SandWashingProcedure.pdf

PDF 13 KB Posted

Attached to
Water Reclamation Sand and Sludge Management
Solicitation number
26-008UO-HK-RFP
Issued by
Hillsborough County, Florida

About this file

This is a technical operational procedure document supporting a Request for Proposals issued by the City of Plant City, Florida for sand and sludge management services at the Water Reclamation Facility located at 1500 Victoria Street. The document outlines the sand washing procedure required before filter startup, including specific steps for water supply, air supply operation, and quality verification. The RFP (No. 26-008UO-HK-RFP) seeks comprehensive services encompassing mobilization and demobilization, pressure washing of aeration basins and clarifiers, grit removal and hauling, sludge pumping and hauling, sand media removal and replacement, and proper disposal of removed materials. Proposals must be submitted electronically through the City's e-Procurement Portal by March 26, 2026 at 2:00 p.m., with a question submission deadline of March 16, 2026 at 5:00 p.m. The resulting contract will commence upon issuance for an initial three-year term with two optional one-year renewal periods at the City Manager's discretion. Respondents must provide three comparable project references, five similar project experiences within the past ten years, all required Florida State Contractor's Licenses and certifications, detailed resumes for project management personnel, organizational charts, equipment lists, and comprehensive safety plans.

Pricing shall be submitted on a unit cost basis for all line items with mobilization and demobilization established at a fixed $50,000 lump sum. For renewal periods, contractors may request fee adjustments with ninety days' notice supported by Consumer Price Index documentation, with maximum allowable increases limited to four percent. Contractors must maintain comprehensive insurance coverage including Workers' Compensation, Commercial General Liability and Property Damage Insurance of at least $500,000 per person and $1,000,000 per occurrence, and Commercial Automobile Liability Insurance of $500,000, naming the City as an additional insured. The contract is non-exclusive with no minimum work guarantee, and the City reserves the right to terminate at any time with thirty days' notice. No specific contract value or budget range is disclosed; costs will be based on actual work performed as verified by the City. Contractors may subcontract up to fifty percent of work with a maximum ten percent administration and management markup. Evaluation criteria weight contractor qualifications at thirty percent, project team qualifications at thirty percent, work narrative and safety plan at twenty percent, and cost evaluation at twenty percent. Proposals shall not exceed fifteen pages and must comply with all applicable OSHA, federal, state, and local regulations, including Florida's public records and sunshine laws.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H Sand Washing Procedure

New sand has a certain amount of fine material that must be washed out before the filter is put in operation. Use the following procedure:

1. Check that all removable weir plates are out of the slot in the reject compartment.

2. Start a supply of clean water to the filter. It is essential that enough flow is supplied to provide the reject flow given in Section 3.4.C. Do not provide less than this amount for each filter. It may be possible to use the water, which the filter is intended to treat if the solids concentration is low, but clean potable water is preferable. The water may be supplied by hose to the top of the unit or through the feed piping.

3. Start the air supply to the airlift at the rate given in Section 3.4.B This will start pumping sand to the top of the airlift. If the airlift does not pump sand, see Section 3.7.C. The fine material will be cleaned from the sand by the reject water flow.

4. Sand washing will require at least 6 to 12 hours. Check that sand is being pumped and that water is running over the reject weir during this time. The sand will be clean when the reject water is no longer cloudy.

5. Some of the fine material will settle out in the reject compartment where it will build up. At the end of the sand washing procedure swirl the water around in the reject compartment by hand so that this material is carried out over the reject weir.

3.3 Pre-Startup Check

Before start-up the following components should be checked and tested separately.

The filter cannot be started up nor operated until ALL of the ancillary equipment is fully operational. All pumps handling feed, reject and filtrate flows must be up and running. The air supply must be connected. Any chemical pretreatment equipment should be on-line and a supply of chemicals should be available.

It is not possible to do a meaningful start-up unless the filter is fully configured for normal operation.