J-2-7,_Submittal_Register_(Bogota).pdf

PDF 65 KB Posted

Attached to
Operational Rooms, Colombia Federal contract opportunity
Solicitation number
SAQMMA17R0127
Issued by
Department of State Office of Acquisition Management

About this file

Attach. J-2-7

View the file

Other files for this federal contract opportunity

Other files attached to Operational Rooms, Colombia, newest first.
File Type Posted
SAQMMA17R0127_Questions_and_Answers_(42-45).pdf PDF
SAQMMA17R0127_A005.pdf PDF
J-3-4,_09-NEV-E_(A005).pdf PDF
J-3-4,_03-BOG-E_(A005).pdf PDF
SAQMMA17R0127_Questions_and_Answers.pdf PDF
SAQMMA17R0127_A004.pdf PDF
SAQMMA17R0127_AutoCAD.zip ZIP file
SAQMMA17R0127_A003.pdf PDF
SAQMMA17R0127_A002.pdf PDF
SAQMMA17R0127_A001.pdf PDF
Schedule_B-M_(A001).pdf PDF
J-2-4,_Deliverables_(Bogota_Specs).xlsx XLSX spreadsheet
J-3-4,_07-NEV-S.pdf PDF
J-2-9,_SAM_Registration.pdf PDF
J-3-3,_Bidding_Chart.xlsx XLSX spreadsheet
J-1-2,_Past_Performance_and_References.xlsx XLSX spreadsheet
J-2-8,_Submittal_Register_(Neiva).pdf PDF
J-3-4,_01-BOG-A.pdf PDF
J-3-4,_02-BOG-M.pdf PDF
J-2-5,_Deliverables_(Neiva_Specs).xlsx XLSX spreadsheet
J-3-4,_05-NEV-U.pdf PDF
J-3-4,_00-BOG-U.pdf PDF
J-1-1,_Past_Performance_Questionnaire_(PPQ).docx DOCX document
J-3-4,_09-NEV-E.pdf PDF
J-3-4,_08-NEV-M.pdf PDF
J-3-5,_Form_4025-R.pdf PDF
J-3-4,_03-BOG-E.pdf PDF
J-3-1,_Specs-Bogota.pdf PDF
J-3-4,_10-NEV-T.pdf PDF
SAQMMA17R0127,_SF1442.pdf PDF
J-3-4,_04-BOG-T.pdf PDF
J-3-2,_Specs-Neiva.pdf PDF
J-2-3,_IncidentReports.docx DOCX document
J-2-6_Tax_Exemption_(Exencion_de_Impuesto).doc DOC document
J-2-1,_Material_or_Product_Substitution_Form.docx DOCX document
J-2-2,_Firm_and_Project_Information.docx DOCX document
J-3-4,_06-NEV-A.pdf PDF
SAAMMA17R0127_Schedule_B-M.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 13 PAGES

OPERATIONAL CENTER FITOUT, 11 CITIES FOR CNP

01 11 00 SD-01 Preconstruction Submittals Submittal Register Performance Insurance:

Payment Insurance:

Liability Insurance Stability Insurance Elements Quality Insurance Correct Equipment Functioning Insurance

Project Schedule Temporary Facilities Personnel List Field Personnel Qualifications Health and Safety Plan Quality Control (QC) Plan List of Proposed Subcontractors List of Proposed Products

01 32 16.00 20 SD-01 Preconstruction Submittals 1.3Construction schedule

Submittal Register 01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

01 78 00 SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 13 PAGES

01 78 00 3.3Operation and Maintenance Manuals

SD-11 Closeout Submittals 3.1As-Built Drawings

02 41 00 SD-01 Preconstruction Submittals 1.2.1Demolition Plan 1.2.1Deconstruction Plan 1.9Existing Conditions

