S02 - Attachment - Price Breakdown Sheet.docx

DOCX document 25 KB Posted

Attached to
6150--FY26 NRM 654-26-020 | 654-26-2-6059-0042 | Bldg 12 Pump Power Relocation | VA Sierra Nevada Health Care System Reno, NV
Solicitation number
36C26126R0050
Issued by

About this file

This is a Price Breakdown Sheet template for submission with proposals in response to Solicitation Number 36C26126R0050 for Building 12 Pump Power Relocation at VA Sierra Nevada Health Care System in Reno, Nevada. The sheet is designed for the Department of Veterans Affairs, Veterans Integrated Service Network 21 (VISN 21) and applies to project 654-26-020.

The template requires offerors to itemize costs across two primary divisions: Division 01 (General Requirements) and Division 26 (Electrical). Within each division, costs must be broken down by category including Material, Labor, Equipment, and Other. The sheet establishes a pricing structure that flows from divisional subtotals to an overall subtotal, followed by separate line items for Overhead, Profit, and Bonds and Insurance, culminating in a Total Proposal price. The template is editable to accommodate additional cost items as needed, and offerors must insert their authorized signatory's name, title, signature, and date, along with the number of calendar days the offer remains valid. This pricing template does not specify response dates, award dates, or contract vehicle information, as it serves solely as a format for cost submission rather than an independent solicitation document.

View the file

Other files

File Type Posted
36C26126R0050 0002.docx DOCX document
36C26126R0050 0001.docx DOCX document
Bldg 12 Basement Pump Power Brief Routing Diagram.pdf PDF
GNHA 9-18-19.xls XLS spreadsheet
MCC SCHEDULE 5-6-22.xlsx XLSX spreadsheet
S02- Specification 013526-2024-05.docx DOCX document
S02 - RNLS Zero Floor Plan.pdf PDF
S02- Specification 260511-2022-11.docx DOCX document
S02 - Key Personnel Attachment for Evaluation.docx DOCX document
S02 - Attachment - EMR Sheet.docx DOCX document
Wage determination NV20260093.docx DOCX document
36C26126R0050_1.docx DOCX document
S02 - VAAR 852.219-75.pdf PDF
S02- Specification 260541-2026-01.docx DOCX document
S02- Specification 010000-2021-11.docx DOCX document
S02 - RFI FORM.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment : Price Breakdown Sheet, 654-26-020 | Bldg. 12 Pump Power Relocation

DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL

Division 01 -General Requirements

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 26 – Electrical
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
SUB TOTAL
$
$
$
$
$
Overhead
$
$
$
$
$
Profit
$
$
$
$
$
Bonds and Insurance
$
$
$
$
$
TOTAL Proposal
$
$
$
$
$

NOTE: All other costs may be included as a separate item and shall be specified in this breakdown. Offerors may edit as needed.

The offeror agrees to perform the work required at the prices specified above in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due. (Failure to insert any number means the offeror accepts the minimum days in the TORFP letter.)

NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

Signature Date

File details come from the government source that posted it. Updated .