GNHA 9-18-19.xls
XLS spreadsheet 29 KB Posted
- Solicitation number
- 36C26126R0050
About this file
This file contains electrical panel schedules and circuit breaker configurations for Building 12 at the VA Sierra Nevada Health Care System in Reno, Nevada. The document, titled "GNHA 9-18-19.xls," is a technical baseline attachment referenced in Amendment 0001 of Solicitation 36C26126R0050 and serves as the existing electrical panel configuration that will be modified under the contract scope of work.
The spreadsheet details the electrical distribution panel (GNHA) located in Room B1165, which is fed from GNHDP1 B2261B at 277/480 volts with 400-amp capacity. It provides a comprehensive circuit breaker schedule listing 42 circuits organized by breaker size (20/1, 20/3, 50/3, and 70/3 configurations) with current descriptions of connected loads, including spare circuits, records space, utility connections, and three-pole breaker configurations. Notable circuits include 12-EF/1, 12-CHP/1, 12-CHP/2, and 12-FCU/3, with a critical safety note indicating that if moving 12-CHP/1 or 12-CHP/2 to emergency power, personnel must turn off power and execute Lock-Out-Tag-Out (LOTO) procedures before disconnecting cord connectors, with reference to posted procedures. This baseline panel schedule is incorporated as Attachment 2 ("MCC Schedules 5-6-22" and "GNHA 9-18-19") to serve as the foundation for required post-award modifications, including red-line drawings and one-line diagram updates specified in Statement of Work Section 4.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26126R0050 0002.docx | DOCX document | |
| MCC SCHEDULE 5-6-22.xlsx | XLSX spreadsheet | |
| 36C26126R0050 0001.docx | DOCX document | |
| Bldg 12 Basement Pump Power Brief Routing Diagram.pdf | ||
| 36C26126R0050_1.docx | DOCX document | |
| S02- Specification 013526-2024-05.docx | DOCX document | |
| S02 - RNLS Zero Floor Plan.pdf | ||
| S02- Specification 260511-2022-11.docx | DOCX document | |
| S02 - Key Personnel Attachment for Evaluation.docx | DOCX document | |
| S02 - Attachment - EMR Sheet.docx | DOCX document | |
| Wage determination NV20260093.docx | DOCX document | |
| S02 - VAAR 852.219-75.pdf | ||
| S02- Specification 260541-2026-01.docx | DOCX document | |
| S02- Specification 010000-2021-11.docx | DOCX document | |
| S02 - RFI FORM.docx | DOCX document | |
| S02 - Attachment - Price Breakdown Sheet.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| REVISION: 9/18/2019 | GNHA | LOCATION: B1165 ELEC ROOM | |||
| FED FROM: GNHDP1 B2261B | 277 /480 VOLT 400 AMP | Building 12 | |||
| DESCRIPTION | BRK | CIR | CIR | BRK | DESCRIPTION |
| GC105 | 20/1 | 1 | 2 | 20/1 | SPACE |
| SPARE | 20/1 | 3 | 4 | 20/1 | SPACE |
| SPARE | 20/1 | 5 | 6 | 20/1 | SPACE |
| SPARE | 20/1 | 7 | 8 | 20/1 | SPACE |
| SPARE | 20/1 | 9 | 10 | 20/1 | SPACE |
| RECORDS | 20/1 | 11 | 12 | 20/1 | SPACE |
| RECORDS | 20/1 | 13 | 14 | 20/3 | 12-EF/1 |
| UTILITY | 20/1 | 15 | 16 | 20/3 | XXXXXX |
| GC-187 | 20/1 | 17 | 18 | 20/3 | 3 POLE 20 AMP |
| SPARE | 20/1 | 19 | 20 | 20/1 | SPARE |
| SPARE | 20/1 | 21 | 22 | 20/1 | SPARE |
| SPARE | 20/1 | 23 | 24 | 20/1 | SPARE |
| SPARE | 20/1 | 25 | 26 | 50/3 | 12-CHP/1 |
| SPARE | 20/1 | 27 | 28 | 50/3 | XXXXXX |
| SPARE | 20/1 | 29 | 30 | 50/3 | 3 POLE 50 AMP |
| SPARE | 20/1 | 31 | 32 | 50/3 | 12-CHP/1 |
| SPARE | 20/1 | 33 | 34 | 50/3 | XXXXXX |
| SPARE | 20/1 | 35 | 36 | 50/3 | 3 POLOE 50 AMP |
| 12-FCU/3 | 20/3 | 37 | 38 | 70/3 | SPARE |
| XXXXXX | 20/3 | 39 | 40 | 70/3 | XXXXXX |
| 3 POLE 20 AMP | 20/3 | 41 | 42 | 70/3 | 3 POLE 70 AMP |
| ***NOTE: IF MOVING 12-CHP/1 OR 12-CHP/2 TO EMERGENCY POWER, TURN POWER, LOTO BREAKER, BEFORE DISCONNECTING CORD CONNECTOR. SEE POSTED PROCEURE FOR THIS PROCESS |
Sheet2
Sheet3