S05 RFI Questions and Answers 1-12-2026.docx

DOCX document 29 KB Posted

Attached to
Y1DZ--NRM-CONST 526-22-115 - UPGRADE OR & PHARMACY DUMBWAITERS
Solicitation number
36C24226B0003
Issued by

About this file

The document is a Request for Information (RFI) Questions and Answers file for the VA Medical Center dumbwaiter replacement project. The RFI addresses two key clarification points: 1) Confirmation that there is no alternate bid, and the base bid must include access panel installation on floors 3, 5, and 9, and 2) Contractor responsibility for hazardous material abatement up to 400 square feet during demolition. The engineering team declined to provide an allowance amount for abatement, stating that contractors must independently estimate their abatement costs based on the specified parameters.

View the file

Other files

File Type Posted
S05 RFI Questions and Answers 1-20-2026.docx DOCX document
S06 SF30 36C24226B0003 0009.docx DOCX document
S05 RFI Question and Answer 1-16-2026.docx DOCX document
S06 SF30 36C24226B0003 0008.docx DOCX document
S06 SF30 36C24226B0003 0007.docx DOCX document
S06 SF30 36C24226B0003 0006.docx DOCX document
S05 RFI Questions and Answers 12-17-2025.docx DOCX document
S06 Revised SOW Upgrade Dumbwaiters 12-17-2025.docx DOCX document
S06 SF30 36C24226B0003 0005.docx DOCX document
S06 SF30 36C24226B0003 0004.docx DOCX document
SF30 36C24226B0003 0003.docx DOCX document
SF30 36C24226B0003 0002.docx DOCX document
S05 Revised RFI Answers 11-18.docx DOCX document
SF30 36C24226B0003 0001.docx DOCX document
S06 Revised SOW - Upgrade OR and Pharmacy Dumbwaiters 11-5-2025.docx DOCX document
S04 IFB 36C24226B0003 UPGRADE DUMBWAITER PRE-BID SITE VISIT SIGN-IN SHEET.pdf PDF
S05 RFI Questions and Answers.pdf PDF
S02 Soliciation 36C24226B0003 10-24-2025.docx DOCX document
S02 526-22-115 VHA Specifications Upgrade SPD OR Dumbwaiters.pdf PDF
S02 526-22-115 Drawings Upgrade SPD OR Dumbwaiters.pdf PDF
S02 WAGE DETERMINATION BRONX COUNTY.pdf PDF
S02 Buy American Certificate blank.pdf PDF
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx DOCX document
S02 013200 Construction Documentation.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Questions and Answers 1-12-2026

1) RFI response states there is an Alternate price, but this Alternate is not listed on the bid pricing sheet, it only lists the base bid.

Answer: There is no alternate bid. The base bid must include the price for installing access panels on floors 3,5, and 9.

2) RFI responses state Contractor to proceed with testing during the demolition phase. If any hazardous material is found the contractor is responsible for the abatement up to 400 square feet (of CMU) The contractor must include the abatement and testing line items cost detailed in their bid. ---- Till the contractor doesn't know the location and quantity of each area of CMU abatement it will be very difficult to provide a price. Can the agency please provide an allowance amount so that all the contractors have the same information and then can provide a fair and reasonable price to the government.

Answer: Engineering will not provide an allowance amount. It is the contractor responsibility to do their cost estimation for the abatement up to 400 square feet as mentioned in the previous RFI.