03 52 16 SD-06 Test Reports 2.1.1Design Mix

04 20 00 SD-03 Product Data

2.1.2 GClay or Shale Brick

05 52 00 SD-03 Product Data

2.2.4 GSteel Railings and Handrails

3.2 GAnchorage and Fastening

Systems 07 11 13 SD-07 Certificates

1.2Materials 07 92 00 SD-03 Product Data

2.1Sealants SD-07 Certificates

3.4.4Sealant 08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.3 GFrames

2.2Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 13 PAGES

08 11 13 2.4Weather stripping SD-03 Product Data

2.1 GDoors

2.3 GFrames

08 71 00 SD-03 Product Data 2.2Hardware Items

SD-08 Manufacturer’s Instructions 3.1Installation

08 81 00 SD-03 Product Data 1.4.1Insulating Glass 2.1.2Tempered Glass

SD-07 Certificates 1.4.1Insulating Glass

09 23 00 SD-04 Samples 1.3.1Gypsum Plaster

09 29 00 SD-03 Product Data 2.1.2Fiber cement units 2.1.6Accessories 2.1.1Gypsum Board 2.1.3Joint Treatment Materials

09 65 00 SD-03 Product Data

2.6 GResilient Flooring and

Accessories 2.2Adhesives 2.1Sheet Vinyl Flooring

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 13 PAGES

09 65 00 3.2Surface Preparation 3.1Installation

09 90 00 SD-02 Shop Drawings 3.8Piping identification 3.8stencil

SD-03 Product Data 2.1Coating 2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.6Color SD-08 Manufacturer’s Instructions

3.5.2Mixing 1.4.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1Coatings:

12 24 13 SD-02 Shop Drawings

3.2Installation SD-03 Product Data

2.1Window Shades SD-08 Manufacturer’s Instructions

2.1Window Shades SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 13 PAGES

12 24 13 2.1Window Shades 12 93 00 SD-02 Shop Drawings

1.3.1Drawings SD-03 Product Data

2.5Chairs 2.6Tables

23 07 00 SD-03 Product Data 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems

SD-08 Manufacturer’s Instructions 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems

23 81 00.00 20 SD-03 Product Data 2.1Air Conditioners 1.4Refrigerant 2.4Refrigerant Piping and

Accessories 2.1.6Drainage Piping 2.1.3Control System

SD-06 Test Reports 3.7.3Start-Up and Initial Operational

Tests SD-08 Manufacturer’s Instructions

2.1Air Conditioners 2.4Refrigerant Piping and

Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 13 PAGES

23 81 00.00 20 2.1.3Control System SD-10 Operation and Maintenance Data

2.1Air Conditioners 2.1.3Control System

26 20 00 SD-02 Shop Drawings 2.12Panelboards 2.4Cable trays

SD-03 Product Data 2.11Receptacles 2.12.3Circuit breakers 2.10Switches

SD-06 Test Reports 3.5.2600-volt wiring test 3.5.4Grounding system test 3.5.3Ground-fault receptacle test

26 32 33.00 10 SD-02 Shop Drawings 2.1UPS System 3.1Installation

SD-03 Product Data 2.1.4Performance Requirements 2.1.3.2Spare Parts

3.3 GField Training

SD-06 Test Reports 2.2Factory Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 13 PAGES

26 32 33.00 10 SD-10 Operation and Maintenance Data

3.3 GOperating and Maintenance

Manuals

26 51 00 SD-03 Product Data 2.2Luminaires 2.4Light Sources 2.3Drivers 1.6.1LED Luminaire Warranty 2.5.2Dimming Controllers (Dimmers) 2.6.1Exit Signs 2.5.3.1Occupancy Sensors

SD-07 Certificates 1.6.1.1Luminaire Useful Life Certificate

27 10 00 SD-02 Shop Drawings 1.6.1.1Telecommunications drawings 1.6.1.2Telecommunications Space

Drawings SD-03 Product Data

2.3Telecommunications cabling 2.4.3Patch panels 2.5Telecommunications outlet/connector assemblies 2.4.1Equipment support frame

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 13 PAGES

27 10 00 3.4.1Telecommunications cabling testing

SD-07 Certificates 1.6.2.1Telecommunications Contractor 1.6.2.2Key Personnel 1.6.2.3Manufacturer Qualifications 1.6.3Test plan

SD-09 Manufacturer’s Field Reports

2.9.1 GFactory reel tests

SD-10 Operation and Maintenance Data

1.10.1Telecommunications cabling and pathway system

SD-11 Closeout Submittals 1.10.2Record Documentation

27 21 29 SD-03 Product Data Switches Technical Data Packages, HW and SW

Training Documentation Software Updates Copies of the Audio-Visual Materials

SD-05 Design Data Network architecture and topology diagrams

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 13 PAGES

27 21 29 SD-10 Operation and Maintenance Data Operation and Maintenance Manuals

Operator's Training Report SD-11 Closeout Submittals Data Entry (Configuration)

27 22 19 SD-03 Product Data Server Technical Data Packages Training Documentation Software Updates Copies of the Audio-Visual Materials

SD-10 Operation and Maintenance Data Operation and Maintenance Manuals

Operator's Training Report SD-11 Closeout Submittals Data Entry (Configuration)

27 22 23 SD-03 Product Data Server Technical Data Packages, HW and SW

Training Documentation Software Updates Copies of the Licenses

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 13 PAGES

27 22 23 Copies of the Audio-Visual Materials

SD-10 Operation and Maintenance Data Operation and Maintenance Manuals

Operator's Training Report SD-11 Closeout Submittals Data Entry (Configuration)

27 41 16 SD-01 Preconstruction Submittals 1.3.6Report Documenting Changes to the Site 1.3.7Predelivery Test Procedures

SD-02 Shop Drawings 2.3.3Graphics 1.3.3As-Built Drawings

SD-03 Product Data Video Wall Technical Data Video Wall Support System Video Wall Controller Software for Video control

2.4Audio System 2.4.1Speakers

Microphones Wired And Wireless Monitors

1.3.8.2Training Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 13 PAGES

27 41 16 Software Updates Copies of the Audio-Visual Materials

SD-06 Test Reports 1.3.8Performance Verification Test 1.3.8Reliability Test Procedures 1.3.2Test Procedures and Reports

Original Copies of all Test Data Report Describing All Results

SD-10 Operation and Maintenance Data

1.3.8.1Operation and Maintenance Manuals

Operator's Training Report SD-11 Closeout Submittals

1.3.8.3Data Entry (Configuration) 28 20 00.00 20 SD-02 Shop Drawings

1.6.1.1ESS components 1.6.1.2Overall system schematic

SD-03 Product Data Duress alarms

GIP Biometric finger print and Proximity Card reader

UTP cable GGraphic map display

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 13 PAGES

28 20 00.00 20 1.4.1.1Backup battery capacity calculations

SD-06 Test Reports 1.6.4ESS operational test plan

SD-07 Certificates 1.6.4ESS operational test plan 1.6.2.1Installer's qualifications 1.6.2.2Instructor's qualifications

SD-10 Operation and Maintenance Data

1.6.1.1ESS components 1.6.5ESS software

SD-11 Closeout Submittals 3.2.1As-Built drawings 2.3.3Posted operating instructions

28 23 23.00 10 SD-01 Preconstruction Submittals 1.4.2Report Documenting Changes to the Site 1.4.3Predelivery Test Procedures

SD-02 Shop Drawings

1.3.3 GAs-Built Drawings

SD-03 Product Data 1.4CCTV Technical Data Packages

1.4.4.2 GTraining Documentation

3.6.9 GSoftware Updates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 13 PAGES

28 23 23.00 10 3.4.1 GCopies of the Audio-Visual Materials

SD-06 Test Reports

1.4.4 GPerformance Verification Test

1.4.4 GReliability Test Procedures

1.3.2Test Procedures and Reports

3.5.1 GOriginal Copies of all Test Data

3.5.2 GReport Describing All Results

SD-07 Certificates 3.3Supplemental Quality Control 3.5.2Letter of Certification

SD-08 Manufacturer’s Instructions 1.4.5Group V Technical Data Package

SD-10 Operation and Maintenance Data

1.4.4.1 GOperation and Maintenance

Manuals

3.4.2Operator's Training Report SD-11 Closeout Submittals

1.4.4.3 GData Entry (Configuration)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR