S05 RFI Questions and Answers 1-20-2026.docx
DOCX document 15 KB Posted
- Solicitation number
- 36C24226B0003
About this file
This is a Questions and Answers document dated January 20, 2026, addressing bidder inquiries related to Solicitation 36C24226B0003 for Project 526-22-115 (Upgrade OR & Pharmacy Dumbwaiters) at the James J. Peters VA Medical Center in Bronx, New York.
The document clarifies requirements regarding asbestos abatement costs for approximately 400 square feet of material. The government confirmed that bidders must include asbestos abatement and testing line item costs within their base bid amount, with the flexibility to show cost breakdowns separately in their bid cost breakdown section. Regarding the nature of the asbestos-containing material (ACM), the document indicates that testing and laboratory results will determine whether the ACM is friable or non-friable, with contractors required to proceed with testing during the demolition phase per the Statement of Work Hazardous Materials Abatement section. The response addresses the government's directive to issue a revised bid form as a separate line item, while maintaining the requirement that all asbestos abatement and testing costs be included in the final base bid submission.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 36C24226B0003 – Project No. 526-22-115 Upgrade OR & Pharmacy Dumbwaiters RFI Question and Answer 1-20-2026
1. Please issue a revised bid form where bidders are to include this separate line item
The base bid amount must include the 400sft of asbestos abatement cost. Bidders can show the cost of asbestos abatement in their bid cost breakdown section. See the SOW Hazardous Materials Abatement section: “The contractor must include the abatement and testing line items cost detailed in their bid”.
1. Advise if this ACM is friable or non-friable.
The testing and lab results would determine if the ACM is friable or non-friable. See the SOW Hazardous Materials Abatement section:
“Contractor to proceed with testing during the demolition phase”