S02 SOW_Att2a 21014 Tomah Replace Chemical Analyzer - Bid Drawings 676-20-004 _1 of 3.pdf
PDF 10 MB Posted
- Solicitation number
- 36C25222B0011
About this file
This file contains bid drawings related to a federal contract solicitation for replacing a chemistry analyzer. The solicitation number is 36C25222B0011 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 for project 676-20-004 to replace the chemistry analyzer. The solicitation includes attachments and details the opportunity to provide products or services for replacing the chemistry analyzer. The bid drawings provide relevant specifications and details to support responses to the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL
PLUMBING
ARCHITECT
NAGEL Architects + Engineers 13980 bishops drive, suite 250 Brookfield, WI 53005 Phone: 262.641.0746
FAX: 888.600.6207
Contact: Kenneth Shane, AIA E-mail: Ken.Shane@Nagel.us
DESIGNER LIST AND STAMPS___________________
OTIE
1033 N Mayfair Road Suite 200 Milwaukee, WI 53226 Phone: 414.607.6766 Contact: Christopher Stipe, PE E-mail: Cstipe@oescgroup.com
OTIE
1033 N Mayfair Road Suite 200 Milwaukee, WI 53226 Phone: 414.607.6764 Contact: Timothy Wendt, PE E-mail: Twendt@oescgroup.com
ELECTRICAL
OTIE
1033 N Mayfair Road Suite 200 Milwaukee, WI 53226 Phone: 414.607.6764 Contact: Michael Smith, PE E-mail: MSmith@oescgroup.com
BLDG 400
5T H
S T
E ST
NORTHCOUNTY HWY E
Tomah VA Medical Center 500 E. Veterans St Tomah, WI 54660
CONTACT:
COR Name: James Conn COR Email: james.conn@va.gov COR Phone #: 608-790-6302
COUNTY HWY E
INTERSTATE 94TOMAH VAMC
CAMPUS
NORTH
NORTH ARROW
ELEVATION REFERENCE
SYMBOL
ELEVATION REFERENCE
SYMBOL
SECTION REFERENCE
SYMBOL
ENLARGED AREA
REFERENCE SYMBOL
DOOR TAG
REVISION TAG
WINDOW TAG
ROOM TAG
COLUMN REFERENCE
SYMBOL
Name Elevation
A101
A101
SIM
A101
SIM
NORTH
PARTITION TAG
A36C G11C
ARCHITECTURAL SYMBOLS___
ROOM NAME
111A
EQUIPMENT TAG######
A101
SIM DETAIL REFERENCE
SYMBOL
AD101.1 MATCH LINE
AREA NOT IN CONTRACT
A ALIGN FINISH SURFACES FLUSH
WALL TAG1iEX1
FINISH WOOD
CONCRETE MASONRY UNIT (CMU)
CONCRETE, CAST-IN-PLACE
CONCRETE, PRE-CAST
FILL - PER NOTE
INTERMITTENT BLOCKING
CONT. ROUGH FRAMING
STEEL
EARTH
RIGID INSULATION
BATT INSULATION
GYPSUM BOARD
MARBLE/GRANITE/STONE
TILE/TERRAZZO
GLASS
LARGE SCALE
SECTIONS
BRICK
PLYWOOD
MATERIAL
MATERIAL LEGEND_________
EARTH, COMPACT
ALUMINUM
FILL, POROUS
SHEET # SHEET NAME
10 - FIRE PROTECTION - F
F001 FIRE PROTECTION GENERAL INFORMATION
FD102 SECOND FLOOR PLAN, FIRE PROT. DEMO, PHASE 0-3
F102 SECOND FLOOR FIRE PROTECTION PLAN, PHASES 0-3
F011 FIRE ALARM GENERAL INFORMATION
FD112 SECOND FLOOR DEMOLITION PLAN, FIRE ALARM, PHASES 0-3
F112 SECOND FLOOR PLAN, FIRE ALARM, PHASES 0-3
11 - PLUMBING - P
P001 PLUMBING GENERAL INFOMRATION
PD101 FIRST FLOOR PLAN, PLUMBING DEMOLITION
PD102 SECOND FLOOR PLAN, PLUMBING DEMOLITION, PHASES 0-3
PD103 SECOND FLOOR PLAN, PLUMBING DEMOLITION, PHASES 4-6
P104 FOURTH FLOOR/PENTHOUSE PLAN, PLUMBING
P501 DETAILS, PLUMBING
P601 ISOMETRICS, PLUMBING
P602 ISOMETRIC, PLUMBING - WASTE AND VENT
P101 FIRST FLOOR PLAN, PLUMBING
P102 SECOND FLOOR PLAN, PLUMBING, PHASES 0-3
P103 SECOND FLOOR PLAN, PLUMBING, PHASES 4-6
13 - MECHANICAL - M
M001 MECHANICAL GENERAL INFORMATION
MD102 SECOND FLOOR MECHANICAL DEMOLITION PLAN, PHASES 0-3
MD103 SECOND FLOOR MECHANICAL DEMOLITION PLAN, PHASES 4-6
MD104 FOURTH FLOOR - PENTHOUSE PLAN
M102 SECOND FLOOR MECHANICAL PLAN, PHASE 0-3
M103 SECOND FLOOR MECHANICAL PLAN, PHASES 4-6
M104 FOURTH FLOOR/PENTHOUSE PLAN, MECHANICAL
M501 DETAILS, MECHANICAL
M601 SCHEDULES, MECHANICAL
14 - ELECTRICAL - E
E001 ELECTRICAL GENERAL INFORMATION
ED102 SECOND FLOOR PLAN, PWR AND DATA DEMOLITION, PHASES 0-3
ED103 SECOND FLOOR PLAN, PWR AND DATA DEMOLITION, PHASES 4-6
ED202 SECOND FLOOR PLAN, LIGHTING DEMOLITION, PHASES 0-3
E102 SECOND FLOOR PLAN, PWR AND DATA, PHASES 0-3
E103 SECOND FLOOR PLAN, PWR AND DATA, PHASES 4-6
E105 FOURTH FLOOR / PENTHOUSE PLAN ELECTRICAL
EL202 SECOND FLOOR PLAN, LIGHTING, PHASES 0-3
E501 ELECTRICAL SCHEDULES AND DIAGRAMS
E601 ELECTRICAL PANEL SCHEDULES
15 - TECHNOLOGY - T
TD102 SECOND FLOOR DEMOLITION PLAN, DATA, PHASES 0-3
TD103 SECOND FLOOR DEMOLITION PLAN, DATA, PHASES 4-6
T102 SECOND FLOOR PLAN, DATA, PHASES 0-3
T103 SECOND FLOOR PLAN, DATA, PHASES 0-3
SHEET # SHEET NAME
00 - GENERAL - G
G001 COVER SHEET
G002 BUILDING CODE REVIEW AND INFECTION CONTROL
G003 GENERAL PHASING DIAGRAMS, NOTES, AND NARRATIVE
G004 EXISTING SITE AND STAGING PLAN
G102 SECOND FLOOR PLAN, LIFE SAFETY
07 - ARCHITECTURAL - A
AD101 FIRST FLOOR PLAN, ARCHITECTURAL DEMOLITION
AD102 SECOND FLOOR PLAN, ARCH. DEMO, PHASES 0-3
AD103 SECOND FLOOR PLAN, ARCH. DEMO, PHASES 4-6
A101 FIRST FLOOR PLAN, ARCHITECTURAL
A102 SECOND FLOOR PLAN, ARCHITECTURAL, PHASES 0-3
A103 SECOND FLOOR PLAN, ARCHITECTURAL, PHASES 4-6
A104 PENTHOUSE / ROOF PLAN, ARCHITECTURAL
A111 SECOND FLOOR PLAN, REFLECTED CEILING
A121 SECOND FLOOR PLAN, WAYFINDING
A501 PARTITION TYPES AND DETAILS
A601 DOOR, WINDOW, AND FRAME SCHEDULES & DETAILS
A701 TYPICAL DETAILS
08 - INTERIORS - I
I102 SECOND FLOOR PLAN, FINISH
I201 INTERIOR ELEVATIONS
I202 INTERIOR ELEVATIONS
I203 INTERIOR ELEVATIONS
09 - EQUIPMENT - Q
Q101 EQUIPMENT RELOCATION PLAN, PHASE 0
Q102 EQUIPMENT PLAN, PHASE 0
Q111 EQUIPMENT RELOCATION PLAN, PHASE 1
Q112 EQUIPMENT PLAN, PHASE 1
Q121 EQUIPMENT RELOCATION PLAN, PHASE 2
Q122 EQUIPMENT PLAN, PHASE 2
Q131 EQUIPMENT RELOCATION PLAN, PHASE 3
Q132 EQUIPMENT PLAN, PHASE 3
Q141 EQUIPMENT RELOCATION PLAN, PHASE 4
Q142 EQUIPMENT PLAN, PHASE 4
Q151 EQUIPMENT RELOCATION PLAN, PHASE 5
Q152 EQUIPMENT PLAN, PHASE 5
Q162 EQUIPMENT PLAN, PHASE 6
Q171 SIEMENS EQUIPMENT DRAWINGS
Q172 SIEMENS EQUIPMENT DRAWINGS
Q173 SIEMENS EQUIPMENT DRAWINGS
Q174 SIEMENS EQUIPMENT DRAWINGS
Q175 SIEMENS EQUIPMENT DRAWINGS
Q176 SIEMENS EQUIPMENT DRAWINGS
13890 bishops drive, suite 250 brookfield, wi 53005
DEPARTMENT OF VETERANS AFFAIRS
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
NAGEL A+E PROJECT NUMBER:VA PROJECT NUMBER:
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Consultant:
Nagel Architects + Engineers project number:
Project NumberProject TitleDrawing Title Phase
B
IM
T om ah
R ep la ce
C he m ic al A na ly ze r/
4_ T om ah
R ep la ce
C he m ic al A na ly ze r.
rv t
/2
2/
:0 1:
P
M
REPLACE CHEMICAL ANALYZER
500 E. VETERANS STREET, BLDG #400
TOMAH, WI 54660
21014676-20-004
G001
COVER SHEET
OTIE
1033 N. Mayfair Rd. Suite 200
Milwaukee, WI 53226
REPLACE CHEMICAL ANALYZER
500 E VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 KS TMO, ATF
FULLY SPRINKLERED
21014
BID DOCUMENTS
T
T&G TONGUE & GROOVE
T/O(T.O.) TOP OF
TB TOWEL BAR
TC TERRA COTTA
TEL TELEPHONE
TEMP TEMPORARY
THK THICKNESS
THR THRESHOLD
THRU THROUGH
TOL TOLERANCE
TOT TOTAL
TOW(T.O.W.) TOP OF WALL
TPD TOILET PAPER DISPENSER
TR TREAD
TRM TRANSOM
TV TELEVISION
TYP TYPICAL
TZ TERRAZZO
U
UC UNDERCUT
UNFIN UNFINISHED
UNO(U.N.O) UNLESS NOTED OTHERWISE
UR URINAL
UTIL UTILITY
V
VA VETERAN'S AFFAIRS, DEPARTMENT
OF
VAR VARNISH
VCT VINYL COMPOSITION TILE
VEH VEHICLE
VERT VERTICAL
VF VINYL FABRIC
VG VERTICAL GRAIN
VIN VINYL
VJ V-JOINT(ED)
VNR VENEER
VT VINYL TILE
W
W WEST
W WIDTH, WIDE
W/ WITH
W/D WASHER & DRYER
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WIRED GLASS
WH WALL HUNG
WHS WHEEL STOP
WI WROUGHT IRON
WM WIRE MESH
WP WATER PROOFING
WPT WORKING POINT
WR WATER REPELLANT
WSCT WAINSCOT
WT WEIGHT
WTW WALL-TO-WALL
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
Q
QRT QUARRY TILE
QT QUARTZ TILE
QTY QUANTITY
R
RA RETURN AIR
RAD RADIUS
RB RUBBER BASE
RBT RABBET, REBATE
RBT RUBBER TILE
RC RESILIENT CHANNEL
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE REINFORCE(D)(ING)
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCED
REM REMOVE
REQ'D REQUIRED
RESIL RESILIENT
REV REVISION
RFG ROOFING
RFH ROOF HATCH
RFL REFLECT(ED)(IVE)(OR)
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RS RISER
RT RETURN
RWC RAINWATER CONDUCTOR
S
S SOUTH
SC SOLID CORE
SCHED SCHEDULE
SCN SCREEN
SD STORM DRAIN
SEC SECTION
SF SQUARE FEET
SFG SAFETY GLASS
SH SHELF, SHELVING
SHR SHEER
SHT SHEET
SHTG SHEATHING
SHV SHELVES
SI SQUARE INCHES
SIM SIMILAR
SL SLEEVE
SNT SEALANT
SP STANDPIPE
SP SOUNDPROOF
SPEC SPECIFICATION
SPK SPEAKER
SPKLR SPRINKLER
SPL SPECIAL
SQ SQUARE
SS STAINLESS STEEL
SSEW SANITARY SEWER
STA STATION
STC SOUND TRANSMISSION CLAS
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUS SUSPENDED
SUSP SUSPENSION
SYM SYMMETRICAL, SYMMETRY
SYN SYNTHETIC
SYS SYSTEM
M
M.O. MASONRY OPENING
M.R. MOISTURE RESISTANT
MAS MASONRY
MAX MAXIMUM
MBR MEMBER
MC MEDICINE CABINET
MECH MECHANIC(AL)
MED MEDIUM
MEMB MEMBRANE
MET METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINUTE, MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MLD MO(U)LDING
MOD MODULAR
MOV MOVABLE
MT MOUNT(ED)(ING)
MTL MATERIAL
MULL MULLION
MWK MILLWORK
N
N NORTH
N/A NOT APPLICABLE
NAT NATURAL
NI NICKEL
NIC NOT IN CONTRACT
NO. NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NTS NOT TO SCALE
O
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR
INSTALLED
OPNG OPENING
OPP OPPOSITE
OPPHD OPPOSITE HAND
OVHD OVERHEAD
OWJ OPEN-WEB JOIST
P
PAR PARALLEL
PB PANIC BAR
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PFN PREFINISHED
PG PLATE GLASS
PKG PARKING
PL PROPERTY LINE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLF POUNDS PER LINEAR FOOT
PNL PANEL
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PRF PREFORMED
PROJ PROJECT
PRT PROPERTY
PSC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT
PTC POST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PWD PLYWOOD
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT(OR)
GCMU GLAZED CONC. MASONRY UNITS
GEN GENERAL
GF GROUND FACE
GKT GASKET(ED)
GL GLASS
GLU LAM GLUE LAMINATED
GOVT GOVERNMENT
GP GALVANIZED PIPE
GPL GYPSUM LATH
GPPL GYPSUM PLASTER
GPT GYPSUM TILE
GRN GRANITE
GS(S) GALVANIZED STEEL (SHEET)
GST GLAZED STRUCTURAL TILE
GT GROUT
GWB GYPSUM WALL BOARD
GYP GYPSUM
H
HB HOSE BIBB
HBD HARDBOARD
HC HANDICAPPED
HDR HEADER
HDWD HARDWOOD
HDWR HARDWARE
HGT HEIGHT
HJT HEAD JOINT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HTG HEATING
HTR HEATER
HVAC HEAT, VENTILATION, & AIR
CONDITIONING
HWH HOT WATER HEATER
I
ID INSIDE DIAMETER
IN INCH
INC INCLUDING
INSUL INSULATE(D)(ION)
INT INTERIOR
INV INVERT
J
JC JANITOR'S CLOSET
JOINT JT
K
KIT KITCHEN
KO KNOCKOUT
KP KICK PLATE
L
LAB LABORATORY
LAD LADDER
LAV LAVATORY
LB POUND
LB LAG BOLT
LBL LABEL
LH LEFT HAND
LL LIVE LOAD
LMS LIMESTONE
LP LIGHT PROOF
LPT LOW POINT
LT LIGHT
LTG LIGHTING
LTL LINTEL
LVR LOUVER
LW LIGHTWEIGHT
D
D DRAIN
DA DOUBLE ACTING
DEG DEGREE
DEMO DEMOLISH, DEMOLITION
DEP DEPRESSED
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA DIAMETER
DIM DIMENSION
DL DEAD LOAD
DMT DEMOUNTABLE
DN DOWN
DP DAMP PROOFING
DPR DAMPER
DR DOOR
DRW DRYWALL
DS DOWNSPOUT
DT DRAIN TILE
DTL DETAIL
DW DUMBWAITER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRAWER
E
E EAST
EA. EACH
EF EXHAUST FAN
EIFS EXTERIOR INSULATION & FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSE
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
ESC ESCALATOR
ESMT EASEMENT
EST ESTIMATE
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
F
F/O FACE OF
FAS FASTEN(ER)
FBD FIBERBOARD
FBO FURNISHED BY OTHERS
FD FLOOR DRAIN
FDN FIRE DEPARTMENT
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FACTORY FINISH
FG FIBERGLASS
FIN FINISH(ED)
FLR FLOOR
FN FENCE
FOB FACE OF BRICK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FPL FIREPLACE
FR FRAME(D)(ING)
FRA FRESH AIR
FRC FIRE-RESISTANT COATING
FRT FIRE-RETARDANT
FS FULL SIZE
FT FOOT
FTG FOOTING
FUR FURRED(ING)
FURN FURNITURE
FUT FUTURE
A
A/C AIR CONDITIONING
AB ANCHOR BOLT
ABV ABOVE
AC ACOUSTICAL
ACC ACCESS
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADDL ADDITIONAL
ADH ADHESIVE
ADJ ADJUSTABLE, ADJACENT
AFF(A.F.F.) ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATE
ANC ANCHOR, ANCHORAGE
ANOD ANODIZED
AP ACCESS PANEL
APX APPROXIMATE
ARCH ARCHITECT(URAL)
ASB ASBESTOS
ASC ABOVE SUSPENDED CEILING
AUTO AUTOMATIC
B
B/O(B.O.) BOTTOM OF
BD BOARD
BELOW BEL
BET BETWEEN
BITUM BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BRK BRICK
BS BOTH SIDES
BSMT BASEMENT
BUR BUILT-UP ROOFING
BVL BEVELED
BW BOTH WAYS
C
C-C CENTER TO CENTER
CAB CABINET
CALC CALCULATION
CB CATCH BASIN
CEM CEMENT
CFL COUNTER FLASH(ING)
CFT CUBIC FOOT
CHAM CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE CONCRETE
CIR CIRCLE
CIRC CIRCUMFERENCE
CJ CONTROL JOINT
CK CAULK(ING)
CL CENTER LINE
CLG CEILING
CLR CLEAR
CLS CLOSURE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMB COMBINATION
COMPO COMPOSITION
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACT
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CPT CARPET
CRS COURSE(S)
CS COUNTERSINK
CSMT CASEMENT
CST CAST STONE
CT CERAMIC TILE
CYD CUBIC YARD
ARCHITECTURAL ABBREVIATIONS_________________________________________________________________________________________________________________________
SHEET INDEX____________________________________________________________________________________ __
PROJECT SITE MAP___________________PROJECT LOCATION MAP______________STATION INFORMATIONPERSPECTIVE__________________________________
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
CONSTRUCTION DOCUMENTS 95% 23 NOV 2021
BID DOCUMENTS 22 DEC 2021
NOTES - INFECTION CONTROL
1. THE INTENT OF INFECTION CONTROL ISOLATION IS TO PROTECT PATIENTS IN THE
HOSPITAL WHICH HAVE LOW IMMUNE LEVELS. THEREFORE, CONSTRUCTION OPERATIONS
NEED TO BE DIRECTED TO CONTAIN DUST AND PARTICULATE MATTER TO THE
CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER SHALL BE SEALED
COMPLETELY WITH MIN 4 MIL POLY AND DUCT TAPE DURING CLASS II, III, OR IV
OPERATIONS.
2. PROVIDE TRIATEK ISOLATION MONITORS OR VA APPROVED EQUAL DURING CLASS III OR
CLASS IV CONSTRUCTION OPERATIONS. EACH AREA TO BE UNDER NEGATIVE PRESSURE
(0.02"WC) DURING THESE OPERATIONS. MONITOR TO MEASURE PRESSURE DIFFERENTIAL
BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY
VA.
3. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE A
REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION
CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION.
PROVIDE AT LEAST 10 DAYS NOTICE FOR EACH PERMIT.
4. WHERE BARRIER SEPARATES CONSTRUCTION FROM OCCUPIED SPACE, CONSTRUCT IC
(INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR TO SUSPENDED CEILING
ABOVE. ALL IC BARRIERS TO BE CONSTRUCTED AS 1 HOUR FIRE AND SMOKE RATED
BARRIERS. MAINTAIN SPRINKLER OPERATION ON BOTHS SIDES OF CONSTRUCTION
BARRIERS. WHERE TEMPORARY SHUTOFF OF SPRINKLERS IS REQUIRED FOR
ADJUSTMENT, PROVIDE FIRE WATCH FOR DURATION OF INOPERATION. PROVIDE STARC
SYSTEMS FIREBLOCKWALL SYSTEM BARRIERS OR VA AND ARCHITECT APPROVED EQUAL.
5. CONTRACTOR SHALL PROVIDE NEW ACCESS DOORS AND PROXIMITY CARD READERS AT
ALL IC BARRIERS. IC BARRIERS SHALL BE INSTALLED AND REMOVED ONLY OUTSIDE OF
NORMAL HOURS OF OPERATION FOR ADJACENT AREAS.
6. WHEN REQUIRED BY IC CONSTRUCTION CLASS, PROVIDE BALANCING DAMPERS IN THE
MAIN SUPPLY AND EXHAUST DUCT WORK SERVING CONSTRUCTION ZONE. TEMPORARILY
BALANCE AIR FLOW TO PROVIDE NEGATIVE AIR FLOW IN CONSTRUCTION ZONE AT ALL
TIMES AS INDICATED BELOW. DAMPERS TO REMAIN IN DUCT AFTER CONSTRUCTION IS
COMPLETE AND IS TO BE SECURED IN FINAL BALANCING POSITION PRIOR TO TURNING
SYSTEM OVER FOR OCCUPANCY.
7. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY
EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE
COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH
REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN
AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR
EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR
CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE
AND/OR EMERGENCY IN AN ADJACENT AREA.
8. ALL CONSTRUCTION DEBRIS, WASTE, AND TRANSPORTATION OF DEMOLITION ITEMS
SHALL BE CONVEYED IN A COVERED DUMPSTER CONTAINER SUCH THAT NO
DEBRIS/ITEMS ARE VISIBLE.
PATIENT RISK
GROUP
LOW RISK
GROUP
CONSTRUCTION TYPE
MEDIUM RISK
GROUP
HIGH RISK
GROUP
HIGHEST RISK
GROUP
TYPE A TYPE B TYPE C TYPE D
I
I
I
II III/IV
II
II
II II
III/IV
III/IV
III
III/IV
IV
IV
IV
INFECTION CONTROL CONSTRUCTION RISK CLASS CHART
CONSTRUCTION RISK CLASS OF WORK FOR THIS PROJECT IS
ANTICIPATED TO BE CLASS IV. RISK CLASS OF SPECIFIC ACTIVIES
SHALL BE COORDINATED WITH THE FACILITY INFECTION CONTROL
OFFICER AND FACILITY INFECTION CONTROL PLAN.
SEE INFECTION CONTROL SPECIFICATION FOR DETAILED
INFORMATION REGARDING CONSTRUCTION TYPE DEFINITIONS
AND INFECTION CONTROL PRECAUTIONS REQUIRED BY EACH
CONSTRUCTION RISK CLASS.
13890 Bishops Drive.
Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
B
IM
T om ah
R ep la ce
C he m ic al A na ly ze r/
4_ T om ah
R ep la ce
C he m ic al A na ly ze r.
rv t
/2
2/
:5 6:
P
M
G002
BUILDING CODE REVIEW AND
INFECTION CONTROLOTIE
1033 N. Mayfair Rd. Suite 200
Milwaukee, WI 53226
REPLACE CHEMICAL ANALYZER
500 E VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 KS TMO, ATF
BID DOCUMENTS
FULLY SPRINKLERED
21014
BUILDING CODE REVIEW
IBC CODE SECTION REQUIRED PROVIDED
NFPA SECTION (NFPA 101
U.N.O.) REQUIRED PROVIDED
OCCUPANCY OR USE CLASSIFICATION
Single B - BUSINESS B - BUSINESS CHAPTER 6.1 NEW BUSINESS NEW BUSINESS Accessory Occupancy [508.4] CHAPTER 6.1.14 N/A N/A Incidental Uses [Table 509] CHAPTER 8.7 N/A N/A
SPECIAL DETAIL REQUIREMENTS PER OCCUPANCY
Special Applications [Ch 4] CHAPTER 38 SPECIMEN LABORATORY Occupancy Separations Needed? [Table 508.4] N/A N/A High Hazard Class [Section 414] N/A N/A N/A N/A
TYPE OF CONSTRUCTION & LIMITS [TABLE 503]
Construction Class 1B, SPRINKLERED (EXISTING) EXISTING NFPA 220 TYPE II [222], SPRINKLERED (EXISTING) EXISTING Allowable Area EXISTING EXISTING N/A EXISTING EXISTING Area Increase: Sprinkler N/A N/A N/A N/A N/A Area Increase; Frontage N/A N/A N/A N/A N/A Total Area w/ increases N/A N/A N/A N/A N/A Allowable Height EXISTING EXISTING N/A N/A N/A Height Modifications N/A N/A N/A N/A N/A Allowable # of Stories N/A N/A N/A N/A N/A
POSITIONING ON PROPERTY [TABLE 602]
Distance to property lines (N, E, S, W) N/A N/A N/A Distance to other buildings N/A N/A N/A Distance to same building N/A N/A N/A Allowable Exterior Wall Openings [705] N/A N/A N/A
FIRE SUPPRESSION SYSTEMS
Sprinkler Requirement NFPA 13 AS REQ'D N/A Alarm & Detection System Requirement NFPA 72 NFPA 72 N/A Monitoring Services Standpipe systems Portable fire extinguishers NFPA 10 SEE G101 NFPA 10 NFPA 10 SEE G101 Smoke control systems N/A N/A N/A N/A
MEANS OF EGRESS PARAMETERS
Occupant Load [Table 1004.1.2] 150 GSF / PERSON 42 PERSONS (SEE OCCUPANCY PLAN, SHEET
G102) [Table 7.3.1.2]
Required Exit Capacities 0.2" * OCCUPANT LOAD = 12.4" SEE PROVIDED EGRESS CHART, SHEET G102 # of exits required [1006.2.2.1] 2 2 Exit width 44" CLR MIN. SEE PROVIDED EGRESS CHART, SHEET G102 CHAPTER 7.3.4 Exit discharge EXISTING SEE PROVIDED EGRESS CHART, SHEET G102 CHAPTER 7.7 EXISTING EXISTING Door Hardware Requirements - - CHAPTER 7.2 CLOSERS & POSITIVE LATCHING ON RATED
DOORS; FREE EGRESS FROM
ACCESS-CONTROLLED AREAS
AS REQ'D
Misc & Special Requirements - - PER CHAPTER 38 Stair Width 0.3" * OCCUPANT LOAD = 18.6" EXISTING CHAPTER 7.2.2 EXISTING PER Table 7.2.2.2.1.1(b) EXISTING Common path of travel 100 FT SEE COMMON PATH CHART, SHEET G102 PER CHAPTER 38 100 FT SEE COMMON PATH CHART, SHEET G102 Travel distance to Exits 300 FT SEE TRAVEL DISTANCE CHART, SHEET G102 PER CHAPTER 38 300 FT SEE TRAVEL DISTANCE CHART, SHEET G102 Stair enclosure 2 HR RATED; EXISTING EXISTING CHAPTER 7.2.2.5 2 HR RATED; EXISTING EXISTING Vertical openings 2 HR RATED; EXISTING EXISTING 2 HR RATED; EXISTING EXISTING Accessible means of egress 50% EXISTING CHAPTER 7.5.4 50% EXISTING Emergency lightning CHAPTER 7.8-9 AS REQ'D AS REQ'D Equipment platform [505] Mezzanine w/o sprinkler CHAPTER 8.6.10 N/A N/A
OTHER ARCHITECTURAL ELEMENTS
Roof requirements N/A N/A N/A N/A -Access N/A N/A CHAPTER 7.2.1.5.9 N/A N/A -Rails N/A N/A N/A N/A
FIRE PERFORMANCE REQUIREMENTS [TABLE 601] NFPA 220 [Table 4.1.1] Columns 2 HR (EXISTING) AS REQ'D Floor 2 HR (EXISTING) AS REQ'D Roof 1 HR (EXISTING) AS REQ'D Roof Covering CLASS B (EXISTING) AS REQ'D Exterior Bearing Walls 2 HR (EXISTING) AS REQ'D Interior Bearing Walls 2 HR (EXISTING) AS REQ'D Fire Walls N/A N/A Opening Protectives [Table 8.3.3.2.2] N/A N/A Other partitions PER ASSEMBLY AND RATING TYPE AS REQ'D Corridors [1020.1] PER CHAPTER 38 Exit passageways Vertical exit enclosures Vertical shafts 2 HR (EXISTING) AS REQ'D Penthouse Walls 1 HR (EXISTING) AS REQ'D Penthouse Roof 1 HR (EXISTING AS REQ'D Storage Rooms SMOKE PARTITION AS REQ'D Occupancy separations [Table 6.1.14.4.1] 2 HR FLOOR TO FLOOR AS REQ'D Hazardous areas CHAPTER 6.2 N/A N/A Accessible means of egress [1009.1.2] EXISTING MATCH EXISTING other
SMOKE COMPARTMENT N/A N/A N/A N/A
ATTIC REQUIREMENTS N/A N/A N/A N/A
-Access N/A N/A N/A N/A -Smoke separations N/A N/A N/A N/A
CONSTRUCTION MATERIALS - FINISHES
Exit Enclosures & Passageways [Table 803.11] CLASS A OR B CLASS A OR B Corridors CLASS B CLASS B Rooms & Enclosed spaces CLASS B CLASS B
ENERGY EFFICIENCY REQUIREMENTS
Energy Conservation:
Insulation Above Deck N/A Walls Above Grade, Wood Framed N/A Walls Below Grade N/A Floors, Mass N/A Slab-on-grade Floors, Heated N/A Opaque Doors N/A Vertical Fenestration, Fixed N/A Vertical Fenestration, Operable N/A Vertical Fenestration, Entrance Doors N/A Skylights N/A
MEP REQUIREMENTS
Lighting NATURAL: 8% OF FLOOR SERVED
-OR- ARTIFICIAL: 10 FOOT CANDLES
OVER AREA AT 30" AFF
AS REQ'D N/A
Water Closets EXISTING MATCH EXISTING N/A Lavatories EXISTING MATCH EXISTING N/A Bathtubs/Showers N/A N/A N/A Drinking Fountains EXISTING EXISTING N/A Other (mop basin) EXISTING EXISTING N/A
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
R O
U T
E R
C
IS
C O
M A
IN
P
O W
E R
D
IS
T R
IB
U
T
IO
N P
L A
T E
H U
B
1214.17 [3'-11 3/4"]
1240.99 [4'-1"]
525.57 [1'-8 3/4"]
965.65 [3'-2"]
847.28 [2'-9 1/2"]
665.60 [2'-2 1/4"]
1647.82 [5'-5"]
A A
U.T.C.
U.T.C.
N O
B
LO
CK
S
AR
EA
No blocks
No blocks
YV
I1M
415 ∅8
1725 ∅8 AIR PIPE
1823 ∅8
1340 ∅8
550 ∅8
295 ∅8
1120 ∅8 AIR PIPE 465 ∅8
400 400
400400
B C D E F
A x1 x2 x3 x4 xC xDxBxA xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
1.5
MENS
TOILET
WOMENS
TOILET
WAITING -
RADIOLOGY
PHASE 1: TEMP
BLOOD DRAW
PHASE 2: TEMP
RECEPTION
P3
P6
P1
P2
P4
P5
PHASE 1/2: TEMP WAITING
T E
M P
C O
R R
ID
(P 1)
STAIR #7
S7
PROPOSED CONTRACTOR
ACCESS, ALL PHASES
B C D E F
A x1 x2 x3 x4 xC xDxBxA xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
1.5
MENS
TOILET
WOMENS
TOILET
WAITING -
RADIOLOGY
PHASE 1: TEMP
BLOOD DRAW
PHASE 2: TEMP
RECEPTION
P3
P6
P1
P2
T E
M P
C O
R R
ID
(P 1)
P4
P5
PHASE 1/2: TEMP WAITING
PROPOSED CONTRACTOR
ACCESS, ALL PHASES
PHASE '0' (P0)
PHASE 1 (P1)
PHASE 2 (P2)
PHASE 3 (P3)
LEGEND - GENERAL PHASING
PHASE 4 (P4)
PHASE 5 (P5)
PHASE 6 (P6)
1. CONTRACTOR SHALL BE RESPONSIBLE FOR SEQUENCING AND
COORDINATION OF CONSTRUCTION PHASING WITH VA'S SCHEDULES,
INFECTION CONTROL, AND INTERIM LIFE SAFETY REQUIREMENTS.
REFER TO SPECIFICATIONS, INFECTION CONTROL NOTES, AND PLANS
FOR PROJECT REQUIREMENTS.
2. CONTRACTOR SHALL PROVIDE ALL SUB-PHASING ACTIVITIES AS
REQUIRED FOR WORK OCCURING BETWEEN VARIOUS PHASES.
3. CONTRACTOR SHALL REFER TO ALL DEMOLITION AND NEW
CONSTRUCTION DRAWINGS FOR DETAILED SCOPE OF WORK.
4. CONTRACTOR SHALL MAINTAIN EGRESS PATHWAYS FROM
LABORATORY SPACE, FROM THE SECOND FLOOR OF BUILDING 400,
AND FROM THE GROUND FLOOR OF BUILDING 400 AT ALL TIMES.
5. CONTRACTOR SHALL NOTE THAT THE BUILDING AND AREA OF WORK
ARE TO REMAIN OCCUPIED AND FUNCTIONING THROUGHOUT
CONSTRUCTION.
6. HOURS OF OPERATION FOR WORK GENERATING SIGNIFICANT NOISE,
VIBRATION, OR OTHERWISE DISRUPTIVE OF BUILDING AND/OR
LABORATORY FUNCTION SHALL BE OUTSIDE NORMAL BUILDING AND
LABORATORY OPERATION HOURS. CONTRACTOR SHALL COORDINATE
WITH VA THE SCHEDULING OF SUCH WORK A MINIMUM OF 2 WEEKS IN
ADVANCE
7. DURING CONTRUCTION ACTIVITIES IT IS REQUIRED TO MINIMIZE OR
AVOID THE DISRUPTION OF, AND EXPEDITE THE INSTALLATION OF,
NEW SPRINKLERS. SPRINKLERS SHALL BE CONSIDERED OPERATIONAL
WHEN INSTALLED AND OPERATING IN ACCORDANCE WITH NFPA 13.
8. CONTRACTOR SHALL INSTALL SMOKE DETECTORS INSIDE ALL AREAS
WHERE SPRINKLERS WILL BE DECOMMISSIONED DUE TO
CONSTRUCTION. SMOKE DETECTORS SHALL BE COVERED WITH A
DUST CAP DURING ACTIVE CONSTRUCTION HOURS. CAP SHALL BE
REMOVED AT THE END OF ACTIVE CONSTRUCTION HOURS EACH DAY.
GENERAL NOTES - PHASING
GENERAL PHASING NARRATIVE
PRE-CONSTRUCTION
• CONTRACTOR TO PROVIDE ALL REQUIRED SUBMITTALS, SHOP
DRAWINGS, AND ITEMS AS OUTLINED IN SPECIFICATION SECTION
01 33 23 FOR REVIEW AND APPROVAL PRIOR TO START OF
CONSTRUCTION.
PHASE '0' - WORK REQUIRED TO BEGIN PHASE 1
• RELOCATE EQUIPMENT AS SHOWN ON SHEET Q101; PROVIDE
TEMPORARY POWER, AIR, WATER, ETC. AS REQ'D FOR
TEMPORARY EQUIPMENT FUNCTION.
• DEMOLISH AND CONSTRUCT NEW AS SHOWN ON PHASE '0' PLANS
FOR ALL DISCIPLINES.
• NEW DOORS '2050' AND '2053' SHALL NOT BE CONSTRUCTED
SIMULTANEOUSLY TO ALLOW FOR CONTINUOUS ACCESS TO
OFFICES BEYOND.
• NEW FLOORING AND WALL BASE IN ROOM 2050 (WAITING)
SHALL BE COMPLETED PRIOR TO SET UP OF TEMPORARY
CORRIDOR AND ITS ASSOCIATED SYSTEMS.
• LOCATE AND INSTALL EQUIPMENT AS SHOWN ON SHEET Q102.
• WORK ASSOCIATED WITH EXISTING SHOWER/EYE WASH AREA
AND NEW WATER PURIFICATION SYSTEM LOCATION SHALL BE
PHASED TO MINIMIZE 'DOWN TIME' FOR PURIFICATION SYSTEM
AND NEED FOR TEMPORARY EYEWASH/SHOWER.
PHASE 1 - BLOOD DRAW, DRUG SCREENING, SPECIMEN PROCESSING,
FRIDGE FARM, & DROP-OFF
• RELOCATE EQUIPMENT AS SHOWN ON SHEET Q111; PROVIDE
TEMPORARY POWER, AIR, WATER, ETC. AS REQ'D FOR
TEMPORARY EQUIPMENT FUNCTION.
• DEMOLISH AND CONSTRUCT NEW AS SHOWN ON PHASE 1 PLANS
FOR ALL DISCIPLINES.
• WORK REQUIRED FOR NEW DOOR 'C1', ADJACENT
CIRCULATION AREAS, AND ROOMS 2046 (DROP-OFF) AND 2048
(CLEAN SUPPLY) SHALL BE COMPLETED AS EARLY WITHIN THIS
PHASE AS POSSIBLE TO MINIMIZE THE AMOUNT OF TIME THE
TEMPORARY CORRIDOR IS REQUIRED.
• LOCATE AND INSTALL EQUIPMENT AS SHOWN ON SHEET Q112.
• TEMPORARY BLOOD DRAW SHALL BE SET UP IN ROOM 2050
(WAITING) FOR THIS PHASE. TEMPORARY WAITING SHALL BE
SHARED WITH THE RADIOLOGY WAITING ROOM DIRECTLY SOUTH
FROM THE ELEVATOR. TEMPORARY EMPLOYEE DRUG SCREENING
SHALL OCCUR IN ROOM 1036. TEMPORARY LAB SPECIMEN
PROCESSING WILL OCCUR IN ROOM 2047 (RECEPTION).
PHASE 2 - RECEPTION & WEST BENCH LINE
• RELOCATE EQUIPMENT AS SHOWN ON SHEET Q121; PROVIDE
TEMPORARY POWER, AIR, WATER, ETC. AS REQ'D FOR
TEMPORARY EQUIPMENT FUNCTION.
• DEMOLISH AND CONSTRUCT NEW AS SHOWN ON PHASE 2 PLANS
FOR ALL DISCIPLINES.
• LOCATE AND INSTALL EQUIPMENT AS SHOWN ON SHEET Q122.
• TEMPORARY RECEPTION SHALL BE SET UP IN ROOM 2050
(WAITING) FOR THIS PHASE. TEMPORARY WAITING SHALL REMAIN
AS IN PHASE 1.
PHASE 3 - URINALYSIS BENCH LINE
• RELOCATE EQUIPMENT AS SHOWN ON SHEET Q131; PROVIDE
TEMPORARY POWER, AIR, WATER, ETC. AS REQ'D FOR
TEMPORARY EQUIPMENT FUNCTION.
• DEMOLISH AND CONSTRUCT NEW AS SHOWN ON PHASE 3 PLANS
FOR ALL DISCIPLINES.
• LOCATE AND INSTALL EQUIPMENT AS SHOWN ON SHEET Q132.
PHASE 4 - HEMATOLOGY BENCH LINE
• RELOCATE EQUIPMENT AS SHOWN ON SHEET Q141; PROVIDE
TEMPORARY POWER, AIR, WATER, ETC. AS REQ'D FOR
TEMPORARY EQUIPMENT FUNCTION.
• DEMOLISH AND CONSTRUCT NEW AS SHOWN ON PHASE 4 PLANS
FOR ALL DISCIPLINES.
• LOCATE AND INSTALL EQUIPMENT AS SHOWN ON SHEET Q142.
PHASE 5 - 'FLOATING' BENCH LINE
• RELOCATE EQUIPMENT AS SHOWN ON SHEET Q151; PROVIDE
TEMPORARY POWER, AIR, WATER, ETC. AS REQ'D FOR
TEMPORARY EQUIPMENT FUNCTION.
• DEMOLISH AND CONSTRUCT NEW AS SHOWN ON PHASE 5 PLANS
FOR ALL DISCIPLINES.
• LOCATE AND INSTALL EQUIPMENT AS SHOWN ON SHEET Q152.
PHASE 6 - SIEMENS ATELLICA & APTIO SYSTEM
• DEMOLISH AND CONSTRUCT NEW AS SHOWN ON PHASE 6 PLANS
FOR ALL DISCIPLINES.
• LOCATE AND INSTALL EQUIPMENT AS SHOWN ON SHEET Q162.
13890 Bishops Drive.
Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
B
IM
T om ah
R ep la ce
C he m ic al A na ly ze r/
4_ T om ah
R ep la ce
C he m ic al A na ly ze r.
rv t
/2
2/
:5 6:
P
M
G003
GENERAL PHASING DIAGRAMS,
NOTES, AND NARRATIVEOTIE
1033 N. Mayfair Rd. Suite 200
Milwaukee, WI 53226
REPLACE CHEMICAL ANALYZER
500 E VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 KS TMO, ATF
BID DOCUMENTS
FULLY SPRINKLERED
21014
1/8" = 1'-0"
SECOND FLOOR PHASING DIAGRAM - NEW
1/8" = 1'-0"
SECOND FLOOR PHASING DIAGRAM - EXISTING
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
1. BUILDING TO REMAIN IN OPERATION DURING CONSTRUCTION.
CONTRACTOR TO MAINTAIN ACCESS TO ENTRIES UNLESS
OTHERWISE COORDINATED WITH THE VA.
2. DUE TO LIMITED AREA WITHIN FENCE CONSTRUCTION SITE, ALL
ON-SITE STORAGE OF NEW MATERIALS AND CONSTRUCTION
EQUIPMENT SHALL BE SHORT-TERM AND COORDINATED BY THE
CONTRACTOR AND THE VA.
3. ALL DAILY ON-SITE CONSTRUCTION TRAFFIC AND PARKING SHALL
BE COORDINATED WITH VA. HOSPITAL PERSONNEL SHALL
MAINTAIN CONTROL OF PRIME PARKING AREAS.
4. AREA OUTSIDE OF THE CONSTRUCTION FENCE IS TO BE KEPT
CLEAR OF ALL CONSTRUCTION MATERIALS AND EQUIPMENT AND
REMAIN SAFE FOR VA USE (TYPICAL).
5. CONTRACTOR TO PROVIDE STEEL ROAD PLATES OVER EXISTING
UNDERGROUND PASSAGES AND UTILITY TUNNELS FOR ALL
EQUIPMENT EXCEEDING 50,000# LOAD. PLATES SHALL EXTEND A
MINIMUM OF 1 FOOT PAST THE EDGE OF TUNNELS AND BE
SECURED AGAINST UPLIFT. PROVIDE STAMPED STRUCTURAL
CALCULATIONS VERIFYING PLATE STRENGTH AS RELATED TO THE
PROPOSED EQUIPMENT LOAD.
6. PROVIDE TEMPORARY CONSTRUCTION FENCE AROUND
DUMPSTER AND STAGING AREA. COORDINATE EXACT LOCATION,
SIZE AND DURATIONS WITH THE VA. AT PROJECT COMPLETION,
ALL TEMPORARY FENCING AND ALL RELATED ITEMS ARE TO BE
REMOVED FROM THE SITE, ALONG WITH ALL CONSTRUCTION
DEBRIS AND DUMPSTERS. ASPHALT PAVING, CONCRETE CURBS,
CONCRETE SIDEWALKS, AND ANY OTHER SITE SURFACES OR
AMENITIES DAMAGED DURING DEMOLITION/CONSTRUCTION ARE
TO BE REPLACED TO THE VA’S SATISFACTION AT THE
CONTRACTOR’S OWN EXPENSE.
7. TEMPORARY CONSTRUCTION FENCE SHALL BE CHAIN LINK. SEE
DETAIL THIS SHEET. PROVIDE PERSONNEL AND EQUIPMENT
GATES WITH LOCKING STRONG ARM AS NEEDED.
8. PROVIDE CONSTRUCTION SIGNAGE AS REQ'D BY SPECS.
GENERAL NOTES - SITE & STAGING PLAN
BLDG 400
EXISTING ENCLOSED WALKWAY
EXISTING PATIENT
& STAFF PARKING
PATIENT
ENTRANCE &
DROPOFF
PROPOSED CONTRACTOR
ACCESS; CONTINUES TO STAIR S7
EXISTING AHU
EXISTING SIDEWALK
& CURB, TYP
1 2
EXISTING DELIVERY ENTRANCE;
FOR LIMITED USE WITH VA
APPROVAL ONLY
S E
E K
E Y
N O
T E
A
S R
E Q
'D
2'
M
IN
1 2
CHAIN LINK
FENCE POST CAP
CHAIN LINK FENCE FRAME
AND FEET, 1.25" OD, HOT
DIPPED GALV STL TUBE,
FULLY WELDED
10 GA. MIN STL WIRE
MESH, 2" MIN OPENING
CONNECT WIRE MESH
TO TENSION BAR AND
CLAMP BAR TO FRAME
BY TENSION BANDS
PROVIDE (4) SANDBAGS
PER POST MIN
10'-0" O.C MAX
7' -0
M
IN
LOCKING STRONG ARM
GATE LATCH; PROVIDE
AT ALL GATES IN
CONSTRUCTION FENCE
GATE HINGES AS
REQUIRED
FENCEGATE
3' -0
M
O U
N T
T O
C O
N S
T R
. F E
N C
E 3'
-0
4'-0"
EXT GRADE FACE PANEL, ALUM SKIN
LAMINATED TO WOOD CORE. CORE
EDGES PHYSICALLY SEALED
NOTES:
1. BASIS OF DESIGN FOR THIS SIGN IS VA
SPECIALITY SIGN SP-24.04. REFER TO VA
SIGNAGE DESIGN GUIDE.
2. SIGN TO BE ATTACHED TO CONSTRUCTION
FENCE POSTS.
3. ALL VISIBLE SURFACES SHALL BE PRIMED AND
PAINTED U.N.O.
4. CONTRACTOR SHALL LOCATE SIGN AS REQ'D BY
COR. SIGN SHALL BE REMOVED AND/OR
RELOCATED AS REQ'D BY COR.
2" 9"
1/
2"
1/ 2"
CHANGEABLE NUMBERS. CONTRACTOR
TO UPDATE NUMBERS ON A DAILY BASIS
2"
KEYNOTES - SITE & STAGING PLAN
1 APPROXIMATE PROPOSED CONTRACTOR LAY-DOWN AREA. MAINTAIN
REQUIRED EGRESS PATH AND CLEARANCE FOR SNOW PLOW BETWEEN
LAYDOWN AND EXISTING BUILDING-ADJACENT SIDEWALK/CURB TO
SOUTH. SEE GENERAL NOTES AND DETAILS THIS SHEET FOR FENCING
REQUIREMENTS.
2 PROPOSED CONTRACTOR DUMPSTER LOCATION
3 PROPOSED CONTRACTOR CRANE LOCATION
13890 Bishops Drive.
Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
B
IM
T om ah
R ep la ce
C he m ic al A na ly ze r/
4_ T om ah
R ep la ce
C he m ic al A na ly ze r.
rv t
/2
2/
:5 6:
P
M
G004
EXISTING SITE AND STAGING
PLANOTIE
1033 N. Mayfair Rd. Suite 200
Milwaukee, WI 53226
REPLACE CHEMICAL ANALYZER
500 E VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 KS TMO, ATF
BID DOCUMENTS
FULLY SPRINKLERED
21014
0' 4' 8' 16'
NORTH
1" = 20'-0"
SITE PLAN, ARCHITECTURAL
1/2" = 1'-0"
CONSTRUCTION FENCE DETAIL
3/4" = 1'-0"
CONSTRUCTION SIGN DETAIL
AREA OF WORK
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
A A
U.T.C.
U.T.C.
N O
B
LO
CK
S
AR
EA
No blocks
No blocks
FIRE BARRIER, 2 HR
BUILDING EXIT
COMMON PATH OF EGRESS TRAVEL
EGRESS WIDTH TAG
EXIT ACCESS CORRIDOR
LEGEND - LIFE SAFETY PLAN
EXIT ACCESS TRAVEL DISTANCE
ROOM TAG WITH OCCUPANT LOAD
ROOM NAME
AREA
OCCU TYPE - LOAD
42"
SMOKE PARTITION PER IBC 710 & NFPA 101 8.4
FE
FEC
FIRE EXTINGUISHER, WALL MOUNTED
FIRE EXTINGUISHER CABINET
KEY PLAN - NTS
NORTH
BUILDING 400
AREA OF
WORK
B C D E
F
A x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH xC.8 x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
1.5
BLOOD
DRAW
BLOOD
DRAW
BLOOD
DRAW
BLOOD
DRAW
DRUG TEST
WRK
DRUG TEST
TLT
RECEIVING
SPECIMEN
TLT SPECIMEN
TLT
NON-LAB
STAFF RM
OFFICE
STAFF TLT
RECEPTION
CLEAN
STORAGE
DROP OFF
STORAGE
SOILED
UTILITY
STAIR #7STAIR #8
PATH A
P A
T H
A
34"
34"
LABORATORY SUITE
APPROX. 3300 SF
P A
T H
OFFICE SUITE
APPROX. 1590 SF
FE
FE
F E
C
BLOOD
DRAW
WAITING
OFFICE
OFFICE
FRIDGE
STOR
CLINICAL
LABORATORY
SPECIMEN
PROC
S7 S2
'-6
6215 SF
AREA OF WORK
13890 Bishops Drive.
Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
B
IM
T om ah
R ep la ce
C he m ic al A na ly ze r/
4_ T om ah
R ep la ce
C he m ic al A na ly ze r.
rv t
/2
2/
:5 7:
P
M
G102
SECOND FLOOR PLAN, LIFE
SAFETYOTIE
1033 N. Mayfair Rd. Suite 200
Milwaukee, WI 53226
REPLACE CHEMICAL ANALYZER
500 E VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 KS TMO, ATF
BID DOCUMENTS
FULLY SPRINKLERED
21014
OCCUPANCY BY AREA PER IBC TABLE 1014.1.2 / NFPA 101 TABLE 7.3.1.2
AREA OCCUPANCY
PERSONS
NAME SF TYPE FUNCTION LOAD FACTOR
BUSINESS
AREA OF WORK 6215 SF BUSINESS BUSINESS 150 42
6215 SF 42
COMMON PATH OF TRAVEL
PATH 1
64'-4"
EXIT DISTANCE
PATH A
214'-5"
PROVIDED EGRESS WIDTH
DOOR NO. EGRESS WIDTH
S2 34" S7 34" Total Provided Egress Width 68"
1/8" = 1'-0"
SECOND FLOOR PLAN, LIFE SAFETY 0' 4' 8' 16'
NORTH
1" = 20'-0"
SECOND FLOOR PLAN, OCCUPANCY
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
B C D E F
A x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
1.5
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
EXAM. ISO
OFFICE, R.N.EXAMEXAM
OFFICE, R.N.
EXAM INTERVIEW
OMNI CELL
CLEAN
STOR
SOILED UTIL
STAFF/PT.
TLT
NURSE
STATION
OFFICE,
PROVIDER
OFFICE,
PROVIDER
PHASE '0'
PHASE 2
PHASE 1
PHASE 1
PHASE 1
PHASE 5
PHASE 5
PHASE 1
LEGEND - DEMOLITION PLAN
EXISTING ELEMENT TO BE REMOVED
EXISTING ELEMENT TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVED
EXISTING DOOR TO REMAIN
INFECTION CONTROL CONSTRUCTION BARRIER - SEE
SHEET G002 FOR DETAILS. PROVIDE STARC SYSTEMS
FIREBLOCKWALL SYSTEM BARRIERS OR VA & ARCHITECT
APPROVED EQUAL.
TEMPORARY CORRIDOR PARTITION
EXISTING DOOR FROM PREVIOUS
CONSTRUCTION PHASE TO REMAIN
A. EXISTING BUILDING PLANS HAVE BEEN SHOWN ACCORDING TO
ORIGINAL BUILDING PLANS AND FIELD NOTES AND MEASUREMENTS.
EXISTING CONDITIONS AND DIMENSIONS SHALL BE FIELD VERIFIED BY
CONTRACTORS AND DISCREPANCIES REPORTED TO THE COR AND
ARCHITECT PRIOR TO FRAMING.
B. CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING
BUILDING AMENITIES NOT SLATED FOR DEMOLITION OR REMODELING.
EXISTING WALLS, PARTITIONS, FLOOR LINES AND DOORS AND FRAMES
THAT REMAIN ARE SHOWN IN CONTINUOUS LINE WEIGHT. THESE AND
EXISTING FLOOR AND WALL FINISHES THAT ARE SCHEDULED TO
REMAIN SHALL BE PROTECTED FROM DAMAGE DURING DEMOLITION
AND CONSTRUCTION. ANY SUCH EXISTING CONDITIONS WHICH ARE
DAMAGED OR BECOME UNSTABLE DUE TO OTHER DEMOLITION SHALL
BE REPLACED AT NO COST TO VA WITH NEW CONSTRUCTION TO
MATCH.
C. ALL EXISTING WALLS, PATCH FLUSH TO REPAIR EXISTING HOLES,
DAMAGED AREAS AND WHERE WALLS WERE PREVIOUSLY REMOVED,
OR UTILITY MODIFICATIONS WERE PERFORMED. PROVIDE NEW
FINISHES PER SCHEDULE. PATCH AND REPAIR EXISTING WALLS TO
REMAIN TO PROVIDE A SUITABLE SURFACE FOR NEW FINISHES.
D. GC SHALL PROVIDE AND MAINTAIN APPROPRIATE BARRICADES AND
SAFETY MEASURES IN AREAS OF CONSTRUCTION AT ALL TIMES.
E. ALL CUTTING AND PATCHING SHALL BE THE RESPONSIBILITY OF EACH
SUBCONTRACTOR UNLESS OTHERWISE STIPULATED BY OR
ARRANGED WITH THE GC.
F. PROVIDE GYPSUM BOARD CONTROL JOINTS AT ALL LOCATIONS
WHERE NEW WALL SURFACE MEETS EXISTING TO REMAIN.
G. ALL DIMENSIONS NOTED TO BE VERIFIED SHALL BE VERIFIED ON SITE
BY THE CONTRACTOR AND REPORTED TO THE COR AND ARCHITECT
FOR CONFIRMATION PRIOR TO FRAMING OF WALLS.
H. DIMENSIONS NOTED AS CLEAR OR CL'R ARE FINAL FINISHED WALL
SURFACE TO FINAL FINISHED WALL SURFACE, SEE FINISH SCHEDULE
AND VERIFY FINAL FINISH OF WALL PRIOR TO FRAMING.
I. REMOVE EXISTING FLOOR FINISHES SLATED FOR DEMOLITION TO SUB
FLOOR AND PREPARE FOR NEW FINISHES.
J. SALVAGE EXISTING DOORS AND HARDWARE FOR REUSE, RETURN
EXCESS DOORS AND HARDWARE TO VA.
K. SALVAGE EXISTING CASEWORK FOR REUSE, RETURN EXCESS
CASEWORK TO VA.
L. SALVAGE EXISTING PLUMBING FIXTURES FOR REUSE, RETURN
EXCESS FIXTURES TO VA.
M. SALVAGE EXISTING LIFE SAFETY EQUIPMENT, FIRE EXTINGUISHERS,
EXIT SIGNS, ETC. FOR REUSE, RETURN EXCESS EQUIPMENT TO VA.
N. REFER TO SHEET G003 FOR ADDITIONAL PHASING INFORMATION AND
REQUIREMENTS.
GENERAL NOTES - ARCHITECTURAL DEMOLITION PLAN
KEY PLAN - NTS
NORTH
BUILDING 400
AREA OF
WORK
1/4" = 1'-0"
FIRST FLOOR PLAN, ARCHITECTURAL DEMOLITION
NORTH
KEYNOTES - ARCHITECTURAL DEMOLITION PLAN
1 DEMOLISH EXISTING CEILING SYSTEM THIS AREA AS NEEDED TO
PERFORM ABOVE-CEILING WORK FOR FLOOR ABOVE. SEE PLUMBING
DWGS FOR DETAILS. SALVAGE ALL EXISTING CEILING-MOUNTED ITEMS
FOR REINSTALLATION. COORDINATE ABOVE-CEILING WORK WITH
PHASED WORK ON FLOOR ABOVE.
13890 Bishops Drive.
Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
B
IM
T om ah
R ep la ce
C he m ic al A na ly ze r/
4_ T om ah
R ep la ce
C he m ic al A na ly ze r.
rv t
/2
2/
:5 7:
P
M
AD101
FIRST FLOOR PLAN,
ARCHITECTURAL DEMOLITIONOTIE
1033 N. Mayfair Rd. Suite 200
Milwaukee, WI 53226
REPLACE CHEMICAL ANALYZER
500 E VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 KS TMO, ATF
BID DOCUMENTS
FULLY SPRINKLERED
21014
0' 4' 8' 16'
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
LEGEND - DEMOLITION PLAN
EXISTING ELEMENT TO BE REMOVED
EXISTING ELEMENT TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVED
EXISTING DOOR TO REMAIN
INFECTION CONTROL CONSTRUCTION BARRIER - SEE
SHEET G002 FOR DETAILS. PROVIDE STARC SYSTEMS
FIREBLOCKWALL SYSTEM BARRIERS OR VA & ARCHITECT
APPROVED EQUAL.
TEMPORARY CORRIDOR PARTITION
EXISTING DOOR FROM PREVIOUS
CONSTRUCTION PHASE TO REMAIN
A. EXISTING BUILDING PLANS HAVE BEEN SHOWN ACCORDING TO
ORIGINAL BUILDING PLANS AND FIELD NOTES AND MEASUREMENTS.
EXISTING CONDITIONS AND DIMENSIONS SHALL BE FIELD VERIFIED BY
CONTRACTORS AND DISCREPANCIES REPORTED TO THE COR AND
ARCHITECT PRIOR TO FRAMING.
B. CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING
BUILDING AMENITIES NOT SLATED FOR DEMOLITION OR REMODELING.
EXISTING WALLS, PARTITIONS, FLOOR LINES AND DOORS AND FRAMES
THAT REMAIN ARE SHOWN IN CONTINUOUS LINE WEIGHT. THESE AND
EXISTING FLOOR AND WALL FINISHES THAT ARE SCHEDULED TO
REMAIN SHALL BE PROTECTED FROM DAMAGE DURING DEMOLITION
AND CONSTRUCTION. ANY SUCH EXISTING CONDITIONS WHICH ARE
DAMAGED OR BECOME UNSTABLE DUE TO OTHER DEMOLITION SHALL
BE REPLACED AT NO COST TO VA WITH NEW CONSTRUCTION TO
MATCH.
C. ALL EXISTING WALLS, PATCH FLUSH TO REPAIR EXISTING HOLES,
DAMAGED AREAS AND WHERE WALLS WERE PREVIOUSLY REMOVED,
OR UTILITY MODIFICATIONS WERE PERFORMED. PROVIDE NEW
FINISHES PER SCHEDULE. PATCH AND REPAIR EXISTING WALLS TO
REMAIN TO PROVIDE A SUITABLE SURFACE FOR NEW FINISHES.
D. GC SHALL PROVIDE AND MAINTAIN APPROPRIATE BARRICADES AND
SAFETY MEASURES IN AREAS OF CONSTRUCTION AT ALL TIMES.
E. ALL CUTTING AND PATCHING SHALL BE THE RESPONSIBILITY OF EACH
SUBCONTRACTOR UNLESS OTHERWISE STIPULATED BY OR
ARRANGED WITH THE GC.
F. PROVIDE GYPSUM BOARD CONTROL JOINTS AT ALL LOCATIONS
WHERE NEW WALL SURFACE MEETS EXISTING TO REMAIN.
G. ALL DIMENSIONS NOTED TO BE VERIFIED SHALL BE VERIFIED ON SITE
BY THE CONTRACTOR AND REPORTED TO THE COR AND ARCHITECT
FOR CONFIRMATION PRIOR TO FRAMING OF WALLS.
H. DIMENSIONS NOTED AS CLEAR OR CL'R ARE FINAL FINISHED WALL
SURFACE TO FINAL FINISHED WALL SURFACE, SEE FINISH SCHEDULE
AND VERIFY FINAL FINISH OF WALL PRIOR TO FRAMING.
I. REMOVE EXISTING FLOOR FINISHES SLATED FOR DEMOLITION TO SUB
FLOOR AND PREPARE FOR NEW FINISHES.
J. SALVAGE EXISTING DOORS AND HARDWARE FOR REUSE, RETURN
EXCESS DOORS AND HARDWARE TO VA.
K. SALVAGE EXISTING CASEWORK FOR REUSE, RETURN EXCESS
CASEWORK TO VA.
L. SALVAGE EXISTING PLUMBING FIXTURES FOR REUSE, RETURN
EXCESS FIXTURES TO VA.
M. SALVAGE EXISTING LIFE SAFETY EQUIPMENT, FIRE EXTINGUISHERS,
EXIT SIGNS, ETC. FOR REUSE, RETURN EXCESS EQUIPMENT TO VA.
N. REFER TO SHEET G003 FOR ADDITIONAL PHASING INFORMATION AND
REQUIREMENTS.
GENERAL NOTES - ARCHITECTURAL DEMOLITION PLAN
KEY PLAN - NTS
NORTH
BUILDING 400
AREA OF
WORK
B C D E F
A x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
1.5
'-4
4'-7 1/2" 6'-7"
CLINICAL
LABORATORY
OFFICE
2055B
CLEAN
WORK RM
OFFICE
OFFICE
WAITING
CLEAN
SUPPLY
WARD
DROP
BLOOD
DRAW
BLOOD
DRAW
BLOOD
DRAW
SPECIMEN
TLT
SPECIMEN
TLT
DRUG
TEST
DRUG TEST
TLT
STORAGE
SPECIMEN
PROC
CORRIDOR
SOILED
UTILITY
STAFF TLT
CORRIDOR
STAIR
STAIR #7
6'-0" CLR
B C D E F
A x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
1.5
3 3
33 3333
8 8 8
RECEPTION
WAITING
OFFICE
2055B
CLEAN
WORK RM
OFFICE
OFFICE
STAIR #7
SOILED
UTILITY
2055C
SPECIMEN
TLT
2049F SPECIMEN
TLT
2049G
CLINICAL
LABORATORY
6'-0" CLR
B C D E F
A x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
1.5
1'-5"
2'-10"
2' -8
CLINICAL
LABORATORY
FRIDGE
STORAGE
SOILED
UTILITY
2055C
RECEIVING
2055D
STORAGE
2055E
DRUG TEST
TLT
2049I
DRUG TEST
2049H
BLOOD
DRAW
BLOOD
DRAW
2049D
BLOOD
DRAW
2049B
BLOOD
DRAW
2049A
BLOOD
DRAW
2049C
SPECIMEN
TLT
2049F SPECIMEN
TLT
2049G
WAITING
CLEAN
SUPPLY
DROP OFF
OFFICE
OFFICE
CLEAN
WORK RM
2056 OFFICE
2055B
STAFF TLT
CORRIDOR
SPECIMEN
PROCESSING
STAIR #8
S8
STAIR #7
S7
B C D E F
A x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
1.5
BLOOD
DRAW
2049A
BLOOD
DRAW
2049C
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
DRUG TEST
TLT
2049I
STORAGE
2055E RECEIVING
2055D
SOILED
UTILITY
2055C
BLOOD
DRAW
2049D
DRUG TEST
2049H
BLOOD
DRAW
BLOOD
DRAW
2049B
WAITING
RECEPTION
STORAGE
2047A
STAFF TLT
2051OFFICE
OFFICE
CLEAN
WORK RM
2056 OFFICE
2055B
CLINICAL
LABORATORY
SPECIMEN
PROCESSING
FRIDGE
STORAGE
CLEAN
SUPPLY
DROP OFF
STAIR #8
S8
STAIR #7
S7
NORTH
KEYNOTES - ARCHITECTURAL DEMOLITION PLAN
1 DEMOLISH EXISTING CASEWORK
2 DEMOLISH EXISTING DOOR AND FRAME
3 DEMOLISH EXISTING SYSTEMS FURNITURE
4 DEMOLISH EXISTING PLUMBING FIXTURE. SEE PLUMBING DWGS
5 DEMOLISH EXISTING OVERHEAD PULL-DOWN SECURITY GRILLE
6 DEMOLISH EXISTING WINDOW
7 DEMOLISH EXISTING SIDELITE
8 DEMOLISH EXISTING GYPSUM BD & STUD FRAMING AS NEEDED TO
PERFORM IN-WALL DEMOLITION AND NEW WORK. COORDINATE EXTENTS
WITH MECHANICAL, ELECTRICAL, PLUMBING, AND TECHNOLOGY
DRAWINGS.
9 SALVAGE AND PROTECT EXISTING WATER PURIFICATION SYSTEM AND
TANKS FOR REINSTALLATION.
10 DEMOLISH EXISTING FLOORING AND WALL BASE. PREP STRUCTURAL SLAB
FOR NEW FLOORING.
13890 Bishops Drive.
Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
B
IM
T om ah
R ep la ce
C he m ic al A na ly ze r/
4_ T om ah
R ep la ce
C he m ic al A na ly ze r.
rv t
/2
2/
:5 7:
P
M
AD102
SECOND FLOOR PLAN, ARCH.
DEMO, PHASES 0-3OTIE
1033 N. Mayfair Rd. Suite 200
Milwaukee, WI 53226
REPLACE CHEMICAL ANALYZER
500 E VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 KS TMO, ATF
BID DOCUMENTS
FULLY SPRINKLERED
21014
0' 4' 8' 16'
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, ARCHITECTURAL - PHASE 0
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, ARCHITECTURAL - PHASE 1
NORTH
0' 4' 8' 16'
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, ARCHITECTURAL - PHASE 2
NORTH
0' 4' 8' 16'
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, ARCHITECTURAL - PHASE 3
NORTH
0' 4' 8' 16'
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
LEGEND - DEMOLITION PLAN
EXISTING ELEMENT TO BE REMOVED
EXISTING ELEMENT TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVED
EXISTING DOOR TO REMAIN
INFECTION CONTROL CONSTRUCTION BARRIER - SEE
SHEET G002 FOR DETAILS. PROVIDE STARC SYSTEMS
FIREBLOCKWALL SYSTEM BARRIERS OR VA & ARCHITECT
APPROVED EQUAL.
TEMPORARY CORRIDOR PARTITION
EXISTING DOOR FROM PREVIOUS
CONSTRUCTION PHASE TO REMAIN
A. EXISTING BUILDING PLANS HAVE BEEN SHOWN ACCORDING TO
ORIGINAL BUILDING PLANS AND FIELD NOTES AND MEASUREMENTS.
EXISTING CONDITIONS AND DIMENSIONS SHALL BE FIELD VERIFIED BY
CONTRACTORS AND DISCREPANCIES REPORTED TO THE COR AND
ARCHITECT PRIOR TO FRAMING.
B. CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING
BUILDING AMENITIES NOT SLATED FOR DEMOLITION OR REMODELING.
EXISTING WALLS, PARTITIONS, FLOOR LINES AND DOORS AND FRAMES
THAT REMAIN ARE SHOWN IN CONTINUOUS LINE WEIGHT. THESE AND
EXISTING FLOOR AND WALL FINISHES THAT ARE SCHEDULED TO
REMAIN SHALL BE PROTECTED FROM DAMAGE DURING DEMOLITION
AND CONSTRUCTION. ANY SUCH EXISTING CONDITIONS WHICH ARE
DAMAGED OR BECOME UNSTABLE DUE TO OTHER DEMOLITION SHALL
BE REPLACED AT NO COST TO VA WITH NEW CONSTRUCTION TO
MATCH.
C. ALL EXISTING WALLS, PATCH FLUSH TO REPAIR EXISTING HOLES,
DAMAGED AREAS AND WHERE WALLS WERE PREVIOUSLY REMOVED,
OR UTILITY MODIFICATIONS WERE PERFORMED. PROVIDE NEW
FINISHES PER SCHEDULE. PATCH AND REPAIR EXISTING WALLS TO
REMAIN TO PROVIDE A SUITABLE SURFACE FOR NEW FINISHES.
D. GC SHALL PROVIDE AND MAINTAIN APPROPRIATE BARRICADES AND
SAFETY MEASURES IN AREAS OF CONSTRUCTION AT ALL TIMES.
E. ALL CUTTING AND PATCHING SHALL BE THE RESPONSIBILITY OF EACH
SUBCONTRACTOR UNLESS OTHERWISE STIPULATED BY OR
ARRANGED WITH THE GC.
F. PROVIDE GYPSUM BOARD CONTROL JOINTS AT ALL LOCATIONS
WHERE NEW WALL SURFACE MEETS EXISTING TO REMAIN.
G. ALL DIMENSIONS NOTED TO BE VERIFIED SHALL BE VERIFIED ON SITE
BY THE CONTRACTOR AND REPORTED TO THE COR AND ARCHITECT
FOR CONFIRMATION PRIOR TO FRAMING OF WALLS.
H. DIMENSIONS NOTED AS CLEAR OR CL'R ARE FINAL FINISHED WALL
SURFACE TO FINAL FINISHED WALL SURFACE, SEE FINISH SCHEDULE
AND VERIFY FINAL FINISH OF WALL PRIOR TO FRAMING.
I. REMOVE EXISTING FLOOR FINISHES SLATED FOR DEMOLITION TO SUB
FLOOR AND PREPARE FOR NEW FINISHES.
J. SALVAGE EXISTING DOORS AND HARDWARE FOR REUSE, RETURN
EXCESS DOORS AND HARDWARE TO VA.
K. SALVAGE EXISTING CASEWORK FOR REUSE, RETURN EXCESS
CASEWORK TO VA.
L. SALVAGE EXISTING PLUMBING FIXTURES FOR REUSE, RETURN
EXCESS FIXTURES TO VA.
M. SALVAGE EXISTING LIFE SAFETY EQUIPMENT, FIRE EXTINGUISHERS,
EXIT SIGNS, ETC. FOR REUSE, RETURN EXCESS EQUIPMENT TO VA.
N. REFER TO SHEET G003 FOR ADDITIONAL PHASING INFORMATION AND
REQUIREMENTS.
GENERAL NOTES - ARCHITECTURAL DEMOLITION PLAN
KEY PLAN - NTS
NORTH
BUILDING 400
AREA OF
WORK
B C D E F
A x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
1.5
2' -1
0" 1'
-6
'-2
12'-0"
13'-1"
STAIR #7
S7
OFFICE
2055B
SOILED
UTILITY
2055C
OFFICE
OFFICE
CLEAN
WORK RM
RECEPTION
WAITING
BLOOD
DRAW
DRUG TEST
2049H STORAGE
2055E
STAIR #8
S8
FRIDGE
STORAGE
RECEIVING
2055D
SPECIMEN
PROCESSING
DROP OFF
CLEAN
SUPPLY
STAFF TLT
CORRIDOR
CLINICAL
LABORATORY
BLOOD
DRAW
2049B
BLOOD
DRAW
2049D
BLOOD
DRAW
2049A
BLOOD
DRAW
2049C
SPECIMEN
TLT
2049F SPECIMEN
TLT
2049G
DRUG TEST
TLT
2049I
STORAGE
2047A
B C D E F
A x1 x2 x3 x4 xC xDxBxA xC.5 xE xF xG xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5
1.5
OFFICE
2055B
SOILED
UTILITY
2055C
OFFICE
OFFICE
CLEAN
WORK RM
RECEPTION
WAITING
BLOOD
DRAW
DRUG TEST
2049H STORAGE
2055E
FRIDGE
STORAGE
RECEIVING
2055D
SPECIMEN
PROCESSING
DROP OFF
CLEAN
SUPPLY
STAFF TLT
CORRIDOR
STORAGE
2047A
STAIR #8
S8
DRUG TEST
TLT
2049I
BLOOD
DRAW
2049D
BLOOD
DRAW
2049B
BLOOD
DRAW
2049A
BLOOD
DRAW
2049C
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
CLINICAL
LABORATORY
B C D E F
A x1 x2 x3 x4 xC xC xD xD xB xB xA xA xC.5 xE xF xG xG xH xH x4.3 x3.4 x2.8 x2.1 x1.8 x1.1 x5x5
1.5
NON-LAB
STAFF RM
2056 OFFICE
2055B
OFFICE
OFFICE
WAITING
STAFF TLT
STORAGE
2047A
SPECIMEN
PROC
SPECIMEN
TLT
2049F
SPECIMEN
TLT
2049G
BLOOD
DRAW
2049C
BLOOD
DRAW
2049A
BLOOD
DRAW
2049B
BLOOD
DRAW
2049D
DRUG TEST
WRK
2049H
DRUG TEST
TLT
2049I
STORAGE
2055E RECEIVING
2055D
SOILED
UTILITY
2055C
FRIDGE
STOR
CLINICAL
LABORATORY
CLEAN
STORAGE
DROP OFF
BLOOD
DRAW
CORRIDOR
KEYNOTES - ARCHITECTURAL DEMOLITION PLAN
1 DEMOLISH EXISTING SYSTEMS FURNITURE
2 DEMOLISH EXISTING CASEWORK
3 DEMOLISH EXISTING PLUMBING FIXTURE. SEE PLUMBING DWGS
4 DEMOLISH EXISTING VERTICAL RACEWAY
13890 Bishops Drive.
Suite 250 Brookfield, WI 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Nagel Architects + Engineers project number:
B
IM
T om ah
R ep la ce
C he m ic al A na ly ze r/
4_ T om ah
R ep la ce
C he m ic al A na ly ze r.
rv t
/2
2/
:5 7:
P
M
AD103
SECOND FLOOR PLAN, ARCH.
DEMO, PHASES 4-6OTIE
1033 N. Mayfair Rd. Suite 200
Milwaukee, WI 53226
REPLACE CHEMICAL ANALYZER
500 E VETERANS STREET, TOMAH, WI 54660
676-20-004
22 DEC 2021 KS TMO, ATF
BID DOCUMENTS
FULLY SPRINKLERED
21014
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, ARCHITECTURAL - PHASE 4
NORTH
0' 4' 8' 16'
NORTH
0' 4' 8' 16'
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, ARCHITECTURAL - PHASE 5
NORTH
0' 4' 8' 16'
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN, ARCHITECTURAL, PHASE 6
Revisions: Date:
SCHEMATIC DESIGN 35% 6 OCT 2021
DESIGN DEVELOPMENT 65% 29 OCT 2021
1. CONTRACTOR SHALL MAINTAIN REQUIRED PATHS OF EGRESS
FROM OCCUPIED AREAS OF EXISTING BUILDING AND AREA OF
WORK AT ALL TIMES.
2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND
CONDITIONS AT THE JOB SITE.
3. CONTRACTOR SHALL MAINTAIN CONTINUOUS UTILITY SERVICE
TO ALL SPACES IN THE BUILDING. ANY DISRUPTION IN SERVICES
SHALL BE COORDINATED WITH THE OWNER.
4. CONTRACTOR SHALL PATCH ALL OPENINGS IN FLOOR, CEILING,
ROOF, AND WALLS WHICH REMAIN AFTER ALTERATIONS TO
BUILDING HAVE BEEN COMPLETED. PATCH TO MATCH EXISTING.
5. CONTRACTOR SHALL MODIFY SPRINKLER HEAD LOCATIONS AS
REQUIRED TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .