Attach I Cable QASP.docx
DOCX document 22 KB Posted
- Solicitation number
- SAQMMA09R0212
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAQMMA09R0212_A006.pdf | ||
| saqmma09R0212_A005.pdf | ||
| SAQMMA09R0212_A004.pdf | ||
| Cable-Conduit SAQMMA09R0212_20090615_amended.pdf | ||
| SAQMMA09R0212_A003.pdf | ||
| SAQMMA09R0212_A002.pdf | ||
| amendment_001.pdf | ||
| Questions and Answers_Cabling_20090529.pdf | ||
| SAQMMA09R0212 A001.pdf | ||
| Attach G | — | |
| Attach B Attachment B Domestic Design and HST Standards 2008.pdf | ||
| Attachment L Wage Determinations.pdf | ||
| Attach H Locationsdocx.docx | DOCX document | |
| Attach D Performance Matrix | — | |
| Attach M DD254.pdf | ||
| Attach A | — | |
| Attach C | — | |
| SAQMMA09R0212_20090514_final.docx | DOCX document | |
| RFP Cover | — | |
| Attach K Offer Schedule Pricing.docx | DOCX document | |
| Attach F | — | |
| Attach E | — | |
| Attach J Non-Disclosure_Cable Recompete.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT I: Quality Assurance Surveillance Plan (QASP)
QUALITY ASSURANCE SURVEILLANCE PLAN
For: Cabling and Conduit Contract Contract Number: SAQMMA09R0212 Contract Description: Cabling, network integration, network installation and repair services Contractor’s name: < TBD > (hereafter referred to as the contractor).
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
The following FAR clauses may apply depending on contract type:
52.246-6 Inspection of Services – Time-and-Material and Labor-Hour
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Ralph Sutherland Agency: Information Systems Branch Telephone: 703-875-6688 Email: SutherlandRR@state.gov
b. Contract Specialist(CS) - The CS acts as an acquisition consultant and serves as liaison between the Department of State (DOS) and the requesting program office.
Assigned CS: Adrienne Bell Telephone: 703-516-1667 Email: BellAM@state.gov
c. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.
Assigned COR: Samuel Boone Telephone: 202-647-7055 Email: BooneSW@state.gov
3. CONTRACTOR REPRESENTATIVES:
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract.
a. Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
b. Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
c. Other Contractor Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
4. PERFORMANCE STANDARDS.
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, paragraph F.6 in the Performance Work Statement includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
PERFORMANCE REQUIREMENTS SUMMARY MATRIX
By monitoring the Contractor, the COR will determine whether the performance levels set forth in the order have been attained. Performance standards are specified in the following Performance Requirements Summary Matrix in the Standard and Acceptable Quality Level columns.
See Attachment D for the Performance Summary Matrix
5. INCENTIVES.
The Government shall use PAST PERFORMANCE as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards. Information about incentives can be found in Attachment D.
6. METHODS OF QA SURVEILLANCE.
Various methods exist to monitor performance. The COR shall use the surveillance methods listed in Section 4, Performance Standard Matrix in the administration of this QASP.
Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the AM, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.
a. PERIODIC INSPECTION. Uses a comprehensive evaluation of selected outputs: As directed in the Performance Matrix (Monthly, Quarterly, or unscheduled).
b. RANDOM SAMPLING: Evaluate the outputs of the award requirement by randomly selecting and inspecting the completed work for the task orders.
c. Analysis of contractor's progress reports: (Evaluate cost, schedule and completed work assignments)
d. Performance reporting. Evaluate metrics for a specific time period as identified in the Performance Matrix Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the KO’s actions.
7. RATINGS.
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
| EXCEPTIONAL: |
| Performance significantly exceeds contract requirements to the Government’s benefit. |
| SATISFACTORY: |
| Performance meets contractual requirements. |
| UNSATISFACTORY: |
| Performance does not meet contractual requirements. |
8. DOCUMENTING PERFORMANCE.
a. ACCEPTABLE PERFORMANCE.
The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.
b. UNACCEPTABLE PERFORMANCE.
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.
9. FREQUENCY OF MEASUREMENT.
a. Frequency of Measurement.
During contract/order performance, the COR shall take periodic measurements, as specified in the AQL column of the Performance Standards Summary Matrix, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor at least quarterly to assess performance and shall provide a written assessment.
Prepared by: <Enter name>
Signature – Contracting Officer’s Representative
PERFORMANCE REPORT
1. CONTRACT NUMBER: <insert number>
2. Prepared by: (Name of COR) <insert name>
3. Date and time of observation:
4. Observation:
<Examples of items to include in a report are:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results.
- Number of observations.>
Prepared by: <Enter COR’s name>
| _____________________________ | ________________ | |
| Signature – Contracting Officer’s Representative | Date |
CONTRACT DISCREPANCY REPORT (CDR)
1. Contract Number: <insert number>
2. TO: (Contractor Task Manager or on-site representative) <insert name>
3. FROM: (Name of COR) <insert name>
4. Date and time observed discrepancy:
5. DISCREPANCY OR PROBLEM:
<Describe in detail. Identify any attachments.>
5. Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this
CDR. >
| _____________________________ | ________________ | |
| Signature – Contracting Officer’s Representative | Date |
Received by:
| _____________________________ | ________________ | |
| Signature - Contractor Task Manager or on-site representative | Date |
< The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance
< This template will be used to formally document surveillance. >
1. CONTRACT NUMBER: <insert number>
2. Prepared by: (Name of COR) <insert name>
3. Date and time of observation:
4. Observation:
<Examples of items to include in a report are:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results.
- Number of observations.>
| _____________________________ | ________________ | |
| Signature – Contracting Officer’s Representative | Date |