This document is a Statement of Work (SOW) for a federal contract opportunity to correct electrical deficiencies at the Rocky Mountain Regional VA Medical Center.
The SOW details the requirement to replace nine substation breaker units, five power quality meters, and three power relays that have reached the end of their service life. It also requires the contractor to capture and record any surge events on the 277/480V switchgear and integrate that data into the existing SCADA system. The work must be performed during off-hours and be completed within a 300-day period of performance. The contractor must provide all necessary equipment, materials, and labor, and comply with all applicable federal regulations and safety requirements. Key qualifications include OSHA-30 certification for the site supervisor and OSHA-10 certification for all contractor personnel. The contractor must also submit a project schedule, safety plan, quality control plan, and obtain approval of all materials prior to ordering.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25924R0099 0003.docx | DOCX document | |
| S05 - Additional RFI ANSWER 554-24-106 Correct Electrical Deficiencies.pdf | ||
| S06 - REVISED Scope Table 554-24-106 - REATTACHED.pdf | ||
| 36C25924R0099 0002.docx | DOCX document | |
| S04 - Site Visit Attendance.pdf | ||
| S06 - REVISED Scope Table 554-24-106.pdf | ||
| S05 - RFI ANSWERS 554-24-106 Correct Electrical Deficiencies.pdf | ||
| 36C25924R0099 0001.docx | DOCX document | |
| S02 - Past Performance Questionnaire.docx | DOCX document | |
| S02 - SOW Attachment 4 DRAFT ICRA - PCRA Electrical Closet Substations.pdf | ||
| S02 - SOW Attachment 3 Specifications 554-24-106.pdf | ||
| S22- 852.219-75 LOS Certificate - GC.docx | DOCX document | |
| 36C25924R0099_1.docx | DOCX document | |
| S02 - SOW Attachment 1 Scope Table 554-24-106.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW ATTACHMENT 2
VAECHCS
3-YEAR ELECTRICAL STUDY REPORT PAGES
PROJECT #
554-24-106
CORRECT ELECTRICAL DEFICIENCIES
ED15 has been removed from the project. There is no work associated with ED 15.
ED 15
PLEASE NOTE THERE IS NOT A DEFECT REPORT FOR ITEM ED 17.
ITEM ED 17 REQUIRES REPLACEMENT OF AN EXISTING GE MULTILIN 350 RELAY.
THE RELAY TO BE REPLACED IS IN BUILDING L ON THE NORMAL, NON EMERGENCY POWER SUBSTATION, ON A DISTRIBUTION BREAKER.
LOCATION OF THE RELAY TO BE REPLACED IS 06-NDCP1
ED 17