Z1DA--554-20-103 Install Partitions at Check-In Desks
Solicitation number
36C25921R0082
Issued by

About this file

This package includes demolition plans, electrical plans, and a federal contract opportunity notice for installing partitions at check-in desks at a Department of Veterans Affairs medical center. The project involves installing partitions at check-in areas in multiple buildings on Levels 1, 2, 3 and 4. The demolition plans identify areas for removal of existing walls and equipment. The electrical plans show the locations for reusing existing power, data, security and control systems to service the new partitions. The related federal contract opportunity is solicitation number 36C25921R0082 for installing the partitions with a response due date TBD and awards by TBD. The soliciting agency is the VA Veterans Health Administration VISN 19.

View the file

Other files

File Type Posted
Amend 08 - Drawings for RFI 2 project 554-20-103.pdf PDF
36C25921R0082 0008.docx DOCX document
36C25921R0082 0007.docx DOCX document
36C25921R0082 0006.docx DOCX document
36C25921R0082 0005.docx DOCX document
36C25921R0082 0004.docx DOCX document
Amendment 03 - 36C25921R0082 0003.docx DOCX document
Amendment 02 - 36C25921R0082 0002.docx DOCX document
S04 - 2022-01-28-RFI_No_1-Project_554-20-103_Install_Partitions_at_Check-In_Desks-VEG-20-16.pdf PDF
S04 - Site Visit Attendance.pdf PDF
S06 - Amend 0001 - 36C25921R0082 0001.docx DOCX document
S02 - Drawings Part 3.pdf PDF
S02 - Drawings Part 2.pdf PDF
S02 - Drawings Part 1.pdf PDF
S02 - Specifications.pdf PDF
S02 - Solicitation - 36C25921R0082.docx DOCX document
S02 - ICRA.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

