S02 SOW_Att2c 21014 Tomah Replace Chemical Analyzer - Bid Drawings 676-20-004 _3 of 3.pdf
PDF 10 MB Posted
- Solicitation number
- 36C25222B0011
About this file
This file contains bid drawings related to a federal contract solicitation for replacing a chemistry analyzer. The solicitation number is 36C25222B0011 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 for project 676-20-004 to replace the chemistry analyzer. The solicitation includes attachments and details the opportunity to provide products or services for replacing the chemistry analyzer. The bid drawings in the file provide additional specifications and requirements for responding to the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A
FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING.
2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.
DUCT SIZES ARE NET INSIDE DIMENSIONS.
3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,
DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH
4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL
UNITS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS AT 50% LOADING.
5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD
EQUIPMENT DETAILS.
6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.
7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO
PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING
DIFFUSERS, REGISTERS, AND GRILLES.
MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.
EQUIPMENT SYMBOL LIST
SYMBOL DESCRIPTION
PUMP
OPPOSED BLADE DAMPER
PARALLEL BLADE DAMPER
G NATURAL GAS
DRAIN LINED
THERMOMETER
PRESSURE GAUGE
MANUAL AIR VENT
PIPE UP
PIPE DOWN
TOP CONNECTION
BOTTOM CONNECTION
ECCENTRIC REDUCER
STRAINER
PRESSURE REDUCING VALVE
CONCENTRIC REDUCER
CAP OR PLUG
UNION
BALL VALVE
ISOLATION VALVE - NORMALLY OPEN. SEE SPECIFICATIONS
CHECK VALVE
HEATING/VENTILATING SYMBOL LIST
SYMBOL DESCRIPTION
NOTE: NOT ALL SYMBOLS AND ABBREVIATIONS INDICATED HERE ARE USED IN DRAWINGS AND
MAY NOT APPLY TO CURRENT PROJECT. ADDITIONAL SYMBOLS MAY BE INDICATED ON DRAWINGS.
HOT WATER SUPPLY
HOT WATER RETURN
HWS
HWR
CWR
CWS
CHILLED WATER RETURN
CHILLED WATER SUPPLY
ISOLATION VALVE - NORMALLY CLOSED. SEE SPECIFICATIONS
CD CONDENSATE DRAIN
BUTTERFLY VALVE
THREE-WAY CONTROL VALVE
GATE VALVE
TWO-WAY CONTROL VALVE
SOLENOID VALVE
MANUAL VOLUME DAMPER
BACKDRAFT DAMPER
TURNING VANES
FLEXIBLE DUCT
FIRE DAMPER
FLEXIBLE DUCT CONNECTION
HUMIDISTAT
ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT
MOTORIZED DAMPER
T
M
NEW CONNECTION POINT
EQUIPMENT TAGXXX-#
## / ## FIRST NUMBER IS SIDE SHOWN
SECOND NUMBER IS SIDE NOT SHOWN
DUCT SIZE
SUPPLY OR OUTDOOR AIR DUCT UP
SUPPLY OR OUTDOOR DUCT DOWN
RETURN AIR DUCT UP
RETURN AIR DUCT DOWN DOWN
EXHAUST OR RELIEF AIR DUCT UP
EXHAUST OR RELIEF AIR DUCT DOWN
CO2/NO2 SENSORCO
H
BD
SMOKE DAMPER
FIRE / SMOKE DAMPER
XX-X
XX
NO2
DISCONNECT POINT
CO2
##∅ ROUND DUCT SIZE
DIFFUSER TAG TOP NUMBER IS DIFFUSER IDENTIFICATION
BOTTOM NUMBER IS DIFFUSER CFM
HEATING/VENTILATING SYMBOL LIST
SYMBOL DESCRIPTION
MECHANICAL GENERAL INFORMATION
GENERAL SYMBOL LIST
SYMBOL DESCRIPTION
PIPE TO BE DEMOLISHED
EQUIPMENT TO BE DEMOLISHED
DUCT TO BE DEMOLISHED
POINT OF CONNECTION
KEY NOTE
REVISION TAG1
POINT OF DISCONNECTION
DETAIL REFERENCE
TOP DESIGNATES DETAIL NUMBER
BOTTOM
DESIGNATES SHEET NUMBER
SECTION REFERENCE
TOP DESIGNATES SECTION NUMBER
BOTTOM
DESIGNATES SHEET NUMBER
P1.10
P1.10
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
PROJECT NUMBER: 2021116
B
IM
/T o m a h
R e p la c e
C h e m ic a l A n a ly z e r/
R
M e c h V
A T o m a h C h e m A n a ly z e r
F
L .r v t
/2
/2
:1 :3
A
M
M001
MECHANICAL GENERAL
INFORMATION
REPLACE CHEMICAL ANALYZER
500 E. VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 CS ND
BID DOCUMENTS
FULLY SPRINKLERED
21014
MECHANICAL ABBREVIATIONS
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SD SMOKE DETECTOR / SLOT DIFFUSER
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SI SQUARE INCHES
SOG SLAB ON GRADE
SP STATIC PRESSURE
SPS STATIC PRESSURE SENSOR
SQFT SQUARE FOOT (FEET)
SRV STEAM RELIEF VALVE
SS STAINLESS STEEL
SV SAFETY VALVE
T TANK
TBR TO BE REMOVED
TCP TEMPERATURE CONTROL PANEL
TD TEMPERATURE DIFFERENCE
TEMP TEMPERATURE
TG TRANSFER GRILLE
TOS TOP OF SLAB / TOP OF STEEL
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
UH UNIT HEATER
V VALVE / VOLTS
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VP VELOCITY PRESSURE
VTR VENT THRU ROOF
WB WET BULB TEMPERATURE
WC WATER COLUMN
WCC WATER-COOLED CONDENSER
WF WATER FILTER
WG WATER GAUGE
WPD WATER PRESSURE DROP
MECHANICAL ABBREVIATIONS
HWP HOT WATER PUMP
HX HEAT EXCHANGER
HZ HERTZ
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
KO KNOCKOUT
KVA KILOVOLT AMPERE
KW KILOWATT
KWH KILOWATT-HOUR
L LOUVER
LAT LEAVING AIR TEMPERATURE
LBS / # POUNDS
LBS/HR POUNDS PER HOUR
LD LINEAR DIFFUSER
LF LINEAR FOOT (FEET)
LPC LOW PRESSURE CONDENSATE (STEAM
CONDENSATE)
LPG LOW PRESSURE GAS
LPS LOW PRESSURE STEAM
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
M.C. MECHANICAL CONTRACTOR
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH THOUSANDS OF BTU PER HOUR
MBH 1000 BTUH
MCA MINIMUM CIRCUIT AMPS
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MCC MOTOR CONTROL CENTER
MD MOTORIZED DAMPER
MEP MECHANICAL ELECTRICAL & PLUMBING
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MUW MAKE-UP WATER
NA NOT APPLICABLE
NC NORMALLY CLOSED / NOISE CRITERIA
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN / NUMBER
NPS NORMAL PIPE SIZE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER
ODP OPEN DRIP-PROOF
OED OPEN END DUCT
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
OV OUTLET VELOCITY
P PUMP
P.C. PLUMBING CONTRACTOR
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DROP
PH PHASE
PPM PARTS PER MILLION
PRV PRESSURE REDUCING / PRESSURE
REGULATING VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSID POUNDS PER SQUARE INCH DIFFERENTIAL
PSIG POUNDS PER SQUARE INCH GAUGE
PTAC PACKAGED TERMINAL AIR CONDITIONER
PVC POLYVINYL CHLORIDE
QTY QUANTITY
R RETURN
RA RETURN AIR
RC ROOM CRITERIA
RC REHEAT COIL
REQ REQUIRED
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY / RELATIVE HUMIDITY
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLP RUN LOAD AMPERE
RP REFRIGERANT PIPING
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOFTOP UNIT
MECHANICAL ABBREVIATIONS
A/E ARCHITECT / ENGINEER
ACU AIR CONDITIONING UNIT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR-HANDLING UNIT
AMP AMPERAGE
ARCH ARCHITECT
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATING AND AIR-CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
BHP BRAKE HOUSE POWER
BLDG BUILDING
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CUBIC FEET
CH CHILLER
CHP CHILLED WATER PUMP
CLG CEILING
CM CONSTRUCTION MANAGER
COND CONDENSATE / CONDENSER
CP CONDENSATE PUMP
CPD CONDENSATE PUMP DISCHARGE
CS CARBON STEEL
CT COOLING TOWER
CU COPPER
CUH CABINET UNIT HEATER
CV CONTROL VALVE OR CONSTANT VOLUME
CW COLD WATER (POTABLE)
D DAMPER - AUTOMATIC
DB DRY BULB TEMPERATOR OR DECIBELS
DDC DIRECT DIGITAL CONTROL
DEG DEGREES
DIA DIAMETER
DN DOWN
DP DIFFERENTIAL PRESSURE
DWG DRAWING
DWH DOMESTIC WATER HEATER
(E) EXISTING
E.C. ELECTRICAL CONTRACTOR
EA EXHAUST AIR / EACH
EAT ETERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EL ELBOW OR ELEVATION
ENT ENTERING
EOM END OF MAIN
ERU ENERGY RECOVERY UNIT
ESP EXTERNAL STATIC PRESSURE
ETR EXISTING TO REMAIN
EWH ELECTRIC WALL HEATER
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
F FILTER
FA FRESH AIR OR FREE AREA
FAT FINAL AIR TEMPERATURE
FC FORWARD CURVED / FAIL CLOSED
FCU FAN COIL UNIT
FD FLOOR DRAIN / FIRE DAMPER
FF FINAL FILTER
FLA FULL LOAD AMPS
FLR FLOOR
FM FLOW METER
FO FAIL OPEN
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FP FILTER PUMP
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSD COMBINATION FIRE AND SMOKE DAMPER
FSTAT FREEZESTAT
FT FEET OR FLASH TANK
FTR FIN TUBE RADIATION
°F DEGREES FAHRENHEIT
G.C. GENERAL CONTRACTOR
GA GAUGE
GAL GALLONS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
H HUMIDIFIER
HB HOSE BIBB
HC HEATING COIL
HD HEAD / HUB DRAIN
HGBP REFRIGERANT HOT GAS BYPASS
HP HORSEPOWER / HEAT PUMP
HR HOUR
HW HOT WATER
HWC HOT WATER COIL
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
CONSTRUCTION DOCUMENTS 95% 23 NOV 2021
BID DOCUMENTS 22 DEC 2021
x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
VAV-212
(E)VAV-202
(E)VAV-201
(E)VAV-203
(E)VAV-210
(E)VAV-209
(E)VAV-208
(E)VAV-204
(E)VAV-205
(E)VAV-207
(E)VAV-206
(E)VAV-211
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)TG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)CD-12
(E)EG-1
(E)EG-1
(E)TG-1(E)CD-2
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-1
(E)CD-1
(E)RG-1
(E)RG-1
(E)CD-1
(E)RG-1
(E)CD-1 (E)CD-1 (E)CD-1
(E)CD-1
(E)CD-2
(E)EG-1
(E)TG-1
(E)TG-1
(E)EG-2
(E)LD-2
(E)RG-1
(E)CD-2
(E)EG-2
(E)EG-2 (E)EG-2
(E)EG-2 (E)EG-2
(E)LD-1
(E)LD-1 (E)LD-1 (E)LD-1
(E)LD-1(E)LD-1
(E)LD-2 (E)LD-2
(E)RG-1
(E)CD-11
(E)EG-2
B C D E F
A
1.5
(E)6ø
(E)12ø
(E)12/13
(E )2
/1
(E)14/13
(E)24/10 (E)34/10
(E)LD-1 (E)LD-1
(E)EG-2
STAIR #7
OFFICE
2055B
SOILED
UTILITY
OFFICE
OFFICE
CLEAN
WORK RM
WAITING
CORRIDOR
BLOOD
DRAW
BLOOD
DRAW
BLOOD
DRAW
DRUG
TEST
DRUG TEST
TLT
SPECIMEN
PROC
STORAGE
CORRIDORCLEAN
SUPPLY
WARD
DROP
STAFF TLT
SPECIMEN
TLT
SPECIMEN
TLT
CORRIDOR
CLINICAL
LABORATORY
STAIR
x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
SOILED
UTILITY
2055C
OFFICE
2055B
CLEAN
WORK RM
OFFICE
OFFICE
RECEPTION
STAIR #7
VAV-212
(E)VAV-201
(E)VAV-202
(E)VAV-204
(E)VAV-205
(E)VAV-207
(E)VAV-206
(E)VAV-211
(E)VAV-203
(E)VAV-210
(E)VAV-209
(E)VAV-208
(E)6ø"
(E)6ø"
(E )6 ø
(E )6 ø "(E)6ø"
(E)6ø
(E)7ø"
(E)10ø"
B C D E F
A
1.5
(E)14/13
(E)34/10
(E)8ø
(E)24/10
(E)14/13
(E)7ø (E)14/13
(E)6ø
(E)CD-2
(E)CD-2
(E)RG-1
(E)RG-1
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-2 (E)TG-1
(E)CD-2
(E)CD-1 (E)RG-1
(E)CD-1
(E)RG-1
(E)RG-1
(E)RG-1
(E)CD-2
(E)CD-12
(E)CD-2
(E)TG-1
(E)TG-1
(E)LD-2 (E)LD-2
(E)LD-1 (E)LD-1
(E)LD-1(E)LD-1
(E)LD-1 (E)LD-1(E)LD-1
(E)LD-1
(E)EG-2 (E)EG-2
(E)EG-2 (E)EG-2
(E)EG-2 (E)EG-2
(E)EG-2
(E)TG-1
(E)TG-1
(E)CD-2
(E)CD-11
(E)RG-1
(E)TG-1 (E)EG-1
(E)EG-1
(E)RG-1 (E)EG-1
(E)CD-1
(E)CD-1
(E)CD-1
(E)CD-1
(E)CD-2
(E)6ø
(E)10/6(E)24/8 (E)34/8
CLINICAL
LABORATORY
(E)6ø
(E)6ø
(E)5ø
(E)7ø
(E)6ø
(E)10ø
(E)7ø
(E)7ø (E)8ø
(E)34/14
(E )4
/1
(E)34/16(E)26/18
(E)6ø
(E)8ø
(E)6ø
(E)7ø
(E)10" DIA.
EA DUCT UP
WAITING
x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
SOILED
UTILITY
2055C
STORAGE
2055E
OFFICE
2055B
CLEAN
WORK RM
OFFICE
OFFICE
WAITING
RECEPTION
CLEAN
SUPPLY
DROP OFF
BLOOD
DRAW
STAIR #7
S7
VAV-212
(E)VAV-201
(E)VAV-202
(E)VAV-204
(E)VAV-203
(E)VAV-205 (E)VAV-207
(E)VAV-206
(E)VAV-211
(E)VAV-210
(E)VAV-209
(E)VAV-208
B C D E F
A
1.5
(E)EG-1
(E)CD-12
(E)RG-1
(E)RG-1
(E)RG-1(E)CD-1
(E)RG-1
(E)RG-1
(E)CD-1
(E)CD-1
(E)CD-1
(E)CD-1
(E)CD-1
(E)TG-1
(E)TG-1
(E)EG-2
(E)LD-2
(E)CD-1
(E)CD-2
(E)EG-2 (E)EG-2 (E)EG-2
(E)EG-2
(E)EG-2 (E)EG-2
(E)LD-1
(E)LD-1(E)LD-1
(E)LD-1
(E)LD-1 (E)LD-1
(E)LD-1 (E)LD-1
(E)LD-2 (E)LD-2
(E)TG-1
RECEIVING
2055D
CLINICAL
LABORATORY
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
DRUG TEST
TLT
2049I
DRUG TEST
2049H
BLOOD
DRAW
2049D
BLOOD
DRAW
2049B
BLOOD
DRAW
2049C
BLOOD
DRAW
2049A FRIDGE
STORAGE
SPECIMEN
PROCESSING
STAFF TLT
STORAGE
2047A
CORRIDOR
OC26
STAIR #8
S8 x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
SOILED
UTILITY
2055C
STORAGE
2055E
DRUG TEST
2049H
OFFICE
2055B
CLEAN
WORK RM
OFFICE
OFFICE
WAITING
CLEAN
SUPPLY
DROP OFF
BLOOD
DRAW
STAIR #7
S7
VAV-212
(E)VAV-201
(E)VAV-202
(E)VAV-204
(E)VAV-203
(E)VAV-205 (E)VAV-207
(E)VAV-206
(E)VAV-210
(E)VAV-209
(E)VAV-208
(E)VAV-211
B C D E F
A
1.5
(E)EG-1
(E)CD-2
(E )2
/1
(E)CD-12
(E)RG-1
(E)RG-1
(E)RG-1
(E)CD-1
(E)RG-1
(E)RG-1
(E)CD-1
(E)CD-1
(E)CD-1
(E)CD-1
(E)CD-1
(E)CD-2
(E)EG-2 (E)EG-2
(E)EG-2 (E)EG-2
(E)EG-2 (E)EG-2
(E)LD-1
(E)LD-1
(E)LD-1 (E)LD-1
(E)LD-1(E)LD-1
(E)LD-1(E)LD-1
(E)LD-2 (E)LD-2
(E)EG-2
(E)TG-1
(E)TG-1
(E)CD-1
(E)LD-2
(E)TG-1
CLINICAL
LABORATORY
RECEIVING
2055D
DRUG TEST
TLT
2049I
BLOOD
DRAW
2049D
BLOOD
DRAW
2049B
STAIR #8
S8
BLOOD
DRAW
2049C
BLOOD
DRAW
2049A
CORRIDOR
STAFF TLT
(E)7ø
(E)6ø
(E)10ø
(E)14ø
(E)6ø(E)6ø
(E )2
/1
(E)12/10
(E)10ø
(E)10ø
(E)10" DIA.
EA DUCT UP
FRIDGE
STORAGE
RECEPTION
CORRIDOR
OC26
KEY PLAN - NTS
NORTH
BUILDING 400
AREA OF
WORK
A. EXISTING BUILDING PLANS HAVE BEEN SHOWN ACCORDING TO
ORIGINAL BUILDING PLANS AND FIELD NOTES AND
MEASUREMENTS. EXISTING CONDITIONS AND DIMENSIONS SHALL
BE FIELD VERIFIED BY CONTRACTORS AND DISCREPANCIES
REPORTED TO THE COR AND ARCHITECT PRIOR TO FRAMING.
B. CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING
BUILDING AMENITIES NOT SLATED FOR DEMOLITION OR
REMODELING. ANY SUCH EXISTING CONDITIONS WHICH ARE
DAMAGED OR BECOME UNSTABLE DUE TO OTHER DEMOLITION
SHALL BE REPLACED AT NO COST TO VA WITH NEW
CONSTRUCTION TO MATCH.
C. ALL CUTTING AND PATCHING SHALL BE THE RESPONSIBILITY OF
EACH SUBCONTRACTOR UNLESS OTHERWISE STIPULATED BY OR
ARRANGED WITH THE GC.
D. SALVAGE EXISTING HVAC GRILLES AND LOUVERS FOR REUSE,
RETURN EXCESS TO VA.
GENERAL NOTES - DEMOLITION
KEYNOTES#
1. DISCONNECT AND REMOVE EXISTING RETURN DUCT
AND GRILLE FOR RELOCATION.
AREA NOT IN CONTRACT
INFECTION CONTROL CONSTRUCTION
BARRIER - SEE SHEET G002 FOR
DETAILS. PROVIDE STARC SYSTEMS
FIREBLOCKWALL SYSTEM BARRIERS
OR VA & ARCHITECT APPROVED EQUAL
TEMPORARY CORRIDOR PARTITION
DRAWING SHADE AND LINE TYPES
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
PROJECT NUMBER: 2021116
B
IM
/T o m a h
R e p la c e
C h e m ic a l A n a ly z e r/
R
M e c h V
A T o m a h C h e m A n a ly z e r
F
L .r v t
/2
/2
:1 :3
A
M
MD102
SECOND FLOOR PLAN,
MECHANICAL DEMO, PHASES 0-3
REPLACE CHEMICAL ANALYZER
500 E. VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 CS ND
BID DOCUMENTS
FULLY SPRINKLERED
21014
0' 4' 8' 16'
NORTH
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 0
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 1
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 3
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 2 0' 4' 8' 16'
NORTH
0' 4' 8' 16'
NORTH
0' 4' 8' 16'
NORTH
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
SOILED
UTILITY
2055C
STORAGE
2055E
DRUG TEST
2049H
OFFICE
2055B
CLEAN
WORK RM
OFFICE
OFFICE
WAITING
RECEPTION
CLEAN
SUPPLY
DROP OFF
BLOOD
DRAW
STAIR #7
S7
VAV-212
(E)VAV-201
(E)VAV-202
(E)VAV-204
(E)VAV-203
(E)VAV-205
(E)VAV-207
(E)VAV-206
(E)VAV-210
(E)VAV-209
(E)VAV-208
(E)VAV-211
B C D E F
A
1.5
(E)EG-1
(E)CD-12
(E)RG-1
(E)RG-1
(E)RG-1(E)CD-1
(E)RG-1
(E)RG-1
(E)CD-1
(E)CD-1
(E)CD-1
(E)CD-1
(E)CD-1
(E)TG-1
(E)TG-1
(E)EG-2
(E)LD-2
(E)CD-1
(E)CD-2
(E)EG-2 (E)EG-2 (E)EG-2
(E)EG-2
(E)EG-2 (E)EG-2
(E)LD-1
(E)LD-1(E)LD-1
(E)LD-1
(E)LD-1 (E)LD-1
(E)LD-1 (E)LD-1
(E)LD-2 (E)LD-2
(E)TG-1
CLINICAL
LABORATORY
RECEIVING
2055D
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
BLOOD
DRAW
2049D
BLOOD
DRAW
2049B
STAIR #8
S8
DRUG TEST
TLT
2049I
BLOOD
DRAW
2049C
BLOOD
DRAW
2049A
CORRIDOR
STAFF TLT
STORAGE
2047A
(E)9ø
(E)9ø
(E)12ø
(E)12ø
FRIDGE
STORAGE
CORRIDOR
OC26
SPECIMEN
PROCESSING
x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
VAV-212
(E)VAV-201
(E)VAV-202
(E)VAV-204
(E)VAV-203
(E)VAV-205
(E)VAV-207 (E)VAV-206
(E)VAV-211
(E)VAV-210
(E)VAV-209
(E)VAV-208
B C D E F
A
1.5
(E)LD-1
(E)LD-1
(E)LD-1(E)LD-1
(E)EG-2
(E)EG-2
CLINICAL
LABORATORY
SOILED
UTILITY
2055C
RECEIVING
2055D
STORAGE
2055E
DRUG TEST
TLT
2049I
DRUG TEST
2049H
BLOOD
DRAW
2049D
BLOOD
DRAW
2049B
BLOOD
DRAW
BLOOD
DRAW
2049C
BLOOD
DRAW
2049A
WAITING
RECEPTION
CLEAN
SUPPLY
OFFICE
STAFF TLT
OFFICE
2055B
CLEAN
WORK RM
OFFICE
CORRIDOR
SPECIMEN
TLT
2049G
SPECIMEN
TLT
2049F
DROP OFF
(E)10" DIA.
EA DUCT UP
(E)8ø (E)8ø
STAIR #8
S8
STORAGE
2047A
FRIDGE
STORAGE
CORRIDOR
OC26
SPECIMEN
PROCESSING
x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
VAV-212
(E)VAV-201
(E)VAV-202
(E)VAV-204
(E)VAV-203
(E)VAV-205 (E)VAV-207
(E)VAV-206
(E)VAV-211
(E)VAV-210
(E)VAV-209
(E)VAV-208
B C D E F
A
1.5
(E)EG-2 (E)EG-2 (E)EG-2
(E)LD-1 (E)LD-1
(E)LD-1 (E)LD-1STAFF TLT
NON-LAB
STAFF RM
SOILED
UTILITY
2055C
RECEIVING
2055D
STORAGE
2055E
DRUG TEST
TLT
2049I
DRUG TEST
WRK
2049H
BLOOD
DRAW
BLOOD
DRAW
2049C
BLOOD
DRAW
2049A
BLOOD
DRAW
2049B
BLOOD
DRAW
2049D
CLINICAL
LABORATORY
OFFICE
2055B
CORRIDOR
OFFICE
OFFICE
WAITING
CLEAN
STORAGE
DROP OFF
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
RECEPTION
STORAGE
2047A
(E)10ø
(E)10ø
(E)EG-2
(E)EG-2
(E)34/16
(E)34/16 (E)50/10
(E )3
/1
(E)26/18
(E)14/13
(E)14/13
(E)12ø
(E )3
/1
(E)7ø
(E)12ø
(E)9ø
(E)9ø
(E )2
/1
(E)40/10
(E)8ø
(E)34/14
(E)14/8
(E)34/8
FRIDGE
STOR
SPECIMEN
PROC
STAIR #8
S8
STAIR #7
S7
OC26
CORRIDOR
MENS
TOILET
WOMENS
TOILET
KEY PLAN - NTS
NORTH
BUILDING 400
AREA OF
WORK
KEYNOTES#
1. DISCONNECT AND REMOVE EXISTING EXHAUST DUCT AND
GRILLE FOR TEMPORARY RELOCATION. TEMPORARILY
CAP DUCT CONNECTION.
AREA NOT IN CONTRACT
INFECTION CONTROL CONSTRUCTION
BARRIER - SEE SHEET G002 FOR
DETAILS. PROVIDE STARC SYSTEMS
FIREBLOCKWALL SYSTEM BARRIERS
OR VA & ARCHITECT APPROVED EQUAL
TEMPORARY CORRIDOR PARTITION
DRAWING SHADE AND LINE TYPES
A. EXISTING BUILDING PLANS HAVE BEEN SHOWN ACCORDING TO
ORIGINAL BUILDING PLANS AND FIELD NOTES AND
MEASUREMENTS. EXISTING CONDITIONS AND DIMENSIONS SHALL
BE FIELD VERIFIED BY CONTRACTORS AND DISCREPANCIES
REPORTED TO THE COR AND ARCHITECT PRIOR TO FRAMING.
B. CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING
BUILDING AMENITIES NOT SLATED FOR DEMOLITION OR
REMODELING. ANY SUCH EXISTING CONDITIONS WHICH ARE
DAMAGED OR BECOME UNSTABLE DUE TO OTHER DEMOLITION
SHALL BE REPLACED AT NO COST TO VA WITH NEW
CONSTRUCTION TO MATCH.
C. ALL CUTTING AND PATCHING SHALL BE THE RESPONSIBILITY OF
EACH SUBCONTRACTOR UNLESS OTHERWISE STIPULATED BY OR
ARRANGED WITH THE GC.
D. SALVAGE EXISTING HVAC GRILLES AND LOUVERS FOR REUSE,
RETURN EXCESS TO VA.
GENERAL NOTES - DEMOLITION
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
PROJECT NUMBER: 2021116
B
IM
/T o m a h
R e p la c e
C h e m ic a l A n a ly z e r/
R
M e c h V
A T o m a h C h e m A n a ly z e r
F
L .r v t
/2
/2
:1 :5
A
M
MD103
SECOND FLOOR PLAN,
MECHANICAL DEMO, PHASES 4-6
REPLACE CHEMICAL ANALYZER
500 E. VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 CS ND
BID DOCUMENTS
FULLY SPRINKLERED
21014
SCALE 1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 4
1 SCALE 1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 5
SCALE 1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 6
0' 4' 8' 16'
NORTH
0' 4' 8' 16'
NORTH
0' 4' 8' 16'
NORTH
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
x3 x4 xC xD xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
B C D E F
A
1.5(E)IF-1
(E)AHU-9
(E)ERU-1
(E)AHU-8
(E)10ø
(E)30/34
(E)28/30
(E)18/16(E)22/22
(E )3
/2
(E )3
/2
(E )2
/1
(E )3
/2
(E)30/18
MD104
TEMPORARY RTU
MD104
/2
(E )2
/2
(E
)36/24
EXISTING EXHAUST
FANS IN THIS AREA
ROOF
36'-0"
FOURTH FLOOR /
PENTHOUSE
35'-8"
31.5
ROOF
36' - 0"
FOURTH FLOOR /
PENTHOUSE
35' - 8" x1 x2
31.5
(E)AHU-9
(E)30/18
(E)23/23
(E )1
/3
(E)18/28
(E)36/22
F
IL
T E
R
S
C T
IO
N
H E
A T
R
C
O V
E R
Y
C O
O L
IN
G
C O
IL
S U
P P
L Y
F
A N
A C
C E
S S
H E
A T
IN
G
C
O
IL
H U
M
ID
IF
IE
R
MD104
24/24
TEMPORARY
RTU
(E )2
/2
ROOF
36'-0"
FOURTH FLOOR /
PENTHOUSE
35'-8"
D E D.5
ROOF
36' - 0"
FOURTH FLOOR /
PENTHOUSE
35' - 8"
D E
MD104
(E)AHU-9
(E )2
/2
(E)24/36
(E)36/22
(E)18/30
KEYNOTES#
1. TEMPORARY RENTAL UNIT TO BE OPERATIONAL WHILE
(E)AHU-9 IS OFFLINE FOR COIL REPLACEMENT WORK.
UNIT TO PROVIDE MIN. 3920 CFM OF 100% OUTDOOR
AIR AT 56°F. MAX. CAPACITY AT DESIGN COOLING
CONDITION IS 345 MBH TOTAL / 190 MBH SENSIBLE. MAX
CAPACITY AT DESIGN HEATING CONDITION IS 324 MBH
(95 KW). ACTUAL CAPACITY REQUIRED WILL NEED TO
BE JUSTIFIED TO COR BASED ON HISTORICAL
TEMPERATURE EXTREMES RECORDED FOR DURATION
OF USE OF TEMPORARY UNIT.
2. DISCONNECT PIPING TO HUMIDIFIER AND COOLING
COIL SECTIONS OF (E)AHU-9. REMOVE HUMIDIFIER,
COOLING COIL AND ACCESS SECTIONS OF (E)AHU-9
FOR REPLACEMENT. BLANK OFF CONNECTION TO
(E)28/18 SA DUCT WHILE AHU SECTIONS ARE BEING
REPLACED.
3. CONNECT NEW 24/24 TEMPORARY SA DUCT TO (E)28/18
SA DUCT.
4. PROVIDE 4x4 PRESSURE-TREATED WOOD TEMPORARY
SUPPORT RAILS UNDER UNIT IN EAST-WEST
DIRECTION. RAILS TO EXTEND FROM COLUMN LINE "C"
TO COLUMN LINE BEYOND OPPOSITE END OF UNIT.
5. CONTRACTOR TO PROVIDE CRANE AS NEEDED FOR
TEMPORARY RTU PLACEMENT AND REMOVAL AS WELL
AS AHU COMPONENT MODULE DELIVERY. PROTECT
ROOFING FROM DAMAGE FOR PATH TO MECHANICAL
PENTHOUSE. REFER TO ARCHITECTURAL DRAWINGS
FOR PROPOSED CRANE LOCATION.
6. WHILE UNIT IS OFFLINE, CLEAN INTERAL COMPONENTS
(COILS, DRAIN PANS, ETC.).
7. EXISTING DUCT HUMIDITY SENSOR.
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
PROJECT NUMBER: 2021116
B
IM
/T o m a h
R e p la c e
C h e m ic a l A n a ly z e r/
R
M e c h V
A T o m a h C h e m A n a ly z e r
F
L .r v t
/2
/2
:1 :5
A
M
MD104
FOURTH FLOOR/PENTHOUSE
PLAN, MECHANICAL DEMO
REPLACE CHEMICAL ANALYZER
500 E. VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 CS ND
BID DOCUMENTS
FULLY SPRINKLERED
21014
SCALE 1/8" = 1'-0"
FOURTH FLOOR / PENTHOUSE DEMOLITION PLAN, MECHANICAL
1SCALE 1/4" = 1'-0"
PENTHOUSE DEMOLITION EAST SECTION, MECHANICAL
2 0' 4' 8' 16'
NORTH
0' 2' 4' 8'
SCALE 1/4" = 1'-0"
PENTHOUSE DEMOLITION NORTH SECTION, MECHANICAL
0' 2' 4' 8'
Revisions: Date:
DESIGN DEVELOPMENT 65% 29 OCT 2021
KEY PLAN - NTS
NORTH
BUILDING 400
AREA OF
WORK
x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
VAV-212
(E)VAV-201
(E)VAV-202
(E)VAV-204
(E)VAV-203
(E)VAV-205
(E)VAV-207
(E)VAV-212 (E)VAV-211
(E)VAV-209
(E)VAV-210
(E)VAV-208
B C D E F
A
1.5
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)TG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)CD-12
(E)EG-1
(E)EG-1
(E)TG-1(E)CD-2
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-1
(E)CD-1
(E)RG-1
(E)RG-1
(E)RG-1
(E)CD-1 (E)CD-1 (E)CD-1
(E)CD-1
(E)CD-2
(E)EG-1
(E)TG-1
(E)TG-1
(E)EG-2
(E)RG-1
(E)CD-2
(E)EG-2
(E)EG-2 (E)EG-2
(E)EG-2 (E)EG-2
(E)LD-1
(E)LD-1 (E)LD-1 (E)LD-1
(E)LD-1(E)LD-1
(E)LD-2 (E)LD-2
(E)RG-1
(E)CD-11
(E)EG-2
(E)LD-1 (E)LD-1
(E)EG-2
STAIR #7
S7
OFFICE
2055B
SOILED
UTILITY
2055C
OFFICE
OFFICE
CLEAN
WORK RM
RECEPTION
WAITING
CORRIDOR
OC26
BLOOD
DRAW
2049B
BLOOD
DRAW
2049C
BLOOD
DRAW
2049D
DRUG
TEST
2057A
DRUG TEST
TLT
2057B
SPECIMEN
PROC
2055D
CLEAN
SUPPLY
WARD
DROP
STAFF TLT
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
GLASS
WASH
2055A
CORRIDOR
CORRIDOR
CLINICAL
LABORATORY
HAC
STORAGE
x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
FRIDGE
STORAGE
SOILED
UTILITY
2055C
STORAGE
2055E
DRUG TEST
2049H
DRUG TEST
TLT
2049I
OFFICE
2055B
CLEAN
WORK RM
OFFICE
OFFICE
RECEPTION
WAITING
CLEAN
SUPPLY
DROP OFF
BLOOD
DRAW
STAIR #7
S7
VAV-212
(E)VAV-201
(E)VAV-202
(E)VAV-204
(E)VAV-203
(E)VAV-205 (E)VAV-207
(E)VAV-206
(E)VAV-211
(E)VAV-210
(E)VAV-209
(E)VAV-208
6ø
6ø
6ø ø ø ø
6ø
7ø
(E)CD-1
10ø
10ø
(E)6ø
B C D E F
A
1.5
(E)CD-1
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)TG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)CD-12
(E)EG-1
(E)EG-1
(E)TG-1(E)CD-2
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-1 (E)RG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)EG-2
(E)LD-2
(E)RG-1
(E)CD-2
(E)EG-2
(E)EG-2 (E)EG-2
(E)EG-2 (E)EG-2
(E)LD-1
(E)LD-1 (E)LD-1 (E)LD-1
(E)LD-1(E)LD-1
(E)LD-2
(E)LD-2
(E)EG-2
(E)LD-1 (E)LD-1
(E)CD-1
(E)14/13
(E)14/13
6ø
(E)24/8 (E)34/8
(E)CD-1
(E)EG-1
(E)7ø
(E)10/6
(E)CD-1
(E)EG-2
(E)CD-1
(E)CD-1
(E)12ø
(E )2
/1
(E)7ø
CORRIDOR
RECEIVING
2055D
BLOOD
DRAW
2049A
BLOOD
DRAW
2049C
(E)24/10 (E)34/10
CLINICAL
LABORATORY
BLOOD
DRAW
2049B
(E)6ø
(E)CD-11
(E)10" DIA.
EA DUCT UP
2055A
GLASS
WASH
STAFF TLT
CORRIDOR
OC26
x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
SOILED
UTILITY
2055C
STORAGE
2055E
DRUG TEST
2049H
DRUG TEST
TLT
2049I
OFFICE
2055B
CLEAN
WORK RM
OFFICE
OFFICE
STORAGE
2047A
WAITING
RECEPTION
CLEAN
SUPPLY
DROP OFF
STAIR #7
S7
VAV-212
(E)VAV-201
(E)VAV-202 (E)VAV-203
(E)VAV-210
(E)VAV-209
(E)VAV-208
(E)VAV-204
(E)VAV-205
(E)VAV-207
(E)VAV-206
(E)VAV-211
10ø
10ø
B C D E F
A
1.5
(E)CD-1
(E)CD-1
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)TG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)CD-12
(E)EG-1
(E)EG-1
(E)TG-1(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-1 (E)RG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)EG-2
(E)LD-2
(E)RG-1
(E)CD-2
(E)EG-2
(E)EG-2 (E)EG-2
(E)EG-2 (E)EG-2
(E)LD-1
(E)LD-1 (E)LD-1 (E)LD-1
(E)LD-1(E)LD-1
(E)LD-2 (E)LD-2
(E)EG-2
(E)LD-1 (E)LD-1
(E)CD-1
(E)CD-1
(E)EG-1
(E)CD-1
(E)EG-2
(E)CD-1
(E)CD-1
BLOOD
DRAW
CLINICAL
LABORATORY
SPECIMEN
TLT
2049G
RECEIVING
2055D
BLOOD
DRAW
2049D
BLOOD
DRAW
2049B
BLOOD
DRAW
2049C
BLOOD
DRAW
2049A
STAFF TLT
CORRIDOR
(E)CD-2
7ø
(E)7ø
(E )1 ø
(E )2
/1
(E)34/10
(E )3
/1
(E )2
/1
(E)10" DIA.
EA DUCT UP
FRIDGE
STORAGE
x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
SOILED
UTILITY
2055C
STORAGE
2055E
DRUG TEST
2049H
OFFICE
2055B
CLEAN
WORK RM
OFFICE
OFFICE
WAITING
RECEPTION
CLEAN
SUPPLY
DROP OFF
BLOOD
DRAW
STAIR #7
S7
VAV-212
(E)VAV-201
(E)VAV-202
(E)VAV-204
(E)VAV-203
(E)VAV-205 (E)VAV-207
(E)VAV-206
(E)VAV-211
(E)VAV-210
(E)VAV-209
(E)VAV-208
B C D E F
A
1.5
(E)CD-1
(E)CD-1
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)TG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)CD-12
(E)EG-1
(E)EG-1
(E)TG-1(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-1 (E)RG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)EG-2
(E)LD-2
(E)RG-1
(E)CD-2
(E)EG-2
(E)EG-2 (E)EG-2
(E)EG-2 (E)EG-2
(E)LD-1
(E)LD-1 (E)LD-1 (E)LD-1
(E)LD-1(E)LD-1
(E)LD-2 (E)LD-2
(E)EG-2
(E)LD-1 (E)LD-1
(E)CD-1
(E)CD-1
(E)EG-1
(E)CD-1
(E)EG-2
(E)CD-1
(E)CD-1
CLINICAL
LABORATORY
CORRIDOR
BLOOD
DRAW
2049D
DRUG TEST
TLT
2049I
RECEIVING
2055D
SPECIMEN
TLT
2049G
SPECIMEN
TLT
2049F
STORAGE
2047A
STAFF TLT
BLOOD
DRAW
2049B
BLOOD
DRAW
2049A
BLOOD
DRAW
2049C
FRIDGE
STORAGE
KEYNOTES#
1. RECONNECT AND REINSTALL EXISTING SUPPLY DUCT
AND DIFFUSER AT NEW LOCATION.
2. RECONNECT AND REINSTALL EXISTING RETURN DUCT
AND GRILLE AT NEW LOCATION.
AREA NOT IN CONTRACT
INFECTION CONTROL CONSTRUCTION
BARRIER - SEE SHEET G002 FOR
DETAILS. PROVIDE STARC SYSTEMS
FIREBLOCKWALL SYSTEM BARRIERS
OR VA & ARCHITECT APPROVED EQUAL
TEMPORARY CORRIDOR PARTITION
DRAWING SHADE AND LINE TYPES
A. BALANCING INFORMATION IS PROVIDED ON PHASE 6 DRAWING
(3/M103). CONTRACTOR SHALL UTILIZE AN INDEPENDENT THIRD-
PARTY BALANCING SUB-CONTRACTOR FOR ALL BALANCING
WORK. BALANCE DEVICES PER PHASE AS NEEDED TO MATCH
THE WORK ASSOCIATED WITH THE PHASE.
GENERAL NOTES - NEW WORK
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
PROJECT NUMBER: 2021116
B
IM
/T o m a h
R e p la c e
C h e m ic a l A n a ly z e r/
R
M e c h V
A T o m a h C h e m A n a ly z e r
F
L .r v t
/2
/2
:1 :5
A
M
M102
SECOND FLOOR PLAN,
MECHANICAL, PHASES 0-3
REPLACE CHEMICAL ANALYZER
500 E. VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 CS ND
BID DOCUMENTS
FULLY SPRINKLERED
21014
1/8" = 1'-0"
SECOND FLOOR PLAN, MECHANICAL - PHASE 0
1/8" = 1'-0"
SECOND FLOOR PLAN, MECHANICAL - PHASE 1
1/8" = 1'-0"
SECOND FLOOR PLAN, MECHANICAL - PHASE 2
1/8" = 1'-0"
SECOND FLOOR PLAN, MECHANICAL - PHASE 3
0' 4' 8' 16'
NORTH
0' 4' 8' 16'
NORTH
0' 4' 8' 16'
NORTH
0' 4' 8' 16'
NORTH
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
VAV-212
(E)VAV-201
(E)VAV-202
(E)VAV-204
(E)VAV-203
(E)VAV-205
(E)VAV-207
(E)VAV-206
(E)VAV-211
(E)VAV-210
(E)VAV-209
(E)VAV-208
B C D E F
A
1.5
(E)CD-1
(E)CD-1
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)TG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)CD-12
(E)EG-1
(E)EG-1
(E)TG-1(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-1 (E)RG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)EG-2
(E)LD-2
(E)RG-1
(E)CD-2
(E)EG-2
(E)EG-2 (E)EG-2
(E)EG-2 (E)EG-2
(E)LD-1
(E)LD-1 (E)LD-1 (E)LD-1
(E)LD-1(E)LD-1
(E)LD-2 (E)LD-2
(E)EG-2
(E)LD-1 (E)LD-1
(E)CD-1
(E)CD-1
(E)EG-1
(E)CD-1
(E)EG-2
(E)CD-1
(E)CD-1
STAIR #7
S7
OFFICE
2055B
SOILED
UTILITY
2055C
OFFICE
OFFICE
CLEAN
WORK RM
RECEPTION
WAITING
BLOOD
DRAW
DRUG TEST
2049H
STORAGE
2055E
STAIR #8
S8
FRIDGE
STORAGE
RECEIVING
2055D
DROP OFF
CLEAN
SUPPLY
STAFF TLT
CORRIDOR
BLOOD
DRAW
2049A
BLOOD
DRAW
2049C
BLOOD
DRAW
2049B
BLOOD
DRAW
2049D
DRUG TEST
TLT
2049I
SPECIMEN
TLT
2049G
SPECIMEN
TLT
2049F
CLINICAL
LABORATORY
STORAGE
2047A x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
VAV-212
(E)VAV-201
(E)VAV-202
(E)VAV-204
(E)VAV-205 (E)VAV-207
(E)VAV-206
(E)VAV-203
(E)VAV-210
(E)VAV-209
(E)VAV-208
(E)VAV-211
ø
8ø
B C D E F
A
1.5
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)TG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)CD-12
(E)EG-1
(E)EG-1
(E)TG-1(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-1 (E)RG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)EG-2
(E)LD-2
(E)RG-1
(E)CD-2
(E)EG-2
(E)EG-2 (E)EG-2
(E)LD-1
(E)LD-1
(E)LD-1 (E)LD-1
(E)LD-1(E)LD-1
(E)LD-2 (E)LD-2
(E)EG-2
(E)LD-1 (E)LD-1
(E)EG-2
(E)EG-2
(E)EG-2
(E)34/16 (E)50/10
(E )3
/1
(E)26/18
(E)10ø (E)10ø
CLINICAL
LABORATORY
CLEAN
WORK RM
OFFICE
OFFICE
OFFICE
2055B
CORRIDOR
STAFF TLT
STORAGE
2047A
WAITING
RECEPTION
CLEAN
SUPPLY
DROP OFF
BLOOD
DRAW
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
BLOOD
DRAW
2049B
BLOOD
DRAW
2049A
BLOOD
DRAW
2049C
BLOOD
DRAW
2049D
DRUG TEST
2049H
DRUG TEST
TLT
2049I
STORAGE
2055E
RECEIVING
2055D
SOILED
UTILITY
2055C
5 6
5 6 x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
VAV-212
(E)VAV-208
(E)VAV-209
(E)VAV-210
(E)VAV-201
(E)VAV-203(E)VAV-202
(E)VAV-204
(E)VAV-205 (E)VAV-207
(E)VAV-206
(E)VAV-211
1 1
1 1
1 1
B C D E F
A
1.5
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)TG-1
(E)TG-1
480 (E)TG-1
(E)CD-12
(E)EG-1
(E)EG-1
(E)TG-1
(E)CD-2
(E)CD-2
(E)RG-1
(E)CD-2
(E)CD-1
(E)RG-1
(E)RG-1
(E)TG-1
(E)TG-1
(E)EG-2
(E)LD-2
(E)RG-1
(E)CD-2
(E)EG-2
(E)LD-1
(E)LD-1
(E)LD-1
(E)LD-1
(E)LD-1
(E)LD-1
(E)LD-2
(E)LD-2
(E)LD-1
(E)LD-1
(E)EG-2
(E)EG-2
(E)EG-2
(E)EG-2
(E)EG-2
(E)34/16 (E)50/10
(E )3
/1
(E)26/18
OFFICE
2055B
NON-LAB
STAFF RM
OFFICE
CORRIDOR
STAFF TLT
2051OFFICE
WAITING
STORAGE
2047A
RECEPTION
CLEAN
STORAGE
DROP OFF
BLOOD
DRAW
2049A
BLOOD
DRAW
2049C
SPECIMEN
TLT
2049G
BLOOD
DRAW
2049B
BLOOD
DRAW
2049D
DRUG TEST
WRK
2049H
DRUG TEST
TLT
2049I
STORAGE
2055E
RECEIVING
2055D
SOILED
UTILITY
2055C
CLINICAL
LABORATORY
10ø
10ø 10ø
(E)12ø(E)14/13
(E)7ø
(E )3
/1
(E)14/13 (E)12ø
(E)6ø
(E)RG-1
(E)CD-1
(E)RG-1
1 1
(E)CD-11
(E)CD-2
(E)CD-1
(E)CD-1
(E)CD-1
60 (E)CD-1
(E)CD-1
60 (E)EG-1
(E)CD-1
(E)CD-1
(E)RG-1
(E)RG-1
12/12
KEY PLAN - NTS
NORTH
BUILDING 400
AREA OF
WORK
KEYNOTES#
1. REBALANCE AIR DEVICE TO INDICATED AIRFLOW.
2. REBALANCE (E)EG-2 AIRFLOW TO INDICATED AIRFLOW.
DISCONNECT AND MOVE BACK EXISTING DUCT AND GRILLE
TO ORIGINAL LOCATION AFTER THIS PHASE.
3. RELOCATE (E)EG-2 TO ORIGINAL LOCATION AND REBALANCE
INDICATED AIRFLOW.
4. RECONNECT AND REINSTALL EXISTING EXHAUST DUCT AND
GRILLE AT NEW LOCATION.
5. EXTEND 8"Ø EA DUCT DOWN TO CONNECTION ON
ANALYZER.
6. BALANCE TO 200 CFM.
AREA NOT IN CONTRACT
INFECTION CONTROL CONSTRUCTION
BARRIER - SEE SHEET G002 FOR
DETAILS. PROVIDE STARC SYSTEMS
FIREBLOCKWALL SYSTEM BARRIERS
OR VA & ARCHITECT APPROVED EQUAL
TEMPORARY CORRIDOR PARTITION
DRAWING SHADE AND LINE TYPES
A. BALANCING INFORMATION IS PROVIDED ON PHASE 6 DRAWING
(3/M103). CONTRACTOR SHALL UTILIZE AN INDEPENDENT THIRD-
PARTY BALANCING SUB-CONTRACTOR FOR ALL BALANCING
WORK. BALANCE DEVICES PER PHASE AS NEEDED TO MATCH
THE WORK ASSOCIATED WITH THE PHASE.
GENERAL NOTES - NEW WORK
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
PROJECT NUMBER: 2021116
B
IM
/T o m a h
R e p la c e
C h e m ic a l A n a ly z e r/
R
M e c h V
A T o m a h C h e m A n a ly z e r
F
L .r v t
/2
/2
:1 :0
A
M
M103
SECOND FLOOR PLAN,
MECHANICAL, PHASES 4-6
REPLACE CHEMICAL ANALYZER
500 E. VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 CS ND
BID DOCUMENTS
FULLY SPRINKLERED
21014
1/8" = 1'-0"
SECOND FLOOR PLAN, MECHANICAL - PHASE 4
1/8" = 1'-0"
SECOND FLOOR PLAN, MECHANICAL - PHASE 5
1/8" = 1'-0"
SECOND FLOOR PLAN, MECHANICAL - PHASE 6
0' 4' 8' 16'
NORTH
0' 4' 8' 16'
NORTH
0' 4' 8' 16'
NORTH
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
x3 x4 xC xD xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
B C D E F
A
1.5
M104
(E)IF-1
(E)AHU-9
(E)ERU-1
(E)AHU-8
10ø
30/34
28/30
18/1622/22
36/22
36/22
28/18
36/24
30/18
H-9
3/4" LPS
AND LPCR
ROOF
36'-0"
FOURTH FLOOR /
PENTHOUSE
35'-8"
31.5
FOURTH FLOOR /
PENTHOUSE
35' - 8" x2
31.5
(E)AHU-9
(E)18/28 (E)30/18
(E)36/22
FILTER
SECTION
HEATING
COILS
COOLING
COILS SUPPLY
FAN
A C
C E
S S
A C
C E
S S
3/4" LPS
AND LPCR
3/4"
LPCR
KEYNOTES#
1. PATCH TEMPORARY SA DUCT WALL PENETRATION
OPENING TO PRECONSTRUCTION CONDITIONS.
2. EXTEND EXISTING LPS AND SPCR PIPING FROM
PREVIOUS LOCATION OF HUMIDIFIER IN AHU-9 TO
NEW LOCATION OF HUMIDIFIER IN DUCTWORK.
INSTALL DRAIN PAN IN DUCT BELOW HUMIDIFIER PER
MANUFACTURER'S RECOMMENDATIONS. HUMIDIFIER
MUST BE IN PLACE BEFORE TEMPORARY UNIT IS
BROUGHT ONLINE.
3. RECONNECT EXISTING 3" CWS AND CWR PIPING TO
NEW COILS IN AHU. RE-USE EXISTING CONTROL
VALVE. PROVIDE NEW BALANCING VALVE FOR EACH
CWR COIL CONNECTION. RECONNECT EXISTING
COOLING COIL CONDENSATE PIPE TO NEW COIL
DRAIN PAN.
4. PROVIDE DUCT ACCESS DOOR UPSTREAM AND
DOWNSTREAM OF HUMIDIFIER ASSEMBLY.
5. EXISTING DUCT HUMIDITY SENSOR.
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
PROJECT NUMBER: 2021116
B
IM
/T o m a h
R e p la c e
C h e m ic a l A n a ly z e r/
R
M e c h V
A T o m a h C h e m A n a ly z e r
F
L .r v t
/2
/2
:1 :0
A
M
M104
FOURTH FLOOR/PENTHOUSE
PLAN, MECHANICAL
REPLACE CHEMICAL ANALYZER
500 E. VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 CS ND
BID DOCUMENTS
FULLY SPRINKLERED
21014
SCALE 1/8" = 1'-0"
FOURTH FLOOR / PENTHOUSE PLAN, MECHANICAL
1 0' 4' 8' 16'
NORTH
SCALE 1/4" = 1'-0"
PENTHOUSE SECTION, MECHANICAL
0' 2' 4' 8'
Revisions: Date:
DESIGN DEVELOPMENT 65% 29 OCT 2021
m m
M A
X
NTS
TO RETURN MAIN
PIPE SIZE SHALL BE SAME SIZE AS
TRAP
FLOAT AND THERMOSTATIC
TRAP. SEE PLANS, AND
SCHEDULES
DIELECTRIC FITTING
WHERE RETURN IS
COPPER PIPE
FLOW
SCHEDULE 80
STEEL PIPE
BYPASS-INSTALL IN HORIZONTAL PLANE
LEVEL WITH TRAP OR IN VERTICAL
PLANE & BELOW TRAP PROVIDE BYPASS
PIPING FOR ALL TRAPS 25mm [1"] AND
LARGER.
EQUIPMENT CONNECTION. MAKE
THE SAME SIZE AS THE SUPPLY
MAIN OR EQUIPMENT CONNECTION.
SCHEDULE 80 STEEL PIPE
SEE DRAWINGS FOR PIPE SIZES
25mm [1"]
GATE VALVE
USE 4-BOLT RAISED FACE FLANGES
FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY
NTS
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
PIPE HANGERS
mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU 3/4]
[7]
[5]
[1]
[7]
[6]
[11/4]
[7]
[7]
[11/2]
[9]
[8]
[2]
[10]
[8]
[21/2]
[11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
[10]
[22]
[12]
[23]
[14]
[25]
[16]
[27]
[18]
[28]
[20]
[30]
[24]
[32]
NTS
TYPICAL MANUAL AIR VENT
TYPICAL CHILLED AND HOT WATER PIPING DRAIN VALVE
CONNECTIONS
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
AIR VENT
1/2" [15mm]
BALL VALVE
1/4" [8mm]
COPPER TUBING
1/2" [15mm] x 4" [100mm]
NIPPLE
CIRCULATING WATER PIPING
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
DRAIN VALVE AND AIR VENT CONNECTIONS (HYDRONIC SYSTEMS)
MV
OR
AV
AIR HANDLING UNIT DRAIN TRAP DETAIL
NTS
DRAW THRU
BLOW THRU
2" [50mm]
PLUS X
1" [25mm]
MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME
SIZE AS THE NIPPLE ON THE DRAIN PAN
PIPING SHALL BE RIGID COPPER TYPE L OR
TYPE M UNLESS NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
FLOOR SINK
DRAIN
PAN
NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND
IS INDOORS AND DOES NOT PASS THROUGH RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE
TO BE CONNECTED.
[2 m m
DIELECTRIC
FITTING
NTS
DUCTWORK SQUARE VANE ELBOWS
NOTE:
1.
2.
3.
4.
ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM
SPACE BETWEEN VANES AND A 3/4" [20mm] TRAILING EDGE.
WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL BE DOUBLE
VANE TYPE.
NTS
DUCTWORK RADIUS ELBOWS
VANE
VANE
NOTE:
1.
2.
THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL
SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED,
SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
R SHALL
EQUAL
OR BE
GREATER
THAN W.
R SHALL
EQUAL
OR BE
GREATER
THAN
1/3W.
R SHALL
EQUAL
OR BE
GREATER
THAN
1/6W.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" [20mm] BALL VALVE
ADAPTER TO 3/4" [20mm] HOSE
THREAD-PROVIDE HOSE CAP NUT
NTS
ALTERNATE SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS
SMACNA FIGURE 4-6
45° LEED IN
RIGID DUCT TO AIR TERMINAL
UNIT.
MAIN SUPPLY
PLAN VIEW
FLOW
F L
O W
NTS
EXHAUST OR RETURN BRANCH DUCTWORK
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR
FLOW AIR
FLOW
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
1/4W OR 4" [100mm]
MIN.
BRANCH DUCT
VD
NTS
ROUND DUCT HANGERS
ONE 1 [25] x 22 GA STRAP
QUANTITY/SIZEMAX. DUCT DIA
26 [650]
HANGER STRAPS OR RODS
MAX. LOAD
LBS. [kg]
260 [119]
MAX.
144 [3600]
IN. [mm]
SPACING
IN. [mm] IN. [mm]
NOTE:
TABULATED DATA FROM SMACNA
ALLOWS FOR DUCT REINFORCING AND
INSULATION, BUT NO EXTERNAL LOAD.
BAND OF SAME
SIZE AS HANGER
STRAP
LOAD RATED
FASTENERS
50" [1250mm]∅
& UNDER
NTS
FROM STRUCTURE
SAME AS DIFFUSER
INLET: 5'-0" MAX
FLEXIBLE DUCT SIZE
LENGTH.
12"
CEILING
SUPPORT SADDLE
VOLUME DAMPER W/
LOCKING QUADSADDLE
SHEET METAL
CONICAL OUTLET
BRANCH DUCT
FOR CHANGE OF
DIRECTION GREATER
USE RIGID ELBOWS
THAN 45°
[300mm]
FLEXIBLE AIR DUCT CONNECTOR
SEE SPECIFICATIONS FOR CLAMPS
AND SEALANT (TYP.)
TYPICAL
DIFFUSER OR
REGISTER IN
LAY-IN CLG.
THERMAL INSULATION
SEE SPECIFICATIONS
1/2" TEST VALVE WITH
HOSE BIBB ADAPTOR
6" DIRT POCKET
INSULATED STEAM
STEAM OUTLET
JACKETED MANIFOLD
STRAINER (TYPICAL)
TRAP
3/4" BUCKET
SUPPLY AIR DUCT
OR AHU
UNION (TYPICAL)
CONTROL VALVE
STEAM HUMIDIFIER
LPR
VALVE
STEAM OUTLET AS SPECIFIED
LPS
NTS
STEAM HUMIDIFIER
WATER COIL
AIR VENT WHEN COIL IS NOT
SELF-VENTING
TEST PLUG (TYP.)
PIPE HANGER SHALL SUPPORT
PIPING INDEPENDENT OF COIL
WATER COIL
REDUCER, IF REQUIRED
FLOW ELEMENT
DRAIN WHEN COIL
IS NOT SELF-DRAINING
DRAIN
NOTES:
1. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE OF ACCESS
DOORS OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALES, OR EQUIPMENT.
2. DETAIL IS SHOWN FOR REFERENCE. RE-USE EXISTING PIPING ACCESSORIES IMPLEMENTED FOR
EXISTING COIL.
MV
MV
MV
FE
TI
MV
CALIBRATED BALANCING
VALVE (TYP.)
NTS
WATER COIL PIPING CONNECTIONS
m m m m
[1
M
IN
[6
M
IN
PROVIDE INSULATION
SHIELD
& INSERT FOR ALL
PIPING
(200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA.
HANGER RODS WITH
900mm [36"] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTE:
SEE SPECIFER FOR DETAILED HANGER
REQUIREMENTS
A B
W
W1
W
R
R
2/3W
/3
W
W W
1/2W
/3
W
1/6W
R
W
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
PROJECT NUMBER: 2021116
B
IM
/T o m a h
R e p la c e
C h e m ic a l A n a ly z e r/
R
M e c h V
A T o m a h C h e m A n a ly z e r
F
L .r v t
/2
/2
:1 :1
A
M
M501
DETAILS, MECHANICAL REPLACE CHEMICAL ANALYZER
500 E. VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 CS ND
BID DOCUMENTS
FULLY SPRINKLERED
21014Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
GRILLE, REGISTER AND DIFFUSER SCHEDULE
MARK LOCATION APPLICATION
AIRFLOW
(CFM)
MAX
PRESS.
DROP
(IN. W.G.)
NECK SIZE
(IN. x IN.)
OR
(IN. DIA.)
FACE SIZE
(IN. x IN.) STYLE
MOUNTING
SURFACE
PATTERN/
DEFLECTION MATERIAL
(E)CD-1 CHEM LAB 15 SUPPLY 85 0.09 6" 9" x 9"
LOUVERED
VANES
LAY-IN 4-WAY STEEL
(E)CD-2 OFFICE 2055B SUPPLY 130 0.09 8" 12" x 12"
LOUVERED
VANES
LAY-IN 4-WAY STEEL
(E)CD-2 CHEM LAB 15 SUPPLY 230 0.09 8" 12" x 12"
LOUVERED
VANES
LAY-IN 4-WAY STEEL
(E)CD-12 CHEM LAB 15 SUPPLY 120 0.09 8" 12" x 12"
LOUVERED
VANES
LAY-IN 2-WAY STEEL
(E)LD-1 CHEM LAB 15 SUPPLY 295 0.05 9" 48" x 24" RADIAL LAY-IN 2-WAY ALUMINUM
(E)LD-2 CHEM LAB 15 SUPPLY 505 0.09 12" 48" x 24" RADIAL LAY-IN 2-WAY ALUMINUM
(E)LD-2 CHEM LAB 15 SUPPLY 585 0.09 12" 48" x 24" RADIAL LAY-IN 2-WAY ALUMINUM
(E)EG-2 CHEM LAB 15 EXHAUST 720 0.09 12" x 12" 24" x 24" EGG CRATE LAY-IN NONE ALUMINUM
(E)EG-2 CHEM LAB 15 EXHAUST 730 0.09 12" x 12" 24" x 24" EGG CRATE LAY-IN NONE ALUMINUM
(E)RG-1 SEE PLANS RETURN 130 0.09 7" 24" x 24" EGG CRATE LAY-IN NONE ALUMINUM
HUMIDIFIER SCHEDULE
MARK LOCATION HUMIDIFICATION STYLE
HUMIDIFICATION
LOAD
(LBS/HR)
DUCT
SIZE
(IN. x IN.)
AIR STEAM OVERALL DIMENSIONS
AIRFLOW
(CFM)
ENTERING AIR LEAVING AIR
PRESSURE
(PSI)
TUBE
DIAMETER
(IN.)
TUBE
SPACING
(IN.)
TUBE
QUANTITY
WIDTH
(IN.)
HEIGHT
(IN.)
LENGTH
(IN.)
TEMP.
(°F)
RELATIVE
HUMIDITY
TEMP.
(°F)
RELATIVE
HUMIDITY
H-9 PENTHOUSE STEAM DISPERSION 131.31 28" x 18" 4600 -20 80% 72 40% 10 1.5 6 4 31 25.25 7.25
VAV SCHEDULE
MARK SERVICE
MAX
AIRFLOW
(CFM)
MIN
AIRFLOW
(CFM)
MIN
INLET
SIZE
BOOSTER COIL
REMARKS
CAPACITY
(MBH)
FLOW
RATE
(GPM)
(E)VAV-201 2056 480 150 7" Ø 12.0 0.8 -
(E)VAV-202 2052 & 2054 505 150 7" Ø 10.5 0.7 -
(E)VAV-203 2047, CORRIDOR 215 85 6" Ø 4.6 0.3 -
(E)VAV-204 2050 350 335 6" Ø 10.2 0.7 -
(E)VAV-205 2049A & 2049B 120 95 5" Ø 2.5 0.2 -
(E)VAV-206 2049C, D, E 180 145 5" Ø 4.0 0.3 -
(E)VAV-207 2046, 48, CORR. 270 85 6" Ø 5.1 0.4 -
(E)VAV-208 2055 1000 1000 10" Ø 26.0 1.8 1
(E)VAV-209 2055 1105 1105 10" Ø 25.6 1.7 1
(E)VAV-210 2055 1275 1275 10" Ø 29.5 2 1
(E)VAV-211 2055 430 430 7" Ø 9.9 0.7 1
(E)VAV-212 2055B 110 110 5" Ø 3.5 0.3 1
REMARKS: 1. THREE WAY (BYPASS) MODULATING HOT WATER VALVE.
AIR HANDLING UNIT SCHEDULE
MARK SERVICE LOCATION
FAN DATA COOLING COIL DATA
SUPPLY AIRFLOW
TOTAL STATIC
PRESS.
(IN. W.G.)
EXT. STATIC
PRESS.
(IN. W.G.) FAN CLASS WHEEL TYPE
MOTOR
SIZE
(HP) VOLTAGE PHASE
CAPACITY ENTERING AIR TEMP. LEAVING AIR TEMP. WATER SIDE
NO. OF ROWS
FIN SPACING
(#/FT)
COIL FACE
AREA
(SQ. FT.)
MAX. AIR PRESS.
DROP
(IN. W.G.)
MAX. COIL FACE
VELOCITY
(FPM)
MAX.
(CFM)
MIN.
(CFM)
SENS.
(MBH)
TOTAL
(MBH)
DRY BULB
(°F)
WET BULB
(°F)
DRY BULB
(°F)
WET BULB
(°F)
WATER
FLOW
(GPM)
E.W.T.
(°F)
L.W.T.
(°F)
MAX. WATER PRESS.
DROP
(FT.)
(E)AHU-9 2ND FLOOR LAB PENTHOUSE 4600 4600 5.1 2.5 II AIRFOIL 10 460 3 234.2 427.6 92 75 45.4 45.2 80 40 51.1 13.1 10 96 19.12 0.34 241
(E)AHU-8 SEE PLANS PENTHOUSE 9000 3000 5.45 4 II AIRFOIL 15 460 3 267 374 80.7 67.2 54 53.7 74.9 47 57 6.2
AIR HANDLING UNIT SCHEDULE (CONTINUED)
MARK
HEATING COIL DATA
FILTER
SECTION(S)
PRE / FINAL
HUMIDIFIER RECLAIM COIL
CAPACITY
(MBH)
E.A.T.
(°F)
L.A.T.
(°F)
MAX. AIR PRESS.
DROP
(IN. W.G.) TYPE
E.A.T.
(°F) LB/HR
MAX. AIR PRESS.
DROP
(IN. W.G.)
LEAVING
AIR RH SEASON
CAPACITY
(MBH)
ENTERING AIR TEMP. LEAVING AIR TEMP.
MAX. COIL
FACE
VELOCITY
(FPM)
MAX. AIR
PRESS.
DROP
(IN. W.G.)
MAX. WATER
PRESS.
DROP
(FT.) GPM
E.W.T.
(°F)
L.W.T.
(°F) REMARKS
DRY
BULB
(°F)
WET
BULB
(°F)
DRY
BULB
(°F)
WET
BULB
(°F)
(E)AHU-9 360 -15 56 0.5 2" MERV 7/- - - - - -
SUMMER
WINTER
57.1 262.2
-15
N/A
71.8 N/A
0.84 0.82
5.4 6.7
43.8
80.8 40.1
1,2,3
(E)AHU-8 490 10 60 0.2 2" MERV 7/-
DIRECT
INJECTION
55 137 0.01 80% - - - - - - - - - - - - 1,3
REMARKS:
1. UNLESS NOTED OTHERWISE, DATA IS EXISTING AND PROVIDED FOR REFERENCE ONLY 3. EXISTING UNIT IS MANUFACTURED BY DAIKIN/McQUAY.
2. COOLING COIL DATA IS FOR NEW COIL UTILIZING 30% PROP. GLYCOL SOLUTION
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
PROJECT NUMBER: 2021116
B
IM
/T o m a h
R e p la c e
C h e m ic a l A n a ly z e r/
R
M e c h V
A T o m a h C h e m A n a ly z e r
F
L .r v t
/2
/2
:1 :1
A
M
M601
SCHEDULES, MECHANICAL REPLACE CHEMICAL ANALYZER
500 E. VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 CS ND
BID DOCUMENTS
FULLY SPRINKLERED
21014Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
LUMINARIES
GENERAL LIGHTING
1'X 1' FIXTURES
1'X 2' FIXTURES
1'X 3' FIXTURES
1'X 4' FIXTURES
2'X 2' FIXTURES
2'X 4' FIXTURES
UNDER CABINET
INDUSTRIAL STRIP
TRACK LIGHTING
DOWNLIGHT
ACCENT LIGHTING
FLOOD LIGHT
2 LAMP FLOOR LIGHT
RECESSED MOUNTED
MOUNTING SYMBOLS
SURFACE MOUNTED
PENDANT MOUNTED
WALL MOUNTED
EMERGENCY POWER INDICATION
NORMAL POWER
HALF EMERGENCY POWER
EMERGENCY POWER
IDENTIFICATION
FIXTURE TYPE
(REFER TO LIGHT
FIXTURE SCHEDULE)
A
1, a
SWITCH LEGCIRCUIT
NUMBER
MOUNTING
INDICATION
EGRESS LIGHTING
SINGLE REMOTE HEAD
DOUBLE REMOTE HEAD
BATTERY UNIT
BATTERY UNIT WITH HEADS
EXIT SIGNS (HATCH INDICATES FACE)
SINGLE FACE EXIT SIGN
DOUBLE FACE EXIT SIGN
SINGLE FACE EXIT SIGN WITH HEADS
DOUBLE FACE EXIT SIGN WITH HEADS
CHEVRON INDICATOR
SIMPLEX RECEPTACLE
GFCI SIMPLEX RECEPTACLE
DUPLEX RECEPTACLE
GFCI DUPLEX RECEPTACLE
DOUBLE DUPLEX RECEPTACLE
GFCI DOUBLE DUPLEX RECEPTACLE
RECEPTACLES
ABBREVIATIONS
AFCI
a C
CO
DR
DW
EWC
MW
REF
T
WA
WP
WR
- ARC FAULT CIRCUIT INTERRUPTER
- SWITCH LEG
- ABOVE COUNTER
- COPIER
- DRYER
- DISHWASHER
- ELECTRIC WATER COOLER
- MICROWAVE
- REFRIGERATOR
- TAMPER RESISTANT SAFETY RECEPTACLE
- WASHER
- WEATHER PROOF IN-USE
- WEATHER RESISTANCE DEVICE
FLUSH TYPE FLOOR RECEPTACLE
CONTROLS
EMERGENCY POWER OFF BUTTON
OVERHEAD DOOR CONTROL
PB PUSH BUTTON
SURFACE MOUNTED PANEL BOARD
POWER
FLUSH MOUNTED PANEL BOARD
INVERTER
AUTOMATIC TRANSFER SWITCH
EQUIPMENT CONNECTION.
REFER TO EQUIPMENT SCHEDULES
F
NON-FUSED SWITCH
FUSED SWITCH
COMBO MOTOR STARTER
V VARIABLE FREQUENCY DRIVE
J JUNCTION BOX
J JUNCTION BOX WITH WHIP
HH
GND BUS
MH
HANDHOLE
MANHOLE
GROUND BUS BAR
LIGHTNING ARRESTOR
GROUND
DRAWING SYMBOLS
1 KEYNOTE
1 REVISION TAG
LINE TYPES
NEW WORK
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
WALL MOUNTED SWITCH/SENSOR
LIGHTING CONTROLS
OS CEILING MOUNTED SENSOR - CEILING OR WALL MOUNT
BASED ON LAYOUT, SENSOR SET FOR VACANC DETECTION WITH TIME
DELAY.
TIME CLOCK
PC PHOTOCELL
DS DAY LIGHT SENSOR
C CONTRACTOR
924 UL 924 RELAY
SECURITY CAMERACCTV
CATV/ SATV
DATA
POWER
CATV / SATV
DATA
6"
48" 48"
18"
96"
80"
6"
54" 72"
WITHIN
12" OF
FRAME
48"
MOUNT FIRE ALARM DEVICES
BETWEEN 80" AND 96" AFF TO
CENTER OF STROBE LENS. IF CEILING
IS LESS THAN 80", MOUNT DEVICE 6"
BELOW FINISHED CEILING.
IF COUNTER TOP IS GREATER THAN
20" DEEP, RECEPTACLE TO BE
MOUNTED NO GREATER THAN 40"
AFF OR 6" ABOVE BACKSPLASH,
WHICHEVER IS LESS
COORDINATE WITH
ARCHITECT FOR ALL
RECEPTACLES
MOUNTED IN
CASEWORK
FIRE
PULL DOWN
REF
TV
96"
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
PROJECT NUMBER: 202116
B
IM
/T o m a h R e p la c e C h e m ic a l A n a ly z e r/
R
E le c V
A T o m a h C h e m
A n a ly z e r
F
L .r v t
/2
/2
:4
:4
A
M
E001
ELECTRICAL GENERAL
INFORMATION
REPLACE CHEMICAL ANALYZER
500 E VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 MS ZN
BID DOCUMENTS
FULLY SPRINKLERED
21014
ELECTRICAL ABBREVIATIONS
ABBR DESCRIPTION
LV LOW VOLTAGE
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPS
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MH MANHOLE
MISC MISCELLANEOUS
MLO MAIN LUG ONLY
MTG MOUNTING
MTS MANUAL TRANSFER SWTICH
MV MEDIUM VOLTAGE
N /A NOT APPLICABLE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
P POLE
PB PULL BOX
PC PLUMBING SYSTEM CONTRACTOR
PH PHASE
PNL PANEL
PP POWER PANEL
PR PAIR
PRI PRIMARY
PVC POLYVINYL CHLORIDE
REC RECESSED
RSC RIGID STEEL CONDUIT
SC SECURITY CONTRACTOR
SN SOLID NEUTRAL
SP SPARE
SS STAINLESS STEEL
ST SHUNT TRIP
STP SHIELDED TWISTED PAIR
SUSP SUSPENDED
SW SWITCH
SWBD SWITCHBOARD
TC TELEPHONE CABINET
TCI TELEPHONE COMMUNICATIONS CABLING INSTALLER
TEL TELEPHONE
TELE/DATA TELEPHONE / DATA
TELECOM TELECOMMUNICATIONS
TP TWISTED PAIR
TV TELEVISION
TYP TYPICAL
UG UNDERGROUND
UOI UNLESS OTHERWISE INDICATED
UTP UNSHIELDED TWISTED PAIR
V VOLT
VOL VOLUME
W WATT
WP WEATHERPROOF
XFMR TRANSFORMER
Y WYE
Δ DELTA
ELECTRICAL ABBREVIATIONS
ABBR DESCRIPTION
# NUMBER
1P ONE POLE
1P,1W ONE POLE, ONE WIRE
1P,2W ONE POLE, TWO WIRE
2P TWO POLE
2P,2W TWO POLE, TWO WIRE
3P THREE POLE
3P,2W THREE POLE, TWO WIRE
3P,3W THREE POLE, THREE WIRE
3P,4W THREE POLE, FOUR WIRE
4P FOUR POLE
4P,4W FOUR POLE, FOUR WIRE
A AMPERE
A/V AUDIO VISUAL
AC ALTERNATING CURRENT
AF AMPERE FRAME
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AIC AMPERE INTERRUPTING CAPACITY
AL ALUMINUM
ARCH ARCHITECT
AS AMP SWITCH
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
B PEDESTAL MOUNTED ON BENCH TOP
BF BELOW FLOOR
BFF BELOW FINISHED FLOOR
BFG BELOW FINISHED GRADE
BLDG BUILDING
C CONDUIT
CATV CABLE TELEVISION
CB CIRCUIT BREAKER
CKT CIRCUIT
CL CENTERLINE
CLG CEILING MOUNTED
CT CURRENT TRANSFORMER
CU COPPER
D DEDICATED DEVICE
DC DIRECT CURRENT
DISC DISCONNECT
DWG DRAWING
EC ELECTRICAL CONTRACTOR
EM EMERGENCY
EMT ELECTRIC METALLIC TUBING
ER EXISTING TO BE REMOVED
ERL EXISTING TO BE RELOCATED
ETR EXISTING TO REMAIN
EX EXISTING
FA FIRE ALARM
FLA FULL LOAD AMPS
FO FIBER OPTIC
FPC FIRE PROTECTION CONTRACTOR
GC GENERAL CONTRACTOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFP GROUND FAULT PROTECTION
GND GROUND
GRC GALVANIZED RIGID CONDUIT
HH HANDHOLE
HP HORSEPOWER
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HZ HERTZ (CYCLE) PER SECOND
JB JUNCTION BOX
KVA KILOVOLT AMPERE
KVAR KILOVOLT AMPERE REACTIVE
LP LIGHTING PANEL
LS LIMIT SWITCH
LTG LIGHTING
TYPICAL DEVICE MOUNTING HEIGHTS
Revisions: Date:
35% SCHEMATIC DESIGN 6 OCT 2021
65% DESIGN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .