36C24225R0007 0002.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C24225R0007
About this file
This is Amendment 0002 to solicitation 36C24225R0007 issued by the VA Network Contracting Office 2 at Franklin D. Roosevelt VA Medical Center, answering questions from RFI #0001. The amendment clarifies that Past Performance Questionnaires can be submitted until the solicitation due date, CPARs are acceptable in place of PPQs, and resumes for key personnel will count toward the page limit. It confirms that additional evaluation factors from Amendment 0001 should be included in Volume 1: Technical Capability section, and clarifies that a Quality Control Plan is not required.
The amendment also addresses pricing requirements, specifying that while a division cost breakdown is required, vendors should use their local form as no template was attached. Additionally, it clarifies that only amendments published under the current solicitation (36C24225R0007) need to be acknowledged, not those from 2022-2023. A Construction Cost Breakdown Sheet was attached to this amendment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24224R0033 PROPOSAL ITEMS.docx | DOCX document | |
| S06_Custom Soil Resource Report.pdf | ||
| 36C24225R0007 0003.docx | DOCX document | |
| Site Visit Sign Sheet.doc | DOC document | |
| S06_Drawing_Amend.pdf | ||
| P07_Wage Determination.txt | TXT text file | |
| Construction Cost Breakdown Sheet.pdf | ||
| 36C24225R0007 0001.docx | DOCX document | |
| Wage Determination.pdf | ||
| S02 Vol 1-0.pdf | ||
| S02 Vol 1-1.pdf | ||
| S02 Vol 1-2.pdf | ||
| FAR 52.225-2 Buy American Certification.pdf | ||
| 013200 Construction Documentation.docx | DOCX document | |
| S02 Vol 3-1.pdf | ||
| 852.219-77 VA Notice of Limitations on Subcontracting.docx | DOCX document | |
| S02 Vol 1-3.pdf | ||
| 36C24225R0007.docx | DOCX document | |
| S02 Vol 3-0.pdf | ||
| Past Performace Questionaire_PPQ.pdf | ||
| S02 Vol 1.pdf | ||
| S02 Vol 2.pdf | ||
| S02 Vol 3-2.pdf | ||
| S02 Vol 2-0.pdf | ||
| S02 Vol 2-1.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 12-09-2024 632-16-101 36C242 Department of Veterans Affairs Network Contracting Office 2 Franklin D. Roosevelt VA Medical Center 2094 Albany Post Road Montrose
NY
10548 36C242 Department of Veterans Affairs Franklin D. Roosevelt VA Medical Center Network Contracting Office 2 2094 Albany Post Road Montrose
NY
110548 To all Offerors/Bidders
36C24225R0007 11-26-2024
X X X X The purpose of Amendment #0002 is to answer RFI#0001.
See continuation sheet.
GRIFFITH, LES
CONTRACTING OFFICER
RFI #1
1. Regarding the Evaluation Criteria for Contractor’s Past Performance – Confidence, the solicitation states “This information shall be submitted for this procurement using Exhibit C, Past Performance Questionnaire, transmitted via Exhibit B, Sample Transmittal Letter and past Performance Evaluation Questionnaire.” In the Exhibit B document, the instructions to the Reference Contact request the document be completed and returned “no later than 11:00am EST on December 09, 2024.” Is this date correct, or can References submit up until the solicitation due date?
The Past Performance Questionnaire can be submitted up until the solicitation due date.
“No later than 11:00am EST on December 09, 2024,” is a typo.
2. Would a CPAR be acceptable in place of a PPQ?
Yes.
3. Please confirm that in Factor 1, Sub-factor 1 – Management Approach, the offeror can provide resumes for the key personnel which will not count toward the page limit.
Resumes for the key personnel which will count toward the page limit.
4. Section 2. Submittal of offers 2.1 states “Proposals should follow in the order of sequence set forth in the Request for Proposal (RFP).” However, Amendment 0001 added additional evaluation factors, but did not specify where to address them in the proposal. Please advise where this information should be included.
Vendors can include the additional evaluation factors from Amendment 0001 in Volume 1: Section one- Technical Capability.
5. Evaluation Factor 1 – Technical Capability describes this section should not exceed 25 pages and excludes “the Organizational Chart (with brief relevant details of individuals' experiences/qualifications), Tentative Schedule, Quality Control Plan synopsis.” There is no further mention of a Quality Control Plan synopsis. Is it required and if so, please advise what the submission requirements are and where this information should be included.
A Quality Control Plan is not required.
6. Evaluation Factor 4 – Volume II – Price references an attached division cost breakdown template, but this document does not appear to be included in the solicitation documentation. Is it required and if so, please said document.
A division cost breakdown is required. However, please use your local form. The division cost breakdown template is not attached.
7. We would like to clarify whether or not you would like the 5 amendments dated from 2022-2023 acknowledged on the SF1442 that is due January 7th.
No. Only the amendments published under solicitation 36C24225R0007.
See attached document: Construction Cost Breakdown Sheet.