H

G

F

E

D

C

B

08-01-G3-04

AUDIOMETRIC

EXAM 4

08-01-C2-02

PAT TLT 1

08-01-G1-03

AUDIO TECH 3

08-01-H2-02

AUDIOLOGIST 6

08-01-E3-02

GROUP RM

08-01-F3-02

SPEECH 1

08-01-B3-01

MULTIFUNCT

TREAT/WORK

08-01-A3-02

GYM

08-01-C4-01

EXAM/TREATMENT

08-01-A1-01

WAIT

08-01-B3-03

TREAT 1

08-01-E2-01

SOILED UTIL08-01-E2-05

STAFF TLT 1

08-01-B4-05

PUBLIC TLT 1

08-01-B3-02

PUBLIC TLT 2

08-01-B3-04

OTBC TREAT

08-01-E2-02

STAFF TLT 2

08-01-E2-04

STAFF TLT 4

08-01-B2-03

OTBC

ORTHO/SPLINTING

08-01-C2-01

PAT TLT 2

08-01-E2-06

STAFF OFFICE 1

08-01-F2-01

AUDIOLOGIST 8

08-01-C2-04

STAFF OFFICE 3

08-01-H3-01

SINUSODIAL TEST

08-01-H4-01

PUBLIC TLT 3

08-01-B2-01

HAC

08-01-G4-02

WAIT

08-01-G3-03

AUDIOLOGIST 5

08-01-H4-02

CHIEF OFFICE

08-01-H3-07

SOC WORKER 4

08-01-H2-04

CONSULT

08-01-H2-06

OFFICE 6

08-01-H2-05

OFFICE 5

08-01-H2-07

INTERN OFFICE

08-01-H1-01

OFFICE

08-01-H1-02

CHIEF OFFICE

08-01-H1-03

SECR/WAIT

08-01-G1-02

AUDIO TECH 2

08-01-G1-01

AUDIO TECH 1

08-01-F1-05

OFFICE 1

08-01-F1-04

OFFICE 4

08-01-E1-01

STAFF LOUNGE

08-01-G4-01

AUDIOLOGIST 3

08-01-G3-02

AUDIOLOGIST 2

08-01-F4-03

CAT WORK

08-01-F3-03

SPEECH

THERAPY IND

08-01-H2-03

INST CAL/STOR

08-01-G2-03

AUDIOMETRIC

EXAM 3

08-01-G2-02

AUDIOMETRIC

EXAM 1

08-01-G2-01

AUDIOLOGIST 1

08-01-F2-04

HEARING AID FAB

08-01-F2-05

AUDIOLOGIST 7

08-01-F4-02

WAIT

08-01-F2-03

RESIDENT OFFICE

08-01-F2-02

STAFF TLT 3

08-01-C2-03

EXAM/TREATMENT

08-01-B2-04

TELEHEALTH 1

08-01-B2-05

PAT TLT 1

08-01-G3-01

AUDIOMETRIC

EXAM 2

08-01-F3-04

SPEECH

ANALYSIS

08-01-F3-01

SPEECH 2

08-01-E3-03

W.C. REPAIR

08-01-E2-03

OT/PT DME 2

08-01-A3-01

PLATFORM

08-01-F4-01

SPEECH

THERAPY GROUP

08-01-A1-02

RECEPT

08-01-A2-02

O2 STOR

08-01-A2-04

O2 COORD 5

08-01-A2-03

O2 COORD 4

08-01-A2-10

CORRIDOR

08-01-A3-11

ELEV LOBBY

08-01-C3-01

EXAM/TREATMENT

08-01-C3-02

ELECTROMYOGRAPHY

08-01-D2-03

LINEN ALCOVE

08-01-C2-10

CORRIDOR

08-01-C3-11

CORRIDOR

08-01-F3-11

CORRIDOR

08-01-B2-02

SHARED OFFICE

08-01-C3-12

CORRIDOR

08-01-F1-03

OFFICE 3

08-01-F1-06

OFFICE 2

08-01-F1-02

OFFICE 6

08-01-F1-01

OFFICE 5

08-01-E1-03

OFFICE 8

08-01-E1-02

OFFICE 7

08-01-D1-04

CLERICAL 2

08-01-D1-03

CLERICAL 1

08-01-D1-02

PROV CONSULT

08-01-D1-01

CONSULT

08-01-C1-03

OFFICE

08-01-C1-04

OFFICE

08-01-C1-02

PAT RM

08-01-C1-01

BRACE REPAIR

LAB

08-01-B1-02

PUR OFFICE

08-01-B1-01

EQUIP STOR

08-01-H2-01

HAC

08-01-H3-06

SOC WORKER 3

08-01-H3-05

SOC WORKER 2

08-01-H3-04

SOC WORKER 1

08-01-H3-03

SECT AND WAIT 1

08-01-C4-04

EDUCATION/TRAIN

08-01-H3-02

VESTIBULOGRAPHY

08-01-G4-03

AUDIOLOGIST 4

08-01-D2-05

STAFF TLT

08-01-G3-11

CORRIDOR

08-01-H3-11

CORRIDOR

08-01-J3-11

CORRIDOR

08-01-C4-02

WAIT

08-01-A4-11

CORRIDOR

08-01-E3-11

CORRIDOR

08-01-D3-11

CORRIDOR

08-01-C3-03

OTBC GYM

08-01-D3-01

ADL TLT

08-01-E3-10

CORRIDOR

08-01-C3-10

CORRIDOR

08-01-B1-03

WORK AREA

08-01-A4-02

RECEPT

08-01-D3-02

FITNESS ROOM

08-01-D4-01

COMM CTR

08-01-D2-01

CLEAN SUPPLY

08-01-D4-02

RECEPT

08-01-F4-04

RECEPT

08-01-A3-03

WAIT

08-01-F1-07

CORRIDOR

08-01-C2-T1

DEMARC ROOM

08-01-D2-E1

ELEC

08-01-D2-H2

CHUTE

08-01-E2-T2

DATA /

TELECOMM

08-01-G2-E2

ELEC

08-01-H2-T3

DATA /

TELECOMM

08-01-ST2

STAIR

08-01-SE5

ELEV

DN

UP

A. DISCONNECT FURINITURE POWER WHIP FROM CIRCUIT. PRESERVE CIRCUIT

FOR FUTURE USE.

B. DISCONNECT DATA OUTLETS FROM NETWORK. PRESERVE CIRCUIT FOR

FUTURE USE.

C. AREAS SHOWN FOR DEMO WORK ARE ALSO AREAS FOR NEW WORK. SEE

SHEETS ED111 AND EP111 FOR REFERENCE.

D. DISCONNECT DURESS ALARM FROM CIRCUIT, PRESERVE CIRCUIT FOR

FUTURE USE.

E. SYSTEM FURNITURE WILL HAVE CHASE/POWER WHIP FOR INSTALLATION.

COORDINATE INSTALLATION REQUIREMENTS USING ARCHITECTURAL

DRAWINGS.

ED111

ED111

ED111

EP111

EP111

EP111

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2 -1

C h e c k -I n

E L

E C

R m lu g o W

Q

P M

.r v t

/1

/2

:3

:1

A

M

ED101

DEMOLITION PLAN AT BUILDING G

(08) LEVEL 1

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 CPR MLS

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING G (08) LEVEL 1

H

G

F

E

D

C

B

08-03-E3-09

HAC 3

08-03-E1-06

STAFF TLT

08-03-H2-06

CHIEF OF STAFF 3

08-03-G4-07

PERS ASST 7

08-03-G4-02

PERS ASST 8

08-03-H4-01

WAIT/RECEP

08-03-H2-02

STAFF ASST 4

08-03-B3-10

CORRIDOR

08-03-H2-08

CHIEF OF STAFF

2 08-03-F2-01

CONSULT 1

08-03-H2-07

HSS ASST 3

08-03-H3-01

OFFICE 2

08-03-F2-03

SOC WORK 1

08-03-H2-01

STAFF ASST 3

08-03-G2-02

WORK ALCOVE

08-03-G3-13

CORRIDOR

08-03-E2-06

CORRIDOR

08-03-F3-11

CORRIDOR

08-03-H1-02

MEDICAL CENTER

DIR

08-03-G1-02

CHIEF OF STAFF 1

08-03-F1-01

STAFF LOUNGE

08-03-E1-05

STAFF LOCKERS

08-03-H1-01

STAFF TLT

08-03-G1-04

HSS ASST 4

08-03-G1-03

HSS ASST 5

08-03-G1-01

HSS ASST 6

08-03-G2-01

OFFICE 1

08-03-H2-03

STAFF ASST 7

08-03-H2-05

STAFF ASST 5

08-03-H2-04

STAFF ASST 6

08-03-G4-05

PERS ASST 5

08-03-G4-03

PERS ASST 3

08-03-G4-08

PERS ASST 6

08-03-G4-06

PERS ASST 4

08-03-G4-04

PERS ASST 2

08-03-G3-10

MAN SPEC 1

08-03-G3-07

MAN SPEC 5

08-03-G3-04

MAN SPEC RESP

08-03-G3-11

MAN SPEC 2

08-03-G3-08

MAN SPEC 6

08-03-G3-05

MAN SPEC RES 2

08-03-G3-12

MAN SPEC 3

08-03-G3-09

MAN SPEC 7

08-03-G3-06

WORKSTATION 1

08-03-G2-06

MAN SPEC 4

08-03-G2-05

MAN SPEC 8

08-03-G2-04

MAN SPEC 9

08-03-G4-01

PERS ASST 1

08-03-G3-03

MAN SPEC RES 3

08-03-G3-02

MAN SPEC RES 4

08-03-G3-01

WORKSTATION 2

08-03-F4-03

SEC OFFICE

08-03-F3-04

WORKSTATION 1

08-03-F3-05

WORKSTATION 2

08-03-F3-06

WORKSTATION 3

08-03-F4-02

WAIT

08-03-F4-01

CONF

08-03-E4-03

CHIEF OFFICE

08-03-F3-03

PIV ROOM

08-03-F3-02

WORK

08-03-F3-01

SECURE WORK

08-03-B5-10

CORRIDOR

08-03-E4-04

BIOFEEDBACK

TECH

08-03-E3-06

BIOFEEDBACK

LAB

08-03-E3-07

COMM CTR

08-03-D4-05

PUBLIC TLT 2

08-03-H3-05

HSS ASST 2

08-03-H3-03

CHIEF OF STAFF 4

08-03-H3-04

DEPUTY CHIEF OF

STAFF

08-03-H4-02

HSS ASST 1

08-03-H3-02

CONF

08-03-G2-07

SHARED OFFICE

08-03-G2-08

CHIEF OFFICE

08-03-F2-07

PERS ASST 9

08-03-F2-06

WORKSTATION 5

08-03-E3-08

SEC 1

08-03-E3-01

SHARED OFFICE

08-03-E3-10

PSYCH OFFICE 12

08-03-E3-02

INTERN 1

08-03-E3-03

INTERN 2

08-03-E3-04

INTERN 3

08-03-E3-05

INTERN 4

08-03-D3-07

GROUP TEST

08-03-D3-06

PSYCH OFFICE 11

08-03-D3-05

PSYCH OFFICE 10

08-03-D4-06

PSYCH OFFICE 9

08-03-D3-01

MULTIPURPOSE/CONTROL

08-03-D3-02

CONTROL

08-03-D3-04

PSYCH OFFICE 8

08-03-D4-01

PSYCH OFFICE 7

08-03-D4-02

PUBLIC TLT 2

08-03-C4-05

WAIT

08-03-B4-03

WAIT

08-03-C3-06

EXAM 1

08-03-C3-05

PSYCH OFFICE 6

08-03-C3-04

PSYCH OFFICE 5

08-03-C3-03

PSYCH OFFICE 4

08-03-C4-06

COMM CTR

08-03-C4-04

WORKSTATION 1

08-03-C4-03

WORKSTATION 2

08-03-C3-01

HEALTH PSYCH

08-03-C3-02

PSYCH OFFICE 3

08-03-C4-01

PSYCH OFFICE 2

08-03-C4-02

PSYCH OFFICE 1

08-03-B3-01

VISN OFFICE 1

08-03-B3-02

VISN OFFICE 2

08-03-B3-07

CONSULT 2

08-03-B3-06

CONSULT 1

08-03-B3-05

WORKSTATION 1

08-03-B3-04

WORKSTATION 2

08-03-B4-05

WORKSTATION 3

08-03-B4-04

SCHED

WORKSTATION 1

08-03-B4-06

WORKSTATION 4

08-03-B3-03

EXAM 1

08-03-B4-01

VITAL SIGNS

08-03-A3-04

CONF

08-03-B4-02

PUBLIC TLT 1

08-03-A3-03

CLASSROOM 1 CLASSROOM 2

08-03-B2-06

CRASH CART

ALCOVE

08-03-A2-01

PUBLIC TLT 1

08-03-A2-02

STAFF TLT

08-03-B2-03

STRETCHER/W. C.

ALCOVE

08-03-B2-04

EXAM

08-03-B2-02

MED PREP

08-03-E1-03

RES

WORKSTATION 1

08-03-E1-01

NP PHY 3

08-03-D1-04

CHIEF NURSE 1

08-03-E1-04

NP PHY 2

08-03-E1-02

NP PHY 4

08-03-D1-05

NP PHY 1

08-03-D1-02

ASST DIET 1

08-03-D1-03

SUPP TECH 1

08-03-D1-01

CHIEF OFFICE

08-03-C1-03

ISO BED STATION

08-03-C1-02

DIALYSIS CHAIR 6

08-03-B1-04

DIALYSIS CHAIR 4

08-03-B1-02

DIALYSIS CHAIR 2

08-03-A1-03

RECEPT

08-03-A1-02

WAIT

08-03-A1-01

PAT ED KIOSK

08-03-A2-10

CORRIDOR

08-03-A3-11

ELEV LOBBY

08-03-B2-10

CORRIDOR

08-03-C1-01

DIALYSIS CHAIR 5

08-03-B1-03

DIALYSIS CHAIR 3

08-03-B1-01

DIALYSIS CHAIR 1

08-03-C1-04

ISO PAT TLT

08-03-F2-02

CONSULT 2

08-03-E2-04

EQUIP STOR

08-03-E2-03

STAFF TLT 1

08-03-E2-02

STAFF TLT 1 08-03-D2-03

EQUIP REPAIR

08-03-D2-02

EQUIP PROC

08-03-C2-05

DIALYSATE PREP

08-03-C2-04

WATER TREAT

08-03-C2-03

CLEAN SUPPLY

08-03-B2-01

NURSE STATION

08-03-B2-05

CORRIDOR

08-03-C2-01

HAC 1

08-03-D2-01

CLEAN LINEN

08-03-E2-01

SOILED UTIL

08-03-F2-04

WORKSTATION 4

08-03-E4-01

NEURO VOCA

REHAB

08-03-B3-11

CORRIDOR

08-03-C3-11

CORRIDOR08-03-D3-11

CORRIDOR

08-03-E3-11

CORRIDOR

08-03-H2-10

CORRIDOR

08-03-E4-02

PUBLIC TLT 3

08-03-C2-02

NOURISH

08-03-E2-05

LAB

08-03-E2-10

CORRIDOR

08-03-B5-10

CORRIDOR

08-03-A3-05

WAIT

08-03-H4-03

CORRIDOR

08-03-D4-07

CORRIDOR

08-03-D2-E1

ELEC

08-03-D2-H1

CHUTE

08-03-E2-T1

DATA /

TELECOMM

08-03-G2-E2

ELEC08-03-H2-T2

DATA /

TELECOMM

08-03-ST2

STAIR

08-03-SE5

ELEV

UP

DN

CR

A. DISCONNECT FURINITURE POWER WHIP FROM CIRCUIT. PRESERVE CIRCUIT

FOR FUTURE USE.

B. DISCONNECT DATA OUTLETS FROM NETWORK. PRESERVE CIRCUIT FOR

FUTURE USE.

C. AREAS SHOWN FOR DEMO WORK ARE ALSO AREAS FOR NEW WORK. SEE

SHEETS ED111 AND EP111 FOR REFERENCE.

D. DISCONNECT DURESS ALARM FROM CIRCUIT, PRESERVE CIRCUIT FOR

FUTURE USE.

E. SYSTEM FURNITURE WILL HAVE CHASE/POWER WHIP FOR INSTALLATION.

COORDINATE INSTALLATION REQUIREMENTS USING ARCHITECTURAL

DRAWINGS.

ED111

EP111

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2 -1

C h e c k -I n

E L

E C

R m lu g o W

Q

P M

.r v t

/1

/2

:3

:1

A

M

ED102

DEMOLITION PLAN AT BUILDING G

(08) LEVEL 3

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 CPR MLS

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING G (08) LEVEL 3

H

G

F

E

D

C

B

09-01-B4-01

OFFICE

09-01-B2-03

TRAVEL

09-01-B2-02

TRAVEL

09-01-B1-02

TRAINER

09-01-A1-01

STRETCHER/W.C.STOR

09-01-A4-03

OFFICE

09-01-B3-03A

OFFICE

09-01-A3-05

OFFICE

09-01-A3-04

OFFICE

09-01-B1-03

OFFICE

09-01-C1-01

OFFICE

09-01-G2-06

PHOTOTHERAPY

TREAT

09-01-G2-05

PHOTOTHERAPY

SHOWER

09-01-H2-02

MED PREP/STOR

09-01-H2-03

TREAT/PROCEDURE

09-01-A1-03

PHONE INTAKE

09-01-A1-02

PHONE INTAKE

09-01-B1-01

PHONE INTAKE

09-01-C2-04

PROCEDURE

09-01-B2-01

HAC

09-01-H4-02

EXAM

09-01-H3-07

EXAM

09-01-H3-06

EXAM

09-01-H3-05

EXAM

09-01-H2-06

EXAM

09-01-H2-05

EXAM

09-01-C3-05

NURSE

STATION/MED

09-01-E2-06

PROCEDURE

09-01-C3-08

WEIGHT STN

09-01-D3-02

WEIGHT STN09-01-E3-09

WEIGHT STN

09-01-F3-02

WEIGHT STN

09-01-E2-01

SOILED UTIL

09-01-B2-05

CLEAN SUPPLY

09-01-F2-01

CLEAN SUPPLY

09-01-B4-03

WAIT

09-01-G4-02

WAIT

09-01-H3-02

NURSE

STATION/MED

09-01-D2-02

EXAM

09-01-F2-03

CONSULT

09-01-H4-01

CONSULT

09-01-H1-03

OFFICE

09-01-H1-04

OFFICE

09-01-H1-05

OFFICE

09-01-H1-01

OFFICE

09-01-H1-02

OFFICE

09-01-G1-05

OFFICE

09-01-G1-06

OFFICE

09-01-G1-03

OFFICE

09-01-G1-04

OFFICE

09-01-G1-01

OFFICE

09-01-H2-04

DERMATOLOGY

LAB

09-01-F1-02

OFFICE

09-01-F1-03

OFFICE

09-01-D1-02

OFFICE

09-01-D1-01

OFFICE

09-01-D1-04

OFFICE

09-01-D1-05

OFFICE

09-01-D1-06

OFFICE

09-01-C1-05

OFFICE

09-01-C4-03

ONSTAGE AREA

09-01-E4-03

ONSTAGE AREA

09-01-C3-07

PRECEPTOR RM

09-01-F2-02

PRECEPTOR RM

09-01-G3-08

WEIGHT STN

09-01-H3-04

WEIGHT STN

09-01-C1-06

OFFICE

09-01-C1-03

OFFICE

09-01-C1-04

OFFICE

09-01-B1-06

OFFICE

09-01-G2-02

HAC

09-01-E2-04

CONSULT

09-01-G4-03

ONSTAGE AREA

09-01-F1-01

CONF

09-01-E1-02

STAFF TLT

09-01-G2-01

SOILED UTIL

09-01-B2-07

WAIT

09-01-B2-04

TRAVEL

09-01-D4-03

WAIT

09-01-C4-02

WAIT

09-01-B1-05

OFFICE

09-01-B1-04

OFFICE

09-01-E2-05

EQUIP STOR

09-01-A3-06

RECEPT

09-01-E4-02

WAIT

09-01-F4-03

WAIT

09-01-B3-05

CORRIDOR

09-01-C3-06

CORRIDOR

09-01-E3-07

CORRIDOR

09-01-G3-06

CORRIDOR

09-01-H3-03

CORRIDOR

09-01-E1-01

STAFF TLT

09-01-D4-01

PUBLIC TLT09-01-F4-01

PUBLIC TLT

09-01-E1-03

STAFF LOUNGE

09-01-D1-03

SECRETARY

09-01-A2-01

CONSULT

09-01-A1-04

CORRIDOR

09-01-B4-02

EXAM/FITTING

09-01-G3-04

CORRIDOR

09-01-H3-01

STAFF TLT

09-01-G3-05

PAT TLT

09-01-E3-08

PRECEPTOR RM

09-01-G3-07

PRECEPTOR RM

09-01-F3-01

PAT TLT

09-01-E3-05

STAFF TLT

09-01-E3-06

CLEAN SUPPLY

09-01-E3-04

CORRIDOR

09-01-F3-03

CORRIDOR

09-01-E4-04

HAS

09-01-C4-04

HAS

09-01-C3-04

PAT TLT

09-01-D3-01

PAT TLT

09-01-D3-03

CORRIDOR

09-01-C3-09

CORRIDOR

09-01-A3-03

OFFICE

09-01-B3-01

WORK

09-01-B3-04

OFFICE

09-01-A4-05

OFFICE

09-01-A4-04

OFFICE

09-01-C4-01

CONSULT

09-01-B3-09

EXAM

09-01-C3-03

EXAM

09-01-B3-08

EXAM

09-01-C3-02

EXAM

09-01-B3-06

RECEPT

09-01-C3-01

EXAM

09-01-C2-02

EXAM

09-01-B2-06

OFFICE

09-01-C2-01

EXAM09-01-C2-03

STOR

09-01-D2-01

CAST/PODIATRY

09-01-E4-01

EXAM

09-01-D4-02

EXAM

09-01-E3-03

EXAM

09-01-D3-06

EXAM

09-01-E3-02

EXAM

09-01-D3-05

EXAM

09-01-E3-01

EXAM

09-01-D3-04

EXAM

09-01-E2-03

EXAM

09-01-D2-04

EXAM

09-01-E2-02

EXAM

09-01-D2-03

EXAM

09-01-F4-02

EXAM

09-01-G4-01

EXAM

09-01-F3-06

EXAM

09-01-G3-03

EXAM

09-01-F3-05

EXAM

09-01-G3-02

EXAM

09-01-F3-04

EXAM

09-01-G3-01

EXAM

09-01-F2-05

EXAM

09-01-G2-04

EXAM

09-01-F2-04

EXAM

09-01-G2-03

EXAM

09-01-G4-04

HAS

09-01-D1-07

CORRIDOR

09-01-F1-04

CORRIDOR

09-01-A4-06

CLINIC WAITING

09-01-B3-07

RECEPT

09-01-B3-02

OFFICE

09-01-B3-03

OFFICE

09-01-D2-E1

ELEC

09-01-D2-H2

CHUTE

09-01-E2-T1

DATA /

TELECOMM

09-01-G2-E2

ELEC09-01-H2-T2

DATA /

TELECOMM

09-01-ST2

STAIR

09-01-SE6

ELEV

DN

UP

A. DISCONNECT FURINITURE POWER WHIP FROM CIRCUIT. PRESERVE CIRCUIT

FOR FUTURE USE.

B. DISCONNECT DATA OUTLETS FROM NETWORK. PRESERVE CIRCUIT FOR

FUTURE USE.

C. AREAS SHOWN FOR DEMO WORK ARE ALSO AREAS FOR NEW WORK. SEE

SHEETS ED111 AND EP111 FOR REFERENCE.

D. DISCONNECT DURESS ALARM FROM CIRCUIT, PRESERVE CIRCUIT FOR

FUTURE USE.

E. SYSTEM FURNITURE WILL HAVE CHASE/POWER WHIP FOR INSTALLATION.

COORDINATE INSTALLATION REQUIREMENTS USING ARCHITECTURAL

DRAWINGS.

ED111

ED111

ED111

EP111

EP111

EP111

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2 -1

C h e c k -I n

E L

E C

R m lu g o W

Q

P M

.r v t

/1

/2

:3

:1

A

M

ED103

DEMOLITION PLAN AT BUILDING E

(09) LEVEL 1

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 CPR MLS

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING E (09) LEVEL 1

H

G

F

E

D

C

B

09-02-E2-04

W.C. ALCOVE

09-02-H3-02

NURSE

STATION/MED

09-02-B2-06

EXAM/SCREEN

09-02-B2-05

EXAM/SCREEN

09-02-B3-03

PRECEPTOR

09-02-E3-02

PRECEPTOR

09-02-F3-06

PRECEPTOR

09-02-B3-06

EXAM

09-02-B3-08

EXAM09-02-G3-06

EXAM

09-02-G2-06

EXAM

09-02-H3-04

EXAM

09-02-B2-02

PROC TLT

09-02-H2-01

EQUIP STOR

09-02-B3-07

EXAM

09-02-H2-04

EXAM

09-02-H2-03

EXAM

09-02-C4-01

OFFICE

09-02-C3-03

EXAM

09-02-C3-02

EXAM

09-02-C2-02

EXAM

09-02-C3-08

EXAM

09-02-D3-05

EXAM

09-02-D2-05

EXAM

09-02-E2-05

EXAM

09-02-H4-03

OFFICE

09-02-F3-04

EXAM

09-02-F2-05

EXAM

09-02-G3-01

EXAM

09-02-G2-04

EXAM

09-02-G4-01

EXAM

09-02-G2-05

EXAM

09-02-F3-02

CLEAN SUPPLY

09-02-B4-01

CONSULT

09-02-A2-03

PROCEDURE

09-02-H4-01

CONSULT

09-02-E2-01

SOILED UTIL

09-02-B2-04

CLEAN SUPPLY

09-02-B2-03

PROCEDURE

09-02-C2-01

EQUIP STOR

09-02-A4-02

HUB

09-02-F4-03

HUB

09-02-G2-01

HAC

09-02-F3-07

WEIGHT STN

09-02-G3-02

WEIGHT STN

09-02-G1-05

OFFICE

09-02-G2-02

CLEAN SUPPLY

09-02-H1-05

OFFICE

09-02-H1-06

OFFICE

09-02-B1-03

OFFICE

09-02-B1-05

OFFICE

09-02-B1-04

OFFICE

09-02-B1-06

OFFICE

09-02-C1-02

OFFICE

09-02-C1-01

OFFICE

09-02-C1-04

OFFICE

09-02-C1-03

OFFICE

09-02-C1-06

OFFICE

09-02-C1-05

OFFICE

09-02-D1-04

OFFICE

09-02-D1-03

OFFICE

09-02-D1-06

OFFICE

09-02-D1-05

OFFICE

09-02-D2-01

LINEN ALCOVE

09-02-F2-03

PROCEDURE

09-02-B3-04

WEIGHT STN

09-02-G1-03

NURSE

09-02-G1-04

NURSE

09-02-G1-01

NURSE

09-02-G1-02

NURSE

09-02-G1-06

NURSE

09-02-F1-03

OFFICE

09-02-F1-02

OFFICE

09-02-D1-02

OFFICE

09-02-H1-02

OFFICE

09-02-H1-01

OFFICE

09-02-H1-04

OFFICE

09-02-H1-03

OFFICE

09-02-D1-01

OFFICE

09-02-A1-02

OFFICE

09-02-A1-01

OFFICE

09-02-A1-04

OFFICE

09-02-A1-03

OFFICE

09-02-B1-02

OFFICE

09-02-B1-01

OFFICE

09-02-F1-01

PAT ED CONF

09-02-H3-03

CRASH CART

ALCOVE

09-02-F2-04

OFFICE

09-02-G2-03

OFFICE

09-02-E1-02

STAFF TLT

09-02-C4-04

CONSULT

09-02-D3-02

NURSE

STATION/MED

09-02-D4-04

HUB

09-02-B3-02

NURSE

STATION/MED

09-02-B4-02

EXAM

09-02-C3-01

EXAM

09-02-A4-03

HAS

09-02-D3-07

WEIGHT STN

09-02-A3-07

WEIGHT STN

09-02-E3-03

WEIGHT STN

09-02-A3-04

CORRIDOR

09-02-A3-06

CORRIDOR

09-02-B3-05

CORRIDOR

09-02-C3-04

CORRIDOR

09-02-D3-04

CORRIDOR

09-02-E3-04

CORRIDOR

09-02-F3-03

CORRIDOR

09-02-G3-05

CORRIDOR

09-02-G3-03

CORRIDOR

09-02-H3-05

CORRIDOR

09-02-D3-03

EXAM

09-02-D4-01

OFFICE

09-02-H3-08

EXAM

09-02-H3-07

EXAM

09-02-H3-06

EXAM

09-02-H2-05

EXAM

09-02-F4-01

PUBLIC TLT

09-02-E1-03

STAFF LOUNGE

09-02-E4-02

WAIT

09-02-F4-02

WAIT

09-02-F2-02

PROC TLT

09-02-E1-01

STAFF TLT

09-02-E2-06

EDUCATION

09-02-E3-07

EDUCATION

09-02-H2-02

OFFICE

09-02-D3-06

CORRIDOR

09-02-D1-07

CORRIDOR

09-02-A2-04

ALCOVE

09-02-F2-06

ALCOVE

09-02-F2-01

OFFICE

09-02-G3-04

PAT TLT

09-02-H3-01

STAFF TLT

09-02-F3-01

PAT TLT

09-02-E3-05

STAFF TLT

09-02-F3-05

CORRIDOR

09-02-E3-06

CORRIDOR

09-02-B3-01

PAT TLT

09-02-A3-05

PAT TLT

09-02-C3-09

CRASH CART

ALCOVE 09-02-C3-06

CORRIDOR

09-02-C3-05

PAT TLT

09-02-D3-01

PAT TLT

09-02-D4-05

HAS

09-02-F4-04

HAS

09-02-E4-01

PUBLIC TLT

09-02-C4-05

WAIT

09-02-D4-02

WAIT

09-02-B4-03

WAIT

09-02-C4-02

WAIT

09-02-G4-02

WAIT

09-02-H4-02

WAIT

09-02-E3-01

EXAM

09-02-E2-03

EXAM

09-02-E2-02

OFFICE

09-02-C2-04

EXAM

09-02-C2-03

OFFICE

09-02-D2-03

EXAM

09-02-D2-02

EXAM

09-02-B2-01

HAC

09-02-F1-04

CORRIDOR

09-02-D2-04

EXAM

09-02-D2-E1

ELEC

09-02-D2-H1

CHUTE

09-02-E3-T1

DATA /

TELECOMM

09-02-G2-E2

ELEC

09-02-H2-T2

DATA /

TELECOMM

09-02-SE6

ELEV

09-02-ST2

STAIR

UP

DN

A. DISCONNECT FURINITURE POWER WHIP FROM CIRCUIT. PRESERVE CIRCUIT

FOR FUTURE USE.

B. DISCONNECT DATA OUTLETS FROM NETWORK. PRESERVE CIRCUIT FOR

FUTURE USE.

C. AREAS SHOWN FOR DEMO WORK ARE ALSO AREAS FOR NEW WORK. SEE

SHEETS ED111 AND EP111 FOR REFERENCE.

D. DISCONNECT DURESS ALARM FROM CIRCUIT, PRESERVE CIRCUIT FOR

FUTURE USE.

E. SYSTEM FURNITURE WILL HAVE CHASE/POWER WHIP FOR INSTALLATION.

COORDINATE INSTALLATION REQUIREMENTS USING ARCHITECTURAL

DRAWINGS.

ED111

ED111

ED111

EP111

EP111

3 EP111

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2 -1

C h e c k -I n

E L

E C

R m lu g o W

Q

P M

.r v t

/1

/2

:3

:2

A

M

ED104

DEMOLITION PLAN AT BUILDING E

(09) LEVEL 2

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 CPR MLS

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING E (09) LEVEL 2

H

G

F

E

D

C

B

09-03-B3-07

VISUAL FIELD

09-03-B3-04

PHOTOGRAPHY

09-03-B4-03

LASER ROOM

09-03-A2-03

PROCEDURE

09-03-A1-01

OFFICE

09-03-C1-01

OFFICE09-03-C1-04

WORK

09-03-C1-05

WORK

09-03-C1-03

OFFICE

09-03-C1-02

OFFICE

09-03-B1-05

OFFICE

09-03-A1-02

OFFICE

09-03-B1-06

OFFICE

09-03-B1-03

OFFICE

09-03-B1-04

OFFICE

09-03-B1-01

OFFICE

09-03-B1-02

OFFICE

09-03-B3-06

EXAM/TREATMENT

09-03-B3-05

EXAM/TREATMENT

09-03-B2-03

EXAM/TREATMENT09-03-B2-06

EXAM/TREATMENT

09-03-A3-06

EXAM/TREATMENT

09-03-A4-02

EXAM/TREATMENT

09-03-A2-02

EXAM/TREATMENT

09-03-A1-03

OFFICE

09-03-D4-01

ONSTAGE AREA

09-03-E1-03

STAFF LOUNGE

09-03-E3-05

WEIGHT STN

09-03-H2-03

NOURISH

09-03-F4-01

ONSTAGE AREA

09-03-B2-01

HAC

09-03-G2-01

HAC

09-03-H3-01

ONSTAGE AREA

09-03-A4-03

HAS

09-03-D1-01

OFFICE

09-03-F1-03

OFFICE

09-03-F1-02

OFFICE

09-03-D1-03

OFFICE

09-03-D1-02

OFFICE

09-03-G1-02

OFFICE

09-03-G1-01

OFFICE

09-03-H1-06

OFFICE

09-03-G1-05

OFFICE

09-03-H2-05

CHEMO PREP

09-03-G2-06

PREP

09-03-H2-02

REFERENCE

09-03-H1-01

OFFICE

09-03-H1-02

OFFICE

09-03-B3-03

ULTRASOUND RM

09-03-E2-01

SOILED UTIL

09-03-C2-01

EXAM

09-03-D4-03

EXAM

09-03-D3-06

EXAM

09-03-D3-05

EXAM

09-03-D3-04

EXAM

09-03-D2-04

EXAM

09-03-D2-03

EXAM

09-03-C4-01

EXAM

09-03-C3-03

EXAM

09-03-C3-02

EXAM

09-03-C3-01

EXAM

09-03-E2-03

EXAM

09-03-C4-02

WAIT

09-03-E4-02

WAIT

09-03-B4-04

WAIT

09-03-F4-05

WAIT

09-03-G4-02

WAIT

09-03-D3-02

NURSE

STATION/MED

09-03-D3-01

STAFF TLT

09-03-G1-04

OFFICE

09-03-E1-01

STAFF TLT

09-03-H4-01

FAMILY COUNSEL

09-03-C2-02

EXAM

09-03-D3-03

PRECEPTOR RM

09-03-F1-01

CONF

09-03-F2-03

EXAM

09-03-F3-08

WEIGHT STN

09-03-F3-02

EQUIP STOR

09-03-G2-02

SOILED UTIL

09-03-F2-02

CLEAN SUPPLY

09-03-E2-05

PROCEDURE

09-03-E2-04

PROC TLT

09-03-F2-04

PROCEDURE

09-03-G1-03

OFFICE

09-03-G4-01

EXAM

09-03-G3-03

EXAM

09-03-G3-02

EXAM

09-03-G4-03

HUB

09-03-F3-03

PRECEPTOR RM

09-03-E2-02

EXAM

09-03-F4-04

EXAM

09-03-F3-06

EXAM

09-03-F3-05

EXAM

09-03-F3-04

EXAM

09-03-F2-06

EXAM

09-03-F2-05

EXAM

09-03-G3-01

EXAM

09-03-G2-04

EXAM

09-03-G2-03

EXAM

09-03-B2-02

EXAM/TREATMENT

09-03-H1-05

OFFICE

09-03-D1-05

TECH

09-03-D1-04

TECH

09-03-B4-01

COHERENCE

TOMOGRAPHY

09-03-A3-05

PUBLIC TLT

09-03-B2-04

CLEAN SUPPLY

09-03-A3-04

EQUIP STOR

09-03-H1-04

OFFICE

09-03-H1-03

OFFICE

09-03-B3-02

MED EQUIP

ALCOVE

09-03-G3-05

CHEMO TLT

09-03-H2-01

STOR

09-03-B3-01

W.C. ALCOVE

09-03-G2-07

PREP

09-03-C2-03

WORKROOM

09-03-D2-02

ENDO CLEAN

ROOM 1

09-03-C2-04

PROCEDURE

09-03-D2-01

CYSTO

09-03-D4-04

WAIT

09-03-G2-08

PAT TLT

09-03-G3-06

TLT

09-03-G3-04

EXAM

09-03-E1-02

STAFF TLT

09-03-E3-01

EXAM

09-03-E3-02

EXAM

09-03-E3-03

EXAM

09-03-E4-01

CONSULT/PROCEDURE

09-03-C3-05

WEIGHT STN

09-03-A2-04

CORRIDOR

09-03-A3-07

CORRIDOR

09-03-B2-07

CORRIDOR

09-03-C3-07

CORRIDOR

09-03-D3-07

CORRIDOR

09-03-D3-08

WEIGHT STN

09-03-E2-06

CORRIDOR

09-03-E3-06

CORRIDOR

09-03-G3-07

WEIGHT STN

09-03-H2-06

CORRIDOR

09-03-C3-04

PAT TLT

09-03-D1-07

CORRIDOR

09-03-E3-04

PAT TLT

09-03-F3-01

PAT TLT

09-03-H2-04

NURSE

STATION/MED 09-03-F3-07

CORRIDOR

09-03-C4-03

HAS

09-03-E4-03

HAS

09-03-G4-04

HAS

09-03-F4-02

PUBLIC TLT 09-03-D4-02

PUBLIC TLT

09-03-G3-08

CORRIDOR

09-03-H3-03

CORRIDOR

09-03-C3-06

CORRIDOR

09-03-F1-04

CORRIDOR

09-03-G2-05

60 SF /89 SF

ANTEROOM

09-03-E4-04

WAIT

09-03-F4-03

WAIT

09-03-B2-05

EXAM/TREATMENT

09-03-F2-01

RENAL ALCOVE

09-03-H3-02C

INFUSION

CENTER

09-03-H3-02B

INFUSION

09-03-H3-02A

INFUSION

CENTER

09-03-H3-02D

INFUSION

09-03-C2-E1

ELEC

09-03-D2-H1

CHUTE

09-03-E2-T1

DATA /

TELECOMM

09-03-G2-E2

ELEC

09-03-H2-T2

DATA /

TELECOMM

09-03-SE6

ELEV

09-03-ST2

STAIR

DN

UP

N U

A. DISCONNECT FURINITURE POWER WHIP FROM CIRCUIT. PRESERVE CIRCUIT

FOR FUTURE USE.

B. DISCONNECT DATA OUTLETS FROM NETWORK. PRESERVE CIRCUIT FOR

FUTURE USE.

C. AREAS SHOWN FOR DEMO WORK ARE ALSO AREAS FOR NEW WORK. SEE

SHEETS ED111 AND EP111 FOR REFERENCE.

D. DISCONNECT DURESS ALARM FROM CIRCUIT, PRESERVE CIRCUIT FOR

FUTURE USE.

E. SYSTEM FURNITURE WILL HAVE CHASE/POWER WHIP FOR INSTALLATION.

COORDINATE INSTALLATION REQUIREMENTS USING ARCHITECTURAL

DRAWINGS.

ED111

ED111

ED111

ED111

EP111

EP111

EP111

3EP111

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2 -1

C h e c k -I n

E L

E C

R m lu g o W

Q

P M

.r v t

/1

/2

:0

:2

P

M

ED105

DEMOLITION PLAN AT BUILDING E

(09) LEVEL 3

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 CPR MLS

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING E (09) LEVEL 3

1.1

2.5

A

A.1

B

B.1

B.5

B.7

C

FEMALE PUBLIC

TLT

10-04-C4-04

CORRIDOR

D

OFFICE

COMPUTER RM

10-04-C5-05 10-04-C5-07

UPS SERVICE DESK

10-04-C5-08

CUSTOMER

PAT

RECORDS

10-04-C8-12

INTAKE/TRIAGE/TEST

10-04-C8-08

10-04-C8-13

COPY/FAX

10-04-C6-05

WAIT

10-04-C5-03

10-04-C5-02

HAC

10-04-C5-04

VEST

10-04-C6-02

ELEC

10-04-C6-04

ELEV 10-04-C7-03

NCOIC MHS

10-04-C7-05

RECEP

10-04-C8-03

CORRIDOR

10-04-C7-06

EYE LANE

10-04-C8-04

EYE LANE

INTAKE/TRIAGE/TEST

10-04-C8-02

CORRIDOR

10-04-C6-03

VEST 10-04-C7-01

CORRIDOR

EQUIP STOR

10-04-C8-07

10-04-B3-15

MAIL

10-04-B2-07

CORRIDOR

10-04-B3-11

CORRIDOR

10-04-B4-10

VEST

10-04-B4-09

CORRIDOR

MALE PUBLIC TLT

10-04-C5-01

10-04-C6-01

ELEV

10-04-C7-02

HAC

VISUAL/FUNDUS

CAMERA

10-04-C7-04

FITTING/DISPENSING

10-04-C8-01

PATIENT TLT

10-04-B8-10

10-04-B8-11

SAT LAB

10-04-C8-06

TELECOM

COMMUNICATIONS

10-04-C8-05

10-04-C9-01

SHAFT

10-04-B8-12

EXAM

10-04-B9-09

EXAM

10-04-B6-02

LOBBY

ISOLATION TLT

10-04-B7-05

10-04-B9-08

CORRIDOR

10-04-B4-03

10-04-B7-02

EXAM

10-04-B7-06

CORRIDOR

10-04-B7-03

EXAM

10-04-B8-07

EXAM

RECEP/OFFICE

10-04-B7-01

10-04-B8-01

OFFICE

10-04-B8-02

MED TECH

10-04-B8-04

OFFICE

10-04-B8-03

MED TECH

10-04-B8-08

EXAM

10-04-B8-09

EXAM

10-04-B8-13

CORRIDOR

10-04-B9-05

10-04-B8-05

OFFICE

10-04-B8-06

OFFICE

10-04-B9-01

E

10-04-B1-02

MDOS/CC1

10-04-B1-03

MDSS/CC1

10-04-B1-04

OFFICE

10-04-B1-05

SGN

10-04-C2-02

CORRIDOR

10-04-B2-08

COPY/FAX

ALCOVE

10-04-B3-12

STAFF TLT

10-04-B2-09

COPY/FAX

10-04-C3-01

TECH

10-04-C3-02

TECH

CLASSROOM

10-04-C2-01 10-04-C2-02

CORRIDOR 10-04-C3-03

COPY/FAX

10-04-C3-04

TELECOM

COMMUNICATIONS

10-04-C3-05

10-04-C3-06

FILE

10-04-C4-02

SHAFT

EQUIP STOR

10-04-C4-03

STAFF LOUNGE

10-04-C3-07

10-04-C4-05

OFFICE

10-04-C3-08

CORRIDOR

A

10-04-C4-06

OFFICE FACILITY MGMT

10-04-C4-08 10-04-C4-10

MEDIA

10-04-C5-06

WORK

10-04-C5-12

OFFICE

10-04-C5-11

10-04-C5-13

OFFICE

POS PHARMACY

10-04-C6-07

FACILITY MGMT

10-04-C4-07

INFO/NCOIC

10-04-C4-09

10-04-C7-08

OFFICE

10-04-C7-09

WAIT

10-04-C7-07

CORRIDOR

10-04-C8-10

RECEPT

10-04-C8-11

OUTREACH

NURSE

10-04-C4-01

EX STAIR 1

10-04-B3-13

STAFF TLT

10-04-B3-14

MAIL

RECORDS STOR

10-04-B4-11

TECH OFFICE

10-04-B5-08

10-04-B5-07

HALL

10-04-B5-09

RECORDS

WINDOW

TECH OFFICE

10-04-B5-12

TECH OFFICE

10-04-B5-11

TECH OFFICE

10-04-B5-13

10-04-B2-05

TECH

10-04-B2-06

TECH

10-04-B3-04

OFFICE

10-04-A2-04

CORRIDOR

10-04-B1-01

STAFF TLT

10-04-B2-01

SECR/WAIT

10-04-B2-02

TECH

10-04-B2-03

TECH

10-04-B2-04

TECH

10-04-B3-03

OFFICE

10-04-B3-06

OFFICE

10-04-B3-10

OFFICE

10-04-B3-09

OFFICE TECH OFFICE

TECH OFFICE

10-04-B4-02

10-04-B4-05

OFFICE

TECH OFFICE

10-04-B4-08

TECH OFFICE

10-04-B5-03

TECH OFFICE

10-04-B4-07

TECH OFFICE

10-04-B5-02

10-04-B5-05

TECH

10-04-B5-06

RECEPT

10-04-B3-01

OFFICE

10-04-B3-02

OFFICE

10-04-B3-05

AUDITOR

10-04-B3-07

GPM1

10-04-B3-08

OFFICE

10-04-B4-01

HCI/UM

10-04-B4-04

HCI/UM

10-04-B4-06

BCAC

10-04-B5-01

MEB

10-04-B5-04

MEB

10-04-B6-01

RECEPT

10-04-A4-04

CORRIDOR

10-04-B5-14

CORRIDOR

10-04-A4-01

OIC TOPA NCOIC TOPA

10-04-A4-02 10-04-A4-03

OFFICE

10-04-A5-01

OFFICE

10-04-A5-02

CONF

NCOIC/RMO/CSS/SUP1

10-04-A2-02

10-04-A1-01

MDG/CC1

10-04-B7-04

EXAM

10-04-A1-02

OFFICE

10-04-A2-01

OFFICE

10-04-A2-03

OIC RMO

10-04-A3-01

CODER

10-04-A3-02

OFFICE 10-04-A3-03

ARMY/NAVY

LIASON

10-04-A3-04

ARMY/NAVY

LIASON

N U

A. DISCONNECT FURINITURE POWER WHIP FROM CIRCUIT. PRESERVE CIRCUIT

FOR FUTURE USE.

B. DISCONNECT DATA OUTLETS FROM NETWORK. PRESERVE CIRCUIT FOR

FUTURE USE.

C. AREAS SHOWN FOR DEMO WORK ARE ALSO AREAS FOR NEW WORK. SEE

SHEETS ED111 AND EP111 FOR REFERENCE.

D. DISCONNECT DURESS ALARM FROM CIRCUIT, PRESERVE CIRCUIT FOR

FUTURE USE.

E. SYSTEM FURNITURE WILL HAVE CHASE/POWER WHIP FOR INSTALLATION.

COORDINATE INSTALLATION REQUIREMENTS USING ARCHITECTURAL

DRAWINGS.

ED111

EP111

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2 -1

C h e c k -I n

E L

E C

R m lu g o W

Q

P M

.r v t

/1

/2

:3

:2

A

M

ED106

DEMOLITION PLAN AT BUILDING A

(10) LEVEL 4

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 CPR MLS

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING A (10) LEVEL 4

N U

N U

CR

A. DISCONNECT FURINITURE POWER WHIP FROM CIRCUIT. PRESERVE CIRCUIT

FOR FUTURE USE.

B. DISCONNECT DATA OUTLETS FROM NETWORK. PRESERVE CIRCUIT FOR

FUTURE USE.

C. AREAS SHOWN FOR DEMO WORK ARE ALSO AREAS FOR NEW WORK. SEE

SHEETS ED111 AND EP111 FOR REFERENCE.

D. DISCONNECT DURESS ALARM FROM CIRCUIT, PRESERVE CIRCUIT FOR

FUTURE USE.

E. SYSTEM FURNITURE WILL HAVE CHASE/POWER WHIP FOR INSTALLATION.

COORDINATE INSTALLATION REQUIREMENTS USING ARCHITECTURAL

DRAWINGS.

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2 -1

C h e c k -I n

E L

E C

R m lu g o W

Q

P M

.r v t

/1

/2

:3

:3

A

M

ED111

ENLARGED DEMOLITION FLOOR

PLANS

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

08,09,10

02/15/2021 CPR MLS

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

2. DISCONNECT AND RELOCATE EXISTING THERMOSTAT TO LOCATION

SHOWN ON SHEET EP111.

3. REUSE EXISTING CARD READER AND THERMOSTAT WIRING, RELOATION TO

POSITION SHOWN ON SHEET EP111.

32'16'8'4'2'0'

N o rt h

1/2" = 1'-0"

TYPICAL ENLARGED DEMOLITION FLOOR PLAN

32'16'8'4'2'0'

N o rt h

1/2" = 1'-0"

ENLARGED DEMOLITION FLOOR PLAN AT BLDG A (10) LEVEL 4

32'16'8'4'2'0'

N o rt h

1/2" = 1'-0"

TYPICAL ENLARGED DEMO FLOOR PLAN

32'16'8'4'2'0'

N o rt h

1/2" = 1'-0"

ENLARGED DEMOLITION FLOOR PLAN BLDG G (08) LEVEL 3

N U

N U

N U

N U

33 44 44444 45 5 5 5 5 5 5 5

A. REUSE EXISTING POWER CIRCUITS TO PROVIDE POWER TO THE

RECEPTIONIST DESKS.

B. COORDINATE DATA AND POWER RECEPTACLE LABELS WITH EXISTING

RECEPTACLE LABELING.

C. ALL RECEPTACLES SHALL SHOW CIRCUIT NUMBER BACK TO PANEL OF

ORIGIN.

D. REUSE EXISTING WIRING FOR DURESS ALARM.

E. REFER TO INTERIOR DRAWING SET FOR PHASIN AND WORK HOUR

COORDINATION.

F. CONNECT DESK POWER CABLE WHIP TO EXISTING CIRCUIT.

G. ALL RECEPTACLES NEED TO BE INSTALLED WITHIN THE CASEWORK,

UNLESS OTHERWISE NOTED.

4 5 3

45 4 5 3 5 4

6 2

4 5 3 45 4 5 3 4 5 4 5 4 5 4 5 4 53 3

4 54 43 54 4 3 54 45 555

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2 -1

C h e c k -I n

E L

E C

R m lu g o W

Q

P M

.r v t

/1

/2

:3

:3

A

M

EP111

ELECTRICAL POWER PLAN INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

08,09,10

02/15/2021 CPR MLS

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/2" = 1'-0"

TYPICAL ENLARGED FLOOR POWER PLAN AT BUILDING "E"

1. DURESS ALARM, REUSE EXISTING CIRCUIT FOR DURESS ALARM.

2. REUSE EXISTING CARD READER WIRING, REDIRECT TO NEW LOCATION AS

SHOWN ON THE DRAWINGS.

3. RECEPTACLES MOUNTED 3' 0" ON CENTER AFF.

4. RECEPTACLES MOUNTED 1' 6" AFF.

5. DATA OUTLET FOR PHONE CONNECTIONS. REUSE EXISTING CIRCUIT.

6. REUSE EXISTING THERMOSTAT WIRING, REDIRECT TO NEW LOCATION AS

SHOWN ON THE DRAWINGS.

32'16'8'4'2'0'

N o rt h

1/2" = 1'-0"

ENLARGED FLOOR POWER PLAN AT BLDG G LVL 3

32'16'8'4'2'0'

N o rt h

1/2" = 1'-0"

ENLARGED FLOOR POWER PLAN AT BLDG A LVL 4

32'16'8'4'2'0'

N o rt h

1/2" = 1'-0"

TYPICAL ENLARGED FLOOR POWER PLAN BUILDING "G" & "E"

ELECTRICAL
ED101 - DEMOLITION PLAN AT BUILDING G (08) LEVEL 1
ED102 - DEMOLITION PLAN AT BUILDING G (08) LEVEL 3
ED103 - DEMOLITION PLAN AT BUILDING E (09) LEVEL 1
ED104 - DEMOLITION PLAN AT BUILDING E (09) LEVEL 2
ED105 - DEMOLITION PLAN AT BUILDING E (09) LEVEL 3
ED106 - DEMOLITION PLAN AT BUILDING A (10) LEVEL 4
ED111 - ENLARGED DEMOLITION FLOOR PLANS
EP111 - ELECTRICAL POWER PLAN