J-2-1,_Material_or_Product_Substitution_Form.docx

DOCX document 19 KB Posted

Attached to
Operational Rooms, Colombia Federal contract opportunity
Solicitation number
SAQMMA17R0127
Issued by
Department of State Office of Acquisition Management

About this file

Attach. J-2-1

View the file

Other files for this federal contract opportunity

Other files attached to Operational Rooms, Colombia, newest first.
File Type Posted
SAQMMA17R0127_Questions_and_Answers_(42-45).pdf PDF
J-3-4,_03-BOG-E_(A005).pdf PDF
J-3-4,_09-NEV-E_(A005).pdf PDF
SAQMMA17R0127_A005.pdf PDF
SAQMMA17R0127_Questions_and_Answers.pdf PDF
SAQMMA17R0127_A004.pdf PDF
SAQMMA17R0127_AutoCAD.zip ZIP file
SAQMMA17R0127_A003.pdf PDF
SAQMMA17R0127_A002.pdf PDF
SAQMMA17R0127_A001.pdf PDF
Schedule_B-M_(A001).pdf PDF
J-2-6_Tax_Exemption_(Exencion_de_Impuesto).doc DOC document
J-2-2,_Firm_and_Project_Information.docx DOCX document
J-3-4,_06-NEV-A.pdf PDF
SAAMMA17R0127_Schedule_B-M.pdf PDF
J-3-4,_02-BOG-M.pdf PDF
J-2-5,_Deliverables_(Neiva_Specs).xlsx XLSX spreadsheet
J-3-4,_05-NEV-U.pdf PDF
J-3-4,_00-BOG-U.pdf PDF
J-1-1,_Past_Performance_Questionnaire_(PPQ).docx DOCX document
J-3-4,_09-NEV-E.pdf PDF
J-3-4,_08-NEV-M.pdf PDF
J-3-5,_Form_4025-R.pdf PDF
J-3-4,_03-BOG-E.pdf PDF
J-2-7,_Submittal_Register_(Bogota).pdf PDF
J-3-1,_Specs-Bogota.pdf PDF
J-2-4,_Deliverables_(Bogota_Specs).xlsx XLSX spreadsheet
J-3-4,_07-NEV-S.pdf PDF
J-2-9,_SAM_Registration.pdf PDF
J-3-3,_Bidding_Chart.xlsx XLSX spreadsheet
J-1-2,_Past_Performance_and_References.xlsx XLSX spreadsheet
J-2-8,_Submittal_Register_(Neiva).pdf PDF
J-3-4,_01-BOG-A.pdf PDF
J-3-4,_10-NEV-T.pdf PDF
SAQMMA17R0127,_SF1442.pdf PDF
J-3-4,_04-BOG-T.pdf PDF
J-3-2,_Specs-Neiva.pdf PDF
J-2-3,_IncidentReports.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material/Product Substitution Request Attachment J-2-1

MATERIAL/PRODUCT SUBSTITUTION REQUEST

Date:

Contractor:

Project:

D/B – A/E:

After the construction NTP, this form shall be used to request consideration of materials for substitution of products specified as a minimum standard.

Specified Material/Product:

Specification Division – Section:

Specified Manufacturer/Origin:

Proposed Substitution:

Proposed Manufacturer/Origin:

Proposed Supplier/Source:

Attached hereto are the specification, data, performance documents and standard laboratory test results supporting the product substitution.

The following criteria has been taken into consideration:

· The use of this material/product is applicable to this product in the prescribed location and will be warranted in the same manner as the specified product for a period of years, when applied and used as per the manufacturers’ guidelines.

· The substitution of this product will not affect the dimensions shown on the drawing in any way.

· This product substitution will not affect the work of other trades working on this product

The advantages of incorporating the proposed substitution into this Project are as follows:

Submitted By:

Submitted by:

of

Name and Title

Company Name

This completed form is to be sent to INL COR with the required submittal. See Section H.31.1.6 for additional details.

File details come from the government source that posted it. Updated .