Asbestos Abatement Roof Schematic Report.pdf
PDF 21 MB Posted
- Attached to
- Z1DA--528-16-112 BUFFALO VAMC ROOF REPLACEMENT
- Solicitation number
- 36C24220B0053
About this file
This notice provides details for a federal contract solicitation to replace the roof at the Buffalo VA Medical Center. The solicitation number is 36C24220B0053 and will be posted on or about August 14, 2020 for all labor, materials, and equipment required to fully replace the roofing of approximately 90,000 square feet. The procurement is a 100% set-aside for small businesses under NAICS code 238160 for roofing contractors with a size standard of $16.5 million. The estimated contract value is between $1 million and $5 million. A site visit will be included with the solicitation. Bids are due electronically by the time specified in the solicitation. Award is anticipated on or about September 20, 2020, with only ancillary work possible before winter. Full mobilization is scheduled for March 15, 2021, permitting weather. Interested parties should monitor the beta.sam.gov website for solicitation materials and any amendments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24220B0053 0001.docx | DOCX document | |
| Core Samples - Roof Schematic Report.pdf | ||
| S02 Specs.pdf | ||
| S02 Structural Drawings.pdf | ||
| S02 Electrical Drawings.pdf | ||
| S02 Hazardous Materials Drawings.pdf | ||
| 36C24220B0053_4.docx | DOCX document | |
| S02 Mechanical Drawings.pdf | ||
| S02 Architectural Drawings.pdf | ||
| S02 General Drawings.pdf | ||
| S02 Plumbing Drawings.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOF REPLACEMENT DESIGN 100% SCHEMATIC SUBMISSION
BUFFALO VAMC | BUFFALO, NEW YORK 2/8/19
ASBESTOS AND LEAD TESTING SURVEY RESULTS
A P P E N D
I X
B
PRE-RENOVATION SURVEY
FOR
ASBESTOS-CONTAINING MATERIALS
AND
LEAD-BASED PAINT
FOR THE
BUILDING 1 AND BUILDING 20 ROOF REPLACEMENTS
AT THE
BUFFALO VA MEDICAL CENTER
3495 BAILEY AVENUE
BUFFALO, NEW YORK
NOVEMBER 2018
PREPARED FOR:
Encorus Group 23 Mechanics Street Springville, New York
PREPARED BY:
95 Per ry S t reet , Su i te 300 Bu f fa lo, New York 14203 p : 716.206.5100 f : 716.206.5199
TABLE OF CONTENTS
1.0 – EXECUTIVE SUMMARY
1.1 – ROOF LEVEL DIAGRAM
2.0 – ASBESTOS-CONTAINING MATERIALS
2.1 – ASBESTOS SAMPLE LOCATION DRAWING
2.2 – PHOTOGRAPHS
2.3 – ASBESTOS LABORATORY REPORTS AND CHAIN-OF-CUSTODY FORMS
3.0 – LEAD-BASED PAINT
3.1 – X-RAY FLUORESCENCE ANALYZER (XRF) LEAD DATA TABLE
3.2 – PHOTOGRAPHS
4.0 – LABORATORY ACCREDITATIONS
5.0 – CONSULTANT’S LICENSE AND PERSONNEL CERTIFICATION
1.0 – EXECUTIVE SUMMARY
1.0 EXECUTIVE SUMMARY
Watts Architecture & Engineering (Watts) was retained by Encorus Group to perform testing for asbestos-containing materials (ACM) and lead-based paints (LBP) on various roofs of buildings 1 and 20 at the Buffalo VA Medical Center, located in Buffalo NY. The purpose of this survey was to determine if any ACM or LBP would be disturbed by the replacement of the various roofs.
This report contains the results of analytical testing of bulk samples collected by Watts. The field work was conducted on October 19 and 26, 2018 and included the following:
• A visual site inspection to identify suspect ACM.
• Collection and laboratory analysis for asbestos content of samples from identified suspect materials.
• Testing of painted surfaces using an X-Ray Fluorescence Analyzer (XRF) for the presence of LBP.
• Documentation of sample locations on a sample location drawing and a chain-of-custody form; and
• Photo documentation.
ASBESTOS-CONTAINING MATERIALS
The inspection included the collection of 184 bulk samples to represent 92 homogeneous materials that were identified as suspect asbestos-containing material (ACM). ACM is defined as any material containing more than one percent (1%) of asbestos. Based on laboratory analysis and visual observations, the following ACM have been identified within the proposed project limits:
Building 1, Roof 1
• Gray lightning rod base tar installed at the penthouse roof of Roof 1. Cumulatively there are four (4) lightning rods with approximately one (1) square foot of asbestos-containing tar at each location. The observed tar is in fair condition and is non-friable.
Building 1, Roof 16
• White caulk at coping installed on the outside seam between the cap flashing and coping stones. There is approximately four (4) square feet (44 linear feet) of this caulk. The asbestos-containing caulk is in good condition and is non-friable.
NON-ASBESTOS CONTAINING MATERIALS
The following materials were sampled by Watts as part of this investigation and determined to be non-ACM:
• Roof 1 field coating.*
• Roof 1 bituminous field.
• Roof 1 penetration tar with silver sealant.*
• Roof 1 flashing core.*
• Roof 1 white flashing caulk.
• Roof 1 tar at underside of penthouse roof.
• Roof 2 field coating.*
• Roof 2 bituminous field.*
• Roof 2 flashing core.*
• Roof 3 field coating.*
• Roof 3 bituminous field.
• Roof 3 flashing core.
• Roof 3 roofing tar.
• Roof 3 white flashing caulk.
• Roof 3 penetration tar with silver coating.
• Roof 4 field coating.
• Roof 4 bituminous field.
• Roof 4 flashing core.
• Roof 4 white flashing caulk.
• Roof 5 bituminous field.
• Roof 5 tar paper.
• Roof 5 white flashing caulk.
• Roof 5 vapor barrier.
• Roof 5B bituminous field.
• Roof 5B tar paper.
• Roof 5B vapor barrier.
• Roof 6 bituminous field.
• Roof 6 tar paper.
• Roof 6 white flashing caulk.
• Roof 6 white penetration sealant at vent stacks.
• Roof 7 field coating.
• Roof 7 bituminous field.
• Roof 7 tar paper.
• Roof 7 gypsum.
• Roof 7 vapor barrier.
• Roof 7 flashing core.
• Roof 7 gray flashing caulk.
• Roof 7 brown penetration sealant.
• Roof 9 bituminous field.
• Roof 9 tar paper.
• Roof 9 vapor barrier.
• Roof 9 flashing tar.
• Roof 9A field coating.
• Roof 9A bituminous field.
• Roof 9A gypsum.
• Roof 9A tar paper.*
• Roof 9A vapor barrier.
• Roof 9A gray flashing tar.
• Roof 10 bituminous field.
• Roof 10 tar paper.
• Roof 10 vapor barrier.
• Roof 10A field coating.
• Roof 10A bituminous field.
• Roof 10A gypsum.
• Roof 10A tar paper.
• Roof 10A vapor barrier.
• Roof 10A flashing core.
• Roof 10A black seam sealant.
• Roof 11 bituminous field.
• Roof 11 tar paper.
• Roof 11 vapor barrier.
• Roof 11 flashing tar.
• Roof 11 gray flashing caulk.
• Roof 12 field coating.
• Roof 12 gypsum.
• Roof 12 green leveler.
• Roof 12 flashing core.
• Roof 13 tar paper.
• Roof 13A tar paper.
• Roof 14 coping seam sealant.
• Roof 14 gray flashing caulk.*
• Roof 16 roofing tar.
• Roof 16 tar paper.
• Roof 16 flashing tar.
• Roof 16 gray flashing caulk.
• Roof 17 saturated felt paper.
• Roof 17 tar paper.
• Roof 18 bituminous field.
• Roof 18 tar paper.
• Roof 18 vapor barrier.
• Roof 18 flashing core.*
• Roof 18 gray flashing caulk.
• Roof 18A bituminous field.
• Roof 18A tar paper.
• Roof 18A vapor barrier.
• Roof 19 saturated felt paper.
• Roof 19 tan parapet caulk.
• Loading dock roof saturated felt paper.
• Loading dock roof tar paper.
• Loading dock roof gray flashing caulk.
*All contractors shall note these materials had detectable levels of asbestos present, but were found to be less than 1.0% asbestos and, therefore, the materials are classified as non-ACM.
Contractors shall follow federal regulations, including those established by OSHA for work involving materials with trace levels (<1.0%) of asbestos.
LEAD-BASED PAINT
Findings
XRF readings were taken from representative components at the various roof levels of Buildings 1 and 20 at the Buffalo VAMC. The following surfaces were determined to be coated with lead-based paint:
• Lead vent stacks at Roof 2, Roof 3, Roof 4 and Roof 7.
• Yellow roof access ladder at Roof 1.
• Brown wood man door and frame at Roof 18.
• Lead flashing buried under newer flashing at the loading dock roof and at Roof 16.
• Silver coated vent hoods at Roof 4.
• Silver coated flashing at Roof 4.
• Light gray door frames at stair towers at Roof 6.
• Tan vent cover at Roof 12.
• Gray man door threshold at Roof 9A.
The vent stacks and flashing are comprised of lead and are in good condition. The yellow painted access ladder, tan coated vent cover and light gray painted door frames were also in good condition with no peeling or flaking paint evident. The brown paint on the wooden man door and frame at Roof 18 was observed to be in poor condition. The silver coated vent hoods and flashing on Roof 4 were observed to be in fair condition but other components with the same silver coating tested negative for lead. It is assumed that a lead-containing primer is underneath the silver coating. The man door threshold at the Roof 9A entrance was observed to be in fair condition.
1.1 – ROOF LEVEL DIAGRAM
Buffalo VA Medical Center Roofs by Building
Building 1:
• Roof 1
• Roof 2
• Roof 3
• Roof 4
• Roof 5
• Roof 5B
• Roof 6
• Roof 7
• Roof 8 (Not Sampled)
• Roof 9
• Roof 9A
• Roof 10
• Roof 10A
• Roof 11
• Roof 12
• Roof 13
• Roof 13A
• Roof 16
• Roof 17
• Roof 18
• Roof 18A
• Roof 19
• Loading Dock Roof
Building 20:
• Roof 14
• Roof 15 (Not Sampled)
2.0 – ASBESTOS-CONTAINING MATERIALS
2.0 ASBESTOS-CONTAINING MATERIALS
This section includes information on all suspect ACM sampledand includes the following:
Homogeneous Materials List containing the homogeneous materials identified, their corresponding sample numbers and whether or not they are ACM, as well as drawings identifying the approximate locations of asbestos bulk samples.
All ACM that was identified has been inspected in order to determine its approximate quantity, condition, and whether it is friable or non-friable. Refer to the sample location drawings for approximate bulk sample locations.
Where possible, Watts visually inspected the identified ACM to assess its condition. The condition of the ACM was classified as good, fair or poor. The requirement for each designation is as follows:
Good - Material with no visible damage or deterioration or showing very limited damage or deterioration.
Fair - The surface of the material is crumbling, blistering, water-stained, gouged, punctured or otherwise damaged with the damage covering less than one tenth of the surface if the damage is evenly distributed or up to 25% of the material if the damage is localized.
Poor - The surface of the material is crumbling, blistering, water-stained, gouged, punctured or otherwise damaged with the damage covering more than one tenth of the surface if the damage is evenly distributed or more than 25% of the material if the damage is localized. Material with large areas hanging from the substrate, delaminated, heavily gouged, crushed, etc.
Sampling and Laboratory Methodology
A NYSDOL-certified asbestos inspector from Watts collected bulk samples of all suspect asbestos-containing roofing materials that were identified in the various roof levels of Building 1 and Building 20 that were included in the project. Bulk samples were collected using simple hand tools from each matrix identified as a potential ACM.
Samples were delivered with the proper chain-of-custody forms to AmeriSci, a New York State accredited laboratory that is a participant in the Environmental Laboratory Approval Program (ELAP) and National Voluntary Laboratory Approval Program (NVLAP). All materials, except non-friable organically bound (NOB) materials, were analyzed using Polarized Light Microscopy (PLM) using ELAP Method 198.1. NOBs, which include but are not limited to, mastics, caulks, and roofing materials underwent gravimetric reduction prior to being analyzed by PLM 198.6. All samples that were negative after PLM 198.6 were further analyzed by Transmission Electron Microscopy (TEM) under ELAP Method 198.4. The New York State Department of Health (NYSDOH) protocol requires analysis by TEM if the PLM analysis does not confirm the presence of asbestos.
It is the belief of Watts that this investigation has identified all reasonably accessible suspect ACMs that will be disturbed by this project. If additional suspect materials are identified during the construction period that have not been previously sampled or sampled as part of this assessment, samples of each material should be collected and analyzed for asbestos content.
