Requirements | $ 0.00 | |
| 01 11 00 | Summary of Work | $ 0.00 | |
| 01 14 00 | Work Restrictions | $ 0.00 | |
| 01 32 16.00 20 | Construction Progress Documentation | $ 0.00 | |
| 01 33 00 | Submittal Procedures | $ 0.00 | |
| 01 40 00 | Quality Requirements | $ 0.00 | |
| 01 42 00 | Sources for Reference Publications | $ 0.00 | |
| 01 50 00 | Temporary Facilities and Controls | $ 0.00 | |
| 01 78 00 | Execution and Closeout Requirements | $ 0.00 | |
| 03 | Concrete | $ 0.00 | |
| 03 30 00 | Cast in Place Concrete | $ 0.00 | |
| 05 | Metals | $ 0.00 | |
| 05 12 00 | Structural Steel | $ 0.00 | |
| 07 | Thermal and Moisture Protection | $ 0.00 | |
| 07 60 00 | Flashing and Sheet Metal | ||
| 07 92 00 | Joint Seals | $ 0.00 | |
| 08 | Openings | $ 0.00 | |
| 08 71 00 | Door Hardware | $ 0.00 | |
| 08 81 00 | Glazing | $ 0.00 | |
| 09 | Finishes | $ 0.00 | |
| 09 29 00 | Gypsum Board | $ 0.00 | |
| 09 65 00 | Resilient Floorings | $ 0.00 | |
| 09 90 00 | Painting and Coating | $ 0.00 | |
| 12 | Furnishings | $ 0.00 | |
| 12 93 00 | Site Furnishings | $ 0.00 | |
| 13 | Special Construction | $ 0.00 | |
| 13 34 19 | Special Building Systems | $ 0.00 | |
| 23 | Heating, Ventilating, and Air Conditioning (HVAC) | $ 0.00 | |
| 23 07 00 | Thermal Insulation for Mechanical Systems | $ 0.00 | |
| 23 81 00 | Unitary AirConditioning equipment | $ 0.00 | |
| 26 | Electrical | $ 0.00 | |
| 26 20 00 | Interior Low Voltage Electrical Distribution System | $ 0.00 | |
| 26 32 33 | Uninterruptible Power Supply | $ 0.00 | |
| 26 51 00 | Inteiror Lighting | $ 0.00 | |
| 27 | Communications | $ 0.00 | |
| 27 10 00 | Building Telecomunications Cabling System | $ 0.00 | |
| 27 21 29 | Data Communications Switches | $ 0.00 | |
| 27 22 19 | Data Communications Servers | $ 0.00 | |
| 27 22 23 | Data Communications Servers | $ 0.00 | |
| 27 41 16 | Integrated Audio-Video Systems and Equipment | $ 0.00 | |
| 28 | Electronic Safety and Security | $ 0.00 | |
| 28 20 00 | Electronic Security Systems (ESS) | $ 0.00 | |
| 28 23 23 | Closed Circuit Television Systems | $ 0.00 | |
| 31 | Earthwork | $ 0.00 | |
| 31 00 00 | EarthWork | $ 0.00 | |
| 33 | Utilities | $ 0.00 | |
| 33 71 01 | Overhead Transformer | $ 0.00 | |
| 33 71 02 | Undergroundg Electrical Distribution | $ 0.00 |
B.1. OVERHEAD $ 0.00
TOTAL DIRECT COSTS (Base bid - CLIN 0002) $ 0.00
| Administration | % | 0 | $ 0.00 |
| Unforenseens | % | 0 | $ 0.00 |
| Profit | % | 0 | $ 0.00 |
| VAT(Over the profit value) | % | 0 | $ 0.00 |
TOTAL COSTS (Base bid - CLIN 0002) $ 0.00
OPTION 1
| EQUIPMENT | LABOR | MATERIAL | ||||||||||
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | UNIT | QUANTITY | UNIT PRICE | UNIT | QUANTITY | UNIT PRICE | TOTAL COST | TOTAL COST BY CHAPTER |
| C. DIRAN OPERATIONS ROOM (CLIN 1001) | $ 0.00 | |||||||||||
