S02 - Key Personnel Attachment for Evaluation.docx

DOCX document 22 KB Posted

Attached to
6150--FY26 NRM 654-26-020 | 654-26-2-6059-0042 | Bldg 12 Pump Power Relocation | VA Sierra Nevada Health Care System Reno, NV
Solicitation number
36C26126R0050
Issued by

About this file

This is a Key Personnel Attachment for Evaluation form that serves as a template for offerors to submit detailed resumes and qualifications of their proposed key personnel for Project 654-23-006, Provide Utility Services Across Kirman Avenue, at the VA Sierra Nevada Health Care System in Reno, Nevada. Offerors must complete the form by providing the name and proposed assignment of each key personnel member, current and previous employment history with firm names and positions, educational background from U.S. accredited universities, professional registrations by year and state, relevant training courses completed (such as construction quality management and safety certifications), and demonstration of familiarity with safety compliance and sustainability requirements. The form requires documentation of up to five projects completed within the past six years, including contract numbers, titles, contract amounts, start and completion dates, the personnel's specific role (Project Manager, Superintendent, Quality Control, or Safety), and detailed descriptions of work performed.

Additionally, the form mandates that offerors clearly delineate the number of years of Project Manager and Project Superintendent experience separately for each key personnel member, explicitly prohibiting the combination of these roles into a single experience category. This personnel submission is part of the evaluation criteria for a Department of Veterans Affairs Network Contracting Office 21 solicitation (36C26126R0050) focused on Building 12 Pump Power Relocation, requiring contractors to demonstrate the qualifications and relevant experience of their proposed management and supervisory team members who will oversee the electrical relocation and installation work within 180 calendar days of the Notice to Proceed.

View the file

Other files

File Type Posted
36C26126R0050 0002.docx DOCX document
MCC SCHEDULE 5-6-22.xlsx XLSX spreadsheet
36C26126R0050 0001.docx DOCX document
Bldg 12 Basement Pump Power Brief Routing Diagram.pdf PDF
GNHA 9-18-19.xls XLS spreadsheet
36C26126R0050_1.docx DOCX document
S02- Specification 013526-2024-05.docx DOCX document
S02 - VAAR 852.219-75.pdf PDF
S02- Specification 260541-2026-01.docx DOCX document
S02- Specification 010000-2021-11.docx DOCX document
S02 - RFI FORM.docx DOCX document
S02 - Attachment - Price Breakdown Sheet.docx DOCX document
S02 - RNLS Zero Floor Plan.pdf PDF
S02- Specification 260511-2022-11.docx DOCX document
S02 - Attachment - EMR Sheet.docx DOCX document
Wage determination NV20260093.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT: PERSONNEL RESUMES EVALUATION

OFFERORS’s NAME: ________________________________

OFFEROR’S KEY PERSONNEL

EXPERIENCE/QUALIFICATIONS

Project 654-23-006 | Provide Utility Services Across Kirman Avenue

Name:

Proposed Assignment to this Project:

Name of Firm, Position held, Dates of Employment:

Number of Years with other Firms, Position held, dates of employment:

Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)

Professional Registration (if any): (Year, State, Discipline)

Training Course Completed: (COE construction quality management, Safety, etc.)

Familiar with Safety Compliance and Sustainability:

Provide a list of projects on a maximum of five projects that were completed by the key personnel within the past six years:

PROJECT 1:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety):

Description of Work (Description shall adequately describe building construction):

PROJECT 2:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

PROJECT 3:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety):

Description of Work (Description shall adequately describe building construction):

PROJECT 4:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety): .

Description of Work (Description shall adequately describe building construction):

PROJECT 5:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

IF it is not clear from the information provided on the five projects described above, the proposal shall clearly indicate the number of years of Project Manager and Project Superintendent experience and shall NOT show combined experience, for example, Project Manager/Project Engineer for three years.