S02 SOW_Att2c 21014 Tomah Replace Chemical Analyzer - Bid Drawings 676-20-004 _3 of 3.pdf

PDF 10 MB Posted

Attached to
Z1DA--PROJECT: 676-20-004 REPLACE CHEMISTRY ANALYZER
Solicitation number
36C25222B0011
Issued by

About this file

This file contains bid drawings related to a federal contract solicitation for replacing a chemistry analyzer. The solicitation number is 36C25222B0011 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 for project 676-20-004 to replace the chemistry analyzer. The solicitation includes attachments and details the opportunity to provide products or services for replacing the chemistry analyzer. The bid drawings in the file provide additional specifications and requirements for responding to the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A

FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.

DUCT SIZES ARE NET INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,

DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND

INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL

UNITS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS AT 50% LOADING.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD

EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO

PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING

DIFFUSERS, REGISTERS, AND GRILLES.

MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.

EQUIPMENT SYMBOL LIST

SYMBOL DESCRIPTION

PUMP

OPPOSED BLADE DAMPER

PARALLEL BLADE DAMPER

G NATURAL GAS

DRAIN LINED

THERMOMETER

PRESSURE GAUGE

MANUAL AIR VENT

PIPE UP

PIPE DOWN

TOP CONNECTION

BOTTOM CONNECTION

ECCENTRIC REDUCER

STRAINER

PRESSURE REDUCING VALVE

CONCENTRIC REDUCER

CAP OR PLUG

UNION

BALL VALVE

ISOLATION VALVE - NORMALLY OPEN. SEE SPECIFICATIONS

CHECK VALVE

HEATING/VENTILATING SYMBOL LIST

SYMBOL DESCRIPTION

NOTE: NOT ALL SYMBOLS AND ABBREVIATIONS INDICATED HERE ARE USED IN DRAWINGS AND

MAY NOT APPLY TO CURRENT PROJECT. ADDITIONAL SYMBOLS MAY BE INDICATED ON DRAWINGS.

HOT WATER SUPPLY

HOT WATER RETURN

HWS

HWR

CWR

CWS

CHILLED WATER RETURN

CHILLED WATER SUPPLY

ISOLATION VALVE - NORMALLY CLOSED. SEE SPECIFICATIONS

CD CONDENSATE DRAIN

BUTTERFLY VALVE

THREE-WAY CONTROL VALVE

GATE VALVE

TWO-WAY CONTROL VALVE

SOLENOID VALVE

MANUAL VOLUME DAMPER

BACKDRAFT DAMPER

TURNING VANES

FLEXIBLE DUCT

FIRE DAMPER

FLEXIBLE DUCT CONNECTION

HUMIDISTAT

ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT

MOTORIZED DAMPER

T

M

NEW CONNECTION POINT

EQUIPMENT TAGXXX-#

## / ## FIRST NUMBER IS SIDE SHOWN

SECOND NUMBER IS SIDE NOT SHOWN

DUCT SIZE

SUPPLY OR OUTDOOR AIR DUCT UP

SUPPLY OR OUTDOOR DUCT DOWN

RETURN AIR DUCT UP

RETURN AIR DUCT DOWN DOWN

EXHAUST OR RELIEF AIR DUCT UP

EXHAUST OR RELIEF AIR DUCT DOWN

CO2/NO2 SENSORCO

H

BD

SMOKE DAMPER

FIRE / SMOKE DAMPER

XX-X

XX

NO2

DISCONNECT POINT

CO2

##∅ ROUND DUCT SIZE

DIFFUSER TAG TOP NUMBER IS DIFFUSER IDENTIFICATION

BOTTOM NUMBER IS DIFFUSER CFM

HEATING/VENTILATING SYMBOL LIST

SYMBOL DESCRIPTION

MECHANICAL GENERAL INFORMATION

GENERAL SYMBOL LIST

SYMBOL DESCRIPTION

PIPE TO BE DEMOLISHED

EQUIPMENT TO BE DEMOLISHED

DUCT TO BE DEMOLISHED

POINT OF CONNECTION

KEY NOTE

REVISION TAG1

POINT OF DISCONNECTION

DETAIL REFERENCE

TOP DESIGNATES DETAIL NUMBER

BOTTOM

DESIGNATES SHEET NUMBER

SECTION REFERENCE

TOP DESIGNATES SECTION NUMBER

BOTTOM

DESIGNATES SHEET NUMBER

P1.10

P1.10

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

PROJECT NUMBER: 2021116

B

IM

/T o m a h

R e p la c e

C h e m ic a l A n a ly z e r/

R

M e c h V

A T o m a h C h e m A n a ly z e r

F

L .r v t

/2

/2

:1 :3

A

M

M001

MECHANICAL GENERAL

INFORMATION

REPLACE CHEMICAL ANALYZER

500 E. VETERANS STREET, TOMAH, WI 54660

676-20-004

22 DEC 2021 CS ND

BID DOCUMENTS

FULLY SPRINKLERED

21014

MECHANICAL ABBREVIATIONS

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SD SMOKE DETECTOR / SLOT DIFFUSER

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SI SQUARE INCHES

SOG SLAB ON GRADE

SP STATIC PRESSURE

SPS STATIC PRESSURE SENSOR

SQFT SQUARE FOOT (FEET)

SRV STEAM RELIEF VALVE

SS STAINLESS STEEL

SV SAFETY VALVE

T TANK

TBR TO BE REMOVED

TCP TEMPERATURE CONTROL PANEL

TD TEMPERATURE DIFFERENCE

TEMP TEMPERATURE

TG TRANSFER GRILLE

TOS TOP OF SLAB / TOP OF STEEL

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

UH UNIT HEATER

V VALVE / VOLTS

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VP VELOCITY PRESSURE

VTR VENT THRU ROOF

WB WET BULB TEMPERATURE

WC WATER COLUMN

WCC WATER-COOLED CONDENSER

WF WATER FILTER

WG WATER GAUGE

WPD WATER PRESSURE DROP

MECHANICAL ABBREVIATIONS

HWP HOT WATER PUMP

HX HEAT EXCHANGER

HZ HERTZ

IAQ INDOOR AIR QUALITY

ID INSIDE DIAMETER

IE INVERT ELEVATION

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

KO KNOCKOUT

KVA KILOVOLT AMPERE

KW KILOWATT

KWH KILOWATT-HOUR

L LOUVER

LAT LEAVING AIR TEMPERATURE

LBS / # POUNDS

LBS/HR POUNDS PER HOUR

LD LINEAR DIFFUSER

LF LINEAR FOOT (FEET)

LPC LOW PRESSURE CONDENSATE (STEAM

CONDENSATE)

LPG LOW PRESSURE GAS

LPS LOW PRESSURE STEAM

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

M.C. MECHANICAL CONTRACTOR

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH THOUSANDS OF BTU PER HOUR

MBH 1000 BTUH

MCA MINIMUM CIRCUIT AMPS

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MCC MOTOR CONTROL CENTER

MD MOTORIZED DAMPER

MEP MECHANICAL ELECTRICAL & PLUMBING

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

MUW MAKE-UP WATER

NA NOT APPLICABLE

NC NORMALLY CLOSED / NOISE CRITERIA

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN / NUMBER

NPS NORMAL PIPE SIZE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD REQUIRED

NPT NATIONAL PIPE THREAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER

ODP OPEN DRIP-PROOF

OED OPEN END DUCT

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OFOI OWNER FURNISHED OWNER INSTALLED

OV OUTLET VELOCITY

P PUMP

P.C. PLUMBING CONTRACTOR

PCF POUNDS PER CUBIC FOOT

PD PRESSURE DROP

PH PHASE

PPM PARTS PER MILLION

PRV PRESSURE REDUCING / PRESSURE

REGULATING VALVE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSID POUNDS PER SQUARE INCH DIFFERENTIAL

PSIG POUNDS PER SQUARE INCH GAUGE

PTAC PACKAGED TERMINAL AIR CONDITIONER

PVC POLYVINYL CHLORIDE

QTY QUANTITY

R RETURN

RA RETURN AIR

RC ROOM CRITERIA

RC REHEAT COIL

REQ REQUIRED

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY / RELATIVE HUMIDITY

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLP RUN LOAD AMPERE

RP REFRIGERANT PIPING

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOFTOP UNIT

MECHANICAL ABBREVIATIONS

A/E ARCHITECT / ENGINEER

ACU AIR CONDITIONING UNIT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR-HANDLING UNIT

AMP AMPERAGE

ARCH ARCHITECT

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATING AND AIR-CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

BHP BRAKE HOUSE POWER

BLDG BUILDING

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CUBIC FEET

CH CHILLER

CHP CHILLED WATER PUMP

CLG CEILING

CM CONSTRUCTION MANAGER

COND CONDENSATE / CONDENSER

CP CONDENSATE PUMP

CPD CONDENSATE PUMP DISCHARGE

CS CARBON STEEL

CT COOLING TOWER

CU COPPER

CUH CABINET UNIT HEATER

CV CONTROL VALVE OR CONSTANT VOLUME

CW COLD WATER (POTABLE)

D DAMPER - AUTOMATIC

DB DRY BULB TEMPERATOR OR DECIBELS

DDC DIRECT DIGITAL CONTROL

DEG DEGREES

DIA DIAMETER

DN DOWN

DP DIFFERENTIAL PRESSURE

DWG DRAWING

DWH DOMESTIC WATER HEATER

(E) EXISTING

E.C. ELECTRICAL CONTRACTOR

EA EXHAUST AIR / EACH

EAT ETERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EL ELBOW OR ELEVATION

ENT ENTERING

EOM END OF MAIN

ERU ENERGY RECOVERY UNIT

ESP EXTERNAL STATIC PRESSURE

ETR EXISTING TO REMAIN

EWH ELECTRIC WALL HEATER

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

F FILTER

FA FRESH AIR OR FREE AREA

FAT FINAL AIR TEMPERATURE

FC FORWARD CURVED / FAIL CLOSED

FCU FAN COIL UNIT

FD FLOOR DRAIN / FIRE DAMPER

FF FINAL FILTER

FLA FULL LOAD AMPS

FLR FLOOR

FM FLOW METER

FO FAIL OPEN

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FP FILTER PUMP

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSD COMBINATION FIRE AND SMOKE DAMPER

FSTAT FREEZESTAT

FT FEET OR FLASH TANK

FTR FIN TUBE RADIATION

°F DEGREES FAHRENHEIT

G.C. GENERAL CONTRACTOR

GA GAUGE

GAL GALLONS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

H HUMIDIFIER

HB HOSE BIBB

HC HEATING COIL

HD HEAD / HUB DRAIN

HGBP REFRIGERANT HOT GAS BYPASS

HP HORSEPOWER / HEAT PUMP

HR HOUR

HW HOT WATER

HWC HOT WATER COIL

Revisions: Date:

SCHEMATIC DESIGN 35% 6 OCT 2021

DESIGN DEVELOPMENT 65% 29 OCT 2021

CONSTRUCTION DOCUMENTS 95% 23 NOV 2021

BID DOCUMENTS 22 DEC 2021

x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

VAV-212

(E)VAV-202

(E)VAV-201

(E)VAV-203

(E)VAV-210

(E)VAV-209

(E)VAV-208

(E)VAV-204

(E)VAV-205

(E)VAV-207

(E)VAV-206

(E)VAV-211

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)TG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)CD-12

(E)EG-1

(E)EG-1

(E)TG-1(E)CD-2

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-1

(E)CD-1

(E)RG-1

(E)RG-1

(E)CD-1

(E)RG-1

(E)CD-1 (E)CD-1 (E)CD-1

(E)CD-1

(E)CD-2

(E)EG-1

(E)TG-1

(E)TG-1

(E)EG-2

(E)LD-2

(E)RG-1

(E)CD-2

(E)EG-2

(E)EG-2 (E)EG-2

(E)EG-2 (E)EG-2

(E)LD-1

(E)LD-1 (E)LD-1 (E)LD-1

(E)LD-1(E)LD-1

(E)LD-2 (E)LD-2

(E)RG-1

(E)CD-11

(E)EG-2

B C D E F

A

1.5

(E)6ø

(E)12ø

(E)12/13

(E )2

/1

(E)14/13

(E)24/10 (E)34/10

(E)LD-1 (E)LD-1

(E)EG-2

STAIR #7

OFFICE

2055B

SOILED

UTILITY

OFFICE

OFFICE

CLEAN

WORK RM

WAITING

CORRIDOR

BLOOD

DRAW

BLOOD

DRAW

BLOOD

DRAW

DRUG

TEST

DRUG TEST

TLT

SPECIMEN

PROC

STORAGE

CORRIDORCLEAN

SUPPLY

WARD

DROP

STAFF TLT

SPECIMEN

TLT

SPECIMEN

TLT

CORRIDOR

CLINICAL

LABORATORY

STAIR

x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

SPECIMEN

TLT

2049F

SPECIMEN

TLT

2049G

SOILED

UTILITY

2055C

OFFICE

2055B

CLEAN

WORK RM

OFFICE

OFFICE

RECEPTION

STAIR #7

VAV-212

(E)VAV-201

(E)VAV-202

(E)VAV-204

(E)VAV-205

(E)VAV-207

(E)VAV-206

(E)VAV-211

(E)VAV-203

(E)VAV-210

(E)VAV-209

(E)VAV-208

(E)6ø"

(E)6ø"

(E )6 ø

(E )6 ø "(E)6ø"

(E)6ø

(E)7ø"

(E)10ø"

B C D E F

A

1.5

(E)14/13

(E)34/10

(E)8ø

(E)24/10

(E)14/13

(E)7ø (E)14/13

(E)6ø

(E)CD-2

(E)CD-2

(E)RG-1

(E)RG-1

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-2 (E)TG-1

(E)CD-2

(E)CD-1 (E)RG-1

(E)CD-1

(E)RG-1

(E)RG-1

(E)RG-1

(E)CD-2

(E)CD-12

(E)CD-2

(E)TG-1

(E)TG-1

(E)LD-2 (E)LD-2

(E)LD-1 (E)LD-1

(E)LD-1(E)LD-1

(E)LD-1 (E)LD-1(E)LD-1

(E)LD-1

(E)EG-2 (E)EG-2

(E)EG-2 (E)EG-2

(E)EG-2 (E)EG-2

(E)EG-2

(E)TG-1

(E)TG-1

(E)CD-2

(E)CD-11

(E)RG-1

(E)TG-1 (E)EG-1

(E)EG-1

(E)RG-1 (E)EG-1

(E)CD-1

(E)CD-1

(E)CD-1

(E)CD-1

(E)CD-2

(E)6ø

(E)10/6(E)24/8 (E)34/8

CLINICAL

LABORATORY

(E)6ø

(E)6ø

(E)5ø

(E)7ø

(E)6ø

(E)10ø

(E)7ø

(E)7ø (E)8ø

(E)34/14

(E )4

/1

(E)34/16(E)26/18

(E)6ø

(E)8ø

(E)6ø

(E)7ø

(E)10" DIA.

EA DUCT UP

WAITING

x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

SOILED

UTILITY

2055C

STORAGE

2055E

OFFICE

2055B

CLEAN

WORK RM

OFFICE

OFFICE

WAITING

RECEPTION

CLEAN

SUPPLY

DROP OFF

BLOOD

DRAW

STAIR #7

S7

VAV-212

(E)VAV-201

(E)VAV-202

(E)VAV-204

(E)VAV-203

(E)VAV-205 (E)VAV-207

(E)VAV-206

(E)VAV-211

(E)VAV-210

(E)VAV-209

(E)VAV-208

B C D E F

A

1.5

(E)EG-1

(E)CD-12

(E)RG-1

(E)RG-1

(E)RG-1(E)CD-1

(E)RG-1

(E)RG-1

(E)CD-1

(E)CD-1

(E)CD-1

(E)CD-1

(E)CD-1

(E)TG-1

(E)TG-1

(E)EG-2

(E)LD-2

(E)CD-1

(E)CD-2

(E)EG-2 (E)EG-2 (E)EG-2

(E)EG-2

(E)EG-2 (E)EG-2

(E)LD-1

(E)LD-1(E)LD-1

(E)LD-1

(E)LD-1 (E)LD-1

(E)LD-1 (E)LD-1

(E)LD-2 (E)LD-2

(E)TG-1

RECEIVING

2055D

CLINICAL

LABORATORY

SPECIMEN

TLT

2049F

SPECIMEN

TLT

2049G

DRUG TEST

TLT

2049I

DRUG TEST

2049H

BLOOD

DRAW

2049D

BLOOD

DRAW

2049B

BLOOD

DRAW

2049C

BLOOD

DRAW

2049A FRIDGE

STORAGE

SPECIMEN

PROCESSING

STAFF TLT

STORAGE

2047A

CORRIDOR

OC26

STAIR #8

S8 x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

SPECIMEN

TLT

2049F

SPECIMEN

TLT

2049G

SOILED

UTILITY

2055C

STORAGE

2055E

DRUG TEST

2049H

OFFICE

2055B

CLEAN

WORK RM

OFFICE

OFFICE

WAITING

CLEAN

SUPPLY

DROP OFF

BLOOD

DRAW

STAIR #7

S7

VAV-212

(E)VAV-201

(E)VAV-202

(E)VAV-204

(E)VAV-203

(E)VAV-205 (E)VAV-207

(E)VAV-206

(E)VAV-210

(E)VAV-209

(E)VAV-208

(E)VAV-211

B C D E F

A

1.5

(E)EG-1

(E)CD-2

(E )2

/1

(E)CD-12

(E)RG-1

(E)RG-1

(E)RG-1

(E)CD-1

(E)RG-1

(E)RG-1

(E)CD-1

(E)CD-1

(E)CD-1

(E)CD-1

(E)CD-1

(E)CD-2

(E)EG-2 (E)EG-2

(E)EG-2 (E)EG-2

(E)EG-2 (E)EG-2

(E)LD-1

(E)LD-1

(E)LD-1 (E)LD-1

(E)LD-1(E)LD-1

(E)LD-1(E)LD-1

(E)LD-2 (E)LD-2

(E)EG-2

(E)TG-1

(E)TG-1

(E)CD-1

(E)LD-2

(E)TG-1

CLINICAL

LABORATORY

RECEIVING

2055D

DRUG TEST

TLT

2049I

BLOOD

DRAW

2049D

BLOOD

DRAW

2049B

STAIR #8

S8

BLOOD

DRAW

2049C

BLOOD

DRAW

2049A

CORRIDOR

STAFF TLT

(E)7ø

(E)6ø

(E)10ø

(E)14ø

(E)6ø(E)6ø

(E )2

/1

(E)12/10

(E)10ø

(E)10ø

(E)10" DIA.

EA DUCT UP

FRIDGE

STORAGE

RECEPTION

CORRIDOR

OC26

KEY PLAN - NTS

NORTH

BUILDING 400

AREA OF

WORK

A. EXISTING BUILDING PLANS HAVE BEEN SHOWN ACCORDING TO

ORIGINAL BUILDING PLANS AND FIELD NOTES AND

MEASUREMENTS. EXISTING CONDITIONS AND DIMENSIONS SHALL

BE FIELD VERIFIED BY CONTRACTORS AND DISCREPANCIES

REPORTED TO THE COR AND ARCHITECT PRIOR TO FRAMING.

B. CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING

BUILDING AMENITIES NOT SLATED FOR DEMOLITION OR

REMODELING. ANY SUCH EXISTING CONDITIONS WHICH ARE

DAMAGED OR BECOME UNSTABLE DUE TO OTHER DEMOLITION

SHALL BE REPLACED AT NO COST TO VA WITH NEW

CONSTRUCTION TO MATCH.

C. ALL CUTTING AND PATCHING SHALL BE THE RESPONSIBILITY OF

EACH SUBCONTRACTOR UNLESS OTHERWISE STIPULATED BY OR

ARRANGED WITH THE GC.

D. SALVAGE EXISTING HVAC GRILLES AND LOUVERS FOR REUSE,

RETURN EXCESS TO VA.

GENERAL NOTES - DEMOLITION

KEYNOTES#

1. DISCONNECT AND REMOVE EXISTING RETURN DUCT

AND GRILLE FOR RELOCATION.

AREA NOT IN CONTRACT

INFECTION CONTROL CONSTRUCTION

BARRIER - SEE SHEET G002 FOR

DETAILS. PROVIDE STARC SYSTEMS

FIREBLOCKWALL SYSTEM BARRIERS

OR VA & ARCHITECT APPROVED EQUAL

TEMPORARY CORRIDOR PARTITION

DRAWING SHADE AND LINE TYPES

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

PROJECT NUMBER: 2021116

B

IM

/T o m a h

R e p la c e

C h e m ic a l A n a ly z e r/

R

M e c h V

A T o m a h C h e m A n a ly z e r

F

L .r v t

/2

/2

:1 :3

A

M

MD102

SECOND FLOOR PLAN,

MECHANICAL DEMO, PHASES 0-3

REPLACE CHEMICAL ANALYZER

500 E. VETERANS STREET, TOMAH, WI 54660

676-20-004

22 DEC 2021 CS ND

BID DOCUMENTS

FULLY SPRINKLERED

21014

0' 4' 8' 16'

NORTH

1/8" = 1'-0"

SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 0

1/8" = 1'-0"

SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 1

1/8" = 1'-0"

SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 3

1/8" = 1'-0"

SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 2 0' 4' 8' 16'

NORTH

0' 4' 8' 16'

NORTH

0' 4' 8' 16'

NORTH

Revisions: Date:

SCHEMATIC DESIGN 35% 6 OCT 2021

DESIGN DEVELOPMENT 65% 29 OCT 2021

x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

SOILED

UTILITY

2055C

STORAGE

2055E

DRUG TEST

2049H

OFFICE

2055B

CLEAN

WORK RM

OFFICE

OFFICE

WAITING

RECEPTION

CLEAN

SUPPLY

DROP OFF

BLOOD

DRAW

STAIR #7

S7

VAV-212

(E)VAV-201

(E)VAV-202

(E)VAV-204

(E)VAV-203

(E)VAV-205

(E)VAV-207

(E)VAV-206

(E)VAV-210

(E)VAV-209

(E)VAV-208

(E)VAV-211

B C D E F

A

1.5

(E)EG-1

(E)CD-12

(E)RG-1

(E)RG-1

(E)RG-1(E)CD-1

(E)RG-1

(E)RG-1

(E)CD-1

(E)CD-1

(E)CD-1

(E)CD-1

(E)CD-1

(E)TG-1

(E)TG-1

(E)EG-2

(E)LD-2

(E)CD-1

(E)CD-2

(E)EG-2 (E)EG-2 (E)EG-2

(E)EG-2

(E)EG-2 (E)EG-2

(E)LD-1

(E)LD-1(E)LD-1

(E)LD-1

(E)LD-1 (E)LD-1

(E)LD-1 (E)LD-1

(E)LD-2 (E)LD-2

(E)TG-1

CLINICAL

LABORATORY

RECEIVING

2055D

SPECIMEN

TLT

2049F

SPECIMEN

TLT

2049G

BLOOD

DRAW

2049D

BLOOD

DRAW

2049B

STAIR #8

S8

DRUG TEST

TLT

2049I

BLOOD

DRAW

2049C

BLOOD

DRAW

2049A

CORRIDOR

STAFF TLT

STORAGE

2047A

(E)9ø

(E)9ø

(E)12ø

(E)12ø

FRIDGE

STORAGE

CORRIDOR

OC26

SPECIMEN

PROCESSING

x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

VAV-212

(E)VAV-201

(E)VAV-202

(E)VAV-204

(E)VAV-203

(E)VAV-205

(E)VAV-207 (E)VAV-206

(E)VAV-211

(E)VAV-210

(E)VAV-209

(E)VAV-208

B C D E F

A

1.5

(E)LD-1

(E)LD-1

(E)LD-1(E)LD-1

(E)EG-2

(E)EG-2

CLINICAL

LABORATORY

SOILED

UTILITY

2055C

RECEIVING

2055D

STORAGE

2055E

DRUG TEST

TLT

2049I

DRUG TEST

2049H

BLOOD

DRAW

2049D

BLOOD

DRAW

2049B

BLOOD

DRAW

BLOOD

DRAW

2049C

BLOOD

DRAW

2049A

WAITING

RECEPTION

CLEAN

SUPPLY

OFFICE

STAFF TLT

OFFICE

2055B

CLEAN

WORK RM

OFFICE

CORRIDOR

SPECIMEN

TLT

2049G

SPECIMEN

TLT

2049F

DROP OFF

(E)10" DIA.

EA DUCT UP

(E)8ø (E)8ø

STAIR #8

S8

STORAGE

2047A

FRIDGE

STORAGE

CORRIDOR

OC26

SPECIMEN

PROCESSING

x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

VAV-212

(E)VAV-201

(E)VAV-202

(E)VAV-204

(E)VAV-203

(E)VAV-205 (E)VAV-207

(E)VAV-206

(E)VAV-211

(E)VAV-210

(E)VAV-209

(E)VAV-208

B C D E F

A

1.5

(E)EG-2 (E)EG-2 (E)EG-2

(E)LD-1 (E)LD-1

(E)LD-1 (E)LD-1STAFF TLT

NON-LAB

STAFF RM

SOILED

UTILITY

2055C

RECEIVING

2055D

STORAGE

2055E

DRUG TEST

TLT

2049I

DRUG TEST

WRK

2049H

BLOOD

DRAW

BLOOD

DRAW

2049C

BLOOD

DRAW

2049A

BLOOD

DRAW

2049B

BLOOD

DRAW

2049D

CLINICAL

LABORATORY

OFFICE

2055B

CORRIDOR

OFFICE

OFFICE

WAITING

CLEAN

STORAGE

DROP OFF

SPECIMEN

TLT

2049F

SPECIMEN

TLT

2049G

RECEPTION

STORAGE

2047A

(E)10ø

(E)10ø

(E)EG-2

(E)EG-2

(E)34/16

(E)34/16 (E)50/10

(E )3

/1

(E)26/18

(E)14/13

(E)14/13

(E)12ø

(E )3

/1

(E)7ø

(E)12ø

(E)9ø

(E)9ø

(E )2

/1

(E)40/10

(E)8ø

(E)34/14

(E)14/8

(E)34/8

FRIDGE

STOR

SPECIMEN

PROC

STAIR #8

S8

STAIR #7

S7

OC26

CORRIDOR

MENS

TOILET

WOMENS

TOILET

KEY PLAN - NTS

NORTH

BUILDING 400

AREA OF

WORK

KEYNOTES#

1. DISCONNECT AND REMOVE EXISTING EXHAUST DUCT AND

GRILLE FOR TEMPORARY RELOCATION. TEMPORARILY

CAP DUCT CONNECTION.

AREA NOT IN CONTRACT

INFECTION CONTROL CONSTRUCTION

BARRIER - SEE SHEET G002 FOR

DETAILS. PROVIDE STARC SYSTEMS

FIREBLOCKWALL SYSTEM BARRIERS

OR VA & ARCHITECT APPROVED EQUAL

TEMPORARY CORRIDOR PARTITION

DRAWING SHADE AND LINE TYPES

A. EXISTING BUILDING PLANS HAVE BEEN SHOWN ACCORDING TO

ORIGINAL BUILDING PLANS AND FIELD NOTES AND

MEASUREMENTS. EXISTING CONDITIONS AND DIMENSIONS SHALL

BE FIELD VERIFIED BY CONTRACTORS AND DISCREPANCIES

REPORTED TO THE COR AND ARCHITECT PRIOR TO FRAMING.

B. CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING

BUILDING AMENITIES NOT SLATED FOR DEMOLITION OR

REMODELING. ANY SUCH EXISTING CONDITIONS WHICH ARE

DAMAGED OR BECOME UNSTABLE DUE TO OTHER DEMOLITION

SHALL BE REPLACED AT NO COST TO VA WITH NEW

CONSTRUCTION TO MATCH.

C. ALL CUTTING AND PATCHING SHALL BE THE RESPONSIBILITY OF

EACH SUBCONTRACTOR UNLESS OTHERWISE STIPULATED BY OR

ARRANGED WITH THE GC.

D. SALVAGE EXISTING HVAC GRILLES AND LOUVERS FOR REUSE,

RETURN EXCESS TO VA.

GENERAL NOTES - DEMOLITION

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

PROJECT NUMBER: 2021116

B

IM

/T o m a h

R e p la c e

C h e m ic a l A n a ly z e r/

R

M e c h V

A T o m a h C h e m A n a ly z e r

F

L .r v t

/2

/2

:1 :5

A

M

MD103

SECOND FLOOR PLAN,

MECHANICAL DEMO, PHASES 4-6

REPLACE CHEMICAL ANALYZER

500 E. VETERANS STREET, TOMAH, WI 54660

676-20-004

22 DEC 2021 CS ND

BID DOCUMENTS

FULLY SPRINKLERED

21014

SCALE 1/8" = 1'-0"

SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 4

1 SCALE 1/8" = 1'-0"

SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 5

SCALE 1/8" = 1'-0"

SECOND FLOOR DEMOLITION PLAN, MECHANICAL - PHASE 6

0' 4' 8' 16'

NORTH

0' 4' 8' 16'

NORTH

0' 4' 8' 16'

NORTH

Revisions: Date:

SCHEMATIC DESIGN 35% 6 OCT 2021

DESIGN DEVELOPMENT 65% 29 OCT 2021

x3 x4 xC xD xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

B C D E F

A

1.5(E)IF-1

(E)AHU-9

(E)ERU-1

(E)AHU-8

(E)10ø

(E)30/34

(E)28/30

(E)18/16(E)22/22

(E )3

/2

(E )3

/2

(E )2

/1

(E )3

/2

(E)30/18

MD104

TEMPORARY RTU

MD104

/2

(E )2

/2

(E

)36/24

EXISTING EXHAUST

FANS IN THIS AREA

ROOF

36'-0"

FOURTH FLOOR /

PENTHOUSE

35'-8"

31.5

ROOF

36' - 0"

FOURTH FLOOR /

PENTHOUSE

35' - 8" x1 x2

31.5

(E)AHU-9

(E)30/18

(E)23/23

(E )1

/3

(E)18/28

(E)36/22

F

IL

T E

R

S

C T

IO

N

H E

A T

R

C

O V

E R

Y

C O

O L

IN

G

C O

IL

S U

P P

L Y

F

A N

A C

C E

S S

H E

A T

IN

G

C

O

IL

H U

M

ID

IF

IE

R

MD104

24/24

TEMPORARY

RTU

(E )2

/2

ROOF

36'-0"

FOURTH FLOOR /

PENTHOUSE

35'-8"

D E D.5

ROOF

36' - 0"

FOURTH FLOOR /

PENTHOUSE

35' - 8"

D E

MD104

(E)AHU-9

(E )2

/2

(E)24/36

(E)36/22

(E)18/30

KEYNOTES#

1. TEMPORARY RENTAL UNIT TO BE OPERATIONAL WHILE

(E)AHU-9 IS OFFLINE FOR COIL REPLACEMENT WORK.

UNIT TO PROVIDE MIN. 3920 CFM OF 100% OUTDOOR

AIR AT 56°F. MAX. CAPACITY AT DESIGN COOLING

CONDITION IS 345 MBH TOTAL / 190 MBH SENSIBLE. MAX

CAPACITY AT DESIGN HEATING CONDITION IS 324 MBH

(95 KW). ACTUAL CAPACITY REQUIRED WILL NEED TO

BE JUSTIFIED TO COR BASED ON HISTORICAL

TEMPERATURE EXTREMES RECORDED FOR DURATION

OF USE OF TEMPORARY UNIT.

2. DISCONNECT PIPING TO HUMIDIFIER AND COOLING

COIL SECTIONS OF (E)AHU-9. REMOVE HUMIDIFIER,

COOLING COIL AND ACCESS SECTIONS OF (E)AHU-9

FOR REPLACEMENT. BLANK OFF CONNECTION TO

(E)28/18 SA DUCT WHILE AHU SECTIONS ARE BEING

REPLACED.

3. CONNECT NEW 24/24 TEMPORARY SA DUCT TO (E)28/18

SA DUCT.

4. PROVIDE 4x4 PRESSURE-TREATED WOOD TEMPORARY

SUPPORT RAILS UNDER UNIT IN EAST-WEST

DIRECTION. RAILS TO EXTEND FROM COLUMN LINE "C"

TO COLUMN LINE BEYOND OPPOSITE END OF UNIT.

5. CONTRACTOR TO PROVIDE CRANE AS NEEDED FOR

TEMPORARY RTU PLACEMENT AND REMOVAL AS WELL

AS AHU COMPONENT MODULE DELIVERY. PROTECT

ROOFING FROM DAMAGE FOR PATH TO MECHANICAL

PENTHOUSE. REFER TO ARCHITECTURAL DRAWINGS

FOR PROPOSED CRANE LOCATION.

6. WHILE UNIT IS OFFLINE, CLEAN INTERAL COMPONENTS

(COILS, DRAIN PANS, ETC.).

7. EXISTING DUCT HUMIDITY SENSOR.

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

PROJECT NUMBER: 2021116

B

IM

/T o m a h

R e p la c e

C h e m ic a l A n a ly z e r/

R

M e c h V

A T o m a h C h e m A n a ly z e r

F

L .r v t

/2

/2

:1 :5

A

M

MD104

FOURTH FLOOR/PENTHOUSE

PLAN, MECHANICAL DEMO

REPLACE CHEMICAL ANALYZER

500 E. VETERANS STREET, TOMAH, WI 54660

676-20-004

22 DEC 2021 CS ND

BID DOCUMENTS

FULLY SPRINKLERED

21014

SCALE 1/8" = 1'-0"

FOURTH FLOOR / PENTHOUSE DEMOLITION PLAN, MECHANICAL

1SCALE 1/4" = 1'-0"

PENTHOUSE DEMOLITION EAST SECTION, MECHANICAL

2 0' 4' 8' 16'

NORTH

0' 2' 4' 8'

SCALE 1/4" = 1'-0"

PENTHOUSE DEMOLITION NORTH SECTION, MECHANICAL

0' 2' 4' 8'

Revisions: Date:

DESIGN DEVELOPMENT 65% 29 OCT 2021

KEY PLAN - NTS

NORTH

BUILDING 400

AREA OF

WORK

x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

VAV-212

(E)VAV-201

(E)VAV-202

(E)VAV-204

(E)VAV-203

(E)VAV-205

(E)VAV-207

(E)VAV-212 (E)VAV-211

(E)VAV-209

(E)VAV-210

(E)VAV-208

B C D E F

A

1.5

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)TG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)CD-12

(E)EG-1

(E)EG-1

(E)TG-1(E)CD-2

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-1

(E)CD-1

(E)RG-1

(E)RG-1

(E)RG-1

(E)CD-1 (E)CD-1 (E)CD-1

(E)CD-1

(E)CD-2

(E)EG-1

(E)TG-1

(E)TG-1

(E)EG-2

(E)RG-1

(E)CD-2

(E)EG-2

(E)EG-2 (E)EG-2

(E)EG-2 (E)EG-2

(E)LD-1

(E)LD-1 (E)LD-1 (E)LD-1

(E)LD-1(E)LD-1

(E)LD-2 (E)LD-2

(E)RG-1

(E)CD-11

(E)EG-2

(E)LD-1 (E)LD-1

(E)EG-2

STAIR #7

S7

OFFICE

2055B

SOILED

UTILITY

2055C

OFFICE

OFFICE

CLEAN

WORK RM

RECEPTION

WAITING

CORRIDOR

OC26

BLOOD

DRAW

2049B

BLOOD

DRAW

2049C

BLOOD

DRAW

2049D

DRUG

TEST

2057A

DRUG TEST

TLT

2057B

SPECIMEN

PROC

2055D

CLEAN

SUPPLY

WARD

DROP

STAFF TLT

SPECIMEN

TLT

2049F

SPECIMEN

TLT

2049G

GLASS

WASH

2055A

CORRIDOR

CORRIDOR

CLINICAL

LABORATORY

HAC

STORAGE

x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

SPECIMEN

TLT

2049F

SPECIMEN

TLT

2049G

FRIDGE

STORAGE

SOILED

UTILITY

2055C

STORAGE

2055E

DRUG TEST

2049H

DRUG TEST

TLT

2049I

OFFICE

2055B

CLEAN

WORK RM

OFFICE

OFFICE

RECEPTION

WAITING

CLEAN

SUPPLY

DROP OFF

BLOOD

DRAW

STAIR #7

S7

VAV-212

(E)VAV-201

(E)VAV-202

(E)VAV-204

(E)VAV-203

(E)VAV-205 (E)VAV-207

(E)VAV-206

(E)VAV-211

(E)VAV-210

(E)VAV-209

(E)VAV-208

6ø

6ø

6ø ø ø ø

6ø

7ø

(E)CD-1

10ø

10ø

(E)6ø

B C D E F

A

1.5

(E)CD-1

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)TG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)CD-12

(E)EG-1

(E)EG-1

(E)TG-1(E)CD-2

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-1 (E)RG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)EG-2

(E)LD-2

(E)RG-1

(E)CD-2

(E)EG-2

(E)EG-2 (E)EG-2

(E)EG-2 (E)EG-2

(E)LD-1

(E)LD-1 (E)LD-1 (E)LD-1

(E)LD-1(E)LD-1

(E)LD-2

(E)LD-2

(E)EG-2

(E)LD-1 (E)LD-1

(E)CD-1

(E)14/13

(E)14/13

6ø

(E)24/8 (E)34/8

(E)CD-1

(E)EG-1

(E)7ø

(E)10/6

(E)CD-1

(E)EG-2

(E)CD-1

(E)CD-1

(E)12ø

(E )2

/1

(E)7ø

CORRIDOR

RECEIVING

2055D

BLOOD

DRAW

2049A

BLOOD

DRAW

2049C

(E)24/10 (E)34/10

CLINICAL

LABORATORY

BLOOD

DRAW

2049B

(E)6ø

(E)CD-11

(E)10" DIA.

EA DUCT UP

2055A

GLASS

WASH

STAFF TLT

CORRIDOR

OC26

x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

SPECIMEN

TLT

2049F

SPECIMEN

TLT

2049G

SOILED

UTILITY

2055C

STORAGE

2055E

DRUG TEST

2049H

DRUG TEST

TLT

2049I

OFFICE

2055B

CLEAN

WORK RM

OFFICE

OFFICE

STORAGE

2047A

WAITING

RECEPTION

CLEAN

SUPPLY

DROP OFF

STAIR #7

S7

VAV-212

(E)VAV-201

(E)VAV-202 (E)VAV-203

(E)VAV-210

(E)VAV-209

(E)VAV-208

(E)VAV-204

(E)VAV-205

(E)VAV-207

(E)VAV-206

(E)VAV-211

10ø

10ø

B C D E F

A

1.5

(E)CD-1

(E)CD-1

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)TG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)CD-12

(E)EG-1

(E)EG-1

(E)TG-1(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-1 (E)RG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)EG-2

(E)LD-2

(E)RG-1

(E)CD-2

(E)EG-2

(E)EG-2 (E)EG-2

(E)EG-2 (E)EG-2

(E)LD-1

(E)LD-1 (E)LD-1 (E)LD-1

(E)LD-1(E)LD-1

(E)LD-2 (E)LD-2

(E)EG-2

(E)LD-1 (E)LD-1

(E)CD-1

(E)CD-1

(E)EG-1

(E)CD-1

(E)EG-2

(E)CD-1

(E)CD-1

BLOOD

DRAW

CLINICAL

LABORATORY

SPECIMEN

TLT

2049G

RECEIVING

2055D

BLOOD

DRAW

2049D

BLOOD

DRAW

2049B

BLOOD

DRAW

2049C

BLOOD

DRAW

2049A

STAFF TLT

CORRIDOR

(E)CD-2

7ø

(E)7ø

(E )1 ø

(E )2

/1

(E)34/10

(E )3

/1

(E )2

/1

(E)10" DIA.

EA DUCT UP

FRIDGE

STORAGE

x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

SOILED

UTILITY

2055C

STORAGE

2055E

DRUG TEST

2049H

OFFICE

2055B

CLEAN

WORK RM

OFFICE

OFFICE

WAITING

RECEPTION

CLEAN

SUPPLY

DROP OFF

BLOOD

DRAW

STAIR #7

S7

VAV-212

(E)VAV-201

(E)VAV-202

(E)VAV-204

(E)VAV-203

(E)VAV-205 (E)VAV-207

(E)VAV-206

(E)VAV-211

(E)VAV-210

(E)VAV-209

(E)VAV-208

B C D E F

A

1.5

(E)CD-1

(E)CD-1

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)TG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)CD-12

(E)EG-1

(E)EG-1

(E)TG-1(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-1 (E)RG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)EG-2

(E)LD-2

(E)RG-1

(E)CD-2

(E)EG-2

(E)EG-2 (E)EG-2

(E)EG-2 (E)EG-2

(E)LD-1

(E)LD-1 (E)LD-1 (E)LD-1

(E)LD-1(E)LD-1

(E)LD-2 (E)LD-2

(E)EG-2

(E)LD-1 (E)LD-1

(E)CD-1

(E)CD-1

(E)EG-1

(E)CD-1

(E)EG-2

(E)CD-1

(E)CD-1

CLINICAL

LABORATORY

CORRIDOR

BLOOD

DRAW

2049D

DRUG TEST

TLT

2049I

RECEIVING

2055D

SPECIMEN

TLT

2049G

SPECIMEN

TLT

2049F

STORAGE

2047A

STAFF TLT

BLOOD

DRAW

2049B

BLOOD

DRAW

2049A

BLOOD

DRAW

2049C

FRIDGE

STORAGE

KEYNOTES#

1. RECONNECT AND REINSTALL EXISTING SUPPLY DUCT

AND DIFFUSER AT NEW LOCATION.

2. RECONNECT AND REINSTALL EXISTING RETURN DUCT

AND GRILLE AT NEW LOCATION.

AREA NOT IN CONTRACT

INFECTION CONTROL CONSTRUCTION

BARRIER - SEE SHEET G002 FOR

DETAILS. PROVIDE STARC SYSTEMS

FIREBLOCKWALL SYSTEM BARRIERS

OR VA & ARCHITECT APPROVED EQUAL

TEMPORARY CORRIDOR PARTITION

DRAWING SHADE AND LINE TYPES

A. BALANCING INFORMATION IS PROVIDED ON PHASE 6 DRAWING

(3/M103). CONTRACTOR SHALL UTILIZE AN INDEPENDENT THIRD-

PARTY BALANCING SUB-CONTRACTOR FOR ALL BALANCING

WORK. BALANCE DEVICES PER PHASE AS NEEDED TO MATCH

THE WORK ASSOCIATED WITH THE PHASE.

GENERAL NOTES - NEW WORK

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

PROJECT NUMBER: 2021116

B

IM

/T o m a h

R e p la c e

C h e m ic a l A n a ly z e r/

R

M e c h V

A T o m a h C h e m A n a ly z e r

F

L .r v t

/2

/2

:1 :5

A

M

M102

SECOND FLOOR PLAN,

MECHANICAL, PHASES 0-3

REPLACE CHEMICAL ANALYZER

500 E. VETERANS STREET, TOMAH, WI 54660

676-20-004

22 DEC 2021 CS ND

BID DOCUMENTS

FULLY SPRINKLERED

21014

1/8" = 1'-0"

SECOND FLOOR PLAN, MECHANICAL - PHASE 0

1/8" = 1'-0"

SECOND FLOOR PLAN, MECHANICAL - PHASE 1

1/8" = 1'-0"

SECOND FLOOR PLAN, MECHANICAL - PHASE 2

1/8" = 1'-0"

SECOND FLOOR PLAN, MECHANICAL - PHASE 3

0' 4' 8' 16'

NORTH

0' 4' 8' 16'

NORTH

0' 4' 8' 16'

NORTH

0' 4' 8' 16'

NORTH

Revisions: Date:

SCHEMATIC DESIGN 35% 6 OCT 2021

DESIGN DEVELOPMENT 65% 29 OCT 2021

x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

VAV-212

(E)VAV-201

(E)VAV-202

(E)VAV-204

(E)VAV-203

(E)VAV-205

(E)VAV-207

(E)VAV-206

(E)VAV-211

(E)VAV-210

(E)VAV-209

(E)VAV-208

B C D E F

A

1.5

(E)CD-1

(E)CD-1

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)TG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)CD-12

(E)EG-1

(E)EG-1

(E)TG-1(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-1 (E)RG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)EG-2

(E)LD-2

(E)RG-1

(E)CD-2

(E)EG-2

(E)EG-2 (E)EG-2

(E)EG-2 (E)EG-2

(E)LD-1

(E)LD-1 (E)LD-1 (E)LD-1

(E)LD-1(E)LD-1

(E)LD-2 (E)LD-2

(E)EG-2

(E)LD-1 (E)LD-1

(E)CD-1

(E)CD-1

(E)EG-1

(E)CD-1

(E)EG-2

(E)CD-1

(E)CD-1

STAIR #7

S7

OFFICE

2055B

SOILED

UTILITY

2055C

OFFICE

OFFICE

CLEAN

WORK RM

RECEPTION

WAITING

BLOOD

DRAW

DRUG TEST

2049H

STORAGE

2055E

STAIR #8

S8

FRIDGE

STORAGE

RECEIVING

2055D

DROP OFF

CLEAN

SUPPLY

STAFF TLT

CORRIDOR

BLOOD

DRAW

2049A

BLOOD

DRAW

2049C

BLOOD

DRAW

2049B

BLOOD

DRAW

2049D

DRUG TEST

TLT

2049I

SPECIMEN

TLT

2049G

SPECIMEN

TLT

2049F

CLINICAL

LABORATORY

STORAGE

2047A x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

VAV-212

(E)VAV-201

(E)VAV-202

(E)VAV-204

(E)VAV-205 (E)VAV-207

(E)VAV-206

(E)VAV-203

(E)VAV-210

(E)VAV-209

(E)VAV-208

(E)VAV-211

ø

8ø

B C D E F

A

1.5

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)TG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)CD-12

(E)EG-1

(E)EG-1

(E)TG-1(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-1 (E)RG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)EG-2

(E)LD-2

(E)RG-1

(E)CD-2

(E)EG-2

(E)EG-2 (E)EG-2

(E)LD-1

(E)LD-1

(E)LD-1 (E)LD-1

(E)LD-1(E)LD-1

(E)LD-2 (E)LD-2

(E)EG-2

(E)LD-1 (E)LD-1

(E)EG-2

(E)EG-2

(E)EG-2

(E)34/16 (E)50/10

(E )3

/1

(E)26/18

(E)10ø (E)10ø

CLINICAL

LABORATORY

CLEAN

WORK RM

OFFICE

OFFICE

OFFICE

2055B

CORRIDOR

STAFF TLT

STORAGE

2047A

WAITING

RECEPTION

CLEAN

SUPPLY

DROP OFF

BLOOD

DRAW

SPECIMEN

TLT

2049F

SPECIMEN

TLT

2049G

BLOOD

DRAW

2049B

BLOOD

DRAW

2049A

BLOOD

DRAW

2049C

BLOOD

DRAW

2049D

DRUG TEST

2049H

DRUG TEST

TLT

2049I

STORAGE

2055E

RECEIVING

2055D

SOILED

UTILITY

2055C

5 6

5 6 x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

VAV-212

(E)VAV-208

(E)VAV-209

(E)VAV-210

(E)VAV-201

(E)VAV-203(E)VAV-202

(E)VAV-204

(E)VAV-205 (E)VAV-207

(E)VAV-206

(E)VAV-211

1 1

1 1

1 1

B C D E F

A

1.5

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)TG-1

(E)TG-1

480 (E)TG-1

(E)CD-12

(E)EG-1

(E)EG-1

(E)TG-1

(E)CD-2

(E)CD-2

(E)RG-1

(E)CD-2

(E)CD-1

(E)RG-1

(E)RG-1

(E)TG-1

(E)TG-1

(E)EG-2

(E)LD-2

(E)RG-1

(E)CD-2

(E)EG-2

(E)LD-1

(E)LD-1

(E)LD-1

(E)LD-1

(E)LD-1

(E)LD-1

(E)LD-2

(E)LD-2

(E)LD-1

(E)LD-1

(E)EG-2

(E)EG-2

(E)EG-2

(E)EG-2

(E)EG-2

(E)34/16 (E)50/10

(E )3

/1

(E)26/18

OFFICE

2055B

NON-LAB

STAFF RM

OFFICE

CORRIDOR

STAFF TLT

2051OFFICE

WAITING

STORAGE

2047A

RECEPTION

CLEAN

STORAGE

DROP OFF

BLOOD

DRAW

2049A

BLOOD

DRAW

2049C

SPECIMEN

TLT

2049G

BLOOD

DRAW

2049B

BLOOD

DRAW

2049D

DRUG TEST

WRK

2049H

DRUG TEST

TLT

2049I

STORAGE

2055E

RECEIVING

2055D

SOILED

UTILITY

2055C

CLINICAL

LABORATORY

10ø

10ø 10ø

(E)12ø(E)14/13

(E)7ø

(E )3

/1

(E)14/13 (E)12ø

(E)6ø

(E)RG-1

(E)CD-1

(E)RG-1

1 1

(E)CD-11

(E)CD-2

(E)CD-1

(E)CD-1

(E)CD-1

60 (E)CD-1

(E)CD-1

60 (E)EG-1

(E)CD-1

(E)CD-1

(E)RG-1

(E)RG-1

12/12

KEY PLAN - NTS

NORTH

BUILDING 400

AREA OF

WORK

KEYNOTES#

1. REBALANCE AIR DEVICE TO INDICATED AIRFLOW.

2. REBALANCE (E)EG-2 AIRFLOW TO INDICATED AIRFLOW.

DISCONNECT AND MOVE BACK EXISTING DUCT AND GRILLE

TO ORIGINAL LOCATION AFTER THIS PHASE.

3. RELOCATE (E)EG-2 TO ORIGINAL LOCATION AND REBALANCE

INDICATED AIRFLOW.

4. RECONNECT AND REINSTALL EXISTING EXHAUST DUCT AND

GRILLE AT NEW LOCATION.

5. EXTEND 8"Ø EA DUCT DOWN TO CONNECTION ON

ANALYZER.

6. BALANCE TO 200 CFM.

AREA NOT IN CONTRACT

INFECTION CONTROL CONSTRUCTION

BARRIER - SEE SHEET G002 FOR

DETAILS. PROVIDE STARC SYSTEMS

FIREBLOCKWALL SYSTEM BARRIERS

OR VA & ARCHITECT APPROVED EQUAL

TEMPORARY CORRIDOR PARTITION

DRAWING SHADE AND LINE TYPES

A. BALANCING INFORMATION IS PROVIDED ON PHASE 6 DRAWING

(3/M103). CONTRACTOR SHALL UTILIZE AN INDEPENDENT THIRD-

PARTY BALANCING SUB-CONTRACTOR FOR ALL BALANCING

WORK. BALANCE DEVICES PER PHASE AS NEEDED TO MATCH

THE WORK ASSOCIATED WITH THE PHASE.

GENERAL NOTES - NEW WORK

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

PROJECT NUMBER: 2021116

B

IM

/T o m a h

R e p la c e

C h e m ic a l A n a ly z e r/

R

M e c h V

A T o m a h C h e m A n a ly z e r

F

L .r v t

/2

/2

:1 :0

A

M

M103

SECOND FLOOR PLAN,

MECHANICAL, PHASES 4-6

REPLACE CHEMICAL ANALYZER

500 E. VETERANS STREET, TOMAH, WI 54660

676-20-004

22 DEC 2021 CS ND

BID DOCUMENTS

FULLY SPRINKLERED

21014

1/8" = 1'-0"

SECOND FLOOR PLAN, MECHANICAL - PHASE 4

1/8" = 1'-0"

SECOND FLOOR PLAN, MECHANICAL - PHASE 5

1/8" = 1'-0"

SECOND FLOOR PLAN, MECHANICAL - PHASE 6

0' 4' 8' 16'

NORTH

0' 4' 8' 16'

NORTH

0' 4' 8' 16'

NORTH

Revisions: Date:

SCHEMATIC DESIGN 35% 6 OCT 2021

DESIGN DEVELOPMENT 65% 29 OCT 2021

x3 x4 xC xD xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5

B C D E F

A

1.5

M104

(E)IF-1

(E)AHU-9

(E)ERU-1

(E)AHU-8

10ø

30/34

28/30

18/1622/22

36/22

36/22

28/18

36/24

30/18

H-9

3/4" LPS

AND LPCR

ROOF

36'-0"

FOURTH FLOOR /

PENTHOUSE

35'-8"

31.5

FOURTH FLOOR /

PENTHOUSE

35' - 8" x2

31.5

(E)AHU-9

(E)18/28 (E)30/18

(E)36/22

FILTER

SECTION

HEATING

COILS

COOLING

COILS SUPPLY

FAN

A C

C E

S S

A C

C E

S S

3/4" LPS

AND LPCR

3/4"

LPCR

KEYNOTES#

1. PATCH TEMPORARY SA DUCT WALL PENETRATION

OPENING TO PRECONSTRUCTION CONDITIONS.

2. EXTEND EXISTING LPS AND SPCR PIPING FROM

PREVIOUS LOCATION OF HUMIDIFIER IN AHU-9 TO

NEW LOCATION OF HUMIDIFIER IN DUCTWORK.

INSTALL DRAIN PAN IN DUCT BELOW HUMIDIFIER PER

MANUFACTURER'S RECOMMENDATIONS. HUMIDIFIER

MUST BE IN PLACE BEFORE TEMPORARY UNIT IS

BROUGHT ONLINE.

3. RECONNECT EXISTING 3" CWS AND CWR PIPING TO

NEW COILS IN AHU. RE-USE EXISTING CONTROL

VALVE. PROVIDE NEW BALANCING VALVE FOR EACH

CWR COIL CONNECTION. RECONNECT EXISTING

COOLING COIL CONDENSATE PIPE TO NEW COIL

DRAIN PAN.

4. PROVIDE DUCT ACCESS DOOR UPSTREAM AND

DOWNSTREAM OF HUMIDIFIER ASSEMBLY.

5. EXISTING DUCT HUMIDITY SENSOR.

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

PROJECT NUMBER: 2021116

B

IM

/T o m a h

R e p la c e

C h e m ic a l A n a ly z e r/

R

M e c h V

A T o m a h C h e m A n a ly z e r

F

L .r v t

/2

/2

:1 :0

A

M

M104

FOURTH FLOOR/PENTHOUSE

PLAN, MECHANICAL

REPLACE CHEMICAL ANALYZER

500 E. VETERANS STREET, TOMAH, WI 54660

676-20-004

22 DEC 2021 CS ND

BID DOCUMENTS

FULLY SPRINKLERED

21014

SCALE 1/8" = 1'-0"

FOURTH FLOOR / PENTHOUSE PLAN, MECHANICAL

1 0' 4' 8' 16'

NORTH

SCALE 1/4" = 1'-0"

PENTHOUSE SECTION, MECHANICAL

0' 2' 4' 8'

Revisions: Date:

DESIGN DEVELOPMENT 65% 29 OCT 2021

m m

M A

X

NTS

TO RETURN MAIN

PIPE SIZE SHALL BE SAME SIZE AS

TRAP

FLOAT AND THERMOSTATIC

TRAP. SEE PLANS, AND

SCHEDULES

DIELECTRIC FITTING

WHERE RETURN IS

COPPER PIPE

FLOW

SCHEDULE 80

STEEL PIPE

BYPASS-INSTALL IN HORIZONTAL PLANE

LEVEL WITH TRAP OR IN VERTICAL

PLANE & BELOW TRAP PROVIDE BYPASS

PIPING FOR ALL TRAPS 25mm [1"] AND

LARGER.

EQUIPMENT CONNECTION. MAKE

THE SAME SIZE AS THE SUPPLY

MAIN OR EQUIPMENT CONNECTION.

SCHEDULE 80 STEEL PIPE

SEE DRAWINGS FOR PIPE SIZES

25mm [1"]

GATE VALVE

USE 4-BOLT RAISED FACE FLANGES

FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY

NTS

SIDE VIEW TRAPEZE HANGER FOR UP TO

453KG [1000 LB.] UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

TUBING

PIPE HANGERS

mm

[IN]

mm

[FT]

mm

[FT]

THRU 20

[THRU 3/4]

[7]

[5]

[1]

[7]

[6]

[11/4]

[7]

[7]

[11/2]

[9]

[8]

[2]

[10]

[8]

[21/2]

[11]

[9]

[3]

[12]

[10]

[4]

[14]

[12]

[5]

[16]

[13]

[6]

[17]

[14]

[8]

[19]

[16]

[10]

[22]

[12]

[23]

[14]

[25]

[16]

[27]

[18]

[28]

[20]

[30]

[24]

[32]

NTS

TYPICAL MANUAL AIR VENT

TYPICAL CHILLED AND HOT WATER PIPING DRAIN VALVE

CONNECTIONS

ELEVATION

THREADED PIPING

ELEVATION

WELDED PIPING

NOTES:

1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.

AIR VENT

1/2" [15mm]

BALL VALVE

1/4" [8mm]

COPPER TUBING

1/2" [15mm] x 4" [100mm]

NIPPLE

CIRCULATING WATER PIPING

ELEVATION

NOTES:

1. VENT ALL HIGH POINTS INDICATED ABOVE.

2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.

DRAIN VALVE AND AIR VENT CONNECTIONS (HYDRONIC SYSTEMS)

MV

OR

AV

AIR HANDLING UNIT DRAIN TRAP DETAIL

NTS

DRAW THRU

BLOW THRU

2" [50mm]

PLUS X

1" [25mm]

MINIMUM

X

2X

UNIT TYPE A B

WHERE X = STATIC PRESSURE IN PAN

DRAIN LINE SHALL BE AT LEAST THE SAME

SIZE AS THE NIPPLE ON THE DRAIN PAN

PIPING SHALL BE RIGID COPPER TYPE L OR

TYPE M UNLESS NOTE BELOW IS MET

PITCH DOWN

TOWARD DRAIN

CLEAN OUT

FLOOR SINK

DRAIN

PAN

NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND

IS INDOORS AND DOES NOT PASS THROUGH RATED BARRIERS.

2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE

TO BE CONNECTED.

[2 m m

DIELECTRIC

FITTING

NTS

DUCTWORK SQUARE VANE ELBOWS

NOTE:

1.

2.

3.

4.

ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.

WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE

REGARDLESS OF W DIMENSION.

ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM

SPACE BETWEEN VANES AND A 3/4" [20mm] TRAILING EDGE.

WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL BE DOUBLE

VANE TYPE.

NTS

DUCTWORK RADIUS ELBOWS

VANE

VANE

NOTE:

1.

2.

THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.

ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL

SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED,

SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.

R SHALL

EQUAL

OR BE

GREATER

THAN W.

R SHALL

EQUAL

OR BE

GREATER

THAN

1/3W.

R SHALL

EQUAL

OR BE

GREATER

THAN

1/6W.

STANDARD RADIUS OR

LONG RADIUS ELBOW

SHORT RADIUS ELBOW

WITH ONE VANE

SHORT RADIUS ELBOW

WITH TWO VANES

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

3/4" [20mm] BALL VALVE

ADAPTER TO 3/4" [20mm] HOSE

THREAD-PROVIDE HOSE CAP NUT

NTS

ALTERNATE SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS

SMACNA FIGURE 4-6

45° LEED IN

RIGID DUCT TO AIR TERMINAL

UNIT.

MAIN SUPPLY

PLAN VIEW

FLOW

F L

O W

NTS

EXHAUST OR RETURN BRANCH DUCTWORK

MAIN EXHAUST OR RETURN

PLAN VIEW

AIR

FLOW AIR

FLOW

PROVIDE VOLUME DAMPER

AT EACH BRANCH DUCT

1/4W OR 4" [100mm]

MIN.

BRANCH DUCT

VD

NTS

ROUND DUCT HANGERS

ONE 1 [25] x 22 GA STRAP

QUANTITY/SIZEMAX. DUCT DIA

26 [650]

HANGER STRAPS OR RODS

MAX. LOAD

LBS. [kg]

260 [119]

MAX.

144 [3600]

IN. [mm]

SPACING

IN. [mm] IN. [mm]

NOTE:

TABULATED DATA FROM SMACNA

ALLOWS FOR DUCT REINFORCING AND

INSULATION, BUT NO EXTERNAL LOAD.

BAND OF SAME

SIZE AS HANGER

STRAP

LOAD RATED

FASTENERS

50" [1250mm]∅

& UNDER

NTS

FROM STRUCTURE

SAME AS DIFFUSER

INLET: 5'-0" MAX

FLEXIBLE DUCT SIZE

LENGTH.

12"

CEILING

SUPPORT SADDLE

VOLUME DAMPER W/

LOCKING QUADSADDLE

SHEET METAL

CONICAL OUTLET

BRANCH DUCT

FOR CHANGE OF

DIRECTION GREATER

USE RIGID ELBOWS

THAN 45°

[300mm]

FLEXIBLE AIR DUCT CONNECTOR

SEE SPECIFICATIONS FOR CLAMPS

AND SEALANT (TYP.)

TYPICAL

DIFFUSER OR

REGISTER IN

LAY-IN CLG.

THERMAL INSULATION

SEE SPECIFICATIONS

1/2" TEST VALVE WITH

HOSE BIBB ADAPTOR

6" DIRT POCKET

INSULATED STEAM

STEAM OUTLET

JACKETED MANIFOLD

STRAINER (TYPICAL)

TRAP

3/4" BUCKET

SUPPLY AIR DUCT

OR AHU

UNION (TYPICAL)

CONTROL VALVE

STEAM HUMIDIFIER

LPR

VALVE

STEAM OUTLET AS SPECIFIED

LPS

NTS

STEAM HUMIDIFIER

WATER COIL

AIR VENT WHEN COIL IS NOT

SELF-VENTING

TEST PLUG (TYP.)

PIPE HANGER SHALL SUPPORT

PIPING INDEPENDENT OF COIL

WATER COIL

REDUCER, IF REQUIRED

FLOW ELEMENT

DRAIN WHEN COIL

IS NOT SELF-DRAINING

DRAIN

NOTES:

1. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE OF ACCESS

DOORS OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALES, OR EQUIPMENT.

2. DETAIL IS SHOWN FOR REFERENCE. RE-USE EXISTING PIPING ACCESSORIES IMPLEMENTED FOR

EXISTING COIL.

MV

MV

MV

FE

TI

MV

CALIBRATED BALANCING

VALVE (TYP.)

NTS

WATER COIL PIPING CONNECTIONS

m m m m

[1

M

IN

[6

M

IN

PROVIDE INSULATION

SHIELD

& INSERT FOR ALL

PIPING

(200mm [8"] MIN.)

BAND

43mm [1-5/8"] 12 GAUGE CHANNEL OR 50x50x6.4mm

[2"X2"X1/4"] ANGLE

15mm [1/2"] DIA.

HANGER RODS WITH

900mm [36"] MAX.

SPACING ON EACH

CHANNEL

WELD

SADDLE

INSULATION SHIELD

AT HANGER

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9

PSF MIN. DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

NOTE:

SEE SPECIFER FOR DETAILED HANGER

REQUIREMENTS

A B

W

W1

W

R

R

2/3W

/3

W

W W

1/2W

/3

W

1/6W

R

W

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

PROJECT NUMBER: 2021116

B

IM

/T o m a h

R e p la c e

C h e m ic a l A n a ly z e r/

R

M e c h V

A T o m a h C h e m A n a ly z e r

F

L .r v t

/2

/2

:1 :1

A

M

M501

DETAILS, MECHANICAL REPLACE CHEMICAL ANALYZER

500 E. VETERANS STREET, TOMAH, WI 54660

676-20-004

22 DEC 2021 CS ND

BID DOCUMENTS

FULLY SPRINKLERED

21014Revisions: Date:

SCHEMATIC DESIGN 35% 6 OCT 2021

DESIGN DEVELOPMENT 65% 29 OCT 2021

GRILLE, REGISTER AND DIFFUSER SCHEDULE

MARK LOCATION APPLICATION

AIRFLOW

(CFM)

MAX

PRESS.

DROP

(IN. W.G.)

NECK SIZE

(IN. x IN.)

OR

(IN. DIA.)

FACE SIZE

(IN. x IN.) STYLE

MOUNTING

SURFACE

PATTERN/

DEFLECTION MATERIAL

(E)CD-1 CHEM LAB 15 SUPPLY 85 0.09 6" 9" x 9"

LOUVERED

VANES

LAY-IN 4-WAY STEEL

(E)CD-2 OFFICE 2055B SUPPLY 130 0.09 8" 12" x 12"

LOUVERED

VANES

LAY-IN 4-WAY STEEL

(E)CD-2 CHEM LAB 15 SUPPLY 230 0.09 8" 12" x 12"

LOUVERED

VANES

LAY-IN 4-WAY STEEL

(E)CD-12 CHEM LAB 15 SUPPLY 120 0.09 8" 12" x 12"

LOUVERED

VANES

LAY-IN 2-WAY STEEL

(E)LD-1 CHEM LAB 15 SUPPLY 295 0.05 9" 48" x 24" RADIAL LAY-IN 2-WAY ALUMINUM

(E)LD-2 CHEM LAB 15 SUPPLY 505 0.09 12" 48" x 24" RADIAL LAY-IN 2-WAY ALUMINUM

(E)LD-2 CHEM LAB 15 SUPPLY 585 0.09 12" 48" x 24" RADIAL LAY-IN 2-WAY ALUMINUM

(E)EG-2 CHEM LAB 15 EXHAUST 720 0.09 12" x 12" 24" x 24" EGG CRATE LAY-IN NONE ALUMINUM

(E)EG-2 CHEM LAB 15 EXHAUST 730 0.09 12" x 12" 24" x 24" EGG CRATE LAY-IN NONE ALUMINUM

(E)RG-1 SEE PLANS RETURN 130 0.09 7" 24" x 24" EGG CRATE LAY-IN NONE ALUMINUM

HUMIDIFIER SCHEDULE

MARK LOCATION HUMIDIFICATION STYLE

HUMIDIFICATION

LOAD

(LBS/HR)

DUCT

SIZE

(IN. x IN.)

AIR STEAM OVERALL DIMENSIONS

AIRFLOW

(CFM)

ENTERING AIR LEAVING AIR

PRESSURE

(PSI)

TUBE

DIAMETER

(IN.)

TUBE

SPACING

(IN.)

TUBE

QUANTITY

WIDTH

(IN.)

HEIGHT

(IN.)

LENGTH

(IN.)

TEMP.

(°F)

RELATIVE

HUMIDITY

TEMP.

(°F)

RELATIVE

HUMIDITY

H-9 PENTHOUSE STEAM DISPERSION 131.31 28" x 18" 4600 -20 80% 72 40% 10 1.5 6 4 31 25.25 7.25

VAV SCHEDULE

MARK SERVICE

MAX

AIRFLOW

(CFM)

MIN

AIRFLOW

(CFM)

MIN

INLET

SIZE

BOOSTER COIL

REMARKS

CAPACITY

(MBH)

FLOW

RATE

(GPM)

(E)VAV-201 2056 480 150 7" Ø 12.0 0.8 -

(E)VAV-202 2052 & 2054 505 150 7" Ø 10.5 0.7 -

(E)VAV-203 2047, CORRIDOR 215 85 6" Ø 4.6 0.3 -

(E)VAV-204 2050 350 335 6" Ø 10.2 0.7 -

(E)VAV-205 2049A & 2049B 120 95 5" Ø 2.5 0.2 -

(E)VAV-206 2049C, D, E 180 145 5" Ø 4.0 0.3 -

(E)VAV-207 2046, 48, CORR. 270 85 6" Ø 5.1 0.4 -

(E)VAV-208 2055 1000 1000 10" Ø 26.0 1.8 1

(E)VAV-209 2055 1105 1105 10" Ø 25.6 1.7 1

(E)VAV-210 2055 1275 1275 10" Ø 29.5 2 1

(E)VAV-211 2055 430 430 7" Ø 9.9 0.7 1

(E)VAV-212 2055B 110 110 5" Ø 3.5 0.3 1

REMARKS: 1. THREE WAY (BYPASS) MODULATING HOT WATER VALVE.

AIR HANDLING UNIT SCHEDULE

MARK SERVICE LOCATION

FAN DATA COOLING COIL DATA

SUPPLY AIRFLOW

TOTAL STATIC

PRESS.

(IN. W.G.)

EXT. STATIC

PRESS.

(IN. W.G.) FAN CLASS WHEEL TYPE

MOTOR

SIZE

(HP) VOLTAGE PHASE

CAPACITY ENTERING AIR TEMP. LEAVING AIR TEMP. WATER SIDE

NO. OF ROWS

FIN SPACING

(#/FT)

COIL FACE

AREA

(SQ. FT.)

MAX. AIR PRESS.

DROP

(IN. W.G.)

MAX. COIL FACE

VELOCITY

(FPM)

MAX.

(CFM)

MIN.

(CFM)

SENS.

(MBH)

TOTAL

(MBH)

DRY BULB

(°F)

WET BULB

(°F)

DRY BULB

(°F)

WET BULB

(°F)

WATER

FLOW

(GPM)

E.W.T.

(°F)

L.W.T.

(°F)

MAX. WATER PRESS.

DROP

(FT.)

(E)AHU-9 2ND FLOOR LAB PENTHOUSE 4600 4600 5.1 2.5 II AIRFOIL 10 460 3 234.2 427.6 92 75 45.4 45.2 80 40 51.1 13.1 10 96 19.12 0.34 241

(E)AHU-8 SEE PLANS PENTHOUSE 9000 3000 5.45 4 II AIRFOIL 15 460 3 267 374 80.7 67.2 54 53.7 74.9 47 57 6.2

AIR HANDLING UNIT SCHEDULE (CONTINUED)

MARK

HEATING COIL DATA

FILTER

SECTION(S)

PRE / FINAL

HUMIDIFIER RECLAIM COIL

CAPACITY

(MBH)

E.A.T.

(°F)

L.A.T.

(°F)

MAX. AIR PRESS.

DROP

(IN. W.G.) TYPE

E.A.T.

(°F) LB/HR

MAX. AIR PRESS.

DROP

(IN. W.G.)

LEAVING

AIR RH SEASON

CAPACITY

(MBH)

ENTERING AIR TEMP. LEAVING AIR TEMP.

MAX. COIL

FACE

VELOCITY

(FPM)

MAX. AIR

PRESS.

DROP

(IN. W.G.)

MAX. WATER

PRESS.

DROP

(FT.) GPM

E.W.T.

(°F)

L.W.T.

(°F) REMARKS

DRY

BULB

(°F)

WET

BULB

(°F)

DRY

BULB

(°F)

WET

BULB

(°F)

(E)AHU-9 360 -15 56 0.5 2" MERV 7/- - - - - -

SUMMER

WINTER

57.1 262.2

-15

N/A

71.8 N/A

0.84 0.82

5.4 6.7

43.8

80.8 40.1

1,2,3

(E)AHU-8 490 10 60 0.2 2" MERV 7/-

DIRECT

INJECTION

55 137 0.01 80% - - - - - - - - - - - - 1,3

REMARKS:

1. UNLESS NOTED OTHERWISE, DATA IS EXISTING AND PROVIDED FOR REFERENCE ONLY 3. EXISTING UNIT IS MANUFACTURED BY DAIKIN/McQUAY.

2. COOLING COIL DATA IS FOR NEW COIL UTILIZING 30% PROP. GLYCOL SOLUTION

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

PROJECT NUMBER: 2021116

B

IM

/T o m a h

R e p la c e

C h e m ic a l A n a ly z e r/

R

M e c h V

A T o m a h C h e m A n a ly z e r

F

L .r v t

/2

/2

:1 :1

A

M

M601

SCHEDULES, MECHANICAL REPLACE CHEMICAL ANALYZER

500 E. VETERANS STREET, TOMAH, WI 54660

676-20-004

22 DEC 2021 CS ND

BID DOCUMENTS

FULLY SPRINKLERED

21014Revisions: Date:

SCHEMATIC DESIGN 35% 6 OCT 2021

DESIGN DEVELOPMENT 65% 29 OCT 2021

LUMINARIES

GENERAL LIGHTING

1'X 1' FIXTURES

1'X 2' FIXTURES

1'X 3' FIXTURES

1'X 4' FIXTURES

2'X 2' FIXTURES

2'X 4' FIXTURES

UNDER CABINET

INDUSTRIAL STRIP

TRACK LIGHTING

DOWNLIGHT

ACCENT LIGHTING

FLOOD LIGHT

2 LAMP FLOOR LIGHT

RECESSED MOUNTED

MOUNTING SYMBOLS

SURFACE MOUNTED

PENDANT MOUNTED

WALL MOUNTED

EMERGENCY POWER INDICATION

NORMAL POWER

HALF EMERGENCY POWER

EMERGENCY POWER

IDENTIFICATION

FIXTURE TYPE

(REFER TO LIGHT

FIXTURE SCHEDULE)

A

1, a

SWITCH LEGCIRCUIT

NUMBER

MOUNTING

INDICATION

EGRESS LIGHTING

SINGLE REMOTE HEAD

DOUBLE REMOTE HEAD

BATTERY UNIT

BATTERY UNIT WITH HEADS

EXIT SIGNS (HATCH INDICATES FACE)

SINGLE FACE EXIT SIGN

DOUBLE FACE EXIT SIGN

SINGLE FACE EXIT SIGN WITH HEADS

DOUBLE FACE EXIT SIGN WITH HEADS

CHEVRON INDICATOR

SIMPLEX RECEPTACLE

GFCI SIMPLEX RECEPTACLE

DUPLEX RECEPTACLE

GFCI DUPLEX RECEPTACLE

DOUBLE DUPLEX RECEPTACLE

GFCI DOUBLE DUPLEX RECEPTACLE

RECEPTACLES

ABBREVIATIONS

AFCI

a C

CO

DR

DW

EWC

MW

REF

T

WA

WP

WR

- ARC FAULT CIRCUIT INTERRUPTER

- SWITCH LEG

- ABOVE COUNTER

- COPIER

- DRYER

- DISHWASHER

- ELECTRIC WATER COOLER

- MICROWAVE

- REFRIGERATOR

- TAMPER RESISTANT SAFETY RECEPTACLE

- WASHER

- WEATHER PROOF IN-USE

- WEATHER RESISTANCE DEVICE

FLUSH TYPE FLOOR RECEPTACLE

CONTROLS

EMERGENCY POWER OFF BUTTON

OVERHEAD DOOR CONTROL

PB PUSH BUTTON

SURFACE MOUNTED PANEL BOARD

POWER

FLUSH MOUNTED PANEL BOARD

INVERTER

AUTOMATIC TRANSFER SWITCH

EQUIPMENT CONNECTION.

REFER TO EQUIPMENT SCHEDULES

F

NON-FUSED SWITCH

FUSED SWITCH

COMBO MOTOR STARTER

V VARIABLE FREQUENCY DRIVE

J JUNCTION BOX

J JUNCTION BOX WITH WHIP

HH

GND BUS

MH

HANDHOLE

MANHOLE

GROUND BUS BAR

LIGHTNING ARRESTOR

GROUND

DRAWING SYMBOLS

1 KEYNOTE

1 REVISION TAG

LINE TYPES

NEW WORK

EXISTING TO REMAIN

EXISTING TO BE DEMOLISHED

WALL MOUNTED SWITCH/SENSOR

LIGHTING CONTROLS

OS CEILING MOUNTED SENSOR - CEILING OR WALL MOUNT

BASED ON LAYOUT, SENSOR SET FOR VACANC DETECTION WITH TIME

DELAY.

TIME CLOCK

PC PHOTOCELL

DS DAY LIGHT SENSOR

C CONTRACTOR

924 UL 924 RELAY

SECURITY CAMERACCTV

CATV/ SATV

DATA

POWER

CATV / SATV

DATA

6"

48" 48"

18"

96"

80"

6"

54" 72"

WITHIN

12" OF

FRAME

48"

MOUNT FIRE ALARM DEVICES

BETWEEN 80" AND 96" AFF TO

CENTER OF STROBE LENS. IF CEILING

IS LESS THAN 80", MOUNT DEVICE 6"

BELOW FINISHED CEILING.

IF COUNTER TOP IS GREATER THAN

20" DEEP, RECEPTACLE TO BE

MOUNTED NO GREATER THAN 40"

AFF OR 6" ABOVE BACKSPLASH,

WHICHEVER IS LESS

COORDINATE WITH

ARCHITECT FOR ALL

RECEPTACLES

MOUNTED IN

CASEWORK

FIRE

PULL DOWN

REF

TV

96"

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

PROJECT NUMBER: 202116

B

IM

/T o m a h R e p la c e C h e m ic a l A n a ly z e r/

R

E le c V

A T o m a h C h e m

A n a ly z e r

F

L .r v t

/2

/2

:4

:4

A

M

E001

ELECTRICAL GENERAL

INFORMATION

REPLACE CHEMICAL ANALYZER

500 E VETERANS STREET, TOMAH, WI 54660

676-20-004

22 DEC 2021 MS ZN

BID DOCUMENTS

FULLY SPRINKLERED

21014

ELECTRICAL ABBREVIATIONS

ABBR DESCRIPTION

LV LOW VOLTAGE

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPS

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MH MANHOLE

MISC MISCELLANEOUS

MLO MAIN LUG ONLY

MTG MOUNTING

MTS MANUAL TRANSFER SWTICH

MV MEDIUM VOLTAGE

N /A NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

P POLE

PB PULL BOX

PC PLUMBING SYSTEM CONTRACTOR

PH PHASE

PNL PANEL

PP POWER PANEL

PR PAIR

PRI PRIMARY

PVC POLYVINYL CHLORIDE

REC RECESSED

RSC RIGID STEEL CONDUIT

SC SECURITY CONTRACTOR

SN SOLID NEUTRAL

SP SPARE

SS STAINLESS STEEL

ST SHUNT TRIP

STP SHIELDED TWISTED PAIR

SUSP SUSPENDED

SW SWITCH

SWBD SWITCHBOARD

TC TELEPHONE CABINET

TCI TELEPHONE COMMUNICATIONS CABLING INSTALLER

TEL TELEPHONE

TELE/DATA TELEPHONE / DATA

TELECOM TELECOMMUNICATIONS

TP TWISTED PAIR

TV TELEVISION

TYP TYPICAL

UG UNDERGROUND

UOI UNLESS OTHERWISE INDICATED

UTP UNSHIELDED TWISTED PAIR

V VOLT

VOL VOLUME

W WATT

WP WEATHERPROOF

XFMR TRANSFORMER

Y WYE

Δ DELTA

ELECTRICAL ABBREVIATIONS

ABBR DESCRIPTION

# NUMBER

1P ONE POLE

1P,1W ONE POLE, ONE WIRE

1P,2W ONE POLE, TWO WIRE

2P TWO POLE

2P,2W TWO POLE, TWO WIRE

3P THREE POLE

3P,2W THREE POLE, TWO WIRE

3P,3W THREE POLE, THREE WIRE

3P,4W THREE POLE, FOUR WIRE

4P FOUR POLE

4P,4W FOUR POLE, FOUR WIRE

A AMPERE

A/V AUDIO VISUAL

AC ALTERNATING CURRENT

AF AMPERE FRAME

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AIC AMPERE INTERRUPTING CAPACITY

AL ALUMINUM

ARCH ARCHITECT

AS AMP SWITCH

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

B PEDESTAL MOUNTED ON BENCH TOP

BF BELOW FLOOR

BFF BELOW FINISHED FLOOR

BFG BELOW FINISHED GRADE

BLDG BUILDING

C CONDUIT

CATV CABLE TELEVISION

CB CIRCUIT BREAKER

CKT CIRCUIT

CL CENTERLINE

CLG CEILING MOUNTED

CT CURRENT TRANSFORMER

CU COPPER

D DEDICATED DEVICE

DC DIRECT CURRENT

DISC DISCONNECT

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EM EMERGENCY

EMT ELECTRIC METALLIC TUBING

ER EXISTING TO BE REMOVED

ERL EXISTING TO BE RELOCATED

ETR EXISTING TO REMAIN

EX EXISTING

FA FIRE ALARM

FLA FULL LOAD AMPS

FO FIBER OPTIC

FPC FIRE PROTECTION CONTRACTOR

GC GENERAL CONTRACTOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GFP GROUND FAULT PROTECTION

GND GROUND

GRC GALVANIZED RIGID CONDUIT

HH HANDHOLE

HP HORSEPOWER

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HZ HERTZ (CYCLE) PER SECOND

JB JUNCTION BOX

KVA KILOVOLT AMPERE

KVAR KILOVOLT AMPERE REACTIVE

LP LIGHTING PANEL

LS LIMIT SWITCH

LTG LIGHTING

TYPICAL DEVICE MOUNTING HEIGHTS

Revisions: Date:

35% SCHEMATIC DESIGN 6 OCT 2021

65% DESIGN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .