This document is an amendment to a solicitation providing answers to questions regarding an opportunity to install partitions at check-in desks for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19. The scope of work includes installing partitions and mounting new data ports, with one port per workspace. Existing power circuits and cabling will be reused, requiring careful demolition. Furniture will include pre-wired components. Electrical and low-voltage work will be limited to through-wall connections and not involve ceiling spaces. Dust precautions shall be at ICRA Class II level with corrective measures such as HEPA filtration if needed to contain dust.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 08 - Drawings for RFI 2 project 554-20-103.pdf | ||
| 36C25921R0082 0007.docx | DOCX document | |
| 36C25921R0082 0006.docx | DOCX document | |
| 36C25921R0082 0005.docx | DOCX document | |
| 36C25921R0082 0004.docx | DOCX document | |
| Amendment 03 - 36C25921R0082 0003.docx | DOCX document | |
| Amendment 02 - 36C25921R0082 0002.docx | DOCX document | |
| S04 - 2022-01-28-RFI_No_1-Project_554-20-103_Install_Partitions_at_Check-In_Desks-VEG-20-16.pdf | ||
| S04 - Site Visit Attendance.pdf | ||
| S06 - Amend 0001 - 36C25921R0082 0001.docx | DOCX document | |
| S02 - Drawings Part 4.pdf | ||
| S02 - Drawings Part 3.pdf | ||
| S02 - Drawings Part 2.pdf | ||
| S02 - Drawings Part 1.pdf | ||
| S02 - Specifications.pdf | ||
| S02 - Solicitation - 36C25921R0082.docx | DOCX document | |
| S02 - ICRA.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI 2 Questions—36C25921R0082 Install Partitions at Check-in Desks
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
554-20-103 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders
36C25921R0082
X
The purpose of this amendment is to provide answers to RFI's submitted.
Q1: Pertaining to Q3, VA response to RFI seems to confirm that the additional data ports are desired. We count 47 existing data ports and 69 new for a total of 116 data ports after construction is complete. This seems excessive based upon the occupancy of the desks and the equipment we observed in place. Please confirm these numbers of new data ports are indeed to be provided under this contract.
A1: See “Drawings for RFI 2 project 554-20-103.pdf”. Reduce number of data outlets to one per workspace per person. All telecom closet work is complete or will be completed by the VAMC. All data cabling from the telecom room to the new desk areas is in place. The VAMC can run additional cabling if required.
Q2: Pertaining to Q3, Response reads to feed new cabling back to telecom closets. Please confirm cabling is to be ran to the nearest telecom closet shown on each drawing. Please also confirm that termination, punch-down, patch panels, and switches are to be provided by owner.
A2: All telecom closet work is complete or will be completed by the VAMC. The Contractor’s work is limited to connecting existing cabling to the data ports at the desks. Careful demolition is required to not damage existing data cabling to be reused.
Q3: Pertaining to Q4, Response does not answer the question. Please confirm that if there are not enough circuits to feed the shown receptacles per code, additional circuits will be treated as unforeseen condition.
A3: See “Drawings for RFI 2 project 554-20-103.pdf”. Existing power circuits and wiring is used. Careful demolition is required to not damage existing power wiring to be reused.
Q4: Pertaining to Q4, Response states reception desks are modular furniture with whips such as Hermann Miller product, etc. Drawings and specs show custom casework assemblies which would not come pre-wired with factory whips. Please confirm the design intent is to run power through the desks in flexible metal conduit.
A4: Basis of design is to provide furniture with manufacturer installed wiring.
Q5: Pertaining to Q8, Response does not answer the question and other question responses indicate additional cabling from telecom closets is required. Bidders need confirmation that electrical and low voltage work will not take place in the ceiling spaces below the desks.
A5: Design intent is through the wall power and data connections and not to drill through the floor Q6: Pertaining to Q16, Designer deferred question to Owner. Response still needed.
A6: RFI 1 Q16 asked, “Solicitation statement of work requires ICRA level 3, however safety specification 01 35 26 requires only Class 2. The project does not involve activities which generate significant dust. Please confirm only Class 2 is required.” Answer to both RFI 1 Q16 and RFI 2 Q6: Use ICRA Class II Precautions. If ICRA Class II Precautions do not keep dust from escaping the work areas, then take corrective actions. The corrective actions may include HEPA filter negative air pressure units.
See attached document: Drawings for RFI 2 project 554-20-103.
File details come from the government source that posted it. Updated .