About this file
This document package includes construction drawings and specifications for asbestos abatement and roof replacement projects at a Veterans Affairs medical center facility. The project involves removing and disposing of asbestos-containing materials from six roof areas, including caulk, tar, and other items. A related federal contract opportunity notices a future solicitation for roof replacement services at the same 90,000 square foot facility, with an estimated value between $1 million to $5 million. The 100% small business set-aside contract will be awarded in September 2020, with some preparatory work occurring through winter and full roof replacement mobilizing by March 15, 2021. The solicitation and amendments will be available electronically starting August 14, 2020 on SAM.gov. Responses must be submitted electronically by the due date, with bid bonds required. Interested parties should monitor the website and direct inquiries to the specified contracting officer by email only.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Asbestos Abatement Roof Schematic Report.pdf | ||
| 36C24220B0053 0001.docx | DOCX document | |
| Core Samples - Roof Schematic Report.pdf | ||
| S02 Specs.pdf | ||
| S02 Structural Drawings.pdf | ||
| S02 Electrical Drawings.pdf | ||
| 36C24220B0053_4.docx | DOCX document | |
| S02 Mechanical Drawings.pdf | ||
| S02 Architectural Drawings.pdf | ||
| S02 General Drawings.pdf | ||
| S02 Plumbing Drawings.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RD
RD
RD
RD
RD
RD
C
C
C
C
C
C C
C
C C C C C C C C
C
C
C C
C C
C
C C
C
C
C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ASBESTOS ABATEMENT-ROOF
AREA 6
CONSTRUCTION
DOCUMENTS
AE DESIGN SERVICES FOR ROOF
REPLACEMENT
3495 BAILEY AVENUE
BUFALO, NY 14215
2019/11/13
HA106
B1
528-17-S49
GA NK
REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
SCALE: 1/8"=1'-0"
ROOF AREA 61
"A" WING
"E"
WING
"D" WING"C" WING
"B" WING
ROOF AREA 6 ROOF
AREA
ROOF AREA 2
ROOF
AREA
ROOF
AREA
ROOF AREA 5ROOF
AREA 8
ROOF AREA 4
KEYPLAN
GENERAL NOTES
A. PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.
B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL IS IDENTIFIED DURING
CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR REPRESENTATIVE FOR FURTHER DIRECTION. UNDER
NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE BULK SAMPLES OF SUSPECT MATERIALS
WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.
C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A
LICENSED ASBESTOS ABATEMENT CONTRACTOR.
D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL
ORIENTATION ONLY.
E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR
PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.
F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR
PROVIDING LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR
REPRESENTATIVE WILL NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.
G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING
TEMPORARY PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT
UNAUTHORIZED ACCESS DURING THE DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF
INADEQUATE TEMPORARY PROTECTION OR CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY
PACKAGED PRIOR TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS
WASTE CONTAINERS AS APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE
REMOVED FROM THE WORK AREA(S) SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE
SHIPMENT RECORDS MUST BE PROVIDED TO THE OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL
WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.
I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE
ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.
J. REFER TO SPECIFICATION SECTIONS 028213.21 AND 028333.13 AND THE CONTRACT DOCUMENTS FOR ADDITIONAL
INFORMATION AND COORDINATION.
LEAD AWARENESS NOTES
1. CONTRACTORS ARE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION;
INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS BEEN PERFORMED ON REPRESENTATIVE BUILDING
COMPONENTS ON THE VARIOUS ROOF LEVELS. REFER TO TEST DATA AVAILABLE UNDER SEPARATE COVER FOR
ADDITIONAL INFORMATION ON SURFACES/COMPONENTS THAT HAVE BEEN IDENTIFIED TO BE COVERED WITH
LEAD-BASED PAINT/COATINGS.
3. ALL DISTURBANCE OF LEAD SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION 028333.13 - LEAD-BASED PAINT
REMOVAL AND DISPOSAL.
4. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE
DISTURBANCE OF LEAD.
5. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE CONTRACTORS OF THEIR RESPONSIBILITIES UNDER
OSHA TO DETERMINE THE LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE
EXPOSED TO, AND TO WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF
LEAD-CONTAINING MATERIALS.
ASBESTOS ABATEMENT NOTES
AA-1 NOT USED.
AA-2 REMOVE AND DISPOSE OF THE ASBESTOS-CONTAINING CAULK ALONG THE SIDES (INTERIOR AND EXTERIOR) AND
BETWEEN THE PARAPET WALL AND COPING STONES. THE CAULK AND BACKER ROD SHALL BE RAKED OUT AND
COMPLETELY REMOVED.
SCALE: NTS
VIEW OF THE CAULK ASSOCIATED WITH THE COPING STONES2
AA-2
95 Perry Street , Suite 300
Buffalo, New York 14203 p: 716.206.5100 f: 716.206.5199
AA-2
SCALE: NTS
VIEW OF THE CAULK BETWEEN THE MASONRY AND COPING STONES3
AA-2
AA-2
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text N
AutoCAD SHX Text N
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
C C C
E
E
E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ASBESTOS ABATEMENT-ROOF
AREA 1
CONSTRUCTION
DOCUMENTS
AE DESIGN SERVICES FOR ROOF
REPLACEMENT
3495 BAILEY AVENUE
BUFALO, NY 14215
2019/11/13
HA101
B1
528-17-S49
GA NK
REV 0 - CONSTRUCTION DOCUMENTS 2019/11/13
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
SCALE: 1/8"=1'-0"
ROOF AREA 11
"A" WING
"E"
WING
"D" WING"C" WING
"B" WING
ROOF AREA 6 ROOF
AREA
ROOF AREA 2
ROOF
AREA
ROOF
AREA
ROOF AREA 5ROOF
AREA 8
ROOF AREA 4
KEYPLAN
ROOF
AREA
GENERAL NOTES
A. PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.
B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL IS IDENTIFIED DURING
CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR REPRESENTATIVE FOR FURTHER DIRECTION. UNDER
NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE BULK SAMPLES OF SUSPECT MATERIALS
WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.
C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A
LICENSED ASBESTOS ABATEMENT CONTRACTOR.
D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL
ORIENTATION ONLY.
E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR
PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.
F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR
PROVIDING LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR
REPRESENTATIVE WILL NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.
G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING
TEMPORARY PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT
UNAUTHORIZED ACCESS DURING THE DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF
INADEQUATE TEMPORARY PROTECTION OR CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY
PACKAGED PRIOR TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS
WASTE CONTAINERS AS APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE
REMOVED FROM THE WORK AREA(S) SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE
SHIPMENT RECORDS MUST BE PROVIDED TO THE OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL
WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.
I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE
ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.
J. REFER TO SPECIFICATION SECTIONS 028213.21 AND 028333.13 AND THE CONTRACT DOCUMENTS FOR ADDITIONAL
INFORMATION AND COORDINATION.
LEAD AWARENESS NOTES
1. CONTRACTORS ARE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION;
INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS BEEN PERFORMED ON REPRESENTATIVE BUILDING
COMPONENTS ON THE VARIOUS ROOF LEVELS. REFER TO TEST DATA AVAILABLE UNDER SEPARATE COVER FOR
ADDITIONAL INFORMATION ON SURFACES/COMPONENTS THAT HAVE BEEN IDENTIFIED TO BE COVERED WITH
LEAD-BASED PAINT/COATINGS.
3. ALL DISTURBANCE OF LEAD SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION 028333.13 - LEAD-BASED PAINT
REMOVAL AND DISPOSAL.
4. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE
DISTURBANCE OF LEAD.
5. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE CONTRACTORS OF THEIR RESPONSIBILITIES UNDER
OSHA TO DETERMINE THE LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE
EXPOSED TO, AND TO WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF
LEAD-CONTAINING MATERIALS.
ASBESTOS ABATEMENT NOTES
AA-1 REMOVE AND DISPOSE OF THE ASBESTOS-CONTAINING GRAY/BLACK TAR ON THE BASE OF THE LIGHTNING RODS. THE
TAR SHALL BE SCRAPED FROM THE BASE COMPLETELY DOWN TO THE SUBSTRATE.
AA-2 NOT USED.
AA-1
AA-1
SCALE: NTS
VIEW OF THE TAR ON THE BASE OF THE LIGHTING RODS2
95 Perry Street , Suite 300
Buffalo, New York 14203 p: 716.206.5100 f: 716.206.5199
AA-1
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text N
AutoCAD SHX Text N
| DWG-18271-HA106.REV0 ASBESTOS ABATEMENT-ROOF AREA 6.pdf |
| Sheets and Views |
| HA106 |
| DWG-18271-HA101.REV0 ASBESTOS ABATEMENT-ROOF AREA 1.pdf |
| Sheets and Views |
| HA101 |
File details come from the government source that posted it. Updated .