This file contains the first portion of the Bid Document drawings for VA Project 632-16-101 "Upgrade Emergency Generators Phase I" at the Northport VA Medical Center in New York. The drawings include general project information, life safety plans, infection control plans, site plans, and detailed architectural, structural, mechanical, electrical and plumbing drawings for a new 2,000 GSF building addition.

The scope involves replacing the hospital's generator emergency system by constructing a new building addition to house two new emergency generators with space for a future third generator, installing underground fuel storage tanks, and removing existing Building 200 generator/fuel tanks. The work includes demolition of existing equipment, installation of new concrete pads for chillers and switchgear, and providing a temporary emergency generator during construction to maintain power. The project requires careful coordination of utilities and protection of critical infrastructure that must remain operational, including the loading dock access road, 15KVA primary duct bank, and underground utilities. The drawings emphasize infection control requirements, life safety measures, and maintaining hospital operations during construction through detailed phasing and temporary measures.

View the file

Other files

File Type Posted
36C24224R0033 PROPOSAL ITEMS.docx DOCX document
S06_Custom Soil Resource Report.pdf PDF
36C24225R0007 0003.docx DOCX document
Site Visit Sign Sheet.doc DOC document
S06_Drawing_Amend.pdf PDF
P07_Wage Determination.txt TXT text file
Construction Cost Breakdown Sheet.pdf PDF
36C24225R0007 0002.docx DOCX document
36C24225R0007 0001.docx DOCX document
Wage Determination.pdf PDF
S02 Vol 1-1.pdf PDF
S02 Vol 1-2.pdf PDF
FAR 52.225-2 Buy American Certification.pdf PDF
013200 Construction Documentation.docx DOCX document
S02 Vol 3-1.pdf PDF
852.219-77 VA Notice of Limitations on Subcontracting.docx DOCX document
S02 Vol 1-3.pdf PDF
36C24225R0007.docx DOCX document
S02 Vol 3-0.pdf PDF
Past Performace Questionaire_PPQ.pdf PDF
S02 Vol 1.pdf PDF
S02 Vol 2.pdf PDF
S02 Vol 3-2.pdf PDF
S02 Vol 2-0.pdf PDF
S02 Vol 2-1.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPGRADE EMERGENCY

632-16-101

NOVEMBER 9, 2023

GENERATORS

H A R R E L L

DESIGN GROUP, PC

FULLY SPRINKLERED

BID DOCUMENTS

COVER SHEET

GI001

GENERAL

GI001 COVER SHEET

GI101 BUILDING 200 LIFE SAFETY PLAN

GI102 BUILDING 200 INTERIM LIFE SAFETY PLAN

GC101 ICRA PLAN

SURVEY

V100 EXISTING SITE PLAN

V101 TOPOGRAPHIC SURVEY

CIVIL

C-0.0 DEMOLITION PLAN

C-1.0 LAYOUT AND MATERIALS PLAN

C-2.0 GRADING, DRAINAGE, AND UTILITIES PLAN

C-3.0 DETAILS

C-3.1 DETAILS

C-3.2 DETAILS

STRUCTURAL

S001 STRUCTURAL GENERAL NOTES

S002 STRUCTURAL GENERAL NOTES

S003 FOUNDATION TYPICAL DETAILS

S004 FRAMING TYPICAL DETAILS

S101 FOUNDATION PLAN

S102 STRUCTURAL ROOF FRAMING PLAN

S301 STRUCTURAL SECTIONS AND DETAILS

S302 STRUCTURAL SECTIONS AND DETAILS

S303 STRUCTURAL SECTIONS AND DETAILS

ARCHITECTURAL

AI001 ARCHITECTURAL GENERAL NOTES & ABBREVIATIONS

AD001 ARCHITECTURAL DEMOLITION SITE PLAN

AD101 ARCHITECTURAL DEMOLITION PLAN

AS101 ARCHITECTURAL SITE PLAN

AE101 FLOOR PLAN

AE102 ROOF PLAN

AE201 BUILDING ELEVATIONS

AE301 BUILDING SECTION

AE302 BUILDING SECTION

AE401 ARCHITECTURAL DETAILS

AE402 ARCHITECTURAL DETAILS

AE601 DOOR SCHEDULE & DETAILS

AF101 ARCHITECTURAL FINISHES PLAN

AF601 FINISH SCHEDULE & SIGNAGE SCHEDULE

FIRE ALARM

FA001 LEGEND, MATRIX, RISER, AND NOTES

FA101 FLOOR PLAN - FIRE ALARM

FIRE PROTECTION

FP001 FIRE PROTECTION GENERAL NOTES, LEGENDS, &

SYMBOLS

FP101 FIRE PROTECTION FLOOR PLAN

PLUMBING

P001 PLUMBING NOTES, SYMBOLS, LEGENDS, & SCHEDULES

PD101 PLUMBING DEMOLITION FLOOR PLAN

P101 PLUMBING FLOOR PLAN

P102 PLUMBING ROOF PLAN

P501 PLUMBING DETAILS & SCHEMATICS

MECHANICAL

MH001 MECHANICAL LEGEND AND GENERAL NOTES

MD101 MECHANICAL DEMOLITION FLOOR PLAN

MH101 MECHANICAL FLOOR PLAN

MH102 MECHANICAL ROOF PLAN

MP100 MECHANICAL PIPING SUB-BASEMENT FLOOR PLAN

MP101 MECHANICAL PIPING FLOOR PLAN

MP102 MECHANICAL PIPING ROOF PLAN

MH501 MECHANICAL DETAILS

MH502 MECHANICAL DETAILS

MH601 MECHANICAL SCHEDULES

MH701 MECHANICAL CONTROLS

ELECTRICAL

EG001 LEGENDS, GENERAL NOTES, AND SCHEDULES

ED101 ELECTRICAL DEMOLITION PLAN

EL101 FLOOR PLAN - LIGHTING

EP101 FLOOR PLAN - POWER

EE102 ROOF PLAN - ELECTRICAL

EP103 LOWER LEVEL PLAN - POWER

EP104 PENTHOUSE PLAN - POWER

EY101 FLOOR PLAN - SYSTEMS

EY103 LOWER FLOOR PLAN - SYSTEMS

EE401 EQUIPMENT ELEVATIONS

EE402 ENLARGED GENERATOR ROOM

EE403 ENLARGED ELECTRICAL ROOM AND GENERATOR

EQUIPMENT ROOM PLAN DEMOLITION

EE404 ENLARGED ELECTRICAL ROOM AND GENERATOR

EQUIPMENT ROOM PLAN POWER

EE405 ENLARGED 200N ELECTRICAL PLANS

EE501 ELECTRICAL DETAILS

EE502 ELECTRICAL DETAILS

EE601 EXISTING ELECTRICAL SINGLE LINE DIAGRAM -

DEMOLITION

EE602 NEW ELECTRICAL SINGLE LINE DIAGRAM

EE701 ELECTRICAL EQUIPMENT SCHEDULE

EE702 PANEL SCHEDULES

EE703 PANEL SCHEDULES

EE704 PANEL SCHEDULES

E

N

NW

SW

NE

SE

S

W

THE SCOPE OF WORK IS TO REPLACE THE HOSPITAL'S GENERATOR EMERGENCY SYSTEM.

THIS PROJECT ENTAILS CIVIL, STRUCTURAL, ARCHITECTURAL AND MECHANICAL/ELECTRICAL/PLUMBING WORK TO PROVIDE FOR A NEW 2000 GSF BUILDING ADDITION THAT WILL HOUSE 2 NEW EMERGENCY GENERATORS AND SPACE FOR A FUTURE 3RD GENERATOR, WITH UNDERGROUND FUEL STORAGE TANKS.

DEMOLITION INCLUDES REMOVAL OF EXISTING BUILDING 200 GENERATOR AND FUEL TANKS AND AUTOMATIC TRANSFER SWITCHES. THE EXISTING GENERATOR ROOM WILL RECEIVE NEW CONCRETE PADS FOR THE INSTALLATION OF A NEW CHILLER AND SWITCHGEAR, AND THE EXISTING SWITCHGEAR ROOM WILL RECEIVE

A NEW CONCRETE PAD FOR NEW SWITCHBOARD.

THE SCOPE OF WORK FOR THE BOILER BUILDING 203 REPLACEMENT GENERATOR IS AS FOLLOWS:

BUILDING 203 WORK INCLUDES REMOVAL OF THE EXISTING EMERGENCY GENERATOR AND ITS AUTOMATIC TRANSFER SWITCH BY REMOVING THE EXISTING BUILDING LOUVER AS IDENTIFIED IN THE DOCUMENTS. THE EXISTING GENERATOR ROOM RECEIVES A NEW 250 KW GENERATOR, CONCRETE PAD AND A NEW AUTOMATIC TRANSFER SWITCH SHALL BE LOCATED IN THE EXISTING SWITCHGEAR ROOM. DURING THIS PERIOD A TEMPORARY EMERGENCY GENERATOR WILL BE PROVIDED TO MAINTAIN EMERGENCY POWER SERVICE FOR THE DURATION OF THE CONSTRUCTION.

LOCATION MAP

CAMPUS MAP LIST OF DRAWINGS

PROJECT DESCRIPTION AND GENERAL REQUIREMENTS

E

N

NW

SW

NE

SE

S

W

THE MECHANICAL CONTRACTOR SHALL TAKE THE LEAD IN PREPARATION OF COORDINATION DRAWINGS. SUCH DRAWINGS SHALL BE ARRANGED AND DESIGNED THROUGH AND FROM COORDINATION WITH ALL OTHER MAJOR AND MINOR SUBCONTRACTORS AND THE GENERAL CONTRACTOR. PROVIDE PLAN VIEWS, SECTIONS AND ELEVATIONS AS REQUIRED TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS. DRAW TO SCALE (AT NOT LESS THAN 3/8" = 1'-0"). DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO: ALL DUCTWORK; ALL AIR DISTRIBUTION; MECHANICAL EQUIPMENT; MECHANICAL PIPING; FIRE PROTECTION PIPING; ALL PLUMBING PIPING; CABLE TRAYS (WITH ELEVATIONS NOTED); LIGHTING FIXTURES (WHEN CEILING MOUNTED); CEILING GRID AND CEILING HEIGHT; MAJOR BEAMS AND JOISTS (WITH ELEVATIONS MARKED); FIRE ALARM DEVICES AND SPEAKERS (WHERE CEILING MOUNTED); ELECTRICAL CONDUITS LARGER THAN 2-INCH DIAMETER; ELECTRICAL BUSWAY AND REQUIRED CLEARANCES; EQUIPMENT PROVIDED BY OTHERS THAT PROTRUDE INTO CEILING CAVITIES OR IMPEDE THE LOCATION OR ACCESS TO ABOVE CEILING PIPING, HANGER SUPPORTS FOR PATIENT LIFTS, DUCTWORK OF OTHER EQUIPMENT.

SECTIONS SHALL BE CUT THROUGH AREAS SHOWING MATERIALS AND SYSTEMS OF ALL CONTRACTS. IF THERE ARE ANY OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH THE ARCHITECT AND/OR ENGINEER (THROUGH THE VA COR) FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN. IT IS IMPORTANT TO NOTE THAT FABRICATION CANNOT BEGIN UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED. ANY MATERIAL, EQUIPMENT, SYSTEMS, ETC., PROCUREMENT OR INSTALLATION COMMENCED PRIOR TO APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK AND MAY HAVE

TO BE MODIFIED, MOVED AND/OR RECONFIGURED AT THE CONTRACTORS COST.

COORDINATION DRAWINGS

NORTHPORT VA MEDICAL CENTER

UPGRADE EMERGENCY GENERATORS PH. 1

79 MIDDLEVILLE ROAD - NORTHPORT, NY 11768

VETERANS HEALTH ADMINISTRATION

| PROJECT NUMBER: 632-16-101

ITEMS REMAINING IN SERVICE DURING CONSTRUCTION REQUIRING CONTRACTOR PROTECTION:

1. LOADING DOCK ACCESS: EXISTING LOADING DOCK ACCESS ROAD MUST REMAIN IN SERVICE

DURING THE ENTIRE CONSTRUCTION PERIOD FOR THIS PROJECT. COVER EXCAVATIONS DAILY W/

1-1/4” THICK ASTM A36 STEEL ROAD PLATES CAPABLE OF SUPPORTING H-20 TRUCK LOADS.

PROVIDE TEMPORARY PROVISIONS INCLUDING STEEL ROAD PLATES, PHASED TRENCH WORK,

FLAGMEN, AND CAUTION SIGNAGE.

2. 15KVA PRIMARY DUCT BANK: EXISTING 15KVA PRIMARY DUCT BANK MUST REMAIN IN SERVICE, PROTECTED, AND UNDISTURBED DURING THE PROJECT'S ENTIRE CONSTRUCTION PERIOD. INSTALL

SHEETING AND SHORING ALONG DUCT BANK EDGES ADJACENT TO CONSTRUCTION.

3. UNDERGROUND UTILITIES: UNDERGROUND UTILITIES IN PLAN SOUTH AREA OF THE PROJECT

AREA SHALL REMAIN IN SERVICE FOR THE PROJECT DURATION, WITHOUT DISTURBANCE. ALL

REQUESTED MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL SHUTDOWNS SHALL BE

REQUESTED FROM, COORDINATED WTH, AND APPROVED BY THE VA-COR. SHUTDOWN REQUESTS

MUST PROVIDE WRITTEN PLAN DESCRIBING AFFECTED UTILITIES, DURATION, AND SAFETY

PRECAUTIONS (ACTIVITY HAZARD ANALYSES--SEE SPEC SECTION 013526). SUBMIT WRITTEN

SHUTDOWN REQUESTS TO VA-COR NOT LESS THAN 14 CALENDAR DAYS PRIOR TO THE REQUESTED

SHUTDOWN.

PROJECT DESCRIPTION

A. ITEM 1; GENERAL CONSTRUCTION: THE CONTRACTOR SHALL PROVIDE ALL NECESSARY TOOLS, LABOR, MATERIAL, EQUIPMENT, PERMITS, LICENSES, AND SUPERVISION FOR "UPGRADE EMERGENCY GENERATORS PHASE 1" PROJECT NUMBER 632-16-101 IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS. WORK INCLUDES BUT IS NOT LIMITED TO, SITE WORK, SITE DEMOLITION, REMOVAL OF UNDERGROUND FUEL STORAGE TANK, NEW ADDITION FOR EMERGENCY GENERATORS, INTERIOR RENOVATION, CONSTRUCTION, STRUCTURAL, PLUMBING, HVAC, ELECTRICAL, FIRE ALARM, AND FIRE

PROTECTION.

B. ITEM 2; DEDUCT ALTERNATE 1: PERFORM ALL WORK AS STATED IN BID ITEM 1, EXCEPT REMOVE ALL WORK IN BUILDING 200N (ROOM D0-5 GENERATOR ROOM)

FROM THE SCOPE OF WORK.

SCHEDULE OF BID ITEMS

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text Affairs

AutoCAD SHX Text Date

AutoCAD SHX Text Project Number

AutoCAD SHX Text DRAWING No.

AutoCAD SHX Text Building Number

AutoCAD SHX Text Reviewed

AutoCAD SHX Text AutoCAD File Name

AutoCAD SHX Text Const. Contract No.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Veterans

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Project Title

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Department of Veterans Affairs

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text Date

AutoCAD SHX Text By

AutoCAD SHX Text

AutoCAD SHX Text Revisions

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BC

AutoCAD SHX Text

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

REVISION NO.

AutoCAD SHX Text

SEAL

AutoCAD SHX Text Recommended Approvals:

AutoCAD SHX Text

1. MEDICAL DIRECTOR

AutoCAD SHX Text

6. OPERATIONS SERVICE LINE MANAGER

AutoCAD SHX Text

7. INFECTION CONTROL MANAGER

AutoCAD SHX Text

2. ASSOCIATE DIRECTOR

AutoCAD SHX Text

8. SAFETY MANAGER

AutoCAD SHX Text

3. CHIEF OF STAFF

AutoCAD SHX Text

4. ASSOC. DIRECTOR

AutoCAD SHX Text

9. GENERAL ENGINEER

AutoCAD SHX Text

5. SERVICE LINE MGRS.

AutoCAD SHX Text

10. COR

AutoCAD SHX Text Architect/Engineer Address

AutoCAD SHX Text

WWW.HARRELLDG.COM

AutoCAD SHX Text F 704.321.0833

AutoCAD SHX Text P 704.814.1320

AutoCAD SHX Text

CHARLOTTE, NC 28227

AutoCAD SHX Text

8016 TOWER POINT DRIVE

AutoCAD SHX Text

COPYRIGHT HARRELL DESIGN GROUP, PC

AutoCAD SHX Text c

AutoCAD SHX Text

AutoCAD SHX Text

HDG PROJECT # 17011

AutoCAD SHX Text

NORTHPORT VA MEDICAL CENTER

AutoCAD SHX Text

NORTHPORT, NY 11768

AutoCAD SHX Text

79 MIDDLEVILLE ROAD

AutoCAD SHX Text

AutoCAD SHX Text

GG

AutoCAD SHX Text

LK

AutoCAD SHX Text

PROJECT

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

PROJECT LOCATION AT HOSPITAL

jcarr JC NC Electronic Seal.jpg

ASPHALT

ELECTRICAL MH

GRASS

WALK

EXISTING

UPGRADE EMERGENCY

632-16-101

NOVEMBER 9, 2023

GENERATORS

H A R R E L L

DESIGN GROUP, PC

FULLY SPRINKLERED

BID DOCUMENTS

BUILDING 200

LIFE SAFETY PLAN

GI101

START OF EGRESS ROUTE

DIRECTION OF TRAVEL

END OF EGRESS ROUTE (EXIT)

PROVIDED EGRESS WIDTH

MINIMUM REQUIRED EGRESS WIDTH

EGRESS OCCUPANT LOAD

EXIT SIGN

OCCUPANT LOAD PER ROOM

ROOM AREA

## NET

### SQFT

## PEOPLE

NAME ROOM NAME

AREA PER OCCUPANT (NET OR GROSS)

X" REQ'D.

