36C24120R0053 0002.pdf

PDF 263 KB Posted

Attached to
Z2DA--631-451 Upgrade Primary Care
Solicitation number
36C24120R005_1
Issued by

About this file

This document includes a solicitation for upgrading a primary care facility and related attachments. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 to upgrade exam rooms, team collaboration areas, waiting rooms and corridors at the VA Central Western Massachusetts healthcare system. The solicitation seeks offers for construction services including demolition, ceilings, flooring, lighting, and medical equipment installation. Offerors must acknowledge any amendments by the date of August 6, 2020. Site visit rosters and specification sections for exterior finishes, insulation, and medical equipment are provided as attachments.

View the file

Other files

File Type Posted
36C24120R0053 0005.pdf PDF
B1-Basement Plan.pdf PDF
DSCN0133.JPG JPG image
DSCN0134.JPG JPG image
36C24120R0053 0004.pdf PDF
36C24120R0053 0003.pdf PDF
S06 Appendices Final 7-21-2020.pdf PDF
S06 Site Visit 1 Roster.pdf PDF
S06 Attachment Spec 07 44 00.pdf PDF
S06 Site Visit 2 Roster.pdf PDF
36C24120R0053 0001.pdf PDF
S02 SOW Primary Care.pdf PDF
S02 Primary Care Spec Sections 0-23.pdf PDF
S02 Primary Care Spec Sections 26-33.pdf PDF
S02 631-451 Part 1.pdf PDF
S02 631-451 Part 4.pdf PDF
S02 631-451 Part 3.pdf PDF
S02 631-451 Part 2.pdf PDF
36C24120R0053_1.docx DOCX document
S02 631-451 Part 5.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 6

0002 07-17-2020

631-451

00241

Department of Veterans Affairs

VA CENTRAL WESTERN MASSACHUSETTS HCS

Acquisitions-90 421 North Main Street Leeds MA 01053-9764

00241

Department of Veterans Affairs VA Central Western Massachusetts HCS Acquisitions-90 421 North Main Street Leeds MA 01053-9764

To all Offerors/Bidders

36C24120R0053

06-05-2020

X x x

See CONTINUATION Page x 1

The purpose of this amendment is to incorporate the following:

1) Answers to address the RFI's.

2) Spec 07 44 00

3) Site Visit 1 Roster

4) Site Visit 2 Roster

5) Due date remains 8/6/2019 at 2:00PM EST.

All other terms and conditions remain unchanged.

Edward Roy Contracting Officer

CONTINUATION PAGE

1) Does this job include work to be performed during Off Hours for CCTV and Access Control?

All noisy work must be performed off hours but non-noisy CCTV and Access Control work can happen anytime – on or off hours. However, regardless of time remaining devices in operational areas must remain operational during this project. Short shutdowns must be coordinated in advance with the COR.

2) What time is considered to be Off Hours?

Monday thru Friday 6pm to 6am and Saturday and Sunday all day

3) Is there a designated area for Contractors Parking?

GC will have 5 parking passes for vehicles to park close to job site otherwise all contractor parking will be at lower lots and shuttle or walk to project site.

4) Do any of the exterior rails, bollards, or lintels require field painting? It is unclear if they will all receive Colorgalv shop finish. Please advise.

All exterior railings and other exposed exterior steel should be color galvanized Colorgalv 10 per spec 050513.

Lintels are to be galvanized with Duragalv per specs 050513 and then field painted. The infill roof railing and stair are to be Duragalv per specs 050513 with no field painting required.

Bollards are called out to be painted, not galv. In the specs (055000 bollard are called out to be “yellow”).

5) There is no exterior paint systems in Section 099100 for painting of exterior Cementitious trim. Please provide if required.

See provided new specification section 07 44 00.

6) There is reference on the plans to use intumescent paint on the exposed steel at the loading dock. If so please provide a specification or clarification the intended finish.

Note on AS-404 requiring intumescent paint is erroneous – there is no requirement for intumescent paint on structural steel in this project.

7) Please provide a specification for the cementitious trim at new work and confirm whether this is field painted.

See provided new specification section 07 44 00.

8) Rooms 1119 and 1320 are called out to AT-1 Ceilings per the finish Schedule. The reflected ceiling plan shows them to have GWB. Please clarify

1119 is to have GWB but 1320 is AT-1.

9) Where is the “Spray Applied Fireproofing” required.

The two infill locations require Spray Applied Fireproofing at all deck, column, and framing locations to achieve a 2-hour fire rating. The fire proofing spec 078100 details that mineral fiber material can be used where the fireproofing will not be exposed otherwise use cementitious fireproofing as detailed in same spec.

10) Wall Section 4, on sheet 1-AS-311 has a note “(N) Closed Cell Spray Foam at Bottom of T&G Deck”. Please provide a specification, and what thickness is required for the spray foam insulation.

References to spray foam throughout architectural drawings are incorrect and should be Mineral Wool to achieve an R38 rating. Additionally, locations that call for Mineral Wool on drawings are also to meet the R38 rating. Manufacturer with product equivalent to Rock Wool Semi-Rigid Batt Insulation is required.

11) There is no direction whatsoever as to which switch controls which light. The individual rooms could be figured out but the common areas is anyone's guess. Also there is a lighting control panel detail shown on 1-ES-700 that is not referenced by the other plans and the room labels in the detail don't line up to the plan.

Lighting systems controlled by addressable modules and central control panel are a preferred substitution.

On drawing ES-700 there is a lighting relay cabinet that identifies the switches and area of service but it is incorrect – see below table for correct locations. This coordinates with the lighting control panels on drawing ES-701. The switches shown on the lighting relay cabinet are to be located at the entrances to those spaces as outlined in the cabinet service column (table below) and where confusion remains COR will locate during construction.

Relay Number

Switch Leg

Service Circuit Number of Switches

Control

1 LVa Patient Corridor C101

See ES-

2 TIME ON/OFF

& KEYPAD

2 LVb Check In/Check out 1118 Recessed

See ES-

Per ES- 101A

TIME ON/OFF

& KEYPAD

3 LVc Corridor C100 See ES-

4 TIME ON/OFF

& KEYPAD

4 LVd Patient Waiting 1101 Recessed Lights

See ES-

2 TIME ON/OFF

& KEYPAD

5 LVe Patient Waiting 1101 Downlights

See ES-

2 TIME ON/OFF

& KEYPAD

6 LVf Reception Downlights

See ES-

1 TIME ON/OFF

& KEYPAD

7 LVg North Wing Corridor See ES-

1 TIME ON/OFF

& KEYPAD

8 LVh Patient Corridor C105 Recessed

See ES-

2 TIME ON/OFF

& KEYPAD

9 LVi Teamwork C102 Recessed

See ES-

2 TIME ON/OFF

& KEYPAD

10 LVj Patient Corridor C103 Recessed

See ES-

2 TIME ON/OFF

& KEYPAD

11 LVk Teamwork Area C104 South Row

See ES-

2 TIME ON/OFF

& KEYPAD

12 LVl Teamwork Area C104 North Rows

See ES-

1 TIME ON/OFF

& KEYPAD

13 LV2m SPARE 15 LV2n LOADING DOCK

1145 4’ LINEAR

RECESSED

See ES-

TIME ON/OFF

& KEYPAD

16 LV2o SPARE 17 LV2p SPARE 18 LV2q SPARE 19 LV2r SPARE 20 LV2s SPARE 21 LV2t SPARE 22 LV2u SPARE 23 LV2v SPARE

24 SPARE

There is also no detail on what type of room controller and/or emergency lighting relay should be utilized.

See ES-800 Emergency Bypass Relay Detail but is required to be UL Listed 820.

12) Bid Form lists Alternate #5 as a deduct to “remove all PWC-1a from the project.

Specifications indicate Alternate #5 as a deduct to “Remove all RWC-1a from the project. Which is correct?

RWC-1a is correct.

13) Bid Form lists Alternate #9 to deduct ballistic glazing and ballistic wall panels.

Specifications do not have a Alternate #9. Please clarify.

Bid Alternate #9 should be removed as a bid alternate and included in base project.

14) Please clarify the scope of the North Wing Deduct – Alternate. Is the North Wing Deduct

– Alternate to include only Rooms 1301 thru 1320, and not Rooms 1239, 1300, 1238 and 1237. Or does the deduct alternate include all of the rooms as shown in plan 3, on sheet 1-AS-112?

There are three different deduct situations for the North Wing.

If you look at AG-101 – it shows the limits of the North Wing. The limits of the North Wing for deduct purposes and Phase 3 are not the same. The main corridor area of Phase 3 is in the base contract and is not part of any deduct. Ie. if the North Wing is deducted then 1239, 1300, 1238, and 1237, etc from phase 3 would remain in Phase 3.

The three deduct possibilities include all and only the entire North Wing as outlined on AG-101 and AS-112. The differences in the deducts is the level of work. In Deduct Alternate 1 for Full Scope remove everything for the entire North Wing space. In Deduct Alternate 2 remove the AHU replacement and associated mechanical upgrades and the renovations to the two bathrooms 1307 and 1308 but keep all the finish upgrades including ceilings, flooring and paint, demolition of millwork and plumbing, and asbestos abatement in the entire wing. Deduct Alternate 3 deducts everything except for new paint (layers as detailed in painting spec) in every room and corridor of the North Wing.

15) What material is Window Type W03?

Frame material is Aluminum with thermal break and with Glass Type GL-A.

16) I cannot find specifications for the “Specialty Equipment” to be provided by the contractor. Per the Specialty Equipment Schedule on the drawings, the Contractor is required to “Supply and Install” the following Equipment. Please provide specifications and model numbers for the equipment required.

‐ Likorral Ceiling Mounted Patient Lift

Likorall TM 250 ES Overhead Lift System https://www.hill-rom.com/international/Products/Products-by-Category/patient-handling/overhead-patient-lifts/likorall-250-es-overhead-lift/

‐ Sharps Container HOLDER,SHARPS CONTAINER,WALL BRKT,LOCKING,5QT cvdssgb10056h

‐ Hand Sanitizer https://www.debmed.com/products-selector/dispensers/air-infused-manual-dispenser/

3 pieces:

1308-Q7 24/case Wall Plate 3D60-Q5 12/case Foam Dispenser 3D61-Q7 24/case Splashguard

‐ Wall Mounted Scale

17) In specification section 111300 Loading dock equipment, there is reference to a scissor lift. There is no reference to it on the drawing. Please clarify.

Eliminate from spec section 111300 the scissor lift, bollards, and dock seals but dock bumpers remain in contract.

18) On Drawing AS 401 to 403, there is a patient lift to be furnished and installed by the contractor. There is no specification for that item. Please provide.

Likorral Ceiling Mounted Patient Lift Likorall TM 250 ES Overhead Lift System https://www.hill-rom.com/international/Products/Products-by-Category/patient-handling/overhead-patient-lifts/likorall-250-es-overhead-lift/

19) Please identify who the manufacturer is for the existing security control system onsite.

The Software is CCure 9000. All components must integrate with this system per all spec sections. However, the particular devices are from different manufacturers and we have different manufacturer devices on campus for the cameras, PACS components, and NVR.

See attached document: S06 Attachment Spec 07 44 00.

See attached document: S06 Site Visit 1 Roster.

See attached document: S06 Site Visit 2 Roster.