Section J Attachment B Existing Deficiency Matrix

View the file

Other files

File Type Posted
SF_30_SAQMMA15R0112_A002.pdf PDF
SF_30_SAQMMA150112_A003.pdf PDF
SF30_SAQMMA15R0112_A001.pdf PDF
SAQMMA15R0112_QA_August_13_2015.docx DOCX document
SAQMMA15R0112_Amendment_003.doc DOC document
SAQMMA15R0112_SECTION_J _ATTACHMENT_C_Amendment_2.docx DOCX document
facilities_maintenance_inventory_MSDS.xlsx XLSX spreadsheet
housekeeping_hazcom_inventory_NPC.docx DOCX document
WD_2005-2339_Revision_18.docx DOCX document
SAQMMA15R0112_Amendment_002.doc DOC document
SAQMMA15R0112_QA_August_7_2015.docx DOCX document
SIGN-IN-SHEET.pdf PDF
SAQMMA15R0112_Amendment_001.doc DOC document
SAQMMA15R0112_Q A_July_31 _2015.docx DOCX document
SAQMMA15R0112_Q A_July_22 _2015.docx DOCX document
SAQMMA15R0112_SECTION_J _ATTACHMENT_A.docx DOCX document
SAQMMA15R0112_SECTION_J _ATTACHMENT_E.docx DOCX document
SAQMMA15R0112_SECTION_J _ATTACHMENT_D.docx DOCX document
SAQMMA15R01112_SECTION_J _ATTACHMENT_K_-_Past_Performance_Questionnaire.docx DOCX document
SAQMMA15R0112_SECTION_B_ATTACHMENT_1_CLINS.xlsx XLSX spreadsheet
SAQMMA15R0112_Portsmouth_O M.pdf PDF
SAQMMA15R0112_SECTION_B_LABOR_RATES_ATTACHMENT_2.xlsx XLSX spreadsheet
SAQMMA15R0112_SECTION_J _ATTACHMENT_G.docx DOCX document
SAQMMA15R0112_SECTION_J _ATTACHMENT_C.docx DOCX document
SAQMMA15R0112_SECTION_J _ATTACHMENT_F.docx DOCX document
SAQMMA15R0112_SECTION_C _ATTACHMENT_3.docx DOCX document
SAQMMA15R0112_SECTION_J _ATTACHMENT_I.docx DOCX document
SAQMMA15R0112_SECTION_J _ATTACHMENT_J.docx DOCX document
SAQMMA15R0112_SECTION_J _ATTACHMENT_H.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. SAQMMA15R0112 FACILITY OPERATION AND MAINTENANCE SUPPORT

ATTACHMENT B

Existing Deficiency Matrix

DESCRIPTION

COR gives Contractor written direction to:

Contractor shall provide the COR with a written cost proposal for the (repair-replacement-adjustment) correction of the deficiency

COR will schedule and complete with the Contractor, a separate Joint Inspection at a future date. The re-inspection will be conducted within ten (10) days after the seasonal start-up of equipment

Contractor shall provide the COR with more specific information. Deficiency description is too generic in nature or too broad to allow the COR a determination for the appropriate action

Contractor shall take no action:

a) deficiency is a PM guide card item and must be corrected by the Contractor, at no additional cost to the Government, as part of the PM schedule

b) item or comment is not a deficiency

c) the Government will correct the deficiency by other means, at the Government's expense

d) the deficiency is noted. COR has determined no action will be taken immediately. If corrected in the future the cost will be borne by the Government

COMMENTS