X" PROV'D.

# PEOPLE

FEC SEPARATION TRAVEL

COMMON PATH OF TRAVEL

REQUIRED EXIT

APPLICABLE CODES IN ORDER OF PRECEDENCE:

OCCUPANCY CLASSIFICATION:

MAIN USE:

SECONDARY USES: N/A

HIGH-RISE / NOT HIGH-RISE: NOT HIGH-RISE ( 3.3.36.7 )

NO. OF STORIES ( PROPOSED / PERMITTED ): 3 STORIES / 1 STORY

CONSTRUCTION TYPE LIMITATIONS: NFPA 101 TABLE 20.1.6.1

HEIGHT (FT) TO ROOF ( PROPOSED / PERMITTED ): 3 STORIES / 1 STORY

MINIMUM CONSTRUCTION CLASSIFICATION: TYPE II (222)

RELEVANT FIRE RESISTANCE RATINGS PER NFPA TABLE A.8.2.1.2:

FIRE SEPARATION DISTANCE NA

CONSTRUCTION ELEMENT TYPE II (222) UL DESIGN

REQUIRED RATING (IF APPLICABLE)

ROOF CEILING / ASSEMBLY 1 UL P701

BEAMS, GIRDERS, TRUSSES, AND ARCHES 1 UL P701)

[SUPPORTING ROOFS ONLY]

COLUMNS [SUPPORTING ROOF ONLY] 1 UL X845

MAX. PERMITTED AREA UL SF

EXISTING SQFT ON PROPOSED FLOOR

NEW ADDITION 1,747 SQFT

NEW FIRST FLOOR TOTAL (EXISTING + NEW) 144,380 SQFT

AUTOMATIC QUICK RESPONSE HEAD SPRINKLERS THROUGHOUT: YES

PER VA FIRE PROTECTION DESIGN MANUAL (2015, P.23 (K)), SEE FIRE PROTECTION

DRAWINGS FOR FURTHER CLARIFICATION

NFPA 101 20.3.7.3 - MAX SMOKE COMPARTMENT PERMITTED = 40,000 SQFT

NFPA 101 20.3.7.3 TABLE 40.2.6 - MAX TRAVEL DISTANCE WITHIN SMOKE BARRIER = 400 FT

STANDPIPE SYSTEM: NO

SEPARATION OF USES: YES, 2 HR PER NFPA 101, TABLE 6.1.14.4.1(6)

AREA INCREASE DUE TO OPEN SPACE: N/A

AREA INCREASE FOR SPRINKLER SYSTEM: N/A

FLOOR AREA (SF) LARGEST FLOOR ( PROPOSED / PERMITTED BY CONSTRUCTION TYPE):

UL

TOTAL PERMITTED FLOOR AREA WITH AREA INCREASES: N/A

ELECTRICAL SUPERVISION OF AUTOMATIC SPRINKLER SYSTEMS:

YES ( 9.7.2 )

ELECTRICAL SUPERVISION OF BUILDING ALARM AND FIRE DETECTION DEVICES:

YES ( 9.6.2 )

FIRE DEPARTMENT NOTIFICATION VIA APPROVED MONITORING OF FIRE SUPPRESSION,

DETECTION AND ALARM DEVICES: YES ( 9.6.4 )

FIRE ALARM SYSTEM SOUNDS AN AUDIBLE AND VISIBLE ALARM IN A CONSTANTLY

ATTENDED RECEIVING STATION WITHIN THE BUILDING: YES (9.6.7 )

BUILDING FIRE COMMAND CENTER: NO

SEISMIC AND WIND LOADING:

PER VA H-18-8 SEISMIC DESIGN MANUAL, P. 15 - SEISMIC BRACING IS NOT REQUIRED,

EXCEPT 4.1 (C) NFPA 13 9.3.5

CODE SUMMARY

INDUSTRIAL OCCUPANCIES

NFPA 101 CHAPTER 40

SUBCLASSIFICATION IS "SPECIAL-PURPOSE

INDUSTRIAL CLASSIFICATION"

ORDINARY HAZARD

ROOF-CEILING ASSEMBLY 1 HOUR

EXTERIOR NON-BEARING WALLS 0 HOUR

142,633 SQFT

HEADROOM AND CORRIDOR / AISLE WIDTH:

MINIMUM HORIZONTAL DIMENSION: 22 IN. CLEAR

MINIMUM HEADROOM: 6'-8"

MINIMUM DOOR WITH: 22 IN. CLEAR

CODE EDITIONS

NFPA 10 PORTABLE FIRE EXTINGUISHERS, 2018 EDITION

NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION

NFPA 14 STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMS, 2019 EDITION NFPA 20 STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION, 2019 EDITION

NFPA 54 NATIONAL FUEL GAS CODE, 2018 EDITION

NFPA 70 NATIONAL ELECTRICAL CODE, 2020 EDITION

NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2019 EDITION

NFPA 80 STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2019 EDITION

NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2018 EDITION NFPA 90B STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS, 2018 EDITION NFPA 96 STANDARD FOR VENTILATION CONTROL AND FIRE PROTECTION OF COMMERCIAL COOKING OPERATIONS, 2017 EDITION

NFPA 99 HEALTH CARE FACILITIES CODE, 2018 EDITION

NFPA 101 LIFE SAFETY CODE, 2018 EDITION

NFPA 105 STANDARD FOR SMOKE DOOR ASSEMBLIES AND OTHER OPENING PROTECTIVES, 2019 EDITION

NFPA 110 STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS, 2019 EDITION

NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, 2019 EDITION ASHRAE 90.1 ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS, 2016 EDITION

NFPA 220 STANDARD ON TYPES PF BUILDING CONSTRUCTION

NFPA 5000 BUILDING CONSTRUCTION AND SAFETY CODE

FIRE EXTINGUISHER MOUNTED ON WALL, W/ AMEREX

EXTINGUISHER BRACKET (TOP MAX. @ 3'6" AFF)

ITEMS REMAINING IN SERVICE DURING CONSTRUCTION REQUIRING CONTRACTOR PROTECTION:

1. LOADING DOCK ACCESS: EXISTING LOADING DOCK ACCESS ROAD MUST REMAIN IN SERVICE

DURING THE ENTIRE CONSTRUCTION PERIOD FOR THIS PROJECT. COVER EXCAVATIONS DAILY W/

1-1/4” THICK ASTM A36 STEEL ROAD PLATES CAPABLE OF SUPPORTING H-20 TRUCK LOADS.

PROVIDE TEMPORARY PROVISIONS INCLUDING STEEL ROAD PLATES, PHASED TRENCH WORK,

FLAGMEN, AND CAUTION SIGNAGE.

2. 15KVA PRIMARY DUCT BANK: EXISTING 15KVA PRIMARY DUCT BANK MUST REMAIN IN SERVICE, PROTECTED, AND UNDISTURBED DURING THE PROJECT'S ENTIRE CONSTRUCTION PERIOD. INSTALL

SHEETING AND SHORING ALONG DUCT BANK EDGES ADJACENT TO CONSTRUCTION.

3. UNDERGROUND UTILITIES: UNDERGROUND UTILITIES IN PLAN SOUTH AREA OF THE PROJECT

AREA SHALL REMAIN IN SERVICE FOR THE PROJECT DURATION, WITHOUT DISTURBANCE. ALL

REQUESTED MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL SHUTDOWNS SHALL BE

REQUESTED FROM, COORDINATED WTH, AND APPROVED BY THE VA-COR. SHUTDOWN REQUESTS

MUST PROVIDE WRITTEN PLAN DESCRIBING AFFECTED UTILITIES, DURATION, AND SAFETY

PRECAUTIONS (ACTIVITY HAZARD ANALYSES--SEE SPEC SECTION 013526). SUBMIT WRITTEN

SHUTDOWN REQUESTS TO VA-COR NOT LESS THAN 14 CALENDAR DAYS PRIOR TO THE REQUESTED

SHUTDOWN.

NEW ADDITION

CONSTRUCTION TYPE

II (2,2,2) SPECIAL

PURPOSE INDUSTRIAL

2 HR FIRE BARRIER

MAIN HOSPITAL

EXISTING HEALTHCARE

CONSTRUCTION TYPE II

(2,2,2)

EXISTING BUILDING TO

REMAIN

FE FE

FE

RE

RE

RE

RE32" REQ'D.

68" PROV'D.

24 PEOPLE

32" REQ'D.

92" PROV'D.

24 PEOPLE

32" REQ'D.

92" PROV'D.

10 PEOPLE

TD LEG 2 - 102.4'

CPOT = 19'

TD LEG 1 - 88.5'

CPOT = 56.5'

RE

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DAY TANK (FUTURE)

AutoCAD SHX Text

SHAFT.7

AutoCAD SHX Text

SHFT. 16

AutoCAD SHX Text

SHFT. 5

AutoCAD SHX Text

SHAFT. 6

AutoCAD SHX Text

SWITCHGEAR

AutoCAD SHX Text A0-28

AutoCAD SHX Text

STAFF.TOIL

AutoCAD SHX Text

AO-29

AutoCAD SHX Text

CLEANLINEN

AutoCAD SHX Text A0-20C

AutoCAD SHX Text

X-RAY FILE

AutoCAD SHX Text A0-20

AutoCAD SHX Text

TELECOMMUNICATION

AutoCAD SHX Text B0-24F

AutoCAD SHX Text

ELEC. RM.

AutoCAD SHX Text B0-29A

AutoCAD SHX Text

CL.

AutoCAD SHX Text B0-22A

AutoCAD SHX Text

AC.SHOP

AutoCAD SHX Text B0-26

AutoCAD SHX Text

ELEV. LOBB

AutoCAD SHX Text A0-5

AutoCAD SHX Text A0-15A

AutoCAD SHX Text

AO-26

AutoCAD SHX Text

STAFF.TOIL

AutoCAD SHX Text A0-11C

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text A0-20A

AutoCAD SHX Text A0-C3B

AutoCAD SHX Text

ST. 5

AutoCAD SHX Text 148.75

AutoCAD SHX Text F-5

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text A0-C2

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text B0-C2

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text A0-11D

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text A0-17

AutoCAD SHX Text

CATEEN PRE

AutoCAD SHX Text A0-2

AutoCAD SHX Text

WAITING ROOM

AutoCAD SHX Text A0-20A

AutoCAD SHX Text

X-RAY FILE

AutoCAD SHX Text A0-10D

AutoCAD SHX Text

TOILET

AutoCAD SHX Text D0-6

AutoCAD SHX Text

PUMP RM.

AutoCAD SHX Text A0-4

AutoCAD SHX Text

SECRETARY

AutoCAD SHX Text D0-C2B

AutoCAD SHX Text

ST. 7

AutoCAD SHX Text D0-C2C

AutoCAD SHX Text

FEC

AutoCAD SHX Text A0-16A

AutoCAD SHX Text

AGENT CASH

AutoCAD SHX Text A0-6

AutoCAD SHX Text

DARK ROOM

AutoCAD SHX Text A0-22

AutoCAD SHX Text

SPD

AutoCAD SHX Text A0-10B

AutoCAD SHX Text A0-14

AutoCAD SHX Text

BENEFICARY

AutoCAD SHX Text B0-25

AutoCAD SHX Text

HOUSEKEEPI

AutoCAD SHX Text A0-10C

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text A0-19

AutoCAD SHX Text

CATEEN PRE

AutoCAD SHX Text A0-1

AutoCAD SHX Text

RECEPTIONIST

AutoCAD SHX Text B0-24C

AutoCAD SHX Text

FEC

AutoCAD SHX Text A0-10

AutoCAD SHX Text

CREDIT

AutoCAD SHX Text A0-13

AutoCAD SHX Text B0-C24B

AutoCAD SHX Text

C.CLOSET

AutoCAD SHX Text B0-C24D

AutoCAD SHX Text

ST.1

AutoCAD SHX Text 131.34

AutoCAD SHX Text A0-7

AutoCAD SHX Text A0-9A

AutoCAD SHX Text

CONSULTANT

AutoCAD SHX Text B0-C24E

AutoCAD SHX Text

ELEC. CL.

AutoCAD SHX Text B0-15

AutoCAD SHX Text

SPIECT.CAM

AutoCAD SHX Text A0-15

AutoCAD SHX Text

AGENT CASH

AutoCAD SHX Text

AO-22E

AutoCAD SHX Text

TOILET

AutoCAD SHX Text A0-25

AutoCAD SHX Text

SPECIMEN ROOM

AutoCAD SHX Text A0-21

AutoCAD SHX Text

KITCHEN ME

AutoCAD SHX Text B0-23A

AutoCAD SHX Text

HOUSEKEEPING

AutoCAD SHX Text B0-27M

AutoCAD SHX Text

ELEC. CL.

AutoCAD SHX Text B0-22

AutoCAD SHX Text

SWITCHGEAR

AutoCAD SHX Text B0-19

AutoCAD SHX Text

TOILET

AutoCAD SHX Text A0-C2

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AO-11B

AutoCAD SHX Text A0-C6

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text A0-30

AutoCAD SHX Text B0-C24A

AutoCAD SHX Text

C.CLOSET

AutoCAD SHX Text F-4

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text B0-30A

AutoCAD SHX Text B0-C3

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

ELEVATOR 3

AutoCAD SHX Text

HOUSEKEEPI

AutoCAD SHX Text

BO-27B

AutoCAD SHX Text B0-22B

AutoCAD SHX Text B0-24

AutoCAD SHX Text

AC.SHOP

AutoCAD SHX Text A0-3

AutoCAD SHX Text

COUNTING ROOM

AutoCAD SHX Text A0-10A

AutoCAD SHX Text

POLYSCAN

AutoCAD SHX Text A0-11A

AutoCAD SHX Text A0-23

AutoCAD SHX Text

COOLER

AutoCAD SHX Text A0-24

AutoCAD SHX Text

AUTOPSY

AutoCAD SHX Text

AO-30

AutoCAD SHX Text

HOUSE KEEPING

AutoCAD SHX Text A0-18

AutoCAD SHX Text

SPD

AutoCAD SHX Text D0-3

AutoCAD SHX Text

ELEC. RM.

AutoCAD SHX Text A0-11

AutoCAD SHX Text

FIRE ALARM

AutoCAD SHX Text A0-C3A

AutoCAD SHX Text

FEC

AutoCAD SHX Text A0-9

AutoCAD SHX Text

CLASS ROOM

AutoCAD SHX Text

BO-29

AutoCAD SHX Text

EQUIP. STO

AutoCAD SHX Text B0-18

AutoCAD SHX Text

TOILET

AutoCAD SHX Text D0-C1

AutoCAD SHX Text

ELEV. LOBBY

AutoCAD SHX Text D0-2

AutoCAD SHX Text

SERVICE LO

AutoCAD SHX Text D0-1

AutoCAD SHX Text

ELEV. MECH

AutoCAD SHX Text D0-2B

AutoCAD SHX Text P 6

AutoCAD SHX Text D0-2A

AutoCAD SHX Text P 7

AutoCAD SHX Text D0-C5

AutoCAD SHX Text

SECRETARY/

AutoCAD SHX Text B0-16

AutoCAD SHX Text

INVITRO LAB

AutoCAD SHX Text B0-16A

AutoCAD SHX Text

CHF.TECH.

AutoCAD SHX Text D0-C3

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text D0-22

AutoCAD SHX Text

H.R.LINKS

AutoCAD SHX Text D0-10

AutoCAD SHX Text

MRI

AutoCAD SHX Text D0-12

AutoCAD SHX Text H.A.C.

AutoCAD SHX Text D0-25

AutoCAD SHX Text

TOILET

AutoCAD SHX Text D0-48

AutoCAD SHX Text

PHYSICIAN

AutoCAD SHX Text D0-34

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text D0-33

AutoCAD SHX Text

RADIATION ONCOLOGY

AutoCAD SHX Text A0-1600

AutoCAD SHX Text

FISCAL SER

AutoCAD SHX Text 1,266.18

AutoCAD SHX Text A0-200

AutoCAD SHX Text I.R.M.

