36C24225R0007 0003.docx

DOCX document 23 KB Posted

Attached to
Z1DA--632-16-101 UPGRADE EMERGENCY GENERATORS - PHASE I
Solicitation number
36C24225R0007
Issued by

About this file

This is Amendment 0003 to solicitation 36C24225R0007, issued by the VA Network Contracting Office 2 at Franklin D. Roosevelt VA Medical Center in Montrose, NY. The amendment extends the proposal due date to January 14, 2025 at 11:00 AM EST and provides answers to 25 contractor questions along with drawing revisions.

Key clarifications include: contractors must use Autodesk Construction Cloud (ACC) at no cost, AISC certification is required and cannot be waived, water shutdowns must be done on weekends and limited to 8 hours, contractors must provide fuel for generator testing and fill tanks upon completion, and the current systems include an Edwards EST3 fire alarm and Johnson Controls FX BAS. Drawing revisions modify concrete pad dimensions, fire protection piping requirements, equipment footprints, and electrical details. The amendment also includes attachments for wage determinations, proposal items, revised drawings, the site visit sign-in sheet, and a soil report.

View the file

Other files

File Type Posted
36C24224R0033 PROPOSAL ITEMS.docx DOCX document
S06_Custom Soil Resource Report.pdf PDF
Site Visit Sign Sheet.doc DOC document
S06_Drawing_Amend.pdf PDF
P07_Wage Determination.txt TXT text file
Construction Cost Breakdown Sheet.pdf PDF
36C24225R0007 0002.docx DOCX document
36C24225R0007 0001.docx DOCX document
Wage Determination.pdf PDF
S02 Vol 1-0.pdf PDF
S02 Vol 1-1.pdf PDF
S02 Vol 1-2.pdf PDF
FAR 52.225-2 Buy American Certification.pdf PDF
013200 Construction Documentation.docx DOCX document
S02 Vol 3-1.pdf PDF
852.219-77 VA Notice of Limitations on Subcontracting.docx DOCX document
S02 Vol 1-3.pdf PDF
36C24225R0007.docx DOCX document
S02 Vol 3-0.pdf PDF
Past Performace Questionaire_PPQ.pdf PDF
S02 Vol 1.pdf PDF
S02 Vol 2.pdf PDF
S02 Vol 3-2.pdf PDF
S02 Vol 2-0.pdf PDF
S02 Vol 2-1.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 01-03-2025 632-16-101 36C242 Department of Veterans Affairs Network Contracting Office 2 Franklin D. Roosevelt VA Medical Center 2094 Albany Post Road Montrose

NY

10548 36C242 Department of Veterans Affairs Franklin D. Roosevelt VA Medical Center Network Contracting Office 2 2094 Albany Post Road Montrose

NY

110548 To all Offerors/Bidders

36C24225R0007 11-26-2024

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 01-14-2025 11:00 EST X The purpose of Amendment #0003 is to answer RFI#0002.

See continuation sheet.

GRIFFITH, LES

CONTRACTING OFFICER

RFI#2 Emergency Generator Solicitation # 36C24225R007

1. Does VA fill 2-fuel storage tanks after load bank and generator test?

Specification section 263213 3.2.O requires that the contractor fill the main storage tank and day tank at the completion of all field tests. This shall require all main fuel tanks to be filled at the completion of all field testing. The contractor shall also provide all fuel for testing.

2. Is Schneider electric doing refurbishment and installation of all replacement breakers in gear `room?

Keynote 3 states Square D/Schneider Electric is basis of design. Schneider through Colonial Electric has provided a scope of work and quote for a manufacturer replacement circuit breaker designed to fit within the existing switch gear this contract does not limit the manufacturer selection to Square D/Schneider Electric.

3. Are we following VA Specification for all electrical wiring installation?

Contractor to following all project specifications as issued.

4. For the above-mentioned solicitation, the "wage rate sheet" attachment will not open. can you provide or post it in a different format?

See attached.

5. Please confirm that CQC System Manager may have fill other roles, including project superintendent.

Specification section 014500 part 3.4.B, if the Project Superintendent meets CQC System Manager qualifications and VA approval, the CQC System Manager could serve dual duties as Project Superintendent.

6. Is the GC required to use Submittal Exchange? If so, does the GC need to include the cost as part of their bid?

Contractor and sub-contractors are required to utilize Autodesk Construction Cloud (ACC) for any construction related documentation exchange. Access to ACC platform is provided to contractors at no cost for the duration of the project. Refer to specification 013200 Construction Documentation included in the solicitation.

7. Is there a geotechnical report that can be provided?

A Geotechnical report does not exist for this project since the government would not allow borings to be conducted during the design phase. See specification section 014529 3.1.

8. Is there an environmental (soils, other hazardous materials) report available that can be provided?

See attached soil report.

9. How will unsuitable and/or contaminated soils be handled? (i.e. priced as a change order or allowance?)

See specification section 312000 3.6.E.

10. Are taxes applicable on this project?

Yes.

11. Per specification 01 00 00-1.3 there are 3 bid items but no location to fill in on the SF1442. Is there a pricing page missing from the SF1442?

The Bid Alternate page is missing from the SF 1442. Please see attached.

12. For each bid item, please confirm that these are priced as sequential deducts and not stand alone.

On sheet GI001 schedule of bid items states A: Item 1 is the projects base bid and B: Item 2 is the Bid Deduct 1 minus the items included.

13. What fire alarm system is currently in place?

The current fire alarm system in place is the Edwards EST3 series.

14. What BAS system is currently in place?

The current BAS is Johnson Controls FX.

15. Can AISC certification be waived on this project? The steel scope is not substantial enough for many of the certified companies in the area.

AISC certification is required and cannot be waived.

16. Alternate bid items are not consistently identified throughout the plans (alternates shown on Aseries drawings but not on E-series). Please confirm that there are indeed (2) alternate bid items and clearly define the associated scopes.

On sheet GI001 there is 1 deduct alternative item. E-series sheets show phasing notes on EG001, new callout added to electrical floor plan EP101, and on the electrical one-line EE602.

17. Is the contractor required to provide the initial fuel for the generator day tanks?

Specification section 263213 3.2.O requires that the contractor fill the main storage tank and day tank at the completion of all field tests. This shall require all main fuel tanks to be filled at the completion of all field testing. The contractor shall also provide all fuel for testing.

18. What size are the existing domestic water and fire lines?

The size of the piping is as follows: fire protection 10” in diameter and domestic water 8” in diameter.

19. The demo plans call for cutting, capping, and removing the existing water main. Will the new water main be installed before the demo?

The new water main will be installed immediately after the new point of connection is established and the overburden is removed from the existing duct bank. This will be during demolition and a domestic water shutdown will require scheduling with the VA.

20. Details call for a tapping sleeve and gate valve for the water services 4" to 8". Will this be required for the domestic and fire line relocates?

The connection tap, in the water services detail, is not applicable. The project does not involve the installation of a connection tap. This project only involves the relocation of the sprinkler and domestic main piping.

21. The final cut and caps of the domestic and fire line will require a shutdown. How long are we allowed to shut down the water for? Can this be done during day-time hours?

Water shut down shall be done on the weekend during the minimal water usage. Work shall be prepared and phased to minimize the shutdown to no more than 8 hours.

22. Can the Bid Date be extended another week?

The RFP due WILL be extended to January 14, 2025, at 11:00 AM.

23. Will there be another one?

No, only one site visit was schedule for this project.

24. I also see this is a negotiated bid. Will we be able to provide a quote that will be considered being that we did not go to the site visit?

Yes, your firm can still submit an RFP regardless of if you attended the site visit or not. The site visit was not mandatory.

25. Will you be uploading a copy of the sign in sheet to SAM? (if so when do you anticipate).

See attached.

DRAWINGS:

1. The following drawings are revised as follows (attached):

a. AE101: The concrete pad width, under “NEW 200CR”, is to be extended to 7-feet.

b. C-0.0: Add GENERAL SHEET NOTE 1 - “The existing fire protection piping, within the new building area, shall be demolished and removed. All work shall be completed during Phase 2.”

c. C-2.0: Add GENERAL SHEET NOTE 1 – “The new fire protection piping shall be installed prior to the end Phase 2.”

2. Drawing sheets are reissued as follows:

a. PD101:

i. Partial basement plan was added illustrating the existing main water main to be demolished.

ii. Supporting key notes 4, 5, and 6 have been added.

b. P101:

i. Partial basement plan was added illustrating the new domestic water main connection to the existing domestic water main.

ii. Supporting key notes 7 and 8 have been added.

c. EP101:

i. Adjusted the equipment footprint of NEW 200CR, 200EQ, and 200EQ4 to accurately match the manufacturer’s physical dimensions.

ii. Relocated NEW 200NDP1 from A0-11B Switchgear room to A0-11 Access to Utilities Room.

d. EY-101:

i. Adjusted the equipment footprint of NEW 200CR, 200EQ, and 200EQ4 to accurately match the manufacturer’s physical dimensions.

ii. Relocated NEW 200NDP1 from A0-11B Switchgear room to A0-11 Access to Utilities Room.

e. EE-404:

i. Adjusted the equipment footprint of NEW 200CR, 200EQ, and 200EQ4 to accurately match the manufacturer’s physical dimensions.

ii. Relocated NEW 200NDP1 from A0-11B Switchgear room to A0-11 Access to Utilities Room.

iii. Adjusted conduit routing to 200NDP1.

f. EE602:

i. Added ATS sizes to the drawings.

ii. Added output feeder sizes for all ATS’.

iii. Added “MCB” to the 200LS panelboard.

iv. Removed main breaker out of 200EQ4.

g. EE702:

i. Updated the schedule for 200CR.

h. EE703

i. Updated the schedule for 200EQ.

ii. Updated the schedule for 200EQ4.

See attached document: 36C24224R0033 PROPOSAL ITEMS.

See attached document: P07_Wage Determination.

See attached document: S06_Drawing_Amend.

See attached document: Site Visit Sign Sheet.

See attached document: S06_Custom Soil Resource Report.

File details come from the government source that posted it. Updated .