Material Description
Sample Location Type Sample Number Results (% Asbestos) ACM
PLM TEM Y/N
Roof 1 Field Coating
Building 1, Roof 1 M 18178-01
18178-02
NAD
Chrysotile Trace
Chrysotile Trace
N
Roof 1 Bituminous Field
Building 1, Roof 1 M 18178-03 18178-04
NAD
NAD
NAD
NAD
N
Penetration Tar with Silver Sealant
18178-05
18178-06
Trace
Chrysotile Trace
N
Roof 1 Flashing Core
18178-07
18178-08
Trace
NAD
N
White Flashing Core
Building 1, Roof 1 M 18178-09 18178-10
NAD
NAD
NAD
NAD
N
Roof 2 Field Coating
Building 1, Roof 2 M 18178-11
18178-12
Trace
Chrysotile Trace
N
Roof 2 Bituminous Field
18178-13
18178-14
Trace
Chrysotile Trace
N
Roof 2 Flashing Core
18178-15
18178-16
Trace
Chrysotile Trace
N
Roof 3 Field Coating
Building 1, Roof 3 M 18178-17
18178-18
Trace
Chrysotile Trace
N
Roof 3 Bituminous Field Building 1, Roof 3 M
18178-19 18178-20
NAD
NAD
NAD
NAD N
Roof 3 Flashing Core
Building 1, Roof 3 M 18178-21 18178-22
NAD
NAD
NAD
NAD
N
Roof 3 Roofing Tar Building 1, Roof 3 M 18178-23 18178-24
NAD
NAD
NAD N
Sample Location Type Sample Number Results (% Asbestos) ACM
PLM TEM Y/N
Roof 3 White Flashing Caulk
Building 1, Roof 3 M 18178-25 18178-26
NAD
NAD
NAD
NAD
N
Roof 3 Penetration Tar with Silver
Coating Building 1, Roof 3 M
18178-27 18178-28
NAD
NAD
NAD
NAD
N
Roof 4 Field Coating
Building 1, Roof 4 M 18178-29 18178-30
NAD
NAD
NAD
NAD
N
Roof 4 Bituminous Field
Building 1, Roof 4 M 18178-31 18178-32
NAD
NAD
NAD
NAD
N
Roof 4 Flashing Core
Building 1, Roof 4 M 18178-33 18178-34
NAD
NAD
NAD
NAD
N
Roof 4 White Flashing Caulk
Building 1, Roof 4 M 18178-35 18178-36
NAD
NAD
NAD
NAD
N
Roof 5 Bituminous Field
Building 1, Roof 5 M 18178-37 18178-38
NAD
NAD
NAD
NAD
N
Roof 5 Tar Paper Building 1, Roof 5 M 18178-39 18178-40
NAD
NAD
NAD
NAD
N
Roof 5 White Flashing Caulk
Building 1, Roof 5 M 18178-41 18178-42
NAD
NAD
NAD
NAD
N
Roof 5 Vapor Barrier
Building 1, Roof 5 M 18178-43 18178-44
NAD
NAD
NAD
NAD
N
Roof 5B Bituminous Field
Building 1, Roof 5B M 18178-45 18178-46
NAD
NAD
NAD
NAD
N
Roof 5B Tar Paper Building 1, Roof 5B M 18178-47 18178-48
NAD
NAD
NAD
NAD
N
Roof 5B Vapor Barrier
Building 1, Roof 5B M 18178-49 18178-50
NAD
NAD
NAD
NAD
N
Roof 6 Bituminous Field
Building 1, Roof 6 M 18178-51 18178-52
NAD
NAD
NAD
N
Sample Location Type Sample Number Results (% Asbestos) ACM
PLM TEM Y/N
Roof 6 Tar Paper Building 1, Roof 6 M 18178-53 18178-54
NAD
NAD
NAD
NAD
N
Roof 6 White Flashing Tar
Building 1, Roof 6 M 18178-55 18178-56
NAD
NAD
NAD
NAD
N
Roof 7 Field Coating
Building 1, Roof 7 M 18178-57 18178-58
NAD
NAD
NAD
NAD
N
Roof 7 Bituminous Field
Building 1, Roof 7 M 18178-59 18178-60
NAD
NAD
NAD
NAD
N
Roof 7 Tar Paper Building 1, Roof 7 M 18178-61 18178-62
NAD
NAD
NAD
NAD
N
Roof 7 Gypsum Building 1, Roof 7 M 18178-63 18178-64
NAD
NAD
NA
NA
N
Roof 7 Vapor Barrier
Building 1, Roof 7 M 18178-65 18178-66
NAD
NAD
NAD
NAD
N
Roof 7 Flashing Core
Building 1, Roof 7 M 18178-67 18178-68
NAD
NAD
NAD
NAD
N
Roof 7 Gray Flashing Caulk
Building 1, Roof 7 M 18178-69 18178-70
NAD
NAD
NAD
NAD
N
Roof 7 Brown Penetration Sealant
Building 1, Roof 7 M 18178-71 18178-72
NAD
NAD
NAD
NAD
N
Roof 9 Bituminous Field
Building 1, Roof 9 M 18178-73 18178-74
NAD
NAD
NAD
NAD
N
Roof 9 Tar Paper Building 1, Roof 9 M 18178-75 18178-76
NAD
NAD
NAD
NAD
N
Roof 9 Vapor Barrier
Building 1, Roof 9 M 18178-77 18178-78
NAD
NAD
NAD
NAD
N
Roof 9 Flashing Tar
Building 1, Roof 9 M 18178-79 18178-80
NAD
NAD
NAD
Sample Location Type Sample Number Results (% Asbestos) ACM
PLM TEM Y/N
Roof 9A Field Coating
Building 1, Roof 9A M 18178-81 18178-82
NAD
NAD
NAD
NAD
N
Roof 9A Bituminous Field
Building 1, Roof 9A M 18178-83 18178-84
NAD
NAD
NAD
NAD
N
Roof 9A Gypsum Building 1, Roof 9A M 18178-85 18178-86
NAD
NAD
NA
NA
N
Roof 9A Tar Paper Building 1, Roof 9A M 18178-87
18178-88
Chrysotile
Trace N
Roof 9A Vapor Barrier
Building 1, Roof 9A M 18178-89 18178-90
NAD
NAD
NAD
NAD
N
Roof 9A Gray Flashing Tar
Building 1, Roof 9A M 18178-91 18178-92
NAD
NAD
NAD
NAD
N
Roof 10 Bituminous Field
Building 1, Roof 10 M 18178-93 18178-94
NAD
NAD
NAD
NAD
N
Roof 10 Tar Paper Building 1, Roof 10 M 18178-95 18178-96
NAD
NAD
NAD
NAD
N
Roof 10 Vapor Barrier
Building 1, Roof 10 M 18178-97 18178-98
NAD
NAD
NAD
NAD
N
Roof 10A Field Coating
Building 1, Roof 10A M 18178-99
18178-100
NAD
NAD
NAD
NAD
N
Roof 10A Bituminous Field
Building 1, Roof 10A M 18178-101 18178-102
NAD
NAD
NAD
NAD
N
Roof 10A Gypsum Building 1, Roof 10A M 18178-103 18178-104
NAD
NAD
NA
NA
N
Roof 10A Tar Paper
Building 1, Roof 10A M 18178-105 18178-106
NAD
NAD
NAD
NAD
N
Roof 10A Vapor Barrier
Building 1, Roof 10A M 18178-107 18178-108
NAD
NAD
NAD
Sample Location Type Sample Number Results (% Asbestos) ACM
PLM TEM Y/N
Roof 10A Flashing Core
Building 1, Roof 10A M 18178-109 18178-110
NAD
NAD
NAD
NAD
N
Roof 10A Black Seam Sealant
Building 1, Roof 10A M 18178-110 18178-112
NAD
NAD
NAD
NAD
N
Roof 11 Bituminous Field
Building 1, Roof 11 M 18178-113 18178-114
NAD
NAD
NAD
NAD
N
Roof 11 Tar Paper Building 1, Roof 11 M 18178-115 18178-116
NAD
NAD
NAD
NAD
N
Roof 11 Vapor Barrier
Building 1, Roof 11 M 18178-117 18178-118
NAD
NAD
NAD
NAD
N
Roof 11 Flashing Tar
Building 1, Roof 11 M 18178-119 18178-120
NAD
NAD
NAD
NAD
N
Roof 11 Gray Flashing Caulk
Building 1, Roof 11 M 18178-121 18178-122
NAD
NAD
NAD
NAD
N
Roof 12 Field Coating
Building 1, Roof 12 M 18178-123 18178-124
NAD
NAD
NAD
NAD
N
Roof 12 Gypsum Building 1, Roof 12 M 18178-125 18178-126
NAD
NAD
NA
NA
N
Roof 12 Green Leveler
Building 1, Roof 12 M 18178-127 18178-128
NAD
NAD
NA
NA
N
Roof 12 Flashing Core
Building 1, Roof 12 M 18178-129 18178-130
NAD
NAD
NAD
NAD
N
Roof 14 Coping Seam Sealant
Building 20, Roof 14 M 18178-131 18178-132
NAD
NAD
NAD
NAD
N
Roof 14 Gray Flashing Caulk
Building 20, Roof 14 M 18178-133
18178-134
Trace
Chrysotile Trace
N
Roof 18 Bituminous Field
Building 1, Roof 18 M 18178-135 18178-136
NAD
NAD
NAD
Sample Location Type Sample Number Results (% Asbestos) ACM
PLM TEM Y/N
Roof 18 Tar Paper Building 1, Roof 18 M 18178-137 18178-138
NAD
NAD
NAD
NAD
N
Roof 18 Vapor Barrier
Building 1, Roof 18 M 18178-139 18178-140
NAD
NAD
NAD
NAD
N
Roof 18 Flashing Core
Building 1, Roof 18 M 18178-141
18178-142
<0.25
Chrysotile <0.25
Chrysotile Trace
Chrysotile Trace
N
Roof 18 Gray Flashing Caulk
Building 1, Roof 18 M 18178-143 18178-144
NAD
NAD
NAD
NAD
N
Roof 18A Bituminous Field
Building 1, Roof 18A M 18178-145 18178-146
NAD
NAD
NAD
NAD
N
Roof 18A Tar Paper
Building 1, Roof 18A M 18178-147 18178-148
NAD
NAD
NAD
NAD
N
Roof 18A Vapor Barrier
Building 1, Roof 18A M 18178-149 18178-150
NAD
NAD
NAD
NAD
N
Roof 1 Lightning Rod Base Tar Building 1, Roof 1 M 18178-151
18178-152
8.0 Chrysotile
NA/PS
NA
NA Y
Roof 1 Tar at Underside of
Penthouse Roof Building 1, Roof 1 M
18178-153 18178-154
NAD
NAD
NAD
NAD
N
Roof 6 White Penetration Sealant at Vent Stacks Building 1, Roof 6 M
18178-155 18178-156
NAD
NAD
NAD
NAD
N
Roof 13 Tar Paper Building 1, Roof 13 M 18178-157 18178-158
NAD
NAD
NAD
NAD
N
Roof 13A Tar Paper
Building 1, Roof 13A M 18178-159 18178-160
NAD
NAD
NAD
NAD
N
Roof 16 Roofing Tar
Building 1, Roof 16 M 18178-161 18178-162
NAD
NAD
NAD
NAD
N
Roof 16 Tar Paper Building 1, Roof 16 M 18178-163 18178-164
NAD
NAD
NAD
Sample Location Type Sample Number Results (% Asbestos) ACM
PLM TEM Y/N
Roof 16 Flashing Tar
Building 1, Roof 16 M 18178-165 18178-166
NAD
NAD
NAD
NAD
N
Roof 16 Gray Flashing Caulk
Building 1, Roof 16 M 18178-167 18178-168
NAD
NAD
NAD
NAD
N
Roof 16 White Caulk at Coping Building 1, Roof 16 M 18178-169
18178-170
3.8 Chrysotile
NA/PS
NA
NA Y
Roof 17 Saturated Felt Paper
Building 1, Roof 17 M 18178-171 18178-172
NAD
NAD
NAD
NAD
N
Roof 17 Tar Paper Building 1, Roof 17 M 18178-173 18178-174
NAD
NAD
NAD
NAD
N
Roof 19 Saturated Felt Paper
Building 1, Roof 19 M 18178-175 18178-176
NAD
NAD
NAD
NAD
N
Roof 19 Tan Parapet Caulk
Building 1, Roof 19 M 18178-177 18178-178
NAD
NAD
NAD
NAD
N
Loading Dock Roof Saturated Felt
Paper
Building 1, Loading Dock Roof
M 18178-179 18178-180
NAD
NAD
NAD
NAD
N
Loading Dock Roof Tar Paper
Building 1, Loading Dock Roof
M 18178-181 18178-182
NAD
NAD
NAD
NAD
N
Loading Dock Roof Gray Flashing
Caulk
Building 1, Loading Dock Roof
M 18178-183 18178-184
NAD
NAD
NAD
ND = None Detected Y = Yes S = Surfacing NA = Not Analyzed N = No T = Thermal System Insulation NA/PS = Not Analyzed/Positive Stop M = Miscellaneous
2.1 – ASBESTOS SAMPLE LOCATION DRAWING
2.2 – ASBESTOS PHOTOGRAPHS
Photo 1: Lightning rod base tar observed tar at Roof 1. This is an asbestos-containing material.
Photo 2: White caulk at coping stone and cap flashing observed at Roof 16. This is an asbestos-containing material.
Photo 3: Roof 1 field core. The materials sampled were the field coating and the bituminous field. The field coating is a trace material and the bituminous field is a non-asbestos-containing material.
Photo 4: Roof 1 flashing core. The material sampled was the flashing core itself. The flashing core is a trace material.
Photo 5: Penetration tar found at Roof 1 & Roof 3. The materials were sampled separately. The tar at Roof 1 was determined to be a trace material while the tar at Roof 3 was determined to be a non-asbestos-containing material.
Photo 6: Tar observed at the underside of the penthouse roof at Roof 1. The material was determined to be a non-asbestos-containing material.
Photo 7: White flashing caulk observed at Roofs 1, 3, 4, 5 & 6. Samples were taken from each of those roof levels. Each sample of the caulk was determined to be non-asbestos-containing.
Photo 8: Roof 2 field coating and bituminous field. Both were determined to be a trace materials.
Photo 9: Roof 2 flashing core. The flashing core is a trace material.
Photo 10: Roof 3 field coating and bituminous field. The field coating is a trace material while the bituminous field is a non-asbestos-containing material.
Photo 11: Roof 3 flashing core. The flashing core is a non-asbestos-containing material.
Photo 12: Roof 3 roofing tar. The roofing tar is a non-asbestos-containing material.
Photo 13: Roof 4 field coating and bituminous field. Both materials are non-asbestos-containing.
Photo 14: Roof 4 flashing core. Material is non-asbestos-containing.
Photo 15: Roof 5 field core. The bituminous field, tar paper and vapor barrier were sampled. All of the materials are non-asbestos-containing.
Photo 16: Roof 5 and 5B flashing core. No suspect-asbestos materials were observed.
Photo 17: Roof 5B field core. The bituminous field and tar paper were sampled. Both materials are non-asbestos-containing.
Photo 18: Roof 6 field core. The bituminous field and tar paper were sampled. Both materials are non-asbestos-containing.
Photo 19: Roof 6 flashing core. No suspect-asbestos materials were observed.
Photo 20: Roof 6 white penetration sealant at vent stacks. The material is non-asbestos-containing.
Photo 21: Roof 7 field core. The materials tested were the field coating, bituminous field, tar paper, gypsum and the vapor barrier. All of the materials are non-asbestos-containing.
Photo 22: Roof 7 flashing core. All of the materials are non-asbestos-containing.
Photo 23: Gray flashing caulk observed at Roofs 7, 11 and 18. The materials were sampled separately. All are non-asbestos-containing.
Photo 24: Roof 7 brown penetration sealant. The material is non-asbestos-containing.
Photo 25: Roof 9 field core. The materials sampled were the bituminous field, the tar paper and the vapor barrier. All of the materials are non-asbestos-containing.
Photo 26: Roof 9 flashing tar. The material is non-asbestos-containing.
Photo 27: Roof 9A field core. The materials sampled were the field coating, bituminous field, gypsum, tar paper and the vapor barrier. All of the materials except the tar paper are non-asbestos-containing. The tar paper is a trace material.
Photo 28: Roof 10 field core. The materials sampled were the bituminous field, tar paper and vapor barrier. All of the materials are non-asbestos-
Photo 29: Roof 10A field core. The materials sampled were the field coating, bituminous field, gypsum, tar paper and vapor barrier. All of the materials are non-asbestos-containing.
Photo 30: Roof 10A flashing core. The material is non-asbestos-containing.
Photo 31: Roof 10A black seam sealant. The material is non-asbestos-containing.
Photo 32: Roof 11 field core. The materials sampled were the bituminous field, tar paper and vapor barrier. All of the materials are non-asbestos-
Photo 33: Roof 11 flashing tar. The material is non-asbestos-containing.
Photo 34: Roof 11 gray flashing caulk. The material is non-asbestos-containing.
Photo 35: Roof 12 field core. The materials sampled were the field coating, gypsum and green leveler. All of the materials are non-asbestos-containing.
Photo 36: Roof 12 flashing core. The material is non-asbestos-containing.
Photo 37: Roof 13 field core. The material sampled was the tar paper which is non-asbestos-containing.
Photo 38: Roof 13 flashing core. There were no suspect-asbestos materials observed.
Photo 39: Roof 13A field core. The material sampled was the tar paper which is non-asbestos-containing.
Photo 40: Roof 13A flashing core. There were no suspect-asbestos materials observed.
Photo 41: Roof 14 coping seam sealant. The material is non-asbestos-containing. It is assumed that the same sealant exists at Roof 15.
Photo 42: Roof 14 gray flashing caulk. The caulk is a trace material. It is assumed that the same caulk exists at Roof 15.
Photo 43: Roof 14 flashing core. There were no suspect-asbestos materials observed. It is assumed that the flashing on Roof 15 is the same.
Photo 44: Roof 16 field core. The materials sampled were the roofing tar and the tar paper. Both materials are non-asbestos-containing.
Photo 45: Roof 16 flashing core. The material is non-asbestos-containing. Note that the tar is adhered to buried lead-containing flashing.
Photo 46: Roof 16 gray flashing caulk. The material is non-asbestos-containing.
Photo 47: Roof 17 field core. The materials sampled were the saturated felt paper and tar paper both of which are non-asbestos-containing.
Photo 48: Roof 18 field core. The materials sampled were the bituminous field, tar paper and vapor barrier. All of the materials are non-asbestos-
Photo 49: Roof 18 flashing core. The material sampled is a trace material.
Photo 50: Roof 18A field core. The materials sampled were the bituminous field, tar paper and vapor barrier. All of the materials are non-asbestos-
Photo 51: Roof 19 field core. The material sampled was the saturated felt paper. The material is non-asbestos-containing.
Photo 52: Roof 19 tan parapet caulk. The material is non-asbestos-containing.
Photo 53: Loading Dock roof field core. The materials sampled were the saturated felt paper and the tar paper. The materials are non-asbestos-containing.
Photo 54: Loading Dock Roof flashing core. The tar was too thin to separate from the buried lead-containing flashing. The tar is assumed to be the same as what is saturated on the field.
Photo 55: Loading Dock Roof gray flashing caulk. The material is non-asbestos-containing.
2.3 – ASBESTOS LABORATORY REPORTS AND
CHAIN-OF-CUSTODY FORMS
3.0 – LEAD-BASED PAINT
3.0 LEAD-BASED PAINT
Methodology
Painted building components were grouped by testing combinations. A testing combination is characterized by location, component type, substrate, and visible color. Refer to section 3.1 for a complete listing of all building component XRF readings taken in this building.
The LBP survey was performed using the Department of Housing and Urban Development (HUD) protocol. Certain aspects of the HUD guidelines are typically applied to public and commercial buildings, most commonly the levels used to establish LBP. HUD defines LBP, when analyzed by a portable XRF, as paint that contains lead at 1.0 milligram per square centimeter (1.0 mg/cm²) or greater. When paint chips are analyzed by Atomic Absorption Spectroscopy (AAS), HUD defines LBP as paint containing 0.5 percent or greater (>0.5%) lead by weight.
For the purposes of this project, the Occupational Safety & Health Administration’s (OSHA) Lead in Construction Standard (29 CFR 1926.62) applies. This standard applies to all construction work where an employee may be occupationally exposed to lead. Construction work is defined as work for construction, alteration and/or repair, including painting and decorating. It includes but is not limited to the following:
• Demolition or salvage of structures where lead or materials containing lead are present;
• Removal or encapsulation of materials containing lead;
• New construction, alteration, repair, or renovation of structures, substrates, or portions thereof, that contain lead, or materials containing lead;
• Installation of products containing lead;
• Lead contamination/emergency cleanup;
• Transportation, disposal, storage, or containment of lead or materials containing lead on the site or location at which construction activities are performed; and
• Maintenance operations associated with the construction activities.
XRF Calibration
In order to field verify the calibration and accuracy of the XRF equipment, “calibration checks” are made both by the equipment itself and by the operator. Before the XRF will allow any testing for lead-based paint, it requires a “calibration check” reading. This is accomplished by placing the XRF unit into the charging holster and running the calibration check, upon completion the XRF will display a Pass or Fail result. If the calibration is successful, the operator checks the calibration of the XRF against National Institute of Standards and Technology (NIST) lead samples that were provided by the manufacturer. The operator’s calibration checks are taken at the beginning and the end of the testing period, and approximately every four hours, if necessary.
The calibration checks are acceptable if the average of the three readings is between 1.0 and
1.1 mg/cm2 (utilizing the error correction factor). A table presenting XRF readings and results is included in the following subsection.
DISCLAIMER
This report is based primarily on the results of visual site observations and a general survey of the conditions on the roofs of Building 1 and 20. Watts did not perform a comprehensive inspection (space by space) of all exterior building components on the various roof levels.
Representative XRF readings were taken from each distinct type of roofing component scheduled to be disturbed by the roof replacement project in order to be able to determine if those components were covered with lead-based paint.
The lead-based paint survey was performed by Watts in October 2018.
3.1 – X-RAY FLUORESCENCE ANALYZER (XRF) LEAD DATA TABLE
Reading Location Side Component Substrate Color Condition Floor Results
(mg/cm2)
1 NA
2 1.09 3 1.07 4 1.02 5 Roof 9A North Man Door Threshold Metal Gray Poor Roof 9A 4.27 6 Roof 9A North Man Door Metal Brown Intact Roof 9A 0.64 7 Roof 9A North Man Door Frame Metal Gray Intact Roof 9A 0.10 8 Roof 9A Roof Cap on Duct Metal Tan Intact Roof 9A 0.00 9 Roof 9 Roof Vent Stack Metal Silver Intact Roof 9 0.02
10 Roof 9 Roof Vent Metal Brown Poor Roof 10 0.30 11 Roof 9 Roof Support Beam Metal Unpainted Intact Roof 11 0.00 12 Roof 9 South Man Door Metal Black Intact Roof 12 0.00 13 Roof 9 South Man Door Frame Metal Black Intact Roof 13 0.02 14 Roof 9 South Fan Metal Blue Fair Roof 14 0.01 15 Roof 10 Roof Access Ladder Metal Brown Intact Roof 10 0.06 16 Roof 10 Roof Access Hatch Metal Silver Intact Roof 10 0.00 17 Roof 10 Roof Roof Drain Cover Metal Silver Intact Roof 10 0.00 18 Roof 10 Roof Fan Metal Green Poor Roof 10 0.03 19 Roof 7 Northwest Man Door Metal Yellow Intact Roof 7 0.00 20 Roof 7 Northwest Man Door Frame Metal Yellow Intact Roof 7 0.00 21 Roof 7 Northeast Man Door Metal Brown Intact Roof 7 0.00 22 Roof 7 Northeast Man Door Frame Metal Brown Intact Roof 7 0.00 23 Roof 7 South Man Door Metal Gray Intact Roof 7 0.00 24 Roof 7 South Man Door Frame Metal Gray Intact Roof 7 0.00 25 Roof 7 South Parapet Brick Yellow Intact Roof 7 0.00 26 Roof 7 Northeast Wall Brick Yellow Intact Roof 7 0.00 27 Roof 7 Roof Coating on Mech. Eqip. Metal Silver Intact Roof 7 0.02 28 Roof 7 Northeast Flashing Metal Gray Intact Roof 7 0.02 29 Roof 7 Roof Roof Drain Cover Metal Red Poor Roof 7 0.01 30 Roof 7 Roof Lead Vent Stacks Metal Metallic Intact Roof 7 >5.00 31 Roof 1 Roof Access Hatch (Interior) Metal Red Intact Roof 1 0.01 32 Roof 1 Roof Access Hatch (Exterior) Metal Silver Poor Roof 1 0.01 33 Roof 1 Roof Access Ladder Metal Yellow Intact Roof 1 1.47 34 Roof 1 Roof Vent Metal Silver Intact Roof 1 0.00 35 Roof 1 Roof Roof Drain Cover Metal Silver Poor Roof 1 0.03 36 Roof 1 North Bracketing Metal Tan Intact Roof 1 0.45 37 Roof 1 Roof Coating on Mech. Eqip. Metal Silver Intact Roof 1 0.51 38 Roof 1 Roof Coating on Penthouse Asphalt Silver Intact Roof 1 0.00 39 Roof 1 Roof Light Post Metal Red Intact Roof 1 0.12 40 Roof 1 East Flashing Metal Silver Intact Roof 1 0.01 41 Roof 2 North Flashing Metal Silver Intact Roof 2 0.00 42 Roof 2 Roof Access Ladder Metal Gray Intact Roof 2 0.35 43 Roof 3 Roof Access Ladder Metal Gray Poor Roof 3 0.21 44 Roof 3 Roof Access Hatch Metal Red Intact Roof 3 0.03 45 Roof 3 Roof Access Hatch Frame Metal Red Intact Roof 3 0.01 46 Roof 3 Roof Roof Drain Cover Metal Silver Intact Roof 3 0.06 47 Roof 3 North Flashing Metal Silver Intact Roof 3 0.00 48 Roof 3 North Conduit Plastic Tan Intact Roof 3 0.00
XRF READINGS
Buffalo VAMC Buildings 1 & 20 Various Roof Levels
Testing Date: October 26, 2018 Innov-X Serial No. 11483, Model 1-3000
Standardization Calibration Calibration
(mg/cm2)
XRF READINGS
Buffalo VAMC Buildings 1 & 20 Various Roof Levels
Testing Date: October 26, 2018 Innov-X Serial No. 11483, Model 1-3000
49 Roof 18 Roof Support Beam Metal Unpainted Intact Roof 18 0.12 50 Roof 18 Roof Staircase Metal Silver Intact Roof 18 0.10 51 Roof 18 Roof Diffuser Metal Silver Intact Roof 18 0.00 52 Roof 18 South Man Door Wood Brown Fair Roof 18 >5.00 53 Roof 18 South Man Door Frame Wood Brown Fair Roof 18 4.29 54 Roof 16 South Flashing Metal Brown Intact Roof 16 0.00
Loading Dock
Roof West New Flashing Metal Brown Intact
Loading Dock Roof
0.00
Loading Dock
Roof West Buried Flashing Metal Brown Intact
Loading Dock Roof
4.07
Loading Dock
Roof Roof Roof Drain Cover Metal Rust Poor
Loading Dock Roof
0.06
58 Roof 19 North Flashing Metal Green Intact Roof 19 0.00 59 Roof 19 East Flashing Metal Brown Intact Roof 19 0.00 60 Roof 13 Roof Transformer Metal Rust Intact Roof 13 0.00 61 Roof 13 Roof Access Ladder Metal Yellow Intact Roof 13 0.00 62 Roof 13 Roof Roof Drain Cover Metal Gray Intact Roof 13 0.03 63 Roof 13A South Flashing Metal White Intact Roof 13A 0.08 64 Roof 13A Roof Roof Drain Cover Metal Yellow Intact Roof 13A 0.04 65 Roof 14 East Man Door Metal White Intact Roof 14 0.02 66 Roof 14 East Man Door Frame Metal White Intact Roof 14 0.02 67 Roof 14 East Man Door Threshold Metal White Intact Roof 14 0.01 68 Roof 14 Roof Windscreen Support Metal Red Intact Roof 14 0.02 69 Roof 14 Roof Windscreen Metal White Intact Roof 14 0.00 70 Roof 14 Roof Pipe Metal White Intact Roof 14 0.00 71 Roof 14 North Flashing Metal Black Intact Roof 14 0.00 72 Roof 14 Roof Roof Drain Cover Metal Yellow Poor Roof 14 0.02 73 Roof 14 Roof Exhaust Fan Metal Blue Intact Roof 14 0.00 74 Roof 4 Roof Access Ladder Metal Gray Intact Roof 4 0.07 75 Roof 4 Roof Access Door Metal Red Intact Roof 4 0.01 76 Roof 4 Roof Access Door Frame Metal Red Intact Roof 4 0.00 77 Roof 4 Roof Vent Hood Metal Silver Intact Roof 4 1.31 78 Roof 4 South West Exterior Access Ladder Metal Gray Intact Roof 4 0.01 79 Roof 4 South West Flashing Metal Silver Intact Roof 4 >5.00 80 Roof 4 Roof Curb Flashing Metal Silver Intact Roof 4 0.00 81 Roof 4 Roof Roof Field EPDM Silver Intact Roof 4 0.01 82 Roof 4 Roof Roof Drain Cover Metal Silver Intact Roof 4 0.00 83 Roof 5 Roof Access Ladder Metal Gray Intact Roof 5 0.00 84 Roof 5 Roof Vent Hood Metal Silver Intact Roof 5 0.72 85 Roof 5 Northeast Access Ladder (Exterior) Metal White Poor Roof 5 0.12 86 Roof 6 Southwest Cementatious Pipe Concrete Silver Poor Roof 6 0.17 87 Roof 6 Southwest Gutter Metal Brown Intact Roof 6 0.00 88 Roof 6 Southwest Man Door Metal White Intact Roof 6 0.03 89 Roof 6 Southwest Man Door Frame Metal White Intact Roof 6 0.02 90 Roof 6 Roof Vent Hood Metal Silver Intact Roof 6 0.00
(mg/cm2)
XRF READINGS
Buffalo VAMC Buildings 1 & 20 Various Roof Levels
Testing Date: October 26, 2018 Innov-X Serial No. 11483, Model 1-3000
91 Roof 6 Southwest Flashing Metal Brown Intact Roof 6 0.00 92 Roof 6 Northeast Man Door Wood Light Gray Intact Roof 6 0.01 93 Roof 6 Northeast Man Door Frame Wood Light Gray Intact Roof 6 >5.00 94 Roof 6 Northwest Man Door Wood Light Gray Intact Roof 6 0.00 95 Roof 6 Northwest Man Door Frame Wood Light Gray Intact Roof 6 3.67 96 Roof 6 East Parapet Brick Yellow Intact Roof 6 0.00 97 Roof 6 Roof Decking Metal Silver Intact Roof 6 0.02 98 Roof 6 Roof Roof Drain Cover Metal Green Poor Roof 6 0.02 99 Roof 12 Roof Roof Vent Cover Metal Tan Intact Roof 12 >1.00
100 Roof 12 Roof Field EPDM Tan Intact Roof 12 0.00 101 Roof 12 West Fencing at Parapet Metal White Intact Roof 12 0.00 102 1.02 103 1.02 104 1.04
Calibration
3.2 – LEAD PHOTOGRAPHS
Photo 1: Vent stacks comprised of lead on Roofs 2, 3, 4 & 7.
Photo 2: Yellow paint applied to metal access ladder used to reach Roof 1is lead-containing.
Photo 3: Brown paint applied to wooden man door and framing on Roof 18 is lead-containing.
Photo 4: Buried flashing comprised of lead underneath new flashing on Loading Dock Roof and Roof 16.
Photo 5: Silver coating observed on metal flashing on Roof 4 is lead-containing. Note that similar silver coating was observed on other roof levels and was found not to contain lead.
Photo 6: Silver coating observed on metal vent hoods on Roof 4 is lead-containing. Note that similar silver coating was observed on other roof levels and was found not to contain lead.
Photo 7: Light gray paint on metal man door frames on Roof 6 is lead-containing. Note that the light gray paint on the doors themselves does not contain lead. It is assumed that there is another paint below the light gray on the frames.
Photo 8: Tan painted metal vent cover was determined to be lead-containing. Note that the tan roof field itself does not contain lead. It is assumed that there is another paint below the tan on the vent cover.
Photo 9: Gray metal threshold at man door that leads to Roof 9A was determined to be lead-containing. Note that man door and frame did not contain lead and that there are several layers of paint exposed currently.
4.0 – LABORATORY ACCREDITATIONS
5.0 – CONSULTANT’S LICENSES AND CERTIFICATION
plomax Image
WATTS A r c h i t e c t u r e & E n g i n e e r i n g
E x c e l l c e i n a l l w e d o .
WATTS A r c h i t e c t u r e & E n g i n e e r i n g
E x c e l l c e i n a l l w e d o .
120 E. Washington St., Suite 414 Syracuse, NY 13202
95 Perry Street, Suite 300 Buffalo, NY 14203
315 5th Ave, 11th Floor New York, NY 10016
E x c e l l e n c e i n a l l w e d o .
WAT T S A r c h i t e c t u r e & E n g i n e e r i n g
Randy Bauer
C – Air Sampling Technician D – Inspector H – Project Monitor
| 1.0 Executive Summary |
| 2.0 General scope |
| 3.0 Site Safety |
| 4.0 existing conditions |
| 4.1 Roof Core Samples |
| 4.2 Asbestos and Lead Testing Survey Results |
| 4.3 Drone Footage |
| 4.4 General Roof Conditions |
| In general, the roofs on Building 1, 28 and 20 consist of smooth or granulated modified bituminous systems, fully adhered single ply EPDM systems, loose laid ballasted single ply EPDM, multi-ply built up and liquid applied roofing systems. |
| The insulation systems when present, are predominately tapered systems with accessory crickets, saddles, sump areas and edge strips. In most cases the insulation is polyisocyanurate with fiberglass type facers. There are multiple layers of insulatio... |
| 4.5 Building 1 |
| 4.5.1 In reference with the above general descriptions, the roofs on building 1 can be further grouped into areas based upon similar roof types, age or vintage, conditions and areas/levels. |
| 4.5.2 Building 1, Roofs 15-18, 11th floor roof: |
| 4.5.3 Building 1, Roofs 19 – 22, 10th floor roofs: |
| 4.5.4 Building 1, South Entrance area Roofs 38, 39, 40, 41, 43 (41 & 44 not included – see Atrium type roofs) |
| This area of the building was an addition done in 1976 by Cannon Design (drawings available) which created a new hospital entrance, emergency department and other hospital services. The roofs were originally built-up multi-ply asphalt as evidenced in ... |
| Again, as with the other roofs, there is the presence of a base/vapor barrier sheet directly to the deck which is structural concrete. The insulation system is tapered polyisocyanurate boards directed to internal roof drains. The insulation levels m... |
| Figure 4 |
| 4.5.5 Building 1, Roof 45 (West, Daycare balcony roof) |
| This roof is functioning as a true plaza/balcony meant for outdoor use by the day care and other events. It is in that context a waterproof membrane with a walking or wearing top course, rather than a roof per sea. The core sample revealed a granula... |
| The drainage appears to be adequate with some taper built into the system flowing to one plaza-type, flat drain. However, there is evidence of some minor ponding around that drain which should be further accessed. (See figure 6) |
| 4.5.6 Building 1 Roofs 33 – 37 (East Kitchen Area, Penthouse) |
| 4.5.7 Building 1 Roof 31 |
| 4.5.8 Building 1, Miscellaneous Roofs (32,47,50, 52, 53, 59) |
| 4.5.9 Stairwell Roofs |
| 4.5.10 Atriums |
| 4.5.11 Ladders and Hatches |
| 4.5.12 Lightning Protection |
| 4.5.13 Roof Drain Piping Investigation |
| 4.5.14 Rooftop Equipment |
| 4.6 Building 20 |
| 4.6.1 Roof System |
| 4.6.2 Roof Deficiencies |
| 4.6.3 Lighting Protection |
| 4.6.4 Roof Drain Piping Investigation |
| 4.6.5 Rooftop Equipment |
| 4.7 Building 28 |
| 4.7.1 This roof is a fully-adhered EPDM type, most likely installed in the 1990s as was the case of the upper EPDM roofs. As their ages are similar, so too are there conditions, serviceability and warranty status. The surfaces are worn, the seams ha... |
| Again, as with the other roofs, there is the presence of a base/vapor barrier sheet directly to the deck which is a metal deck. In this case it is a plastic sheet. The insulation system is tapered polyisocyanurate boards directed to internal roof dra... |
| 4.7.2 Ladders and Hatches |
| 4.7.3 Lightning Protection |
| 4.7.4 Roof Drain Piping Investigation |
| 4.7.5 Rooftop Equipment |
| 5.0 proposed recommendations |
| 5.1 Roof Replacement Priority List |
| 5.2 Asbestos and Lead Abatement |
| 5.3 Building 1 |
| 5.3.1 It is our opinion that the following roofs should be considered Priority 1 for replacement based upon the supporting data in section 4: |
| 5.3.2 It is our opinion that the following roofs should be considered Priority 2 for replacement based upon the supporting data in section 4: |
| 5.3.3 It is our opinion that the following roofs should be considered Priority 3 for replacement based upon the supporting data in section 4: |
| 5.3.4 It is our opinion that the following roofs should be considered Priority 4 for replacement based upon the supporting data in section 4: |
| 5.3.5 Atriums |
| 5.3.6 Ladders and Hatches |
| Lightning Protection |
| 5.3.7 Roof Drains and Roof Drain Piping |
| 5.3.8 Rooftop Equipment |
| 5.4 Building 20 |
| 5.4.1 It is our opinion that Building 20 should be considered Priority 1 for replacement based upon the supporting data in section 4. The existing roof system is approximately 28 years old and at the end of its life expectancy. It is recommended that ... |
| 5.4.2 Ladders and Hatches |
| 5.4.3 Lightning Protection |
| 5.4.4 Roof Drains and Roof Drain Piping |
| There are 17 roof drain leaders, out of 76 total, that require investigation as of this report. Only 1 of the 17 remaining roof drain leaders are located in Building 20. Encorus will work with the Buffalo VAMC to determine if investigating the remaini... |
| Where it is determined that entire roof-drain assemblies are in poor condition, it is recommended that replacement roof drain inserts are utilized. Such assemblies consist of a light gauge metal insert that is installed within the existing roof drain ... |
| 5.4.5 Rooftop Equipment |
| 5.5 Building 28 |
| 5.5.1 It is our opinion that the following roofs should be considered Priority 2 for replacement based upon the supporting data in section 4. |
| 5.5.2 Ladders and Hatches |
| 5.5.3 Lightning Protection |
| 5.5.4 Roof Drains and Roof Drain Piping |
| 5.5.5 Rooftop Equipment |
5.6 Roofing Material Recommendation
| 6.0 Project Phasing and impacts on medical center |
| 7.0 Estimate of construction costs |
| 2 - REP-18271-001.REVC Appendices - 100% Schematic.pdf |
| ROOF CORE SAMPLE RESULTS |
| A |
| ASBESTOS AND LEAD TESTING SURVEY RESULTS |
| A |
| RADIO FREQUENCY SITE COMPLIANCE AND SITE SAFETY PLAN |
| A |
| KEY PLAN |
| A |
| 4 - Buffalo VAMC B1 & B20 Roof Survey Report.pdf |
| Cover |
| Table of Contents |
| 1.0 Executive Summary |
| 1.1 Roof Level Diagram |
| 2.0 Asbestos-Containing Materials |
| 2.1 Asbestos Sample Location Drawing |
| 2.2 Asbetsos Photographs |
| 2.3 Asbestos Laboratory Reports and Chains of Custody Forms |
| 3.0 Lead-Based Paint |
| 3.1 X-Ray Fluorescence Analyzer (XRF) Lead Table Data |
| 3.2 Lead Photographs |
| 4.0 Laboratory Accreditations |
| 5.0 Consultant's License and Certification and |
| 3.0b Lead Based Paint Summary.pdf |
| Methodology |
| XRF Calibration |
Untitled
| 7 - DWG-18271-GI101.REVC ROOF KEY PLAN.pdf |
| Sheets and Views |
| DWG-18271-GI101.REVX ROOF KEY PLAN |
File details come from the government source that posted it. Updated .