This document is a Solicitation (Request for Proposal) for a construction project at the James J. Peters VA Medical Center in Bronx, New York. The project involves upgrading and replacing dumbwaiters in the Operating Room and Pharmacy areas of Building 100, with a total contract value between $1,000,000 and $2,000,000. It is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220, with a size standard of $45 million.
The project requires complete replacement of existing dumbwaiters, including guide rails, motors, controllers, and associated systems, while maintaining existing stainless steel surrounds. Key details include a 270-calendar day performance period from Notice to Proceed, a mandatory pre-bid site visit on 11/04/2025, and bid submissions due by 10:00am EST on 11/24/2025 via email. Bidders must be registered in SAM.gov, verified as an SDVOSB, and comply with specific VA specifications, infection control requirements, and construction regulations. The bid will be opened online via Microsoft Teams, with contractors required to follow strict safety protocols and coordinate work primarily during duty hours.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24226B0003
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C24226B0003 X
526-26-1-5051-0001
526-22-115 36C242 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468-3904 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468-3904 Kurian, Akkil A.
718-526-1000 x 22406 The Contractor shall furnish all materials, supplies, equipment, personnel and supervision for Project 526-22-115 Upgrade OR & Pharmacy Dumbwaiters in accordance with the drawings and specifications at the James J. Peters VAMC Bronx, New York.
Completion Time: 270 Calendar Days from the Notice to Proceed.
This is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set aside procurement.
In order to be eligible for award, Contractor must be registered in SAM (www.sam.gov) with a Unique Entity Identifier and are verified/visible/certified as SDVOSB in the Small Business Search https://search.certifications.sba.gov/ at the time of bid/offer submission and before award of this procurement. Offerors must submit their annual Vets4212 Report. The North American Industry Classification System Code (NAICS) is 236220- Business Size is $45 Million.
Magnitude of Construction: Between $1,000,000 and $2,000,000.
Contractor will be responsible to coordinate and schedule work and shall be expected to plan work typically during duty hours of 8 AM to 4:30 PM eastern time except as noted in the general conditions and as approved by the CO. Work shall comply with VA Specifications and regulations, all applicable Federal, State and Local codes, including specific regulations related to working at the VA Bronx Campus.
A pre-bid site visit is scheduled for Tuesday, 11/04/25 at 10:30am. Prospective bidders shall meet at James J. Peters VAMC, 130 West Kingsbridge Road, Bronx, NY 10468 building 100 and room number GC-100.
NOTE: NO OTHER SITE VISITS WILL BE ALLOWED. INTERESTED BIDDERS ARE STRONGLY ENCOURAGED TO ATTEND.
DURING THIS SITE VISIT HARD HATS AND SAFETY SHOES WILL BE REQUIRED TO GO TO THE SUB-BASEMENT OF THE HOSPITAL.
To preserve the integrity of the procurement process, all questions and request for information must be submitted in writing to Akkil Kurian, akkil.kurian@va.gov. Questions must be received no later than November 6, 2025 at 10:00am.
The bid opening will be held online via Microsoft Teams on 11/24/25 at 10:00am. Details are on page 16. ONLY EMAILED BIDS to akkil.kurian@va.gov will be accepted. The bids shall include copies of the original bid bond. The bid opening shall take place on Monday, 11/24/25 at 10:00am EST.
VAAR 852.219-75 Limitations on Subcontracting Certificate is a separate requirement Attached or Page Numbers 58-60.
FAR 52.225-2 Buy American Act Certificate is a separate requirement attached in the solicitation. The signed certificates must be received with the bid. Include specification 01 32 00 Autodesk Build Contract Management Platform in construction documents. Refer to pages 14-15. Spec 01 32 00 Construction documentation attached.
FAR Part 36.209 Construction contracts with architect-engineer firms. No contract for the construction of a project shall be awarded to Paradigm Engineers and Constructors, PLLC or its subsidiaries or affiliates.
NOTE: CONTRACTORS MUST ACKNOWLEDGE ALL SOLICIATION AMENDMENTS.
x x
52.211-10 X
10 days 10:00am
EST
11-24-2025 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
526-3660162-5051-854200-2670 23NR3BS04
36C242 Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx NY 10468-3904
Tungsten Network http://www.tungsten-network.com/us/en /veterans-affairs
Patricia Cordero Contracting Officer
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 5 |
| 1.1 BID PRICING SHEET | 6 |
| 1.2 STATEMENT OF WORK | 7 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 16 |
| 2.1 BID OPENING INFORMATION | 16 |
| 2.2 Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes: | 16 |
| 2.3 FAR DEVIATION FEB 2025 Instructions: | 17 |
| 2.4 52.216-1 TYPE OF CONTRACT (APR 1984) | 17 |
| 2.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 17 |
| 2.6 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 17 |
| 2.7 52.233-2 SERVICE OF PROTEST (SEP 2006) | 18 |
| 2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 19 |
| 2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 19 |
| 2.10 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 20 |
| 2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 21 |
| REPRESENTATIONS AND CERTIFICATIONS | 22 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025) | 22 |
| 3.2 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023) | 26 |
| 3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 27 |
| 3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 28 |
| GENERAL CONDITIONS | 31 |
| 4.1 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021) | 31 |
| 4.2 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984) | 32 |
| 4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025) | 33 |
| 4.4 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022) | 36 |
| 4.5 52.236-4 PHYSICAL DATA (APR 1984) | 41 |
| 4.6 SUPPLEMENTAL INSURANCE REQUIREMENTS | 41 |
| 4.7 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 42 |
| 4.8 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 45 |
| 4.9 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 45 |
| 4.10 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 45 |
| 4.11 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY (FEB 2023) | 46 |
| 4.12 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018) | 55 |
| 4.13 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 55 |
| 4.14 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 58 |
| 4.15 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899 (DEVIATION)(APR 2025) | 60 |
| 4.16 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 60 |
| 4.17 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 60 |
| 4.18 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 60 |
| 4.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 63 |
| 4.20 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 64 |
| 4.21 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 2019) | 65 |
| 4.22 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 66 |
| 4.23 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 66 |
| 4.24 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 67 |
| 4.25 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 67 |
| 4.26 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 67 |
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
(a) Bidding materials consisting of Invitation for Bids, drawings, specifications and contract forms will be available on https://sam.gov/ in electronic format only by searching for solicitation number 36C24226B0003. All interested parties (subs & primes) should register at https://sam.gov/ as an “Interested Vendor” so that others will know of our interest in participating in this procurement. A Bidder’s mailing list WILL NOT BE prepared by the Contract Specialist. SOLICITATION AMENDMENTS: Amendments to the solicitation will be posted at https://sam.gov/ Paper copies of the amendments will NOT be individually mailed. By registering to “Receive Notification”, you will be notified by e-mail of any new amendments that have been issued and posted. No other notification of amendments will be provided. Bidders are reminded that they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of bids.
(b) If bid exceeds $150,000 a bid bond must be submitted. A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.
(c) If the contract will exceed $150,000 (see FAR 28.102-1 for lesser amount), the bidder to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Specification. Copies of SFs 25 and 25A may be obtained upon application to the issuing office.
(d) If the bid is between $30,000 - $150,000. The bidder to whom award is made will be required to furnish a Payment Bond, Standard Form 25A or alternative payment protection which conforms to the requirements set forth in FAR Clause 52.228-13, Alternative Payment Protections, as noted in the General Conditions of this Specification. Copies of the Standard Form of Payment Bond may be obtained upon application to the Issuing Office.
DESCRIPTION OF WORK: GENERAL CONSTRUCTION: : The Contractor shall furnish all necessary professional Construction services to provide complete scope of work for Project # 526-22-115 Upgrade OR & Pharmacy Dumbwaiters in accordance to the project Statement of Work and specifications for the James J. Peters VA Medical Center in Bronx, New York.
Magnitude of Construction: $1,000,000.00 and $2,000,000.00
1.1 BID PRICING SHEET
IFB No.: 36C24226B0003 Project No.: 526-22-115
Bids providing less that 120 Calendar Days of Government Acceptance after the date bids are due will not be considered and will be rejected.
The bidder agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this bid is accepted by the Government in writing within 120 calendar days after the date bidders are due.
BASE BID
A. ITEM I, GENERAL CONSTRUCTION: BASE BID: Contractor shall furnish all supervision, labor, equipment, and material necessary to replace OR and Pharmacy Dumbwaiters in Building 100 of the James J. Peters VA Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468.
The Contract period of performance for Base Bid construction shall be 270 calendar days from Notice to Proceed (NTP).
Base Bid $ ___________________________
Offers shall provide a complete package to include the completed bid sheet along with the following to be determined responsive, responsible, and considered for award:
o Bid Bond and associated documents on correct forms;
o Acknowledgement of all amendments;
o Completed 52.225-2 Buy America Certificate o Completed 852.219-75 VA Notice of Limitations in Subcontractors Compliance Certificate o Verified/visible/certified on the Small Business Administration Certification (VetCert) of VetBiz (https://veterans.certify.sba.gov); and/or Dynamic Small Business Search (DSBS) SBA - Dynamic Small Business Search o Proof of compliance with VETS 4212 Federal Contractor Reporting.
1.2 STATEMENT OF WORK
STATEMENT OF WORK
UPGRADE OR & PHARMACY DUMBWAITERS
NRM -CONSTRUCTION PROJECT NO. 526-22-115
JAMES J. PETERS VETERANS AFFAIRS MEDICAL CENTER
130 WEST KINGSBRIDGE ROAD, BRONX, NY 10468
This is a construction contract for the James J. Peters Veterans Affairs Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468 to furnish all supervision, labor, equipment, and material necessary to replace OR and Pharmacy Dumbwaiters in Building 100 of the James J. Peters VA Medical Center. All work shall be completed in accordance with all published applicable local/state/federal/national codes, ordinances, and regulations, along with all related VA directives, design guides and manuals, specifications, and standards plus all VA requirements (federal or local) that are project specific to the documented scope of work on this site. VA recommends that prior to bidding, interested Contractors attend the scheduled site visit and meet with the Contracting Officer’s Representative (COR) to better understand the project.
Scope of Work:
Demolish and remove the existing dumbwaiters (simultaneously or in succession per VA directive), including dumbwaiter guide rails, motors, controllers, and all associated items/systems related to the dumbwaiters and in the construction documents. New access panels are to be created and installed for access to the dumbwaiter shafts on certain levels so this will be a part of the demolition process. Existing lights and some fire alarm systems shall be removed during the demolition phase in the 2 shafts for the dumbwaiters. Existing stainless-steel surrounds for the dumbwaiter stop levels are not to be removed or damaged and must be protected during construction. Associated demolition includes finishes, ceilings, lighting, and any structural components necessary to perform the upgrades. No flooring, ceilings, ceiling lights, walls, base or any other portion of the dumbwaiter system outside the shafts are to be touched outside the addition of new controls per level and new dumbwaiter location monitor per level where there are dumbwaiter elevator stops. Any damage to any surface outside the dumbwaiter elevator shaft is to be patched and repaired/replaced by the General Contractor. Movement of construction materials into the building and to the appropriate floor where they will be used is to be confirmed through the VA COR. Drop off points of materials by trucks is to be a “means and methods” decision that the VA COR must confirm and approve. If a dedicated room is needed on the campus for material drop-offs, then such locations must be approved by the VA COR.
Laydown spaces for new materials are to be within the infectious Control walls (workspace) and not in adjoining hallways, rooms or offices. If more space is needed, then confirmation and approval by the VA COR is required to alter the ICRA plans and workspace plans. Work conducted in any fashion that is loud is to be discussed with the VA COR and time allocated after VA shift work so that it in no way disturbs the normal VA daily work.
All materials and equipment removed as a part of the demolition are to be removed from the campus daily and dumped in an approved lawful process at an approved lawful dump location with records kept of all dumps. New dumbwaiters to replace existing dumbwaiters in size and raise ability. Replace all tracks, switches, call buttons, and doors apart from the dumbwaiters. Existing stainless steel surrounds dumbwaiter openings at stops to remain. Add new stainless steel access panels as noted in drawings. Assure that dumbwaiter shafts remain 2-hour fire rated at all floors after construction. Assure that dumbwaiter shafts are contained with temporary fire walls and smoke barriers during construction. Assure that VA ICRA plans are followed for temporary walls and doors as well as negative pressure within work areas. Assured that all life safety plans are followed for continual egress ability of staff and public use during construction. Create sub phasing plans with the VA COR for work scheduling due to means and methods. Remove and replace LED lighting inside the two (2) dumbwaiter shafts. Remove and replace Dumbwaiter motors inside the two (2) dumbwaiter shafts. Remove and replace switchgear within the two (2) dumbwaiter shafts. Run new emergency power lines from existing emergency rated panels to one (1) dumbwaiter (Pharmacy) and to (1) dumbwaiter (OR). Add one fire alarm detector in one (1) dumbwaiter shaft (Pharmacy).
To avoid disturbing hospital operations, work shall be required to take place during off-hours and weekends, as determined and approved by VA COR. Coordination with affected departments is essential to ensure patient care and operational activities are not impacted.
Follow all drawing and spec documents for bidding up and above the bidding SOW here.
Phasing:
Sub-phasing by floor is permitted where feasible. Sub phasing shall be created by the General Contractor for work on different floors at different times and subject to VA COR approval. There is no overall phasing except were described in the general contactor`s means and method plan.
Safety/Site Control:
· The contractor must clean and sanitize all the carts and equipment before entering the OR.
· The contractor must install ICRA hard barriers with level 4 paint finish for dust and/or infection control prior to start of construction.
· Furnish and install temporary construction barrier walls with secure 45-minute rated construction access door and hardware. The construction barrier walls shall be 1-hour rated, extend to the underside of deck above and all penetrations are fire stopped.
· Supply, install and maintain walk-off tacky mats. Shall replace tacky mats in a timely fashion when they are soiled.
· Maintain negative pressure machine in the project site and vent to outside of the
· Contractors abide with all in-house policies such as safety, ID badges, security, etc.
· Alternate entrance is always secured and never to be left open while contractor is off site.
Quality Control/Assurance:
· Follow the manufacturer’s instructions for inspecting and installing new equipment and fixtures.
· Provide submittal log of all material and applicable equipment, procedures, and certifications to the COR for approval, prior to starting construction.
· Any drawings provided may not be up to date and must be field verified by contractor for accuracy.
· Provide updated MS project schedule upon request by Engineering Services withing 2 working days.
· Maintenance:
· Provide a critical spare parts list with pricing and warranty information for all installed fixtures.
Coordination Plan:
· If any utilities need to be shut off for demolition or installation, a coordination plan shall be provided to the COR for approval, at least 72 hours prior to work being performed.
· Cleanup and Disposal:
· Housekeeping
· The contractor should maintain a clean work environment, keeping the surfaces in the area free of dust and debris. Dry sweeping or compressed air for cleanup is not authorized.
· At the end of each work period (not longer than 8 hours), the contractor shall use a HEPA vacuum to ensure all dust and debris have been properly collected and contained for disposal.
· If the COR and/or designated representative finds the area unacceptable, the contractor, at his/her own cost, shall re-clean until acceptance is gained. The contractor is to perform the necessary corrective action immediately without exception.
· Disposal of Trash and Hazardous Waste:
· The contractor shall be responsible for the cleanup and removal of all trash and debris from VA property after the Government’s final acceptance of work.
· The contractor shall comply with local/state/federal/national, OSHA, EPA, and all other applicable codes, ordinances, and regulations governing the proper handling, disposal, and removal of all waste and debris.
Deliverables:
Project deliverables include the following:
· MS project scheduled within 45 days of NTP. Include procurement of materials and critical path activities.
· Testing and Acceptance
· All equipment shall be tested prior to the Government’s final acceptance. All testing reports and specification documents must be provided to the Contracting Officer Representative, if applicable.
General:
1. All work is to be coordinated with the VA COR to allow for minimum disruption to the building occupants.
2. All rigging, hoisting, lifting and moving of materials and equipment necessary to perform the work is to be provided by the Contractor.
3. Damage to any existing surfaces caused by the contractor are to be repaired to the original condition and at the contractor’s expense.
4. All materials, installation practices, debris disposal, and work performed as part of these specifications are to meet all applicable codes including but not limited to, USEPA and OSHA.
5. At the completion of the project, all rubbish, tools and surplus materials are to be removed, and the work area is left completely clean.
6. Any work, material or supplies which have not been specifically mentioned but are reasonably implied and is necessary for the safe and satisfactory completion of the entire project are to be included and installed by the Contractor.
7. All materials are to be installed and completed in a first-class workman like manner and in accordance with the best industry standards. Any materials installed which are not in an orderly and neat workman like appearance are to be removed and replaced when so directed by the VA COR at the contractor’s expense.
8. All workers and staff of the Contractor working on site shall be required to have VA issued identification badges for all of his/her personnel working on VA property. Anyone observed without VA identification will be asked to leave VA property. No VA identification, no work, no exception. 13. No work or the ordering of materials outside of the scope of work is to be done without approval of change order.
Site Conditions:
1. All work is to be coordinated with VA COR.
2. This is an occupied facility.
3. A material and equipment staging area is to be coordinated and confirmed with the VA COR. The staging area is considered unsafe.
4. The contractor is to leave no area unsafe at the end of the working day.
5. It is the contractor’s responsibility to verify all existing conditions and dimensions prior to submitting the bid.
6. It is the contractor’s responsibility to address unforeseen conditions and dimensions.
Submittals:
1. Submit, for review and approval to the VA COR, the manufacturers / supplier’s spec sheets, shop drawings (if requested), and any other requested information for all materials to be used as part of this project.
2. Submit only materials which are known to be fully compatible with the actual installation conditions.
Cost Liability:
The James J. Peters VA Medical Center does not assume responsibility and does not bear any liability for the cost incurred by a bidder in the preparation and submittal of a bid proposal in response to this request for proposals.
The contractor shall be responsible for the actions of all individuals provided to work for the VA under this contract. If damages arise for work performed by contractor provided personnel, the contractor shall be responsible for all the necessary resources to remedy the incident.
The Contractor shall be responsible for ensuring all provided personnel are properly licensed to operate a motor vehicle if operating a motor vehicle on VA property is required.
7. Protection of Work and Property
7.1. The contractor shall continuously maintain adequate protection of all his work from damage and shall protect the James J. Peters VA Medical Center property from injury or loss arising out of this contract. The contractor shall make good any such damage, injury, or loss, except such as may be directly caused by agents or employees of the James J. Peters VA Medical Center.
7.2. The contractor will erect barricades and railings, give warnings, display lights, screens or signs and exercise precautions as may be reasonably necessary to prevent injury or damage.
Additional Work Should additional work be required, which is beyond the scope of this request for proposal but is related to the overall contract, the vendor will be requested to submit a written proposal and upon approval, a purchase order will be issued to authorize the work.
Warranty:
1. The contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation will provide the capacities and characteristics specified. The contract further guarantees that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects will be repaired by the contractor at his own cost.
2. Final inspection is to be done by the Contractor, VA COR, Using Agency, and end users onsite.
Estimated Completion Time: 270 Calendar Days.
PERMITS AND RESPONSIBILITIES:
The Contractor shall, without additional expense to the Government after award of the contract, be responsible for all damages to persons or property. The Contractor shall take proper safety precautions to protect the worksite, the workers, the public and the property of others. Contractor shall also be responsible for all materials delivered and work per-formed until completion and acceptance of the entire work.
PROJECT MANAGEMENT:
Contractor shall assign a full-time site superintendent for the duration of the project in its entirety. The site superintendent and Project Manager must have a minimum of 5 years of experience directly related to electrical trade. The Project Manager shall have the necessary training, knowledge, and experience required to help ensure the timely and successful completion of the project and all related duties. The Contractor will submit qualifications of their Project Manager to the Contracting Officer’s Representative within 10-days of contract award and have to be approved by the VA COR. The Project Manager shall be the on-site representative of the Contractor and shall oversee all aspects of day-to-day project operations and shall serve as the Contractor’s primary point of contact, including the ability to meet with the Contracting Officer, at the Government’s convenience, for meetings to discuss project status and/or contractual issues as necessary.
ADMINISTRATION:
a) Accident Reporting: In the event an accident occurs of Government personnel or property, the Contractor shall provide a report to the Contracting Officer and COR in writing that shall include the following: (1) the time and date of occurrence; (2) the place of occurrence; (3) a list of personnel directly involved; and (4) a narrative or description of the accident to include chronological order of the accident and circumstances; (5) corrective action to prevent future occurrences.
b) Federal Holidays: Federal law (5 U.S.C. 6103) establishes the public holidays. Please note that most Federal employees work on a Monday through Friday schedule. For these employees, when a holiday falls on a non-workday -- Saturday or Sunday -- the holiday usually is observed on Monday (if the holiday falls on Sunday) or Friday (if the holiday falls on Saturday). Federal holidays include New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving, and Christmas.
c) Invoice: Payment will be made upon receipt of a properly prepared, itemized invoice, validated by the COR, and submitted through the Tungsten Network. A properly prepared invoice will resemble the contract line items reflected in the Price/Cost Schedule and contain:
i. Invoice Number and Date
ii. Contractor’s Name and Address
iii. Accurate Purchase Order Number
iv. Dates service performed.
v. Location of service performed.
vi. Total amount due
Autodesk Build Construction management platform:
Requirements:
1. Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform.
1. Contractor shall accomplish and complete the following tasks upon award of contract:
1. Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR NLT 14 days from contract award.
1. Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.
1. The access request shall be in writing and include a list of staff. The list shall include the following information:
· Full Name
· Company Name
· Email Address
· Role/Position on the project (i.e., Project manager, site super)
1. Upon granting access, staff shall complete required ACC training through ProductivityNOW platform within 12 Calendar days.
1. Upon successful completion of training, contractor shall submit certificates of completion to COR NLT 2 business days.
1. Access to ProductivityNOW eLearning will expire after 12 Calendar days after online access is granted. Contractor shall complete ACC training within that period.
1. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above.
1. The contractor shall only use the ACC platform for contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor’s failure to utilize the ACC platform as the project’s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor’s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.
1. Contractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertains to staff who was granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform.
1. Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 BID OPENING INFORMATION
In accordance with FAR 14.202-8, the government is authorizing electronic bids on this solicitation. ALL bids shall be emailed to Akkil Kurian, Contracting Officer at Akkil.Kurian@va.gov and timestamped by 11/24/2025 10:00 AM EST prior to the bid opening time. The bids shall include copies of a bid bond. The bid opening shall take place on 11/24/2025 10:00 AM EST. No hand-carried or mailed bids will be accepted.
The bid opening will take place via Microsoft Teams conference call. To access the conference, please access:
Microsoft Teams Join the meeting now Meeting ID: 246 528 277 497 9 Passcode: AX2ta7CK To join by phone please dial 1-347-566-4838 Phone conference ID: 987 477 064#
2.2 Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes:
Offerors are hereby notified that under New York Consolidated Laws, Chapter 60 - Tax, Article 28 - Sales and Compensating Use Taxes, Part 3 – 1116 (2), the United States of America, any of its agencies and instrumentalities, is immune from taxation when it is the purchaser, user, or consumer, or when it sells services or property of a kind not ordinarily sold by private persons.
Pursuant to Chapter 60, Article 28, Part 3-1115(17), a contractor’s purchase of such building and construction materials within New York to be incorporated into the real property belonging to the U.S. Department of Veterans Affairs (VA) is subject to the exemption from the New York State sales and compensating use taxes. To take advantage of the tax exemption the successful offeror under this solicitation must complete ST-120.1 “Contractor Exempt Purchase Certificate” when it purchases construction materials for this contract and keep on file as required by the state of New York tax laws.
Notwithstanding FAR 52.229-3, all bids received in response to this solicitation are presumed to reflect this tax exemption, and therefore should not include the New York’s state sales and compensating use taxes on sales of materials for incorporation into VA real estate under this contract.
2.3 FAR DEVIATION FEB 2025 Instructions:
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
2.4 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm -fixed price contract resulting from this solicitation.
(End of Provision)
2.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.6 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Patricia Cordero Contracting Officer Hand-Carried Address:
Department of Veterans Affairs James J. Peters VA Medical Center Network Acquisition & Logistics(10N2NCO) 130 West Kingsbridge Road, Bronx NY 10468-3904 Mailing Address:
Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 3 (10N2NCO) 130 West Kingsbridge Road, Bronx NY 10468-3904
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for— 11/04/2025 at 10:30 AM EST
(c) Participants will meet at— Bronx VAMC Building 100 Engineering dept. GC-100
PLEASE NOTE: THIS SITE VISIT REQUIRES CONTRACTORS TO WEAR PROPER PPE LIKE HARD HATS AND SAFETY SHOES IF THEY WANT TO VISIT THE HOSPITAL’S SUB-BASEMENT. HARD HATS AND SAFETY SHOES WILL NOT BE PROVIDED BY THE VA.
(End of Provision)
2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
(End of Provision)
| FAR Number |
| Title |
| Date |
| 52.204-7 |
| SYSTEM FOR AWARD MANAGEMENT |
| NOV 2024 |
| 52.204-16 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING |
| AUG 2020 |
| 52.204-22 |
| ALTERNATIVE LINE ITEM PROPOSAL |
| JAN 2017 |
| 52.211-6 |
| BRAND NAME OR EQUAL |
| AUG 1999 |
| 52.214-3 |
| AMENDMENTS TO INVITATIONS FOR BIDS |
| DEC 2016 |
| 52.214-4 |
| FALSE STATEMENTS IN BIDS |
| APR 1984 |
| 52.214-5 |
| SUBMISSION OF BIDS |
| DEC 2016 |
| 52.214-6 |
| EXPLANATION TO PROSPECTIVE BIDDERS |
| APR 1984 |
| 52.214-7 |
| LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS |
| NOV 1999 |
| 52.214-18 |
| PREPARATION OF BIDS—CONSTRUCTION |
| APR 1984 |
| 52.214-19 |
| CONTRACT AWARD—SEALED BIDDING—CONSTRUCTION |
| AUG 1996 |
| 52.214-34 |
| SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE |
| APR 1991 |
| 52.214-35 |
| SUBMISSION OF OFFERS IN U.S. CURRENCY |
| APR 1991 |
| 52.228-1 |
| BID GUARANTEE |
| SEP 1996 |
| 52.228-17 |
| INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) |
| FEB 2021 |
| 52.229-11 |
| TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION |
| JUN 2020 |
2.10 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)
(a) Any protest filed by an interested party shall—
(1) Include the name, address, fax number, email and telephone number of the protester;
(2) Identify the solicitation and/or contract number;
(3) Include an original signed by the protester or the protester’s representative and at least one copy;
(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;
(5) Specifically request a ruling of the individual upon whom the protest is served;
(6) State the form of relief requested; and
(7) Provide all information establishing the timeliness of the protest.
(b) Failure to comply with the above may result in dismissal of the protest without further consideration.
(c) Bidders/offerors and Contracting Officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.
(End of Provision)
2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.
(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.
(End of Provision)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.
(2) The small business size standard is $45 Million.
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition—
(i) Is set aside for small business and has a value above the simplified acquisition threshold;
(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204–7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (d) applies.
[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .