About this file

WPS 2 Amendment regarding deliverable templates for the RFP

View the file

Other files

File Type Posted
WPS_2_A011.pdf PDF
WPS_2_A010_SF_30.pdf PDF
WPS_2_A009_SF30.pdf PDF
WPS_2_Revised_A008.pdf PDF
WPS_2_Revised_Pricing_Spreadsheet_Larger_Cells_Table_7_and_8.xlsx XLSX spreadsheet
WPS_2_Attach_18_Vehicle_Safety_and_Equipment_Inspection.xlsx XLSX spreadsheet
WPS_2_A008_SF30.pdf PDF
WPS_2_A007_SF_30.pdf PDF
WPS_2_Q_ _A_Clarification.doc.docx DOCX document
WPS_2_A006_SF_30.pdf PDF
WPS_2_A005_SF_30.pdf PDF
WPS_2_Revised_Pricing_Spreadsheet.xlsx XLSX spreadsheet
WPS_2_Revised_Attachment_1.doc.docx DOCX document
WPS_2_Revised_Attachment_14.doc.docx DOCX document
WPS_2_A004.pdf PDF
WPS_2_A003.pdf PDF
WPS_2_Section_Changes_07_01_2015.doc.docx DOCX document
WPS_2_Questions_and_Answers_07_01_2015.doc.docx DOCX document
WPS_2_A002.pdf PDF
WPS_2_A001.pdf PDF
WPS_2_Attachment_25.xlsx XLSX spreadsheet
WPS_2_Attachment_26.xlsx XLSX spreadsheet
WPS_2_Attachment_19.xlsx XLSX spreadsheet
WPS_2_Attachment_24.docx DOCX document
WPS_2_Attachment_21.xlsx XLSX spreadsheet
WPS_2_Attachment_22.xlsx XLSX spreadsheet
WPS_2_Attachment_23.xlsx XLSX spreadsheet
WPS_2_Attachment_20.xlsx XLSX spreadsheet
WPS_2_Section_L_Matrix_Attachment_A_and_Questionnaire_Attachment_B.zip ZIP file
WPS_2_Attachments_(2).zip ZIP file
WPS_2_Pricing_Spreadsheet.xlsx XLSX spreadsheet
WPS_2_Restricted_Access_Request_Form.doc.docx DOCX document
WPS_2_Solicitation.zip ZIP file
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NO.

A001

3. EFFECTIVE DATE

06/22/2015

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

LMAQMCODE

OFFICE OF ACQUISITION MANAGEMENT

(A/LM/AQM)

PO BOX 9115, ROSSLYN STATION

US DEPARTMENT OF STATE

ARLINGTON, VA 22219

John R. Menard

NAME

703-875-6745

TEL.

menardjr@state.gov

EMAIL

6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

SAQMMA15R0282

CONTACT DUNS

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

06/03/2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THE PURPOSE OF THIS AMENDMENT IS TO ADD THE FOLLOWING ATTACHMENTS TO THE RFP:

1) Attachment #19 - Monthly Explosives Canine Activity Report.

2) Attachment # 20 - Personnel and Canine Daily Accountability Report.

3) Attachment # 21 - Vehicle Safety and Equipment Inspection Checklist.

4) Attachment # 22 - Weapons Qualification Status Report.

5) Attachment # 23 - WPS II Basic Training Status Report.

6) Attachment # 24 - Montly Performance Status Report.

7) Attachment # 25 - Physical Fitness Qualification Status Report.

8) Attachment # 26 - Muster Report.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Frank J. Villamizar

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

06/22/2015

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SAQMMA15R0282

Table of Contents

Section Description Page Number

J List of Attachments

Line Item Summary

Solicitation Number:

SAQMMA15R0282

Contract Number: Title: Worldwide Protective Services

(WPS) 2

Date of Solicitation:

06/22/2015

Line Item No. Description Quantity Unit Unit Price Total Cost

Section J- List of Attachments Identifier Title Date Number of

Pages 19 Monthly Explosives Detection Canine Activity Report Form - ADDED 06/22/2015 20 Personnel and Canine Daily Accountability Report - ADDED 06/22/2015 21 Vehicle Safety and Equipment Inspection Checklist - ADDED 06/22/2015 22 Weapons Qualification Status Report - ADDED 06/22/2015 23 Basic Training Status Report - ADDED 06/22/2015 24 Monthly Performance Status Report - ADDED 06/22/2015 25 Physical Fitness Qualification Report - ADDED 06/22/2015 26 Muster Report - ADDED 06/22/2015