| 28 | Electronic Safety and Security | $ 0.00 | ||||||||||
| 28 23 23 | Closed Circuit Television Systems, 1 year Maintenace | $ 0.00 |
C.1. OVERHEAD $ 0.00
TOTAL DIRECT COSTS (Option 1 - CLIN 1001) $ 0.00
| Administration | % | 0 | $ 0.00 |
| Unforenseens | % | 0 | $ 0.00 |
| Profit | % | 0 | $ 0.00 |
| VAT(Over the profit value) | % | 0 | $ 0.00 |
TOTAL COSTS (Option 1 - CLIN 1001) $ 0.00
| D. NEIVA OPERATION ROOM (CLIN 1002) | $ 0.00 | ||
| 28 | Electronic Safety and Security | $ 0.00 | |
| 28 23 23 | Closed Circuit Television Systems, 1 year Maintenance | $ 0.00 |
D.1. OVERHEAD $ 0.00
TOTAL DIRECT COSTS (Option 1 - CLIN 1002) $ 0.00
| Administration | % | 0 | $ 0.00 |
| Unforenseens | % | 0 | $ 0.00 |
| Profit | % | 0 | $ 0.00 |
| VAT(Over the profit value) | % | 0 | $ 0.00 |
TOTAL COSTS (Option 1 - CLIN 1002) $ 0.00
&"Arial Narrow,Regular"Department of State- INL &"Arial Narrow,Regular"Virtual Interview Rooms &"Arial Narrow,Regular"&P of &N
COMPRAS
| PRESUPUESTO - CNP MARIQUITA |
| A&E DESIGN FOR A NEW LODGING BUILDING AT THE CNP AVIATION SCHOOL IN MARIQUITA TOLIMA |
| COMPRAS - CNP |
| A&E DESIGN FOR A NEW LODGING BUILDING AT THE CNP AVIATION SCHOOL IN MARIQUITA TOLIMA |
| 4/6/17 | ||||||
| ITEM | DESCRIPCIÓN | U.M. | CANT. | VR. UNITARIO | VR. PARCIAL | VR. TOTAL |
| 6 | INSTALACIONES ELÉCTRICAS | ERROR:#REF! | ||||
| 6,5,14 | Suministro Planta de Emergencia Insonorisada 150KVA | UN | 1.00 | ERROR:#REF! | ERROR:#REF! |
| 8 | INSTALACIONES AIRE ACONDICIONADO | ERROR:#REF! | ||||
| 8.1 | EQUIPOS DE AIRE ACONDICIONADO | |||||
| 8,1,1 | UCMS-01/UAMS-01: Equipo Mini Split 12,000 Btu/H, R-410, 208-230/1/60 | UN | 40.00 | ERROR:#REF! | ERROR:#REF! |
| 14 | CARPINTERIA DE MADERA | ERROR:#REF! | ||||
| 14.2 | Suministro e instalacion de M-1,Closet 2.05 x 2.10 en triplex pizano entamborado para las, divisiones y entrepaños. Sus cajones serán en madera de sajo o equivalente. Los filos de los costados serán marqueteados en sajo o equivalente. Se ubicarán tres bisagras por puerta a las cuales también se les instalará manija metálica y tope de lira. Se instalará bolillo metalico de 1”. | UN | 40.00 | ERROR:#REF! | ERROR:#REF! |
TOTAL COSTOS DIRECTOS ERROR:#REF!
| Administración | % | 0.03 | ERROR:#REF! |
| Imprevistos | % | 0.01 | ERROR:#REF! |
| Utilidad | % | 0.03 | ERROR:#REF! |
| I.V.A./Utilidad | % | 0.16 | ERROR:#REF! |
TOTAL OBRA ERROR:#REF!
Summary
| CLIN | Section B.2 Value | |||||
| Number | Description | Contract Type | Quantity | Unit | Total | VAT (not included in contract) |
| 0001 | Operational Room – Diran/Bogota | FFP | 1 | Lot | $0.00 | $0.00 |
| 0002 | Operational Room –Neiva | FFP | 1 | Lot | $0.00 | $0.00 |
| 1001 | (optional service) 1-year CCTV Maintenance – Bogota | FFP | 1 | Lot | $0.00 | $0.00 |
| 1002 | (optional service) 1-year CCTV Maintenance – Neiva | FFP | 1 | Lot | $0.00 | $0.00 |
| [$USD] 0.00 |