S02 - Attachment - Price Breakdown Sheet.docx
DOCX document 25 KB Posted
- Solicitation number
- 36C26126R0050
About this file
This is a Price Breakdown Sheet template for submission with proposals in response to Solicitation Number 36C26126R0050 for Building 12 Pump Power Relocation at VA Sierra Nevada Health Care System in Reno, Nevada. The sheet is designed for the Department of Veterans Affairs, Veterans Integrated Service Network 21 (VISN 21) and applies to project 654-26-020.
The template requires offerors to itemize costs across two primary divisions: Division 01 (General Requirements) and Division 26 (Electrical). Within each division, costs must be broken down by category including Material, Labor, Equipment, and Other. The sheet establishes a pricing structure that flows from divisional subtotals to an overall subtotal, followed by separate line items for Overhead, Profit, and Bonds and Insurance, culminating in a Total Proposal price. The template is editable to accommodate additional cost items as needed, and offerors must insert their authorized signatory's name, title, signature, and date, along with the number of calendar days the offer remains valid. This pricing template does not specify response dates, award dates, or contract vehicle information, as it serves solely as a format for cost submission rather than an independent solicitation document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26126R0050 0002.docx | DOCX document | |
| 36C26126R0050 0001.docx | DOCX document | |
| Bldg 12 Basement Pump Power Brief Routing Diagram.pdf | ||
| GNHA 9-18-19.xls | XLS spreadsheet | |
| MCC SCHEDULE 5-6-22.xlsx | XLSX spreadsheet | |
| S02- Specification 013526-2024-05.docx | DOCX document | |
| S02 - RNLS Zero Floor Plan.pdf | ||
| S02- Specification 260511-2022-11.docx | DOCX document | |
| S02 - Key Personnel Attachment for Evaluation.docx | DOCX document | |
| S02 - Attachment - EMR Sheet.docx | DOCX document | |
| Wage determination NV20260093.docx | DOCX document | |
| 36C26126R0050_1.docx | DOCX document | |
| S02 - VAAR 852.219-75.pdf | ||
| S02- Specification 260541-2026-01.docx | DOCX document | |
| S02- Specification 010000-2021-11.docx | DOCX document | |
| S02 - RFI FORM.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment : Price Breakdown Sheet, 654-26-020 | Bldg. 12 Pump Power Relocation
| DESCRIPTION |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
Division 01 -General Requirements
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 26 – Electrical |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| SUB TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| Overhead |
| $ |
| $ |
| $ |
| $ |
| $ |
| Profit |
| $ |
| $ |
| $ |
| $ |
| $ |
| Bonds and Insurance |
| $ |
| $ |
| $ |
| $ |
| $ |
| TOTAL Proposal |
| $ |
| $ |
| $ |
| $ |
| $ |
NOTE: All other costs may be included as a separate item and shall be specified in this breakdown. Offerors may edit as needed.
The offeror agrees to perform the work required at the prices specified above in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due. (Failure to insert any number means the offeror accepts the minimum days in the TORFP letter.)
NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
Signature Date
File details come from the government source that posted it. Updated .