S02 Primary Care Spec Sections 26-33.pdf
PDF 3 MB Posted
- Attached to
- Z2DA--631-451 Upgrade Primary Care
- Solicitation number
- 36C24120R005_1
About this file
This solicitation is for electrical upgrades to the primary care area at the Central Western Massachusetts Healthcare System VA Medical Center in Liberty Building. Key requirements include upgrading electrical panels and distribution, lighting, branch circuit wiring, grounding systems, and related low voltage systems such as fire alarm, access control, security, and data infrastructure. The contractor will be responsible for demolition, new conduit and wire installation, connection of equipment, and ensuring all power and communication outages are properly coordinated. The work must be performed to comply with all applicable codes and safety standards. The response date is not provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24120R0053 0005.pdf | ||
| B1-Basement Plan.pdf | ||
| DSCN0133.JPG | JPG image | |
| DSCN0134.JPG | JPG image | |
| 36C24120R0053 0004.pdf | ||
| 36C24120R0053 0003.pdf | ||
| S06 Appendices Final 7-21-2020.pdf | ||
| S06 Site Visit 1 Roster.pdf | ||
| 36C24120R0053 0002.pdf | ||
| S06 Attachment Spec 07 44 00.pdf | ||
| S06 Site Visit 2 Roster.pdf | ||
| 36C24120R0053 0001.pdf | ||
| S02 SOW Primary Care.pdf | ||
| S02 Primary Care Spec Sections 0-23.pdf | ||
| S02 631-451 Part 1.pdf | ||
| S02 631-451 Part 4.pdf | ||
| S02 631-451 Part 3.pdf | ||
| S02 631-451 Part 2.pdf | ||
| 36C24120R0053_1.docx | DOCX document | |
| S02 631-451 Part 5.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
April 30, 2020 Central Western Massachusetts Healthcare System VA Project No. 631-451 Liberty Building - Upgrade Primary Care
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 1 of 14
SECTION 26 05 11
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section applies to all sections of Division 26.
B. The Contractor is expected to supply all tools, equipment, materials and supplies necessary to complete the services specified for a complete and operating system. Materials and supplies used will be reputable name brands and kept in excellent condition. Occupational Safety and Health Act
(OSHA) training, if applicable, will be provided to all employees required to operate equipment. The
Contractor (GC) will be held responsible for damages resulting from improper use of tools, materials and equipment and shall repair or pay for such damages, at its sole cost.
C. Install electrical systems including but not limited to: select demolition, electrical panelboards, normal and emergency power distribution, lighting, branch circuit wiring, grounding, nurse call, access control, camera and security systems, telephone, CATV, telecom, network and data infrastructure, electrical controls, surge protection, life safety systems including fire alarm, egress and exit signs and related electrical systems for a complete and functioning system.
D. All power, data and telecommunication outages to those systems shall be coordinated with the
Contracting Officer’s Representative (COR). Contractor shall coordinate outages with the COR or any other designated end users by the COR affected by work. Failure to do so, and any subsequent expenses due to failure, shall be the responsibility of the Contractor.
E. Throughout construction Contractor shall provide upgraded schedules to accurately reflect time frame of work.
F. Complying with requirements of all codes and regulatory agencies.
G. Installing equipment furnished by others and installing electrical circuits, devices and wiring for systems being provided by others:
1. Installing and connecting electrically operated equipment, cabinets, starters, controls and related items furnished under other Divisions (includes but not limited to the following:
HVAC equipment, fans, pumps, ERV units, heat pumps, condensers, etc.).
2. Provide power for all automatic or power actuated door operators. Coordinate requirements with the hardware schedule indicated on the architectural plans. Obtain control power from nearest available source with adequate capacity source (if a circuit has not been provided on the contract documents) – utilize ¾”c with 2#12 & 1#12G and label panel board with the appropriate circuit directory completed.
3. Provide power for all access control equipment; coordinate requirements with General
Contractor (GC) and the Access Control Vendor. Obtain control power from nearest available
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 2 of 14 source (if a circuit has not been provided on the contract documents) with adequate capacity – utilize ¾”c with 2#12 & 1#12G and label panelboard with the appropriate circuit directory complete. Coordinate requirements with the Access Control shop drawings and hardware schedule indicated on the architectural plans.
4. Provide power for ATC (Automatic Temperature Control) / BMS (Building Management
System) furnished under other Divisions. Obtain control power from nearest available source
(if a circuit has not been provided on the contract documents) with adequate capacity – utilize
¾”c with 2#12 & 1#12G and label panel board with the appropriate circuit directory completed.
5. Provide power for all smoke dampers and coordinate the requirements with Division 23 and include all control modules (refer to Fire Alarm Specifications).
6. Elevators that are being refurbished shall be supplied with new electric copper feeder wires to the terminals of the elevator control panel, including approved circuit breakers or fuse disconnects (properly sized) and include all control wiring in conduit to transfer switches per the manufacturer panel, including:
a) Provide a vapor tight LED light fixture (10 FC at floor minimum output) and 20A, 120V
GFCI outlet in each elevator pit and machine room from separate 120V circuits if these items do not currently exist.
b) Furnish electric power for testing and adjusting elevator equipment.
c) Furnish circuit breaker panel in machine room for car and hoistway lights and receptacles per the manufacturer’s requirements.
d) Provide power for cab lighting and ventilation from an emergency power panel and telephone line per the manufacturer’s requirements.
e) Provide equipment and devices to meet the latest requirements for elevator recall, smoke and heat detection as well as other regulatory requirements required by the Government and the State.
H. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the existing facility operations will not be hindered.
Contractor shall permit access to VA personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by Owner so that facilities operations will continue during the construction period.
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 3 of 14
I. Backup Power: Provide backup power to existing circuits when required for phasing of the work.
The general intent of this requirement is that this work be scheduled well in advance prior to starting the work and generally is limited to non-business hours, weekends or holidays as to limit the amount of downtime of the facility, or specific Department. It is clearly understood by the
Owner there will be times during the execution of the work branch circuits maybe without power.
It is critical that temporary power be provided for those circuits that are critical to the operation of the facility; those include refrigeration, IT systems, patient areas and rooms, kitchen, heating plant etc. Work can be scheduled during other hours through the GC and temporary power will need to be made available to minimize any inconvenience to the facility.
a. Acceptable means for temporary power will need to be reviewed by the COR. If the electrical contractor can provide safe and workable solutions via back feeding from other equipment with adequate capacity within the facility and maintain safe working conditions those options may be considered by the COR. Adequate protection for cabling, overcurrent settings and related work will need to be presented clearly, concisely with safety the foremost factor. The existing generators at the facility are not intended to provide temporary power for the
Contractor in the performance of his work.
b. During construction the Contractor shall at all times maintain electrical utilities of the buildings to the maximum extent possible without interruption. Should it be necessary to interrupt any electrical service or switchboard, the contractor shall secure permission in writing from the COR for such interruption at least fourteen days in advance. Any interruption shall be made with minimum amount of inconvenience to the facility and any shut-down time shall be coordinated and such time to be included in the Contractor's bid.
c. Arrange to provide and pay for all temporary power sources (portable generators or alternate power supply from existing sources) as required by project conditions. Sizing of the emergency generator or alternate power supply (panel not affected by the work) and a layout shall be furnished for approval by the COR. Locations of temporary power sources
(generators) shall be coordinated with the COR.
d. Comply with applicable National Electrical Code and NECA 200 standard for installing temporary electric power at construction site. The temporary power required to support the facility’s electrical power requirements shall conform to the following:
1) All work shall conform to the National Electrical Code (ANSI/NFPA standard 70).
Installers shall follow the NEC, applicable OSHA standards, manufacturers' instructions, and contract documents when installing and maintaining temporary power systems.
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 4 of 14
2) Only qualified persons familiar with the construction and operation of temporary electrical power systems should perform the work.
3) General requirements for installing electrical products and systems are described in
NECA 1, Standard Practices for Good Workmanship in Electrical Construction (ANSI).
Other national electrical installation standards provide additional guidance for installing particular types of electrical products and systems for temporary services.
4) The temporary power needs shall be fully coordinated with the GC.
J. Temporary use of electrical equipment shall include the following:
a. Use of new installed electrical equipment to provide light and power will be permitted subject to written approval and compliance with the following provisions: Permission to use each unit or system must be given by COR in writing.
b. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.
c. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical
Code, Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded.
d. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the
Owner. This paragraph shall not reduce the requirements of the electrical specifications sections. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
K. Conductor ampacities specified or shown on the drawings are based on copper conductors, with the conduit and raceways sized per NEC. Aluminum conductors are prohibited.
1.2 MINIMUM REQUIREMENTS
A. The latest International Building Code (IBC), Underwriters Laboratories, Inc. (UL), Institute of
Electrical and Electronics Engineers (IEEE), and National Fire Protection Association (NFPA) codes and standards are the minimum requirements for materials and installation.
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 5 of 14
B. The drawings and specifications shall govern in those instances where requirements are greater than those stated in the above codes and standards.
1.3 TEST STANDARDS
A. All materials and equipment shall be listed, labeled, or certified by a Nationally Recognized Testing
Laboratory (NRTL) to meet Underwriters Laboratories, Inc. (UL), standards where test standards have been established. Materials and equipment which are not covered by UL standards will be accepted, providing that materials and equipment are listed, labeled, certified or otherwise determined to meet the safety requirements of a NRTL. Materials and equipment which no NRTL accepts, certifies, lists, labels, or determines to be safe, will be considered if inspected or tested in accordance with national industrial standards, such as ANSI, NEMA, and NETA. Evidence of compliance shall include certified test reports and definitive shop drawings.
B. Definitions:
1. Listed: Materials and equipment included in a list published by an organization that is acceptable to the Contracting Officer and concerned with evaluation of products or services, that maintains periodic inspection of production or listed materials and equipment or periodic evaluation of services, and whose listing states that the materials and equipment either meets appropriate designated standards or has been tested and found suitable for a specified purpose.
2. Labeled: Materials and equipment to which has been attached a label, symbol, or other identifying mark of an organization that is acceptable to the Contracting Officer and concerned with product evaluation, that maintains periodic inspection of production of labeled materials and equipment, and by whose labeling the manufacturer indicates compliance with appropriate standards or performance in a specified manner.
3. Certified: Materials and equipment which:
a. Have been tested and found by a NRTL to meet nationally recognized standards or to be safe for use in a specified manner.
b. Are periodically inspected by a NRTL.
c. Bear a label, tag, or other record of certification.
4. Nationally Recognized Testing Laboratory: Testing laboratory which is recognized and approved by the Secretary of Labor in accordance with OSHA regulations.
1.4 QUALIFICATIONS (PRODUCTS AND SERVICES)
A. Manufacturer’s Qualifications: The manufacturer shall regularly and currently produce, as one of the manufacturer's principal products, the materials and equipment specified for this project, and shall have manufactured the materials and equipment for at least three years.
B. Product Qualification:
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 6 of 14
1. Manufacturer's materials and equipment shall have been in satisfactory operation, on three installations of similar size and type as this project, for at least three years.
2. The Government reserves the right to require the Contractor to submit a list of installations where the materials and equipment have been in operation before approval.
C. Service Qualifications: There shall be a permanent service organization maintained or trained by the manufacturer which will render satisfactory service to this installation within four hours of receipt of notification that service is needed. Submit name and address of service organizations.
1.5 APPLICABLE PUBLICATIONS
A. Applicable publications listed in all Sections of Division 26 shall be the latest issue.
B. Products specified in all sections of Division 26 shall comply with the applicable publications listed in each section.
1.6 DEFINITIONS
A. Definitions used in Section 26 are not intended to change the meaning of other terms used in the Contract Documents, such as specialties, systems, structures, finishes, accessories, and similar terms. Such terms are self-explanatory and have well-recognized meanings in the construction industry.
1. Products are items purchased for incorporation in the Work, whether purchased for the
Project or taken from previously furnished stock. The term product includes the terms material, equipment, system, and terms of similar intent.
a. Named Products are items identified by manufacturer’s product name, including make or model designation, indicated in the manufacturer’s published product literature, which is current as of the date of the Contract Documents.
b. Materials are products that are substantially shaped; cut, worked, mixed, finished, refined or otherwise fabricated, processed, or installed to form a part of the Work.
c. Equipment is a product with operational parts, whether motorized or manually operated, that require service connections such as wiring or piping.
d. When the terms “utility hole”, “electrical vault”, “electrical manhole”, “electrical utility vault”, and “electrical utility manhole” are used, they may be used interchangeably.
e. Installer: An “Installer” is the Contractor or another entity engaged by the
Contractor, either as an employee, Subcontractor, or Contractor of lower tier, for performance of a particular construction activity, including installation, erection, application, and similar operations. Installers are required to be experienced in the operations they are engaged to perform.
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 7 of 14
“Provide” is used when the term “Install” means to furnish, install and test a particular segment of the work described, or when reasonably implied, within the
Contract Documents.
f. The term “experienced,” when used with the term “Installer,” means having a minimum of five previous projects similar in size and scope to this Project, being familiar with the special requirements indicated, and having complied with requirements of the authority having jurisdiction.
g. Trades: Using terms such as “carpentry” is not intended to imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as “carpenter.” It also does not imply that requirements specified apply exclusively to tradespersons of the corresponding generic name.
h. Restoration: Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
1. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
2. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
3. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. Repair any
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 8 of 14 damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
1.7 MANUFACTURED PRODUCTS
A. Materials and equipment furnished shall be of current production by manufacturers regularly engaged in the manufacture of such items, and for which replacement parts shall be available. Materials and equipment furnished shall be new and shall have superior quality and freshness.
B. When more than one unit of the same class or type of materials and equipment is required, such units shall be the product of a single manufacturer.
C. Equipment Assemblies and Components:
1. Components of an assembled unit need not be products of the same manufacturer.
2. Manufacturers of equipment assemblies, which include components made by others, shall assume complete responsibility for the final assembled unit.
3. Components shall be compatible with each other and with the total assembly for the intended service.
4. Constituent parts which are similar shall be the product of a single manufacturer.
D. Factory wiring and terminals shall be identified on the equipment being furnished and on all wiring diagrams.
E. When Factory Tests are specified, Factory Tests shall be performed in the factory by the equipment manufacturer and witnessed by the contractor. In addition, the following requirements shall be complied with:
1. The Government shall have the option of witnessing factory tests. The Contractor shall notify the
Government through the COR a minimum of thirty (30) days prior to the manufacturer’s performing of the factory tests.
2. When factory tests are successful, contractor shall furnish four (4) copies of the equipment manufacturer’s certified test reports to the COR fourteen (14) days prior to shipment of the equipment, and not more than ninety (90) days after completion of the factory tests.
3. When factory tests are not successful, factory tests shall be repeated in the factory by the equipment manufacturer and witnessed by the Contractor. The Contractor shall be liable for all additional expenses for the Government to witness factory re-testing.
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 9 of 14
1.8 VARIATIONS FROM CONTRACT REQUIREMENTS
A. Where the Government or the Contractor requests variations from the contract requirements, the connecting work and related components shall include, but not be limited to additions or changes to branch circuits, circuit protective devices, conduits, wire, feeders, controls, panels and installation methods.
1.9 MATERIALS AND EQUIPMENT PROTECTION
A. Materials and equipment shall be protected during shipment and storage against physical damage, vermin, dirt, corrosive substances, fumes, moisture, cold and rain.
1. Store materials and equipment indoors in clean dry space with uniform temperature to prevent condensation.
2. During installation, equipment shall be protected against entry of foreign matter, and be vacuum-cleaned both inside and outside before testing and operating. Compressed air shall not be used to clean equipment. Remove loose packing and flammable materials from inside equipment.
3. Damaged equipment shall be repaired or replaced, as determined by the COR.
4. Painted surfaces shall be protected with factory installed removable heavy kraft paper, sheet vinyl or equal.
5. Damaged paint on equipment shall be refinished with the same quality of paint and workmanship as used by the manufacturer so repaired areas are not obvious.
1.10 WORK PERFORMANCE
A. All electrical work shall comply with requirements of the latest NFPA 70 (NEC), NFPA 70B, NFPA
70E, NFPA 99, NFPA 110, OSHA Part 1910 subpart J – General Environmental Controls, OSHA
Part 1910 subpart K – Medical and First Aid, and OSHA Part 1910 subpart S – Electrical, in addition to other references required by contract.
B. Job site safety and worker safety is the responsibility of the Contractor.
C. Electrical work shall be accomplished with all affected circuits or equipment de-energized. However, energized electrical work may be performed only for the non-destructive and non-invasive diagnostic testing(s), or when scheduled outage poses an imminent hazard to patient care, safety, or physical security. In such case, all aspects of energized electrical work, such as the availability of appropriate/correct personal protective equipment (PPE) and the use of PPE, shall comply with the latest NFPA 70E, as well as the following requirements:
1. Only Qualified Person(s) shall perform energized electrical work. Supervisor of Qualified
Person(s) shall witness the work of its entirety to ensure compliance with safety requirements and approved work plan.
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 10 of 14
2. At least two weeks before initiating any energized electrical work, the Contractor and the
Qualified Person(s) who is designated to perform the work shall visually inspect, verify and confirm that the work area and electrical equipment can safely accommodate the work involved.
3. At least two weeks before initiating any energized electrical work, the Contractor shall develop and submit a job specific work plan, and energized electrical work request to the COR. At the minimum, the work plan must include relevant information such as proposed work schedule, area of work, description of work, name(s) of Supervisor and Qualified Person(s) performing the work, equipment to be used, procedures to be used on and near the live electrical equipment, barriers to be installed, safety equipment to be used, and exit pathways.
4. Energized electrical work shall begin only after the Contractor has obtained written approval of the work plan, and the energized electrical work request from the COR. The Contractor shall make these approved documents present and available at the time and place of energized electrical work.
5. Energized electrical work shall begin only after the Contractor has invited and received acknowledgment from the COR to witness the work.
D. For work that affects existing electrical systems, arrange, phase and perform work to assure minimal interference with normal functioning of the facility. Refer to Article OPERATIONS AND STORAGE
AREAS under Section 01 00 00, GENERAL REQUIREMENTS.
E. New work shall be installed and connected to existing work neatly, safely and professionally.
Disturbed or damaged work shall be replaced or repaired to its prior conditions, as required by
Section 01 00 00, GENERAL REQUIREMENTS.
F. Coordinate location of equipment and conduit with other trades to minimize interference.
1.11 EQUIPMENT INSTALLATION AND REQUIREMENTS
A. Equipment location shall be as close as practical to locations shown on the drawings.
B. Working clearances shall not be less than specified in the NEC.
C. Inaccessible Equipment:
1. Where the Government determines that the Contractor has installed equipment not readily accessible for operation and maintenance, the equipment shall be removed and reinstalled as directed at no additional cost to the Government.
2. "Readily accessible” is defined as being capable of being reached quickly for operation, maintenance, or inspections without the use of ladders, or without climbing or crawling under or over obstacles such as, but not limited to, motors, pumps, belt guards, transformers, piping, ductwork, conduit and raceways.
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 11 of 14
1.12 EQUIPMENT IDENTIFICATION
A. In addition to the requirements of the NEC, install an identification sign which clearly indicates information required for use and maintenance of items such as switchboards and switchgear, panelboards, cabinets, motor controllers, fused and non-fused safety switches, generators, automatic transfer switches, separately enclosed circuit breakers, individual breakers and controllers in switchboards, switchgear and motor control assemblies, control devices and other significant equipment.
B. Identification signs for Normal Power System equipment shall be laminated black phenolic resin with a white core with engraved lettering. Identification signs for Essential Electrical System (EES) equipment, as defined in the NEC, shall be laminated red phenolic resin with a white core with engraved lettering. Lettering shall be a minimum of 12 mm (1/2 inch) high. Identification signs shall indicate equipment designation, rated bus amperage, voltage, number of phases, number of wires, and type of EES power branch as applicable. Secure nameplates with screws.
C. Install adhesive arc flash warning labels on all equipment as required by the latest NFPA 70E. Label shall show specific and correct information for specific equipment based on its arc flash calculations.
Label shall show the followings:
1. Nominal system voltage.
2. Equipment/bus name, date prepared, and manufacturer name and address.
3. Arc flash boundary.
4. Available arc flash incident energy and the corresponding working distance.
5. Minimum arc rating of clothing.
6. Site-specific level of PPE.
1.13 SUBMITTALS
A. Submit to the COR in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. The Government's approval shall be obtained for all materials and equipment before delivery to the job site. Delivery, storage or installation of materials and equipment which has not had prior approval will not be permitted.
C. All submittals shall include six copies of adequate descriptive literature, catalog cuts, shop drawings, test reports, certifications, samples, and other data necessary for the Government to ascertain that the proposed materials and equipment comply with drawing and specification requirements. Catalog cuts submitted for approval shall be legible and clearly identify specific materials and equipment being submitted.
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 12 of 14
D. Submittals for individual systems and equipment assemblies which consist of more than one item or component shall be made for the system or assembly as a whole. Partial submittals will not be considered for approval.
1. Mark the submittals, "SUBMITTED UNDER SECTION__________________".
2. Submittals shall be marked to show specification reference including the section and paragraph numbers.
3. Submit each section separately.
E. The submittals shall include the following:
1. Information that confirms compliance with contract requirements. Include the manufacturer's name, model or catalog numbers, catalog information, technical data sheets, shop drawings, manuals, pictures, nameplate data, and test reports as required.
2. Elementary and interconnection wiring diagrams for communication and signal systems, control systems, and equipment assemblies. All terminal points and wiring shall be identified on wiring diagrams.
3. Parts list which shall include information for replacement parts and ordering instructions, as recommended by the equipment manufacturer.
F. Maintenance and Operation Manuals:
1. Submit as required for systems and equipment specified in the technical sections. Furnish in hardcover binders or an approved equivalent.
2. Inscribe the following identification on the cover: the words "MAINTENANCE AND
OPERATION MANUAL," the name and location of the system, material, equipment, building, name of Contractor, and contract name and number. Include in the manual the names, addresses, and telephone numbers of each subcontractor installing the system or equipment and the local representatives for the material or equipment.
3. Provide a table of contents and assemble the manual to conform to the table of contents, with tab sheets placed before instructions covering the subject. The instructions shall be legible and easily read, with large sheets of drawings folded in.
4. The manuals shall include:
a. Internal and interconnecting wiring and control diagrams with data to explain detailed operation and control of the equipment.
b. A control sequence describing start-up, operation, and shutdown.
c. Description of the function of each principal item of equipment.
d. Installation instructions.
e. Safety precautions for operation and maintenance.
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 13 of 14
f. Diagrams and illustrations.
g. Periodic maintenance and testing procedures and frequencies, including replacement parts numbers.
h. Performance data.
i. Pictorial "exploded" parts list with part numbers. Emphasis shall be placed on the use of special tools and instruments. The list shall indicate sources of supply, recommended spare and replacement parts, and name of servicing organization.
j. List of factory approved or qualified permanent servicing organizations for equipment repair and periodic testing and maintenance, including addresses and factory certification qualifications.
G. Approvals will be based on complete submission of shop drawings, manuals, test reports, certifications, and samples as applicable.
H. After approval and prior to installation, furnish the COR with one sample of each of the following:
1. A minimum 300 mm (12 inches) length of each type and size of wire and cable along with the tag from the coils or reels from which the sample was taken. The length of the sample shall be sufficient to show all markings provided by the manufacturer.
2. Each type of conduit coupling, bushing, and termination fitting.
3. Conduit hangers, clamps, and supports.
4. Duct sealing compound.
5. Each type of receptacle, toggle switch, lighting control sensor, outlet box, manual motor starter, device wall plate, engraved nameplate, wire and cable splicing and terminating material, and branch circuit single pole molded case circuit breaker.
1.14 SINGULAR NUMBER
A. Where any device or part of equipment is referred to in these specifications in the singular number
(e.g., "the switch"), this reference shall be deemed to apply to as many such devices as are required to complete the installation as shown on the drawings.
1.15 ACCEPTANCE CHECKS AND TESTS
A. The Contractor shall furnish the instruments, materials, and labor for tests.
B. Where systems are comprised of components specified in more than one section of Division 26, the
Contractor shall coordinate the installation, testing, and adjustment of all components between various manufacturer’s representatives and technicians so that a complete, functional, and operational system is delivered to the Government.
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
260511 - page 14 of 14
C. When test results indicate any defects, the Contractor shall repair or replace the defective materials or equipment and repeat the tests for the equipment. Repair, replacement, and re-testing shall be accomplished at no additional cost to the Government.
1.16 WARRANTY
A. All work performed and all equipment and material furnished under this Division shall be free from defects and shall remain so for a period of one year from the date of acceptance of the entire installation by the Contracting Officer for the Government.
1.17 INSTRUCTION
A. Instruction to designated Government personnel shall be provided for the particular equipment or system as required in each associated technical specification section.
B. Furnish the services of competent and factory-trained instructors to give full instruction in the adjustment, operation, and maintenance of the specified equipment and system, including pertinent safety requirements. Instructors shall be thoroughly familiar with all aspects of the installation and shall be factory-trained in operating theory as well as practical operation and maintenance procedures.
C. A training schedule shall be developed and submitted by the Contractor and approved by the COR at least 30 days prior to the planned training.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
- - - E N D - - -
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260519 - page 1 of 6
SECTION 26 05 19
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies the furnishing, installation, connection, and testing of the electrical conductors and cables for use in electrical systems rated 600 V and below, indicated as cable(s), conductor(s), wire, or wiring in this section.
1.2 RELATED WORK
A. Section 07 84 00, FIRESTOPPING: Sealing around penetrations to maintain the integrity of fire-resistant rated construction.
B. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Requirements that apply to all sections of Division 26.
C. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible ground fault currents.
D. Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduits for conductors and cables.
1.3 QUALITY ASSURANCE
A. Refer to Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES), in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
1.4 FACTORY TESTS
A. Conductors and cables shall be thoroughly tested at the factory per NEMA to ensure that there are no electrical defects. Factory tests shall be certified.
1.5 SUBMITTALS
A. Electronically submit the following in accordance with Section 26 05 11, REQUIREMENTS FOR
ELECTRICAL INSTALLATIONS.
1. Shop Drawings:
a. Submit sufficient information to demonstrate compliance with drawings and specifications.
Riser diagram shown on the drawings are for general information only and a detail riser is required as part of the shop drawing submittal process.
b. Submit the following data for approval:
1) Electrical ratings and insulation type for each conductor and cable.
2) Splicing materials and pulling lubricant.
2. Certifications: Two weeks prior to final inspection, submit the following.
a. Certification by the manufacturer that the conductors and cables conform to the requirements of the drawings and specifications.
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260519 - page 2 of 6
b. Certification by the Contractor that the conductors and cables have been properly installed, adjusted, and tested.
1.6 APPLICABLE PUBLICATIONS
A. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification to the extent referenced. Publications are reference in the text by designation only.
B. American Society of Testing Material (ASTM):
D2301-10 ................................... Standard Specification for Vinyl Chloride Plastic Pressure-Sensitive
Electrical Insulating Tape
D2304-10 ................................... Test Method for Thermal Endurance of Rigid Electrical Insulating
Materials
D3005-10 ................................... Low-Temperature Resistant Vinyl Chloride Plastic Pressure-
Sensitive Electrical Insulating Tape
C. National Electrical Manufacturers Association (NEMA):
WC 70-09 ................................... Power Cables Rated 2000 Volts or Less for the Distribution of
Electrical Energy
D. National Fire Protection Association (NFPA):
70-11 .......................................... National Electrical Code (NEC)
E. Underwriters Laboratories, Inc. (UL):
44-10 .......................................... Thermoset-Insulated Wires and Cables
83-08 .......................................... Thermoplastic-Insulated Wires and Cables
467-07 ........................................ Grounding and Bonding Equipment
486A-486B-03 ........................... Wire Connectors
486C-04 ..................................... Splicing Wire Connectors
486D-05 ..................................... Sealed Wire Connector Systems
486E-09………Equipment Wiring Terminals for Use with Aluminum and/or Copper Conductors
493-07…………………….Thermoplastic-Insulated Underground Feeder and Branch Circuit Cables
514B-04 ..................................... Conduit, Tubing, and Cable Fittings
1.7 WARRANTY
A. Construction Warranty: Comply with FAR clause 52.246-21 “Warranty of Construction”.
PART 2 - PRODUCTS
2.1 CONDUCTORS AND CABLES
A. Conductors and cables shall be in accordance with NEMA, UL, as specified herein, and as shown on the drawings.
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260519 - page 3 of 6
B. All conductors shall be copper.
C. Single Conductor and Cable:
1. No. 12 AWG: Minimum size, except where smaller sizes are specified herein or shown on the drawings.
2. No. 8 AWG and larger: Stranded.
3. No. 10 AWG and smaller: Solid; except shall be stranded for final connection to motors, transformers, and vibrating equipment.
4. Insulation: THHN-THWN and XHHW-2. XHHW-2 shall be used for isolated power systems.
D. Color Code:
1. No. 10 AWG and smaller: Solid color insulation or solid color coating.
2. No. 8 AWG and larger: Color-coded using one of the following methods:
a. Solid color insulation or solid color coating.
b. Stripes, bands, or hash marks of color specified.
c. Color using 19 mm (0.75 inches) wide tape.
4. For modifications and additions to existing wiring systems, color coding shall conform to the existing wiring system.
5. Conductors shall be color-coded as follows:
208/120 V Phase 480/277 V
Black A Brown
Red B Orange
Blue C Yellow
White Neutral Gray *
* or white with colored (other than green) tracer.
6. Lighting circuit “switch legs”, and 3-way and 4-way switch “traveling wires,” shall have color coding that is unique and distinct (e.g., pink and purple) from the color coding indicated above.
The unique color codes shall be solid and in accordance with the NEC. Coordinate color coding in the field with the COR.
2.2 SPLICES
A. Splices shall be in accordance with NEC and UL.
B. Above Ground Splices for No. 10 AWG and Smaller:
1. Solderless, screw-on, reusable pressure cable type, with integral insulation, approved for copper and aluminum conductors.
2. The integral insulator shall have a skirt to completely cover the stripped conductors.
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260519 - page 4 of 6
3. The number, size, and combination of conductors used with the connector, as listed on the manufacturer's packaging, shall be strictly followed.
C. Above Ground Splices for No. 8 AWG to No. 4/0 AWG:
1. Compression, hex screw, or bolt clamp-type of high conductivity and corrosion-resistant material, listed for use with copper and aluminum conductors.
2. Insulate with materials approved for the particular use, location, voltage, and temperature.
Insulation level shall be not less than the insulation level of the conductors being joined.
3. Splice and insulation shall be product of the same manufacturer.
4. All bolts, nuts, and washers used with splices shall be zinc-plated steel.
D. Above Ground Splices for 250 kcmil and Larger:
1. Long barrel “butt-splice” or “sleeve” type compression connectors, with minimum of two compression indents per wire, listed for use with copper and aluminum conductors.
2. Insulate with materials approved for the particular use, location, voltage, and temperature.
Insulation level shall be not less than the insulation level of the conductors being joined.
3. Splice and insulation shall be product of the same manufacturer.
E. Plastic electrical insulating tape: Per ASTM D2304, flame-retardant, cold and weather resistant.
2.3 CONNECTORS AND TERMINATIONS
A. Mechanical type of high conductivity and corrosion-resistant material, listed for use with copper and aluminum conductors.
B. Long barrel compression type of high conductivity and corrosion-resistant material, with minimum of two compression indents per wire, listed for use with copper and aluminum conductors.
C. All bolts, nuts, and washers used to connect connections and terminations to bus bars or other termination points shall be zinc-plated steel.
2.4 CONTROL WIRING
A. Unless otherwise specified elsewhere in these specifications, control wiring shall be as specified herein, except that the minimum size shall be not less than No. 14 AWG.
B. Control wiring shall be sized such that the voltage drop under in-rush conditions does not adversely affect operation of the controls.
2.5 WIRE LUBRICATING COMPOUND
A. Lubricating compound shall be suitable for the wire insulation and conduit and shall not harden or become adhesive.
B. Shall not be used on conductors for isolated power systems.
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260519 - page 5 of 6
PART 3 - EXECUTION
3.1 GENERAL
A. Install conductors in accordance with the NEC, as specified, and as shown on the drawings.
B. Install all conductors in raceway systems.
C. Splice conductors only in outlet boxes, junction boxes, pullboxes, manholes, or handholes.
D. Conductors of different systems (e.g., 120 V and 277 V) shall not be installed in the same raceway.
E. Install cable supports for all vertical feeders in accordance with the NEC. Provide split wedge type which firmly clamps each individual cable and tightens due to cable weight.
F. In panelboards, cabinets, wireways, switches, enclosures, and equipment assemblies, neatly form, train, and tie the conductors with non-metallic ties.
G. For connections to motors, transformers, and vibrating equipment, stranded conductors shall be used only from the last fixed point of connection to the motors, transformers, or vibrating equipment.
H. Use expanding foam or non-hardening duct-seal to seal conduits entering a building, after installation of conductors.
I. Conductor and Cable Pulling:
1. Provide installation equipment that will prevent the cutting or abrasion of insulation during pulling. Use lubricants approved for the cable.
2. Use nonmetallic pull ropes.
3. Attach pull ropes by means of either woven basket grips or pulling eyes attached directly to the conductors.
4. All conductors in a single conduit shall be pulled simultaneously.
5. Do not exceed manufacturer’s recommended maximum pulling tensions and sidewall pressure values.
J. No more than three branch circuits shall be installed in any one conduit.
K. When stripping stranded conductors, use a tool that does not damage the conductor or remove conductor strands.
3.2 SPLICE AND TERMINATION INSTALLATION
A. Splices and terminations shall be mechanically and electrically secure and tightened to manufacturer’s published torque values using a torque screwdriver or wrench.
B. Where the Government determines that unsatisfactory splices or terminations have been installed, replace the splices or terminations at no additional cost to the Government.
3.3 CONDUCTOR IDENTIFICATION
A. When using colored tape to identify phase, neutral, and ground conductors larger than No. 8 AWG, apply tape in half-overlapping turns for a minimum of 75 mm (3 inches) from terminal points, and in
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260519 - page 6 of 6 junction boxes, and pullboxes. Apply the last two laps of tape with no tension to prevent possible unwinding. Where cable markings are covered by tape, apply tags to cable, stating size and insulation type.
3.4 FEEDER CONDUCTOR IDENTIFICATION
A. In each interior pullbox and each underground manhole and handhole, install brass tags on all feeder conductors to clearly designate their circuit identification and voltage. The tags shall be the embossed type, 40 mm (1-1/2 inches) in diameter and 40 mils thick. Attach tags with plastic ties.
3.5 EXISTING CONDUCTORS
A. Unless specifically indicated on the plans, existing conductors shall not be reused.
3.6 CONTROL WIRING INSTALLATION
A. Unless otherwise specified in other sections, install control wiring and connect to equipment to perform the required functions as specified or as shown on the drawings.
B. Install a separate power supply circuit for each system, except where otherwise shown on the drawings.
3.7 CONTROL WIRING IDENTIFICATION
A. Install a permanent wire marker on each wire at each termination.
B. Identifying numbers and letters on the wire markers shall correspond to those on the wiring diagrams used for installing the systems.
C. Wire markers shall retain their markings after cleaning.
D. In each manhole and handhole, install embossed brass tags to identify the system served and function.
3.8 ACCEPTANCE CHECKS AND TESTS
A. Perform in accordance with the manufacturer's recommendations. In addition, include the following:
1. Visual Inspection and Tests: Inspect physical condition.
2. Electrical tests:
a. After installation but before connection to utilization devices, such as fixtures, motors, or appliances, test conductors phase-to-phase and phase-to-ground resistance with an insulation resistance tester. Existing conductors to be reused shall also be tested.
b. Applied voltage shall be 500 V DC for 300 V rated cable, and 1000 V DC for 600 V rated cable. Apply test for one minute or until reading is constant for 15 seconds, whichever is longer. Minimum insulation resistance values shall not be less than 25 megohms for 300 V rated cable and 100 megohms for 600 V rated cable.
c. Perform phase rotation test on all three-phase circuits.
---END---
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260526 - page 1 of 5
SECTION 26 05 26
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies the furnishing, installation, connection, and testing of grounding and bonding equipment, indicated as grounding equipment in this section.
B. The terms “connect” and “bond” are used interchangeably in this section and have the same meaning.
1.2 RELATED WORK
A. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Requirements that apply to all sections of Division 26.
B. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES:
Low-voltage conductors.
C. Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduit and boxes.
D. Section 26 24 16, PANELBOARDS: Low-voltage panelboards.
1.3 QUALITY ASSURANCE
A. Refer to Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES), in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
1.4 SUBMITTALS
A. Electronically submit the following in accordance with Section 26 05 11, REQUIREMENTS FOR
ELECTRICAL INSTALLATIONS.
1. Shop Drawings:
a. Submit sufficient information to demonstrate compliance with drawings and specifications.
Riser diagram shown on the drawings are for general information only and a detail riser is required as part of the shop drawing submittal process
b. Submit plans showing the location of system grounding electrodes and connections, and the routing of aboveground and underground grounding electrode conductors.
2. Test Reports: Two weeks prior to the final inspection, submit ground resistance field test reports to the COR.
3. Certifications: Certification by the Contractor that the grounding equipment has been properly installed and tested.
1.5 APPLICABLE PUBLICATIONS
A. Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only.
B. American Society for Testing and Materials (ASTM):
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260526 - page…