AutoCAD SHX Text A0-2400

AutoCAD SHX Text

MORGUE

AutoCAD SHX Text A0-1900

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text A0-1400

AutoCAD SHX Text

TRAVEL

AutoCAD SHX Text 509.20

AutoCAD SHX Text

BO-2200

AutoCAD SHX Text

AC.SHOP

AutoCAD SHX Text B0-2360

AutoCAD SHX Text

NEUROLOGY

AutoCAD SHX Text B0-1600

AutoCAD SHX Text

NUCLEARMED

AutoCAD SHX Text 8,259.25

AutoCAD SHX Text D0-21

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

PANEL

AutoCAD SHX Text A0-11

AutoCAD SHX Text

ACCESS TO UTILITIES ROOM

AutoCAD SHX Text

MEDICINE

AutoCAD SHX Text

SCHOOL OF NUCLEAR

AutoCAD SHX Text D0-33

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

PHARMACY

AutoCAD SHX Text D0-32

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

MEDICINE

AutoCAD SHX Text

NUCLEAR

AutoCAD SHX Text

ATTENDING PHYSICIAN

AutoCAD SHX Text

NUCLEAR MEDICINE

AutoCAD SHX Text

CHEIEF

AutoCAD SHX Text

DIGITAL SCANNER

AutoCAD SHX Text

THYROID LAB

AutoCAD SHX Text

UNION

AutoCAD SHX Text

NUCLEAR MEDICINE

AutoCAD SHX Text E0-7

AutoCAD SHX Text A0-18A

AutoCAD SHX Text

TRAVEL

AutoCAD SHX Text

TRAVEL

AutoCAD SHX Text

BENEFICIARY

AutoCAD SHX Text D0-15

AutoCAD SHX Text

DRESSING AREA

AutoCAD SHX Text

RESTROOM

AutoCAD SHX Text A0 C2

AutoCAD SHX Text

CLIMATE CONTROL

AutoCAD SHX Text A0-20C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

TELECOMMUNICATION

AutoCAD SHX Text

EO-2

AutoCAD SHX Text

X-RAY # 1

AutoCAD SHX Text

EO-46

AutoCAD SHX Text

CARD

AutoCAD SHX Text

EO-32

AutoCAD SHX Text

PORTABLE

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

EO-51

AutoCAD SHX Text

BIOMED

AutoCAD SHX Text

EO-47A

AutoCAD SHX Text

NRSCAN

AutoCAD SHX Text

EO-1A

AutoCAD SHX Text

NURSE OFFICE

AutoCAD SHX Text

DARK ROOM

AutoCAD SHX Text

CARD READER

AutoCAD SHX Text

READER

AutoCAD SHX Text

EO-49

AutoCAD SHX Text

BIO MEDICAL

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

EO-48

AutoCAD SHX Text

EO-47

AutoCAD SHX Text

CHANGING

AutoCAD SHX Text

ROOMS

AutoCAD SHX Text

CHANGING

AutoCAD SHX Text

ROOMS

AutoCAD SHX Text

EXISTING AREAWAY

AutoCAD SHX Text

GENERATOR EQUIPMENT ROOM

AutoCAD SHX Text A0-12

AutoCAD SHX Text

GENERATOR ROOM

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text Affairs

AutoCAD SHX Text Date

AutoCAD SHX Text Project Number

AutoCAD SHX Text DRAWING No.

AutoCAD SHX Text Building Number

AutoCAD SHX Text Reviewed

AutoCAD SHX Text AutoCAD File Name

AutoCAD SHX Text Const. Contract No.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Veterans

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Project Title

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Department of Veterans Affairs

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text Date

AutoCAD SHX Text By

AutoCAD SHX Text

AutoCAD SHX Text Revisions

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BC

AutoCAD SHX Text

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

REVISION NO.

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

CONCRETE SHEAR WALL

AutoCAD SHX Text

SEE COVER SHEET FOR COORDINATION NOTES.

AutoCAD SHX Text Recommended Approvals:

AutoCAD SHX Text

1. MEDICAL DIRECTOR

AutoCAD SHX Text

6. OPERATIONS SERVICE LINE MANAGER

AutoCAD SHX Text

7. INFECTION CONTROL MANAGER

AutoCAD SHX Text

2. ASSOCIATE DIRECTOR

AutoCAD SHX Text

8. SAFETY MANAGER

AutoCAD SHX Text

3. CHIEF OF STAFF

AutoCAD SHX Text

4. ASSOC. DIRECTOR

AutoCAD SHX Text

9. GENERAL ENGINEER

AutoCAD SHX Text

5. SERVICE LINE MGRS.

AutoCAD SHX Text

10. COR

AutoCAD SHX Text Architect/Engineer Address

AutoCAD SHX Text

WWW.HARRELLDG.COM

AutoCAD SHX Text F 704.321.0833

AutoCAD SHX Text P 704.814.1320

AutoCAD SHX Text

CHARLOTTE, NC 28227

AutoCAD SHX Text

8016 TOWER POINT DRIVE

AutoCAD SHX Text

COPYRIGHT HARRELL DESIGN GROUP, PC

AutoCAD SHX Text c

AutoCAD SHX Text

AutoCAD SHX Text

HDG PROJECT # 17011

AutoCAD SHX Text

NO PIPING OR DUCTWORK SHALL BE ROUTED THROUGH ELECTRICAL AND/OR DATA ROOMS.

AutoCAD SHX Text HATCHING INDICATES AREAS OUTSIDE PRIMARY PROJECT LIMITS. SOME PROJECT LIMITS. SOME ACCESSORY WORK WILL OCCUR IN SHADED AREAS. REFER TO ALL DISCIPLINE DRAWINGS FOR COMPLETE SCOPE.

AutoCAD SHX Text

SYMBOL LEGEND

AutoCAD SHX Text

COORDINATION DRAWINGS

AutoCAD SHX Text

NORTHPORT VA MEDICAL CENTER

AutoCAD SHX Text

NORTHPORT, NY 11768

AutoCAD SHX Text

79 MIDDLEVILLE ROAD

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL SHEET NOTES

AutoCAD SHX Text

KEYPLAN

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text

NW

AutoCAD SHX Text

SW

AutoCAD SHX Text

NE

AutoCAD SHX Text

SE

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text

AREA OF WORK

AutoCAD SHX Text

1-HOUR FIRE RATED WALL

AutoCAD SHX Text

NEW WALL

AutoCAD SHX Text EXISTING WALL, DOOR, WINDOW, MILLWORK, FIXTURE OR OTHER FIXTURE OR ASSEMBLY TO BE REMOVED..

AutoCAD SHX Text EXISTING WALL, DOOR, WINDOW, MILLWORK, FIXTURE OR OTHER FIXTURE OR ASSEMBLY TO REMAIN..

AutoCAD SHX Text

2-HOUR FIRE/SMOKE RATED WALL

AutoCAD SHX Text

SMOKE TIGHT WALL

AutoCAD SHX Text

3-HOUR FIRE/SMOKE RATED WALL

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

AutoCAD SHX Text 5'

AutoCAD SHX Text 10'

AutoCAD SHX Text 20'

AutoCAD SHX Text 3/32" = 1'-0"

AutoCAD SHX Text

BUILDING 200

AutoCAD SHX Text

LIFE SAFETY PLAN

AutoCAD SHX Text E2

AutoCAD SHX Text

GG

AutoCAD SHX Text

LK

AutoCAD SHX Text

LIFE SAFETY SYMBOL LEGEND

AutoCAD SHX Text

RE

AutoCAD SHX Text

FE

GRASS

ASPHALT

STORM

GRATE

(EXISTING)

STORM

GRATE

(EXISTING)

ELECTRICAL MH

GRASS

GRASS

GRASS

GRASS

WALK

WALK

WALK

WALK

WALK

CONCRETE

GRASS

ASPHALT

WALK

GRASS

GRASS

WALK

WALK

EXISTING

MH

(EXISTING)

SAN

MH

(EXISTING)

UPGRADE EMERGENCY

632-16-101

NOVEMBER 9, 2023

GENERATORS

H A R R E L L

DESIGN GROUP, PC

FULLY SPRINKLERED

BID DOCUMENTS

BUILDING 200 INTERIM

LIFE SAFETY PLAN

GI102

START OF TEMPORARY EGRESS ROUTE

DIRECTION OF TRAVEL

END OF TEMPORARY EGRESS ROUTE (EXIT)

PROVIDED EGRESS WIDTH

MINIMUM REQUIRED EGRESS WIDTH

EGRESS OCCUPANT LOAD

EXIT SIGN

OCCUPANT LOAD PER ROOM

ROOM AREA

## NET

### SQFT

## PEOPLE

NAME ROOM NAME

AREA PER OCCUPANT (NET OR GROSS)

X" REQ'D.

X" PROV'D.

# PEOPLE

FEC SEPARATION TRAVEL

COMMON PATH OF TRAVEL

REQUIRED EXIT

NEW ADDITION

CONSTRUCTION TYPE

II (2,2,2) SPECIAL

PURPOSE INDUSTRIAL

MAIN HOSPITAL

EXISTING HEALTHCARE

CONSTRUCTION TYPE II

(2,2,2)

CODE EDITIONS

NFPA 10 PORTABLE FIRE EXTINGUISHERS, 2018 EDITION

NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION

NFPA 14 STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMS, 2019 EDITION NFPA 20 STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION, 2019 EDITION

NFPA 54 NATIONAL FUEL GAS CODE, 2018 EDITION

NFPA 70 NATIONAL ELECTRICAL CODE, 2020 EDITION

NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2019 EDITION

NFPA 80 STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2019 EDITION

NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2018 EDITION NFPA 90B STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS, 2018 EDITION NFPA 96 STANDARD FOR VENTILATION CONTROL AND FIRE PROTECTION OF COMMERCIAL COOKING OPERATIONS, 2017 EDITION

NFPA 99 HEALTH CARE FACILITIES CODE, 2018 EDITION

NFPA 101 LIFE SAFETY CODE, 2018 EDITION

NFPA 105 STANDARD FOR SMOKE DOOR ASSEMBLIES AND OTHER OPENING PROTECTIVES, 2019 EDITION

NFPA 110 STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS, 2019 EDITION

NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, 2019 EDITION ASHRAE 90.1 ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS, 2016 EDITION

NFPA 220 STANDARD ON TYPES PF BUILDING CONSTRUCTION

NFPA 5000 BUILDING CONSTRUCTION AND SAFETY CODE

EXISTING BUILDING TO

REMAIN

FIRE EXTINGUISHER MOUNTED ON WALL, W/ AMEREX

EXTINGUISHER BRACKET (TOP MAX. @ 3'6" AFF)

A. CONTRACTOR SHALL MAINTAIN UNOBSTRUCTED

EXISTS FOR EGRESS AND PROVIDE ALL REQUIRED

TEMPORARY SIGNAGE NECESSARY FOR EGRESS.

B. CONTRACTOR SHALL ENSURE FIRE ALARM,

DETECTION, AND SUPPRESSION SYSTEMS ARE

FUNCTIONING PROPERLY AND ARE NOT IMPAIRED.

WHEN CEILING IS REMOVED THE SPRINKLER HEADS

SHALL BE TURNED TO FACE UP DURING

CONSTRUCTION.

C. TEMPORARY CONSTRUCTION PARTITIONS SHALL BE

CONSTRUCTED TO MEET VA REQUIREMENTS FOR

1-HOUR FIRE SEPARATION BETWEEN CONSTRUCTION

AREA AND HOSPITAL. IN FULLY SPRINKLERED

FACILITIES THE 1-HOUR FIRE-RATED PARTITION MAY

TERMINATE AT THE CEILING.

D. CONTRACTOR SHALL PROVIDE ADDITIONAL

FIRE-FIGHTING EQUIPMENT AND USE TRAINING FOR

CONSTRUCTION PERSONNEL IN THE CONSTRUCTION

AREA.

E. CONTRACTOR SHALL PROVIDE A FIRE-WATCH FOR 9

MONTHS FROM THE START OF THE PROJECT SITE

WORK WHILE EXISTING EXIT IS BLOCKED AND NOT IN

USE.

NOT AN EXIT DURING

CONSTRUCTION

TEMPORARY CLOSURE

OR EXIT DURING

CONSTRUCTION OF

NEW GENERATOR

ADDITION AND

SITEWORK

TEMPORARILY COVER EXIT SIGN ON THIS

SIDE OF THE DOUBLE EGRESS DOORS

ITEMS REMAINING IN SERVICE DURING CONSTRUCTION REQUIRING CONTRACTOR PROTECTION:

1. LOADING DOCK ACCESS: EXISTING LOADING DOCK ACCESS ROAD MUST REMAIN IN SERVICE

DURING THE ENTIRE CONSTRUCTION PERIOD FOR THIS PROJECT. COVER EXCAVATIONS DAILY W/

1-1/4” THICK ASTM A36 STEEL ROAD PLATES CAPABLE OF SUPPORTING H-20 TRUCK LOADS.

PROVIDE TEMPORARY PROVISIONS INCLUDING STEEL ROAD PLATES, PHASED TRENCH WORK,

FLAGMEN, AND CAUTION SIGNAGE.

2. 15KVA PRIMARY DUCT BANK: EXISTING 15KVA PRIMARY DUCT BANK MUST REMAIN IN SERVICE, PROTECTED, AND UNDISTURBED DURING THE PROJECT'S ENTIRE CONSTRUCTION PERIOD. INSTALL

SHEETING AND SHORING ALONG DUCT BANK EDGES ADJACENT TO CONSTRUCTION.

3. UNDERGROUND UTILITIES: UNDERGROUND UTILITIES IN PLAN SOUTH AREA OF THE PROJECT

AREA SHALL REMAIN IN SERVICE FOR THE PROJECT DURATION, WITHOUT DISTURBANCE. ALL

REQUESTED MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL SHUTDOWNS SHALL BE

REQUESTED FROM, COORDINATED WTH, AND APPROVED BY THE VA-COR. SHUTDOWN REQUESTS

MUST PROVIDE WRITTEN PLAN DESCRIBING AFFECTED UTILITIES, DURATION, AND SAFETY

PRECAUTIONS (ACTIVITY HAZARD ANALYSES--SEE SPEC SECTION 013526). SUBMIT WRITTEN

SHUTDOWN REQUESTS TO VA-COR NOT LESS THAN 14 CALENDAR DAYS PRIOR TO THE REQUESTED

SHUTDOWN.

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text S

AutoCAD SHX Text

WALK

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text Affairs

AutoCAD SHX Text Date

AutoCAD SHX Text Project Number

AutoCAD SHX Text DRAWING No.

AutoCAD SHX Text Building Number

AutoCAD SHX Text Reviewed

AutoCAD SHX Text AutoCAD File Name

AutoCAD SHX Text Const. Contract No.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Veterans

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Project Title

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Department of Veterans Affairs

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text Date

AutoCAD SHX Text By

AutoCAD SHX Text

AutoCAD SHX Text Revisions

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BC

AutoCAD SHX Text

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

REVISION NO.

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

CONCRETE SHEAR WALL

AutoCAD SHX Text

SEE COVER SHEET FOR COORDINATION NOTES.

AutoCAD SHX Text Recommended Approvals:

AutoCAD SHX Text

1. MEDICAL DIRECTOR

AutoCAD SHX Text

6. OPERATIONS SERVICE LINE MANAGER

AutoCAD SHX Text

7. INFECTION CONTROL MANAGER

AutoCAD SHX Text

2. ASSOCIATE DIRECTOR

AutoCAD SHX Text

8. SAFETY MANAGER

AutoCAD SHX Text

3. CHIEF OF STAFF

AutoCAD SHX Text

4. ASSOC. DIRECTOR

AutoCAD SHX Text

9. GENERAL ENGINEER

AutoCAD SHX Text

5. SERVICE LINE MGRS.

AutoCAD SHX Text

10. COR

AutoCAD SHX Text Architect/Engineer Address

AutoCAD SHX Text

WWW.HARRELLDG.COM

AutoCAD SHX Text F 704.321.0833

AutoCAD SHX Text P 704.814.1320

AutoCAD SHX Text

CHARLOTTE, NC 28227

AutoCAD SHX Text

8016 TOWER POINT DRIVE

AutoCAD SHX Text

COPYRIGHT HARRELL DESIGN GROUP, PC

AutoCAD SHX Text c

AutoCAD SHX Text

AutoCAD SHX Text

HDG PROJECT # 17011

AutoCAD SHX Text

NO PIPING OR DUCTWORK SHALL BE ROUTED THROUGH ELECTRICAL AND/OR DATA ROOMS.

AutoCAD SHX Text HATCHING INDICATES AREAS OUTSIDE PRIMARY PROJECT LIMITS. SOME PROJECT LIMITS. SOME ACCESSORY WORK WILL OCCUR IN SHADED AREAS. REFER TO ALL DISCIPLINE DRAWINGS FOR COMPLETE SCOPE.

AutoCAD SHX Text

SYMBOL LEGEND

AutoCAD SHX Text

COORDINATION DRAWINGS

AutoCAD SHX Text

NORTHPORT VA MEDICAL CENTER

AutoCAD SHX Text

NORTHPORT, NY 11768

AutoCAD SHX Text

79 MIDDLEVILLE ROAD

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL SHEET NOTES

AutoCAD SHX Text

KEYPLAN

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text

NW

AutoCAD SHX Text

SW

AutoCAD SHX Text

NE

AutoCAD SHX Text

SE

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text

AREA OF WORK

AutoCAD SHX Text

1-HOUR FIRE RATED WALL

AutoCAD SHX Text

NEW WALL

AutoCAD SHX Text EXISTING WALL, DOOR, WINDOW, MILLWORK, FIXTURE OR OTHER FIXTURE OR ASSEMBLY TO BE REMOVED..

AutoCAD SHX Text EXISTING WALL, DOOR, WINDOW, MILLWORK, FIXTURE OR OTHER FIXTURE OR ASSEMBLY TO REMAIN..

AutoCAD SHX Text

2-HOUR FIRE/SMOKE RATED WALL

AutoCAD SHX Text

SMOKE TIGHT WALL

AutoCAD SHX Text

3-HOUR FIRE/SMOKE RATED WALL

AutoCAD SHX Text

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 16'

AutoCAD SHX Text 32'

AutoCAD SHX Text 64'

AutoCAD SHX Text 1/32" = 1'-0"

AutoCAD SHX Text

BUILDING 200

AutoCAD SHX Text

INTERIM LIFE SAFETY PLAN

AutoCAD SHX Text E2

AutoCAD SHX Text

MS

AutoCAD SHX Text

LK

AutoCAD SHX Text

LIFE SAFETY SYMBOL LEGEND

AutoCAD SHX Text

RE

AutoCAD SHX Text

FE

ELECTRICAL MH

GRASS

WALK

WALK

EXISTING

TEMPORARY

GENERATOR

LIMIT OF DISTURBANCE (BLDG)

LIMIT OF DISTURBANCE (BLDG)

LI

M

IT

O

F D

IS

TU

R B

A N

C E

(B

LD

G

LI

M

IT

O

F D

IS

TU

R B

A N

C E

(B

LD

G

UPGRADE EMERGENCY

632-16-101

NOVEMBER 9, 2023

GENERATORS

H A R R E L L

DESIGN GROUP, PC

FULLY SPRINKLERED

BID DOCUMENTS

ICRA PLAN

GC101

1. PROVIDE TEMPORARY 1-HR FIRE-RATED FULL

HEIGHT PARTITION AS INDICATED. PROVIDE 1-HR

RATED DOOR. FINISH AND PAINT ANY EXPOSED

SURFACE OF TEMPORARY WALLS TO THE PUBLIC.

2. CONSTRUCTION ENTRY/EXIT.

3. EXISTING DOORS LEADING TO HOSPITAL INTERIOR

TO BE CLOSED SHUT DURING CONSTRUCTION. GC

WILL HAVE LIMITED ACCESS OUTSIDE OF PROJECT

LIMITS. GC TO COORDINATE ANY ACCESS WITH COR

PRIOR TO THE START OF THE SCHEDULE.

4. PROVIDE PROTECTION AT PORTION OF AREAWAY

TO BE REMOVED/REPLACED DURING

CONSTRUCTION.

5. FOR SITE WORK EXTENTS, SEE CIVIL DRAWINGS.

A. REFER TO SHEET AD001 AND AD101 FOR

DEMOLITION NOTES.

B. MAINTAIN CORRIDOR WIDTHS AT SIX FEET.

C. GC TO PROVIDE TEMPORARY 1 HOUR

CONSTRUCTION PARTITIONS TO SEPARATE ALL

OCCUPIED AREAS FROM DEMOLITION AND

CONSTRUCTION. PARTITIONS SHALL BE 1-HOUR

FIRE-RATED FULL HEIGHT, EXTENDING THROUGH

SUSPENDED CEILINGS TO THE FLOOR SLAB OR

ROOF DECK. AS CONTRACTOR OPTION, IF

SPRINKLERS REMAIN OPERATIONAL ON BOTH SIDES

OF THE TEMPORARY 1 HOUR PARTITION, AND

SPRINKLER HEADS ARE ROTATED UPRIGHT IN THE

CONSTRUCTION AREA, THEN 1 HOUR PARTITION

MAY BE PERMITTED TO TERMINATE AT THE CEILING.

D. GC TO PROVIDE ADHESIVE/TACKY MAT FOR

INFECTION CONTROL. CHANGE MAT AT LEAST DAILY

AND MORE FREQUENTLY AS MAT GETS CLOGGED.

E. CONTRACTOR TO SEAL ALL EXISTING

PENETRATIONS IN EXISTING WALLS AT PERIMETER

OF PROJECT AREA. SEAL PENETRATIONS WITH FIRE

CAULK.

F. ANY DEMOLITION WORK DISRUPTING DAILY

OPERATION OF HOSPITAL MUST BE COORDINATED

WITH RESIDENT ENGINEER AND END USER AT LEAST

TWO WEEKS IN ADVANCE.

G. PROVIDE TEMPORARY 1-HOUR ANTEROOMS

SEPARATING CONSTRUCTION ZONES FROM

OCCUPIED AREAS. MINIMUM SIZE 4'-0" X 6'-0".

H. DO NOT CART CONSTRUCTION DEBRIS THROUGH

HOSPITAL. VACATE DEBRIS THROUGH ADJACENT

CONSTRUCTION AREAS, DIRECTLY TO THE OUTSIDE.

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING

DUST FROM CONSTRUCTION OPERATIONS.

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR

VISUAL INSPECTION.

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I.

2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST

FROM DISPERSING INTO ATMOSPHERE.

3. WATER MIST WORK SURFACES TO CONTROL DUST

WHILE CUTTING.

4. SEAL UNUSED DOORS WITH DUCT TAPE.

5. BLOCK OFF AND SEAL SUPPLY AND RETURN AIR VENTS.

6. REPLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AN

EXIT OF WORK AREA. REPLACE USED MATS IN

ACCORDANCE WITH MANUFACTURER'S

RECOMMENDATIONS.

7. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE

WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM.

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II.

2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL

SAFETY OFFICER OR FACILITIES MANAGEMENT

MAINTENANCE AND ENGINEERING DEPARTMENT

BEFORE CONSTRUCTION BEGINS.

3. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE

WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM.

4. COMPLETE ALL CRITICAL BARRIERS BEFORE

CONSTRUCTION BEGINS OR IMPLEMENT CONTROL CUBE

METHOD.

5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA-EQUIPPED AIR FILTRATION UNITS.

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT

IN TIGHTLY COVERED CONTAINERS.

7. COVER TRANSPORT RECEPTACLES OR CARS. TAPE

COVERS.

8. WET MOP AND/OR VACUUM WITH HEPA FILTERED

VACUUM BEFORE LEAVING WORK AREAS.

9. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE

WORK IS BEING PERFORMED.

1. WIPE SURFACES TO REMOVE DUST.

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. WET MOP AND/OR VACUUM WORK AREA WITH HEPA

FILTERED VACUUM BEFORE LEAVING WORK AREAS.

4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS

WHERE WORK IS BEING PERFORMED.

1. REMOVE BARRIER MATERIALS CAREFULLY TO

MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS.

TAPE COVERING.

4. VACUUM WORK WITH HEPA-FILTERED VACUUMS.

5. WET MOP WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS

WHERE WORK IS BEING PERFORMED.

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS III.

2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL

SAFETY OFFICER OR FACILITIES MANAGEMENT

MAINTENANCE AND ENGINEERING DEPARTMENT BEFORE

CONSTRUCTION BEGINS.

3. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING

DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

4. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT

CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.

5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA-EQUIPPED AIR FILTRATION UNITS.

6. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES

APPROPRIATELY. CONSTRUCT ANTEROOM AND REQUIRE

ALL PERSONNEL TO PASS-THROUGH THIS ROOM SO THEY

CAN BE VACUUMED USING A HEPA VACUUM CLEANER

BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH

OR PAPER COVERALLS THAT ARE REMOVED EACH TIME

THEY LEAVE THE WORK SITE.

7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO

WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED

EACH TIME THE WORKER EXITS THE WORK AREA.

8. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE TO WORK

AREA WITH ANTEROOM. REPLACE PER MANUFACTURER'S

RECOMMENDATIONS.

9. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED EACH BY THE

HOSPITAL SAFETY OFFICER, FACILITIES MANAGEMENT

MAINTENANCE AND ENGINEERING DEPARTMENT AND

THOROUGHLY CLEANED BY THE HOSPITAL ENVIRONMENTAL

SERVICES DEPARTMENT OR THEIR CONTRACTED

ENVIRONMENTAL SERVICES COMPANY.

10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

11. COVER TRANSPORT RECEPTACLES OR CARS. TAPE

COVERING.

12. VACUUM WITH HEPA FILTERED VACUUM. WET MOP WITH

DISINFECTANT AFTER BARRIERS ARE REMOVED.

13. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE

WORK IS BEING PERFORMED.

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE

COVERING.

4. VACUUM WORK WITH HEPA-FILTERED VACUUMS.

5. WET MOP WITH DISINFECTANT AFTER BARRIERS ARE

REMOVED.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE

WORK WAS BEING PERFORMED.

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE

FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON

THE AREA CLASS DESIGNATION

IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING

UPON THE AREA CLASS DESIGNATION

CLASS I

CLASS II

CLASS III

CLASS IV

GROUP 1-LOW RISK

· OFFICE AREAS

(NON-CLINICAL)

PATIENT RISK GROUP TABLE

GROUP 2-MEDIUM RISK

· CARDIOLOGY

· ECHOCARDIOLOGY

· ENDOSCOPY-GI

· PHYSICAL THERAPY

· RADIOLOGY/MRI

· NUCLEAR MEDICINE

· RESPIRATORY CARE (EXCEPT

BRONCHOSCOPY AREA)

· CAFETERIA

· OUTPATIENT AREAS-CLINICS AND

OFFICES (EXCEPTION: TRANSPLANT AND

ONCOLOGY)

GROUP 3-HIGH RISK

· EMERGENCY ROOM

· POST ANESTHESIA

· CARE UNITS

· LABOR AND DELIVERY

· PEDIATRICS

· ADMISSION/DISCHARGE AREA

· LABORATORIES

· PHARMACY

· INPATIENT UNITS (NOT

OTHERWISE SPECIFIED)

GROUP 4-HIGHEST RISK

· ALL OPERATING ROOMS INCLUDING LABOR AND

DELIVERY

· ANESTHESIA AND PUMP AREAS

· CENTRAL EQUIPMENT/STERILE SUPPLY

· CARDIAC CATHETERIZATION AND ANGIOGRAPHY

AREAS

· INTERVENTIONAL RADIOLOGY

· RADIATION ONCOLOGY

· ALL INTENSIVE CARE UNITS

· NEWBORN NURSERIES, INCLUDING NICU

· DIALYSIS UNIT

· ONCOLOGY-INPATIENT AND OUTPATIENT

· TRANSPLANT-INPATIENT AND OUTPATIENT

· PHARMACY ADMIXTURE

· NEGATIVE PRESSURE ISOLATION ROOMS/AREAS

(INCLUDING BRONCHOSCOPY AREA)

INFECTION CONTROL MATRIX-CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK

PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D

LOW RISK GROUP 1 I II II III/IV

MEDIUM RISK GROUP 2 I II III IV

HIGH RISK GROUP 3 I III III/IV IV

HIGHEST RISK GROUP 4 III III/IV III/IV IV

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK

LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES BUT IS NOT LIMITED TO:

· REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE IN 50 SQUARE FEET

· PAINTING (BUT NOT SANDING), WALL COVERING

· ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES THAT DO NOT GENERATE DUST OR

REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION

TYPE OF CONSTRUCTION/PROJECT ACTIVITY TABLE

TYPE A

SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL DUST

INCLUDES BUT IS NOT LIMITED TO:

· INSTALLATION OF TELEPHONE AND COMPUTER CABLING

· ACCESS TO CHASE SPACES

· CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED

TYPE B

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL

OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

INCLUDES BUT IS NOT LIMITED TO:

· SANDING OF WALLS FOR PAINTING OR WALL COVERING

· REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK

· NEW WALL CONSTRUCTION

· MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS

· MAJOR CABLING ACTIVITIES

· ANY ACTIVITY THAT CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT

TYPE C

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES BUT IS NOT LIMITED TO:

· ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS

· REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM

· NEW CONSTRUCTION

TYPE D

ICRA GENERAL NOTES

A. PROVIDE CONTAINMENT AS REQUIRED (BY HOSPITAL) INFECTION CONTROL REPRESENTATIVE FOR

WORK OUTSIDE MAJOR AREA.

B. PROVIDE CONTAINMENT AT THE FLOOR BELOW FOR ANY WORK IN THE CEILING PLENUM.

C. PROVIDE TEMPORARY DOOR WITH GASKETING TO PREVENT THE MOVEMENT OF DUST.

D. PROVIDE TEMPORARY EMERGENCY EXIT FROM CONSTRUCTION ZONE; HOWEVER, ALL GENERAL

CONSTRUCTION TRAFFIC SHOULD BE THROUGH VESTIBULE.

E. CONTRACTOR TO PROTECT ALL FINISHES INCLUDING (BUT NOT LIMITED TO) FLOORING, CEILING, WALL

SURFACES, DOORS, AND DOOR FRAMES DURING THE MOVEMENT OF MATERIALS TO/FROM LIMIT OF

WORK. COORDINATE WITH COR AND SPECIFICATIONS FOR PROCEDURES/REQUIREMENTS.

NOTE:

EXISTING BUILDINGS AND AREAS ADJACENT TO CONSTRUCTION REMAIN

OPERATIONAL AND OCCUPIED DURING ALL PHASES OF CONSTRUCTION.

ITEMS REMAINING IN SERVICE DURING CONSTRUCTION REQUIRING CONTRACTOR PROTECTION:

1. LOADING DOCK ACCESS: EXISTING LOADING DOCK ACCESS ROAD MUST REMAIN IN SERVICE

DURING THE ENTIRE CONSTRUCTION PERIOD FOR THIS PROJECT. COVER EXCAVATIONS DAILY W/

1-1/4” THICK ASTM A36 STEEL ROAD PLATES CAPABLE OF SUPPORTING H-20 TRUCK LOADS.

PROVIDE TEMPORARY PROVISIONS INCLUDING STEEL ROAD PLATES, PHASED TRENCH WORK,

FLAGMEN, AND CAUTION SIGNAGE.

2. 15KVA PRIMARY DUCT BANK: EXISTING 15KVA PRIMARY DUCT BANK MUST REMAIN IN SERVICE, PROTECTED, AND UNDISTURBED DURING THE PROJECT'S ENTIRE CONSTRUCTION PERIOD. INSTALL

SHEETING AND SHORING ALONG DUCT BANK EDGES ADJACENT TO CONSTRUCTION.

3. UNDERGROUND UTILITIES: UNDERGROUND UTILITIES IN PLAN SOUTH AREA OF THE PROJECT

AREA SHALL REMAIN IN SERVICE FOR THE PROJECT DURATION, WITHOUT DISTURBANCE. ALL

REQUESTED MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL SHUTDOWNS SHALL BE

REQUESTED FROM, COORDINATED WTH, AND APPROVED BY THE VA-COR. SHUTDOWN REQUESTS

MUST PROVIDE WRITTEN PLAN DESCRIBING AFFECTED UTILITIES, DURATION, AND SAFETY

PRECAUTIONS (ACTIVITY HAZARD ANALYSES--SEE SPEC SECTION 013526). SUBMIT WRITTEN

SHUTDOWN REQUESTS TO VA-COR NOT LESS THAN 14 CALENDAR DAYS PRIOR TO THE REQUESTED

SHUTDOWN.

DEDUCT ALTERNATE 1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text Q

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

SHFT. 5

AutoCAD SHX Text R.9

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text

DN

AutoCAD SHX Text

SWITCHGEAR

AutoCAD SHX Text D0-5

AutoCAD SHX Text

GENERATOR ROOM

AutoCAD SHX Text A0-11C

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text A0-C3B

AutoCAD SHX Text

ST. 5

AutoCAD SHX Text 148.75

AutoCAD SHX Text A0-C2

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text A0-11D

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text D0-6

AutoCAD SHX Text

PUMP RM.

AutoCAD SHX Text D0-C2B

AutoCAD SHX Text

ST. 7

AutoCAD SHX Text D0-C2C

AutoCAD SHX Text

FEC

AutoCAD SHX Text A0-9A

AutoCAD SHX Text

CONSULTANT

AutoCAD SHX Text

AO-11B

AutoCAD SHX Text D0-4

AutoCAD SHX Text

ELEC.PANEL

AutoCAD SHX Text A0-11A

AutoCAD SHX Text

GENERATOR EQUIPMENT ROOM

AutoCAD SHX Text D0-3

AutoCAD SHX Text

ELEC. RM.

AutoCAD SHX Text A0-11

AutoCAD SHX Text

FIRE ALARM

AutoCAD SHX Text A0-C3A

AutoCAD SHX Text

FEC

AutoCAD SHX Text A0-9

AutoCAD SHX Text

CLASS ROOM

AutoCAD SHX Text D0-C5

AutoCAD SHX Text

SECRETARY/

AutoCAD SHX Text D0-11

AutoCAD SHX Text

TOILET

AutoCAD SHX Text D0-29

AutoCAD SHX Text

MRI CONSULTATION

AutoCAD SHX Text D0-C3

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text D0-22

AutoCAD SHX Text

H.R.LINKS

AutoCAD SHX Text D0-10

AutoCAD SHX Text

MRI

AutoCAD SHX Text D0-12

AutoCAD SHX Text H.A.C.

AutoCAD SHX Text D0-25

AutoCAD SHX Text

TOILET

AutoCAD SHX Text D0-48

AutoCAD SHX Text

PHYSICIAN

AutoCAD SHX Text D0-34

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text D0-35

AutoCAD SHX Text

PHYSICS

AutoCAD SHX Text D0-33

AutoCAD SHX Text

RADIATION ONCOLOGY

AutoCAD SHX Text D0-21

AutoCAD SHX Text D0-20

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

PANEL

AutoCAD SHX Text A0-11

AutoCAD SHX Text

ACCESS TO UTILITIES ROOM

AutoCAD SHX Text

MEDICINE

AutoCAD SHX Text

SCHOOL OF NUCLEAR

AutoCAD SHX Text D0-32

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

MEDICINE

AutoCAD SHX Text

NUCLEAR

AutoCAD SHX Text

ATTENDING PHYSICIAN

AutoCAD SHX Text

NUCLEAR MEDICINE

AutoCAD SHX Text D0-15

AutoCAD SHX Text

DRESSING AREA

AutoCAD SHX Text

RESTROOM

AutoCAD SHX Text A0 C2

AutoCAD SHX Text

CLIMATE CONTROL

AutoCAD SHX Text

CLIMATE CONTROL

AutoCAD SHX Text

EO-2

AutoCAD SHX Text

X-RAY # 1

AutoCAD SHX Text

EO-2A

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

EO-1A

AutoCAD SHX Text

NURSE OFFICE

AutoCAD SHX Text

DARK ROOM

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text Affairs

AutoCAD SHX Text Date

AutoCAD SHX Text Project Number

AutoCAD SHX Text DRAWING No.

AutoCAD SHX Text Building Number

AutoCAD SHX Text Reviewed

AutoCAD SHX Text AutoCAD File Name

AutoCAD SHX Text Const. Contract No.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Veterans

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Project Title

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

Auto…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .