This document provides details for a federal contract solicitation to replace the roof at the Veterans Affairs Medical Center in Buffalo, New York. The solicitation, to be posted on August 14, 2020, is for roof replacement services with an estimated value between $1,000,000 and $5,000,000. The procurement is set aside 100% for small businesses under NAICS code 238160 for roofing contractors with a size standard of $16.5 million. Interested vendors must visit the site and respond electronically by the anticipated award date of September 20, 2020, with bid bonding required. Full roof replacement will not commence until weather permits starting around March 15, 2021, with some preparatory work allowed in the interim. The solicitation and amendments will be available at SAM.gov, with the Department of Veterans Affairs and Veterans Health Administration/Veterans Integrated Service Network 2 listed as the involved agencies.

View the file

Other files

File Type Posted
Asbestos Abatement Roof Schematic Report.pdf PDF
36C24220B0053 0001.docx DOCX document
Core Samples - Roof Schematic Report.pdf PDF
S02 Specs.pdf PDF
S02 Structural Drawings.pdf PDF
S02 Electrical Drawings.pdf PDF
S02 Hazardous Materials Drawings.pdf PDF
36C24220B0053_4.docx DOCX document
S02 Mechanical Drawings.pdf PDF
S02 Architectural Drawings.pdf PDF
S02 General Drawings.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING NOTES & LEGEND CONSTRUCTION

DOCUMENTS

AE DESIGN SERVICES FOR ROOF

REPLACEMENT

3495 BAILEY AVENUE

BUFALO, NY 14215

2019/11/13 P-001

B1, B20, B28

528-17-S49

ELK MAW

REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

EQUIPMENT TYPE

01-BA-77-EVAP-001A

NUMBERING DESIGNATIONS FOR EQUIPMENT

SEQUENTIAL NUMBER WITH OPTIONAL

LETTER

BUILDING NUMBER

BUILDING FLOOR

WING (BUILDING 1 ONLY)

ROOF NUMBER

RD = ROOF DRAIN

A B C D E

SB SUB-BASEMENT

B BASEMENT

1 1st FLOOR 2 2nd FLOOR

ETC.

ROOF DRAIN

VENT PIPE

VENTILATION HOOD WITH CURB

X ROOF LEGEND KEY

X KEYED NOTE

ROOF OR SMOKE HATCH

RD

POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK

GENERAL NOTES:

1. DESIGN CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE AND OWNER SPECIFIC CODES, INCLUDING (BUT NOT LIMITED TO) THE INTERNATIONAL BUILDING CODE (IBC 2015), THE NFPA 101 LIFE SAFETY CODE, 2015, ANSI A117.1 - 2009, OSHA, AND ANY OTHER CODES GOVERNED BY THE

JURISDICTION IN WHICH THIS PROJECT IS BEING CONSTRUCTED.

2. PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED TO COMPLETE DEMOLITION OF THE CURRENT PIPING, AS WELL AS AN OPERABLE FINAL CONFIGURATION PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY APPLICABLE LOCAL CODES AND REGULATIONS.

3. CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.

4. INSTALL ALL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND ALL

APPLICABLE CODES AND REGULATIONS.

5. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL, AND HVAC WORK SHOWN ON OTHER

CONTRACT DRAWINGS.

6. LABEL ALL PIPING IN ACCORDANCE WITH ASME A13.1.

7. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS, OR CALLED OUT IN THE SPECIFICATIONS, ARE APPROXIMATE ONLY. DO NOT SCALE DRAWINGS.

8. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSET IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO

ADDITIONAL COST TO THE OWNER. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER TRADES.

9. ALL PENETRATIONS THROUGH FLOORS AND FULL HEIGHT WALLS TO BE FIRE STOPPED. ALL GAPS AND JOINTS AT FIRE RESISTIVE FLOORS, ROOFS AND

WALL TO BE FIRE AND SMOKE STOPPED. GAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK WALL TO BEAMS, AND CONTROL OR EXPANSION FIRE STOPPING INCLUDES BOTH FORM OR PACKING MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL.

10. ALL PIPING SHALL CLEAR DOORS.

11. INCLUDE FLOW-DIRECTION ARROWS INTEGRAL WITH PIPING SYSTEM SERVICE LETTERING TO ACCOMMODATE BOTH DIRECTIONS OR AS SEPARATE UNIT ON

EACH PIPE LABEL TO INDICATE FLOW DIRECTION.

12. PIPE LABEL LOCATIONS: LOCATE PIPE LABELS, WHERE PIPING IS EXPOSED OR ABOVE ACCESSIBLE CEILINGS IN FINISHED SPACES; MACHINE ROOMS;

ACCESSIBLE MAINTENANCE SPACES SUCH AS SHAFTS, TUNNELS, AND PLENUMS; AND EXTERIOR EXPOSED LOCATIONS AS FOLLOWS:

A. NEAR EACH VALVE AND CONTROL DEVICE.

B. NEAR EACH BRANCH CONNECTION, EXCLUDING SHORT TAKEOFFS FOR FIXTURES AND TERMINAL UNITS. WHERE FLOW PATTERN IS NOT OBVIOUS, MARK EACH PIPE AT BRANCH.

C. NEAR PENETRATIONS AND ON BOTH SIDES OF THROUGH WALLS, FLOORS, CEILINGS, AND INACCESSIBLE ENCLOSURES.

D. AT ACCESS DOORS, MANHOLES, AND SIMILAR ACCESS POINTS THAT PERMIT VIEW OF CONCEALED PIPING.

E. NEAR MAJOR EQUIPMENT ITEMS AND OTHER POINTS OF ORIGINATION AND TERMINATION.

F. SPACED AT MAXIMUM INTERVALS OF 50 FEET ALONG EACH RUN. REDUCE INTERVALS TO 25 FEET IN AREAS OF CONGESTED PIPING AND EQUIPMENT.

PIPE MARKING COLOR SCHEDULE

FLUID SERVICE BACKGROUND COLOR LETTER COLOR

FIRE QUENCHING FLUIDS SAFETY RED WHITE

TOXIC AND CORROSVIE FLUIDS SAFETY ORANGE BLACK

FLAMMABLE FLUIDS SAFETY YELLOW BLACK

COMBUSTIBLE FLUIDS SAFETY BROWN WHITE

POTABLE, COOLING, BOILER FEED, AND OTHER WATER SAFETY GREEN WHITE

COMPRESSED AIR SAFETY BLUE WHITE

REFRIGERANT LIQUID SAFETY PURPLE WHITE

REFRIGERANT GAS SAFETY WHITE BLACK

DRAIN/SANITARY SAFETY GRAY WHITE

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

PIPE UP

PIPE DOWN

GENERAL SYMBOLS

GENERAL LINETYPES

GENERAL PLUMBING SYMBOLS

COLUMN NUMBER

SD STORM WATER

11/14/2019

10 6 2

01-14-2-RD-001

01-14-3-RD-001

01-12-11-RD-001

01-13-8-RD-001

01-14-4-RD-001

01-13-7-RD-001

01-12-14-RD-001

01-13-10-RD-001

01-1-51-RD-001 01-14-6-RD-001

01-12-13-RD-001

01-14-5-RD-001

01-13-9-RD-001

01-12-12-RD-002

01-12-12-RD-001

01-3-45-RD-001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING PLAN - ROOF AREA 1 CONSTRUCTION

DOCUMENTS

AE DESIGN SERVICES FOR ROOF

REPLACEMENT

3495 BAILEY AVENUE

BUFALO, NY 14215

2019/11/13 P-101

B1

528-17-S49

REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

SCALE: 1/8"=1'-0"

ROOF AREA 11

GENERAL NOTES

1. SEE P-001 FOR P-SERIES NOTES & LEGENDS.

ROOF LEGEND

KEY DESCRIPTION BUILDING ROOF AREA

PENTHOUSE ROOF - CORE 1 1

UPPER 14TH FLOOR ROOF - CORE 1 1

14TH FLOOR ROOF EAST - CORE 1 1

14TH FLOOR ROOF SOUTH - CORE 1 1

14TH FLOOR ROOF WEST - CORE 1 1

14TH FLOOR ROOF NORTH - CORE 1 1

13TH FLOOR ROOF EAST - CORE 1 1

13TH FLOOR ROOF SOUTH - CORE 1 1

13TH FLOOR ROOF WEST - CORE 1 1

13TH FLOOR ROOF NORTH - CORE 1 1

12TH FLOOR ROOF SOUTH EAST - CORE 1 1

12TH FLOOR ROOF SOUTH WEST - CORE 1 1

12TH FLOOR ROOF NORTH WEST - CORE 1 1

12TH FLOOR ROOF NORTH EAST - CORE 1 1

DAYCARE BALCONY ROOF 1 1

PATIO ENTRANCE ROOF 1 1

EMPLOYEE ENTRANCE ROOF 1 1

ELK MAW

A WING

E

WING

D WINGC WING

B WING

ROOF AREA 6 ROOF

AREA

ROOF

AREA 2

ROOF

AREA 1

ROOF

AREA

ROOF AREA 5

ROOF

AREA 4

KEYPLAN

ROOF

AREA

ROOF

AREA 8

ROOF DRAIN PIPE CONDITIONS

ROOF DRAIN

NUMBER

DRAIN PIPE

ACCESSIBLE? (Y/N) ACCESSIBILITY COMMENTS

INSULATION?

(Y/N)

FIREPROOFING?

(Y/N)

LEAKS?

(Y/N) CONDITION COMMENTS

01-14-2-RD-001 Y NONE Y N N GOOD

01-14-3-RD-001 Y NEAR VENT DUCTS Y N N GOOD

01-14-4-RD-001 Y NONE Y N N GOOD

01-14-5-RD-001 Y NONE N N N GOOD

01-14-6-RD-001 Y LOCATED ABOVE DUCT Y N N GOOD

01-13-7-RD-001 Y NEAR VENT DUCTS N N N GOOD

01-13-8-RD-001 Y NEAR VENT DUCTS AND PIPING Y N N GOOD

01-13-9-RD-001 Y NONE Y N N GOOD

01-13-10-RD-001 Y NEAR PIPING N N N GOOD

01-12-11-RD-001 Y NEAR VENT DUCTS N N N GOOD

01-12-12-RD-001 Y NEAR VENT DUCTS Y N N GOOD

01-12-12-RD-002 Y NONE Y N N GOOD

01-12-13-RD-001 Y NEAR VENT DUCTS N N N GOOD

01-12-14-RD-001 Y NONE Y N N GOOD

01-1-51-RD-001 N FROM LEFT WALL (FACING FORWARD)

OUTSIDE ON PATIO ROOF

- - - - DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-3-45-RD-001 Y LOCATED IN AUDITORIUM, LEFT SIDE, 12

TILES FROM WALL, 2 OVER

N Y N GOOD

24 43

01-11D-15-RD-001

01-11D-15-RD-002

01-10D-19-RD-003

01-10D-19-RD-001

01-10D-19-RD-002

01-1D-43-RD-001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING PLAN - ROOF AREA 2 CONSTRUCTION

DOCUMENTS

AE DESIGN SERVICES FOR ROOF

REPLACEMENT

3495 BAILEY AVENUE

BUFALO, NY 14215

2019/11/13 P-102

B1

528-17-S49

REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

SCALE: 1/8"=1'-0"

ROOF AREA 21

GENERAL NOTES

1. SEE P-001 FOR P-SERIES NOTES & LEGENDS.

ROOF LEGEND

KEY DESCRIPTION BUILDING ROOF AREA

11TH FLOOR ROOF - D WING 1 2

10TH FLOOR ROOF - D WING 1 2

STAIRWELL ROOF - D WING 1 2

STAIRWELL ROOF - D WING 1 2

AMBULANCE ENTRANCE ROOF - D WING 1 2

AMBULANCE ENTRANCE ATRIUM - D WING 1 2

ELK MAW

A WING

E

WING

D WINGC WING

B WING

ROOF AREA 6 ROOF

AREA

ROOF

AREA 2

ROOF

AREA 1

ROOF

AREA

ROOF AREA 5

ROOF

AREA 4

KEYPLAN

ROOF

AREA 8

ROOF DRAIN PIPE CONDITIONS

ROOF DRAIN

NUMBER

DRAIN PIPE

ACCESSIBLE? (Y/N) ACCESSIBILITY COMMENTS

INSULATION?

(Y/N)

FIREPROOFING?

(Y/N)

LEAKS?

(Y/N) CONDITION COMMENTS

01-11D-15-RD-001 Y IN FRONT OF FIRE DOOR Y N N GOOD

01-11D-15-RD-002 Y IN FRONT OF STAIRWAY Y N N GOOD

01-10D-19-RD-001 Y DIFFICULT ACCESS, ROOM 1008D IN

BACK CORNER

Y N N GOOD

01-10D-19-RD-002 Y NEXT TO STAIRWAY 11 ABOVE CEILING

TILES

N N N GOOD

01-10D-19-RD-003 Y ABOVE CEILING TILES OUTSIDE OF

ROOM 1018D

Y N N GOOD

01-1D-43-RD-001 Y LOCATED IN CENTER ROOM 132D-1 N N N GOOD

38 42

01-3E-38-RD-00101-3E-38-RD-002 01-1E-42-RD-001

01-2E-39-RD-006

01-2E-39-RD-003

01-2E-39-RD-005

01-2E-39-RD-002

01-2E-39-RD-004

01-1E-40-RD-002

01-1E-40-RD-001

01-1E-40-RD-003

01-2E-39-RD-007

01-2E-39-RD-001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING PLAN - ROOF AREA 3 CONSTRUCTION

DOCUMENTS

AE DESIGN SERVICES FOR ROOF

REPLACEMENT

3495 BAILEY AVENUE

BUFALO, NY 14215

2019/11/13 P-103

B1

528-17-S49

REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

SCALE: 1/8"=1'-0"

ROOF AREA 31

GENERAL NOTES

1. SEE P-001 FOR P-SERIES NOTES & LEGENDS.

ROOF LEGEND

KEY DESCRIPTION BUILDING ROOF AREA

PENTHOUSE ROOF - E WING 1 3

2ND FLOOR ROOF - E WING 1 3

1ST FLOOR ROOF - E WING 1 3

PATIENT ENTRANCE ATRIUM - E WING 1 3

PATIENT ENTRANCE ROOF - E WING 1 3

ELK MAW

A WING

E

WING

D WINGC WING

B WING

ROOF AREA 6 ROOF

AREA

ROOF

AREA 2

ROOF

AREA 1

ROOF

AREA

ROOF AREA 5

ROOF

AREA 4

KEYPLAN

ROOF

AREA 8

ROOF DRAIN PIPE CONDITIONS

ROOF DRAIN

NUMBER

DRAIN PIPE

ACCESSIBLE? (Y/N) ACCESSIBILITY COMMENTS

INSULATION?

(Y/N)

FIREPROOFING?

(Y/N)

LEAKS?

(Y/N) CONDITION COMMENTS

01-3E-38-RD-001 N LOCATED ABOVE DUCTS ON HIGH

CEILING

UNKNOWN DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-3E-38-RD-002 Y LOCATED ABOVE DUCT WORK Y N N GOOD

01-2E-39-RD-001 Y ABOVE CEILING TILES, ABOVE LIGHT N N N GOOD

01-2E-39-RD-002 Y ABOVE CEILING TILES, ADJACENT TO

FIRE ALARM HALLWAY

Y N N GOOD

01-2E-39-RD-003 Y ABOVE CEILING TILES, IN ROOM 229E N N N GOOD

01-2E-39-RD-004 Y ABOVE CEILING TILES IN SERVER ROOM Y Y N GOOD

01-2E-39-RD-005 Y ABOVE CEILING TILES IN SERVER ROOM Y Y N GOOD

01-2E-39-RD-006 N LOCATED IN MICROBIOLOGY LAB. NO

ACCESS

DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-2E-39-RD-007 INACCESSIBLE

01-1E-40-RD-001 Y LOCATED IN WAITING ROOM FOR

PODIATRY

N N N NEEDS

REPIR REPLACE LEADER,TEE, AND CLEANOUT

01-1E-40-RD-002 N UNABLE TO LOCATE DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-1E-40-RD-003 N UNABLE TO LOCATE DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-1E-42-RD-001 N CANNOT MOVE CEILING PANELS DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-11A-16-RD-001

01-11A-16-RD-002

01-10A-20-RD-001

01-10A-20-RD-002

01-10A-20-RD-003

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING PLAN - ROOF AREA 4 CONSTRUCTION

DOCUMENTS

AE DESIGN SERVICES FOR ROOF

REPLACEMENT

3495 BAILEY AVENUE

BUFALO, NY 14215

2019/11/13 P-104

B1

528-17-S49

ELK CJR

REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

SCALE: 1/8"=1'-0"

ROOF AREA 41

GENERAL NOTES

1. SEE P-001 FOR P-SERIES NOTES & LEGENDS.

ROOF LEGEND

KEY DESCRIPTION BUILDING ROOF AREA

11TH FLOOR ROOF - A WING 1 4

10TH FLOOR ROOF - A WING 1 4

STAIRWELL ROOF - A WING 1 4

STAIRWELL ROOF - A WING 1 4

ENTRANCE ROOF - A WING 1 4

A WING

E

WING

D WINGC WING

B WING

ROOF AREA 6 ROOF

AREA

ROOF

AREA 2

ROOF

AREA 1

ROOF

AREA

ROOF AREA 5

ROOF

AREA 4

KEYPLAN

ROOF

AREA 8

ROOF DRAIN PIPE CONDITIONS

ROOF DRAIN

NUMBER

DRAIN PIPE

ACCESSIBLE? (Y/N) ACCESSIBILITY COMMENTS

INSULATION?

(Y/N)

FIREPROOFING?

(Y/N)

LEAKS?

(Y/N) CONDITION COMMENTS

01-11A-16-RD-001 N EXISTING DRAIN TO REMAIN

01-11A-16-RD-002 N EXISTING DRAIN TO REMAIN

01-10A-20-RD-001 Y LOCATED IN MECHANICAL ROOM 1019A Y N N GOOD

01-10A-20-RD-002 N ABOVE HARD CEILING- PATIENT ROOM DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-10A-20-RD-003 N NOT ACCESSED BY MI GROUP - - - - UNDER EQUIPMENT ENCLOSURE

01-10B-21-RD-001

01-10B-21-RD-002

01-10B-21-RD-003

01-11B-17-RD-002

01-11B-17-RD-001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING PLAN - ROOF AREA 5 CONSTRUCTION

DOCUMENTS

AE DESIGN SERVICES FOR ROOF

REPLACEMENT

3495 BAILEY AVENUE

BUFALO, NY 14215

2019/11/13 P-105

B1

528-17-S49

ELK CJR

REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

SCALE: 1/8"=1'-0"

ROOF AREA 51

GENERAL NOTES

1. SEE P-001 FOR P-SERIES NOTES & LEGENDS.

ROOF LEGEND

KEY DESCRIPTION BUILDING ROOF AREA

11TH FLOOR ROOF - B WING 1 5

10TH FLOOR ROOF - B WING 1 5

STAIRWELL ROOF - B WING 1 5

STAIRWELL ROOF - B WING 1 5

A WING

E

WING

D WINGC WING

B WING

ROOF AREA 6 ROOF

AREA

ROOF

AREA 2

ROOF

AREA 1

ROOF

AREA

ROOF AREA 5

ROOF

AREA 4

KEYPLAN

ROOF

AREA 8

ROOF DRAIN PIPE CONDITIONS

ROOF DRAIN

NUMBER

DRAIN PIPE

ACCESSIBLE?

(Y/N)

ACCESSIBILITY COMMENTS

INSULATIO

N? (Y/N)

FIREPROOFIN

G? (Y/N)

LEAKS?

(Y/N) CONDITION COMMENTS

01-11B-17-RD-001 N ACCESS BLOCKED BY DUCTWORK DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-11B-17-RD-002 N ACCESS BLOCKED BY DUCTWORK DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-10B-21-RD-001 Y HALLWAY OUTSIDE ROOM 1032B/WAITING AREA Y N N GOOD

01-10B-21-RD-002 Y HALLWAY OUTSIDE STAIRWELL/ROOM 1022B N N N GOOD

01-10B-21-RD-003 Y HALLWAY ABOVE ROOM 1011B Y N N DAMAGED

INSULATION

REPLACE INSULATION WITH NEW

MATERIAL

GLASS PANEL ROOF

50 29

01-BC-47-RD-002 01-BC-47-RD-001

01-10C-22-RD-003

01-10C-22-RD-002

01-10C-22-RD-001

01-2C-31-RD-001

01-11C-18-RD-001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING PLAN - ROOF AREA 6 CONSTRUCTION

DOCUMENTS

AE DESIGN SERVICES FOR ROOF

REPLACEMENT

3495 BAILEY AVENUE

BUFALO, NY 14215

2019/11/13 P-106

B1

528-17-S49

REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

SCALE: 1/8"=1'-0"

ROOF AREA 61

GENERAL NOTES

1. SEE P-001 FOR P-SERIES NOTES & LEGENDS.

ROOF LEGEND

KEY DESCRIPTION BUILDING ROOF AREA

11TH FLOOR ROOF - C WING 1 6

10TH FLOOR ROOF - C WING 1 6

STAIRWELL ROOF - C WING 1 6

STAIRWELL ROOF - C WING 1 6

2ND FLOOR ROOF - C WING 1 6

STAIRWELL ROOF - C WING 1 6

LOADING DOCK ROOF 1 6

EMERGENCY GENERATOR & TANK ROOF - C WING 1 6

POLICE TRAINING ATRIUM 1 6

POLICE TRAINING GARAGE ROOF - C WING 1 6

ELK MAW

A WING

E

WING

D WINGC WING

B WING

ROOF AREA 6 ROOF

AREA

ROOF

AREA 2

ROOF

AREA 1

ROOF

AREA

ROOF AREA 5

ROOF

AREA 4

KEYPLAN

ROOF

AREA 8

ROOF DRAIN PIPE CONDITIONS

ROOF DRAIN

NUMBER

DRAIN PIPE

ACCESSIBLE? (Y/N) ACCESSIBILITY COMMENTS

INSULATION?

(Y/N)

FIREPROOFING?

(Y/N)

LEAKS?

(Y/N) CONDITION COMMENTS

01-11C-18-RD-001 N POSSIBLY LOCATED IN ROOM 1101C, NO

ACCESS - - - - DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-10C-22-RD-001 N LOCATED ABOVE HARD CEILING - - - - DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-10C-22-RD-002 Y HALLWAY OUTSIDE ROOM 1013C Y N N GOOD

01-10C-22-RD-003 Y HALLWAY OUTSIDE ROOM 1018C Y N N GOOD

01-2C-31-RD-001 N LOCATED IN OPERATING ROOM, NO

ACCESS - - - - DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-BC-47-RD-001 Y LOCATED IN LOADING DOCK N N N GOOD

01-BC-47-RD-002 Y LOCATED IN LOADING DOCK N N N GOOD

01-3-33-RD-001

01-3-33-RD-00201-3-33-RD-003

01-B-37-RD-001

01-3-33-RD-005

01-3-34-RD-001

01-1-35-RD-001

01-B-36-RD-001

01-B-36-RD-002

01-3-33-RD-004

01-3-33-RD-007

01-3-33-RD-008

01-3-33-RD-006

INSTALL NEW ROOF

DRAIN LEADER BELOW

P-401

P-401

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING PLAN - ROOF AREA 7 CONSTRUCTION

DOCUMENTS

AE DESIGN SERVICES FOR ROOF

REPLACEMENT

3495 BAILEY AVENUE

BUFALO, NY 14215

2019/11/13 P-107

B1

528-17-S49

ELK MAW

REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

SCALE: 1/8"=1'-0"

ROOF AREA 71

GENERAL NOTES

1. SEE A-001 FOR A-SERIES NOTES & LEGENDS.

ROOF LEGEND

KEY DESCRIPTION BUILDING ROOF AREA

SPS ROOF 1 7

STAIRWELL ROOF 1 7

KITCHEN PENTHOUSE ROOF AREA 1 7

KITCHEN ROOF AREA 1 7

KITCHEN ROOF AREA 1 7

A WING

E

WING

D WINGC WING

B WING

ROOF AREA 6 ROOF

AREA

ROOF

AREA 2

ROOF

AREA 1

ROOF

AREA

ROOF AREA 5

ROOF

AREA 4

KEYPLAN

ROOF

AREA 8

ROOF DRAIN PIPE CONDITIONS

ROOF DRAIN

NUMBER

DRAIN PIPE

ACCESSIBLE? (Y/N) ACCESSIBILITY COMMENTS

INSULATION?

(Y/N)

FIREPROOFING?

(Y/N)

LEAKS?

(Y/N) CONDITION COMMENTS

01-3-33-RD-001 N NO ACCESS TO SPS AREA, POSSIBILITY

OF ACCESS LATER

DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR. ROOF DRAIN TO

REMAIN AS IS.

01-3-33-RD-002 N NO ACCESS TO SPS AREA, POSSIBILITY

OF ACCESS LATER

DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR. ROOF DRAIN TO

REMAIN AS IS.

01-3-33-RD-003 N NO ACCESS TO SPS AREA, POSSIBILITY

OF ACCESS LATER

DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR. ROOF DRAIN TO

REMAIN AS IS.

01-3-33-RD-004 N NO ACCESS TO SPS AREA, POSSIBILITY

OF ACCESS LATER

DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR. ROOF DRAIN TO

REMAIN AS IS.

01-3-33-RD-005 N NO ACCESS TO SPS AREA, POSSIBILITY

OF ACCESS LATER

DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR. ROOF DRAIN TO

REMAIN AS IS.

01-3-33-RD-006 N NO ACCESS TO SPS AREA, POSSIBILITY

OF ACCESS LATER

DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR. ROOF DRAIN TO

REMAIN AS IS.

01-3-33-RD-007 N NO ACCESS TO SPS AREA, POSSIBILITY

OF ACCESS LATER

DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR. ROOF DRAIN TO

REMAIN AS IS.

01-3-33-RD-008 N NO ACCESS TO SPS AREA, POSSIBILITY

OF ACCESS LATER

DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR. ROOF DRAIN TO

REMAIN AS IS.

01-3-34-RD-001 Y WILL REQUIRE SCAFFOLDING Y N N GOOD

01-1-35-RD-001 N ABOVE KITCHEN, PLASTERED OVER - - - - DRAIN PIPING NOT ACCESSIBLE BY A/E

COORDINATE WITH COR.

01-B-36-RD-001 Y ABOVE KITCHEN, TILE LABELED STEAM

VALVE

N N N GOOD

01-B-36-RD-002 NEW NEW NEW NEW, SEE DETAIL 9/A-501

01-B-37-RD-001 Y OUTSIDE KITCHEN OFFICE B-72-1 Y N N GOOD

20-4-57-RD-001

20-3-54-RD-008 20-3-54-RD-007 20-3-54-RD-006 20-3-54-RD-005

20-4-58-RD-001

20-3-54-RD-004 20-3-54-RD-003 20-3-54-RD-002 20-3-54-RD-001

20-4-56-RD-001

20-4-55-RD-001

20-1-59-RD-002

28-1-46-RD-002

28-1-46-RD-001

20-1-59-RD-001

REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING PLAN - ROOF AREA 8 CONSTRUCTION

DOCUMENTS

AE DESIGN SERVICES FOR ROOF

REPLACEMENT

3495 BAILEY AVENUE

BUFALO, NY 14215

2019/11/13 P-108

B20, B28

528-17-S49

ELK MAW

A WING

E

WING

D WINGC WING

B WING

ROOF AREA 6 ROOF

AREA

ROOF

AREA 2

ROOF

AREA 1

ROOF

AREA

ROOF AREA 5

ROOF

AREA 4

KEYPLAN

ROOF

AREA 8

GENERAL NOTES

1. SEE P-001 FOR P-SERIES NOTES & LEGENDS.

2. GRAY HATCHED AREAS REPRESENT ROOF AREAS NIC.

ROOF LEGEND

KEY DESCRIPTION BUILDING ROOF AREA

HVAC CHILLER BUILDING ROOF 28 8

MEDICAL RESEARCH BUILDING ROOF 20 8

MEDICAL RESEARCH BUILDING STAIRWELL ROOF 20 8

MEDICAL RESEARCH BUILDING STAIRWELL ROOF 20 8

MEDICAL RESEARCH BUILDING ENTRANCE ROOF 20 8

MEDICAL RESEARCH BUILDING MECHANICAL ROOM ROOF 20 8

MEDICAL RESEARCH BUILDING PASSAGEWAY ROOF 20 8

ROOF DRAIN PIPE CONDITIONS

ROOF DRAIN

NUMBER

DRAIN PIPE

ACCESSIBLE?

(Y/N)

ACCESSIBILITY COMMENTS

INSULATION?

(Y/N)

FIREPROOFING

? (Y/N)

LEAKS?

(Y/N) CONDITION COMMENTS

28-1-46-RD-001 Y NONE Y Y N GOOD

28-1-46-RD-002 Y NONE Y Y N GOOD

20-3-54-RD-001 Y LOCATED ABOVE CONDUIT RACK Y N N GOOD

20-3-54-RD-002 Y LOCATED ABOVE CONDUIT RACK Y N N GOOD

20-3-54-RD-003 Y LOCATED ABOVE CONDUIT RACK Y N N GOOD

20-3-54-RD-004 Y NONE Y N Y WATER

DAMAGE

20-3-54-RD-005 Y NONE Y N N GOOD

20-3-54-RD-006 Y NONE Y N N GOOD

20-3-54-RD-007 Y ABOVE CONDUIT RACK AND

PIPING

Y N N GOOD

20-3-54-RD-008 Y LOCATED ABOVE CONDUIT RACK Y N N GOOD

20-4-55-RD-001 Y ACCESS THROUGH ROOF HATCH Y UNKNOWN UNKNOWN UNKNOWN RELOCATE PER ARCHITECTURAL

DRAWINGS

20-4-56-RD-001 Y NONE Y N N GOOD

20-4-57-RD-001 Y ABOVE CEILING TILES N Y N GOOD

20-4-58-RD-001 N BUILDING 20, ROOM 138, HARD

CEILING

- - - - DRAIN PIPING NOT ACCESSIBLE

BY A/E COORDINATE WITH COR.

01-1-59-RD-001 Y ABOVE CEILING TILE Y N N GOOD

01-1-59-RD-002 Y ABOVE CEILING TILE Y N N GOOD

SCALE: 1/8"=1'-0"

ROOF AREA 81

LEGEND

NOT IN CONTRACT (NIC)

SD

SD

01-B-36-RD-002

NEW 6" RISER

STORM LEADER ROUTED

ABOVE CEILING

NEW ROOF DRAIN ABOVE

SEE A-501, DETAIL 5

CO

SD

SD

SD

SD

SD

SD

SDSDSDSDSDSDSDSDSDSDSDSD

SD

EXISTING RISER

NEW 6" RISER

CO

307308309

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING ENLARGED PLAN - ROOF

AREA 7

CONSTRUCTION

DOCUMENTS

AE DESIGN SERVICES FOR ROOF

REPLACEMENT

3495 BAILEY AVENUE

BUFALO, NY 14215

2019/11/13 P-401

B1

528-17-S49

SBV CJR

REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

A WING

E

WING

D WINGC WING

B WING

ROOF AREA 6 ROOF

AREA

ROOF

AREA 2

ROOF

AREA 1

ROOF

AREA

ROOF AREA 5

ROOF

AREA 4

KEYPLAN

ROOF

AREA 8

GENERAL NOTES

1. SEE P-001 FOR P-SERIES NOTES & LEGENDS.

KEYED NOTES

FIELD ROUTE TO EXISTING STORM SEWER IN SUB-BASEMENT.1

SCALE: 3/8" = 1'-0"

PARTIAL PLAN AT KITCHEN AREA (ROOF 36)

P-107

SCALE: 3/8" = 1'-0"

PARTIAL PLAN AT KITCHEN AREA SUB-BASEMENT (ROOF 36)

P-107

DWG-18271-P-001.REV0 PLUMBING NOTES & LEGEND
Sheets and Views
DWG-18271-P-001.REVX PLUMBING NOTES & LEGEND
DWG-18271-P-101.REV0 PLUMBING PLAN - ROOF AREA 1
Sheets and Views
DWG-18271-P-101.REVX PLUMBING PLAN - ROOF AREA 1
DWG-18271-P-102.REV0 PLUMBING PLAN - ROOF AREA 2
Sheets and Views
DWG-18271-P-102.REVX PLUMBING PLAN - ROOF AREA 2
DWG-18271-P-103.REV0 PLUMBING PLAN - ROOF AREA 3
Sheets and Views
DWG-18271-P-103.REVX PLUMBING PLAN - ROOF AREA 3
DWG-18271-P-104.REV0 PLUMBING PLAN - ROOF AREA 4
Sheets and Views
DWG-18271-P-104.REVX PLUMBING PLAN - ROOF AREA 4
DWG-18271-P-105.REV0 PLUMBING PLAN - ROOF AREA 5
Sheets and Views
DWG-18271-P-105.REVX PLUMBING PLAN - ROOF AREA 5
DWG-18271-P-106.REV0 PLUMBING PLAN - ROOF AREA 6
Sheets and Views
DWG-18271-P-106.REVX PLUMBING PLAN - ROOF AREA 6
DWG-18271-P-107.REV0 PLUMBING PLAN - ROOF AREA 7
Sheets and Views
DWG-18271-P-107.REVX PLUMBING PLAN - ROOF AREA 7
DWG-18271-P-108.REV0 PLUMBING PLAN - ROOF AREA 8
Sheets and Views
DWG-18271-P-108.REVX PLUMBING PLAN - ROOF AREA 8
DWG-18271-P-401.REV0 PLUMBING ENLARGED PLAN - ROOF AREA 7
Sheets and Views
DWG-18271-P-401.REVX PLUMBING ENLARGED PLAN - ROOF AREA 7

File details come from the government source that posted it. Updated .