S02 - Drawings Part 1.pdf
PDF 16 MB Posted
- Solicitation number
- 36C25921R0082
About this file
This document outlines a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 to install partitions at check-in desks. The solicitation number is 36C25921R0082 and seeks to award a contract for Z1DA--554-20-103 to install partitions at check-in desks. No other details are provided regarding response dates, pricing terms, set asides, incumbent contractors, or work specifications. The attached file S02 - Drawings Part 1.pdf is noted but its content is not described.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 08 - Drawings for RFI 2 project 554-20-103.pdf | ||
| 36C25921R0082 0008.docx | DOCX document | |
| 36C25921R0082 0007.docx | DOCX document | |
| 36C25921R0082 0006.docx | DOCX document | |
| 36C25921R0082 0005.docx | DOCX document | |
| 36C25921R0082 0004.docx | DOCX document | |
| Amendment 03 - 36C25921R0082 0003.docx | DOCX document | |
| Amendment 02 - 36C25921R0082 0002.docx | DOCX document | |
| S04 - 2022-01-28-RFI_No_1-Project_554-20-103_Install_Partitions_at_Check-In_Desks-VEG-20-16.pdf | ||
| S04 - Site Visit Attendance.pdf | ||
| S06 - Amend 0001 - 36C25921R0082 0001.docx | DOCX document | |
| S02 - Drawings Part 4.pdf | ||
| S02 - Drawings Part 3.pdf | ||
| S02 - Drawings Part 2.pdf | ||
| S02 - Specifications.pdf | ||
| S02 - Solicitation - 36C25921R0082.docx | DOCX document | |
| S02 - ICRA.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N o rt h N o rt h
VICINITY MAP
AREA OF WORK
PROJECT LOCATION
AREA OF
WORK
G (08)
E (09)
A (10)
E 6TH AVE
E COLFAX AVE
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C R e v it
\5
-2
-1
C h e c k -I n A
R C
H R c jo h n s to n Y
W
N
.r v t
/5
/2
:0
:5
P
M
GI001
COVER SHEET INSTALL PARTITIONS AT CHECK-IN
DESKS
1700 N WHEELING ST, AURORA, CO 80045
554-20-103
NA
02/15/2021 TW CJ
100% CONSTRUCTION
DOCUMENTS
VEG 20.17
ROCKY MOUNTAIN REGIONAL VAMC
1700 N WHEELING ST, AURORA, CO 80045
VAMC PROJECT #: 554-20-103
INSTALL PARTITIONS AT CHECK-IN DESKS
SHEET INDEXRENDERED IMAGESAREA OF WORK
SHEET NUMBER SHEET NAME
GENERAL
GI001 COVER SHEET
GI002 GENERAL INFORMATION AND ABBREVIATIONS
INTERIORS
ID101 DEMOLITION PLAN AT BUILDING G (08) LEVEL 1
ID102 DEMOLITION PLAN AT BUILDING G (08) LEVEL 3
ID103 DEMOLITION PLAN AT BUILDING E (09) LEVEL 1
ID104 DEMOLITION PLAN AT BUILDING E (09) LEVEL 2
ID105 DEMOLITION PLAN AT BUILDING E (09) LEVEL 3
ID106 DEMOLITION PLAN AT BUILDING A (10) LEVEL 4
ID111 ENLARGED DEMOLITION FLOOR PLANS
I-111 ENLARGED PLANS AND ELEVATIONS
I-112 ENLARGED PLANS AND ELEVATIONS
I-113 ENLARGED PLANS AND ELEVATIONS
I-114 ENLARGED PLANS AND ELEVATIONS
I-500 MILLWORK DETAILS
I-901 PERSPECTIVES BLDG G LEVEL 1
I-902 PERSPECTIVES BLDG A(10) LEVEL 4
I-903 PERSPECTIVES BLDG G LEVEL 3
ELECTRICAL
E-001 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES
E-002 ELECTRICAL SYMBOLS
ED101 DEMOLITION PLAN AT BUILDING G (08) LEVEL 1
ED102 DEMOLITION PLAN AT BUILDING G (08) LEVEL 3
ED103 DEMOLITION PLAN AT BUILDING E (09) LEVEL 1
ED104 DEMOLITION PLAN AT BUILDING E (09) LEVEL 2
ED105 DEMOLITION PLAN AT BUILDING E (09) LEVEL 3
ED106 DEMOLITION PLAN AT BUILDING A (10) LEVEL 4
ED111 ENLARGED DEMOLITION FLOOR PLANS
EP111 ELECTRICAL POWER PLAN
02/08/2021
A. ALL CONTRACTORS AND THEIR SUPERVISORY PERSONNEL MUST REVIEW THE GENERAL AND
SUPPLEMENTARY CONDITIONS TO THE CONTRACT.
B. ALL WORK MUST CONFORM WITH SPECS.
C. CONTRACTOR MUST BECOME FULLY ACQUAINTED WITH CONDITIONS RELATED TO THE WORK.
D. CONTRACTOR MUST BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF
CONSTRUCTION AND THE SAFETY OF ALL CONSTRUCTION PERSONNEL AND VISITORS.
E. DRAWINGS CONTAINED IN THIS SET MUST NOT BE REPRODUCED FOR SHOP DRAWINGS. COPIES OF THESE DRAWINGS SUBMITTED AS SHOP DRAWINGS WILL BE REJECTED AND RETURNED TO THE CONTRACTOR.
F. EACH INSTALLER MUST EXAMINE SUBSTRATE AND/OR CONDITIONS UNDER WHICH THE WORK WILL BE INSTALLED AND REPORT TO THE CONTRACTOR IN WRITING ANY CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY EXECUTION OF THAT INSTALLER'S WORK. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS ARE CORRECTED. COMMENCING WITH INSTALLATION WILL CONSTITUTE ACCEPTANCE OF THE
SUBSTRATE AND/OR CONDITIONS.
G. DO NOT SCALE DRAWINGS: FOLLOW WRITTEN DIMENSIONS AND NOTES. CONTACT VHA COR FOR
CLARIFICATIONS, IF REQUIRED.
H. DIMENSIONS SHOWN ON THE FLOOR PLAN ARE TO THE FACE OF GYPSUM WALL BOARD (FOG), FACE OF MASONRY (FOM), FACE OF CONCRETE WALLS (FOC) AND COLUMN GRID LINES, UNLESS OTHERWISE NOTED
OR INDICATED.
I. "TYPICAL", AS USED IN THESE DOCUMENTS, MEANS THAT THE CONDITION OR DIMENSION IS
REPRESENTATIVE OF, OR THE SAME, FOR SIMILAR CONDITIONS THROUGHOUT.
J. IF THERE IS A DISCREPANCY BETWEEN SMALL SCALE AND LARGE SCALE DRAWINGS, (PLAN, SECTION, &
DETAIL DRAWINGS, ETC), CONTACT VHA COR FOR CLARIFICATION.
K. IF THERE ARE ANY DISCREPANCIES BETWEEN THE DRAWINGS AND SPECIFICATIONS, CONTACT VHA COR FOR
CLARIFICATION. FOR BIDDING PURPOSES.
L. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL CONDITIONS MUST BE REPORTED TO THE VHA
COR IN WRITING FOR RESOLUTION, PRIOR TO PROCEEDING WITH THE WORK.
M. ANY AND ALL DISCREPANCIES MUST BE REPORTED TO THE VHA COR IN WRITING FOR RESOLUTION, PRIOR TO PROCEEDING WITH THE WORK. IN THESE INSTANCES, NO CHANGE ORDERS OR EXTENSIONS OF TIME WILL BE ALLOWED OR ACCEPTED FOR PROCEEDING WITH THE WORK WITHOUT THE VHA CONTRACTING OFFICER
WRITTEN DIRECTION AND APPROVAL. ALSO, CONTRACTOR MUST REPAIR AND/OR REPLACE ANY
UNAUTHORIZED WORK, AS INDICATED BY THE VHA COR, AT NO ADDITIONAL COST TO THE OWNER.
N. ALL DISSIMILAR METAL MATERIALS MUST BE ISOLATED WITH AN APPROVED, NONMETAL ISOLATION
MATERIAL.
O. PROVIDE SEALANT AND/OR CAULKING BETWEEN DISSIMILAR ADJOINING INTERIOR MATERIALS. (I.E. WINDOW
SILLS TO GWB, ACT CEILINGS TO MASONRY WALLS, ETC.), REFER TO SPEC 079200.
P. GLASS DOORS, ADJACENT PANELS AND ALL GLAZED OPENINGS WITHIN 1'-6" OF THE FLOOR, AND WITHIN A 24" ARC OF EITHER VERTICAL EDGE OF A DOOR, ETC, MUST BE SAFETY GLAZING AS, , AND MUST BE LABELED AS
SUCH. REFER TO SPEC 088000
Q. CONTRACTOR TO INSTALL WOOD BLOCKING AND PLYWOOD AS REQUIRED FOR THE MOUNTING OF ALL TOILET ACCESSORIES, MILLWORK, CASEWORK, AV EQUIPMENT, MEP ITEMS AND RADIOLOGY EQUIPMENT, ETC, REFER TO SPEC 061000.
R. ALL PROPRIETARY PRODUCTS DESCRIBED AND/OR DRAWN IN THE DOCUMENTS (BUT NOT SPECIFIED) ARE TO
MEET THE MANUFACTURER'S STANDARD CRITERIA WHICH IS NOT LIMITED TO THE FOLLOWING:
PERFORMANCE REQUIREMENTS, QUALITY ASSURANCE REQUIREMENTS, APPLICABLE CODES AND INDUSTRY STANDARDS, FABRICATION, ASSEMBLY, HANDLING, DELIVERY, STORAGE, INSTALLATION, OPERATION, ADJUSTMENTS, ETC. PROVIDE THE MANUFACTURER'S STANDARD WARRANTY AND STANDARD FINISH WARRANTY. PROVIDE PRODUCT DATA, SHOP DRAWINGS, SAMPLES AND MAINTENANCE DATA, AS REQUIRED.
REFER TO DIVISION 01 SPECIFICATION SECTIONS WHICH ALSO APPLY, SUCH AS SUBSTITUTION PROCEDURES, SUBMITTAL PROCEDURES, QUALITY REQUIREMENTS, REFERENCES, EXECUTION AND CLOSEOUT PROCEDURES. ANY SUBSTITUTIONS MUST MEET THE DESIGN INTENT, AS WELL AS THE CRITERIA
DESCRIBED ABOVE.
S. REFER TO SPECIFICATIONS FOR ALL REQUIRED TESTING AND INSPECTIONS.
GENERAL NOTES
ACOUSTICAL TILE (SECTION)
GYPSUM BOARD
COVER BOARD
WOOD/HPL
CONT FIRE RETARDANT
WOOD BLOCKING / ROUGH
FRAMING
DISCONTINUOUS FIRE
RETARDANT WOOD
BLOCKING / SHIM
FIRE RETARDANT PLYWOOD
SPANDREL GLASS
MATERIALS LEGEND
SUBSTRATE
PLYWOOD
REMOVE
FLOORING
A
ROOM NAME
SECTION, DETAIL, OR ELEVATION TITLE EXAMPLE
ELEVATION CALLOUT EXAMPLE
DETAIL CALLOUT EXAMPLE
SECTION CALLOUT EXAMPLE
SECTION, DETAIL, OR ELEVATION
SYMBOL IDENTIFIERS
DETAIL NAME
LETTER OR NUMBER
DESIGNATOR
DRAWING
SEQUENCE NUMBER
INDICATES WHERE
TITLE IS LOCATED
ONE OR TWO CHARACTER
DISCIPLINE DESIGNATOR (MAY
NOT BE PRESENT IF CALLOUT
AND TITLE ARE ON DRAWINGS
WITHIN THE SAME DISCIPLINE)
AE101
CENTER LINE
COLUMN
BUBBLE
ROOM TAG
DETAIL NUMBER
ON SHEET
SHEET NUMBER
DETAIL NUMBER
ON SHEET
SHEET NUMBER
NEW LINE TYPE
EXISTING LINE TYPE
DEMO LINE TYPE
View Name
1/8" = 1'-0"
AE101
AE101
A
A101
FLOOR PLAN SYMBOLS LEGEND
AE101
EXTERIOR
INTERIOR
XX KEYNOTE
REVISION TAG1
DRAWING SCALE
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C R e v it
\5
-2
-1
C h e c k -I n A
R C
H R c jo h n s to n Y
W
N
.r v t
/5
/2
:0
:0
P
M
GI002
GENERAL INFORMATION AND
ABBREVIATIONS
INSTALL PARTITIONS AT CHECK-IN
DESKS
1700 N WHEELING ST, AURORA, CO 80045
554-20-103
NA
02/15/2021 TW CJ
100% CONSTRUCTION
DOCUMENTS
VEG 20.17
ARCHITECTURAL ABBREVIATIONS
SYM SYMMETRICAL /
SYMBOL
SYS SYSTEM
T
T TREAD
TEL TELEPHONE
TEMP TEMPORARY
TG TONGUE & GROOVE
THK THICK (NESS)
THRU THROUGH
TKBD TACK BOARD
TM TEMPERED
TO TOP OF
TOC TOP OF CURB /
CONCRETE
TOD TOP OF DECK
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOR TOP OF ROOF
TOS TOP OF STEEL
TOW TOP OF WALL
TPO THERMOPLASTIC
POLYOLEFIN
TRANSF TRANSFORMER
TV TELEVISION
TYP TYPICAL
TZ TERRAZZO
U
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED
OTHERWISE
V
VB VAPOR BARRIER (VPR
BR)
VC GOVERNMENT
FURNISHED/
CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION
TILE
VERT VERTICAL
VEST VESTIBULE
VHA VETERAN HEALTH
ADMINISTRATION
VIF VERIFY IN FIELD
VNR VENEER
VTR VENT THROUGH ROOF
VV GOVERNMENT
FURNISHED/
GOVERNMENT
INSTALLED
VWC VINYL
WALLCOVERING
W
W WEST, WIDTH, WIDE
W/ WITH
W/IN WITHIN
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WDW WINDOW
WH WALL HYDRANT /
WATER HEATER
WP WATERPROOFING /
WORKING POINT
WR WEATHER RESISTANT
WSF WELDED SEAM SHEET
FLOORING
WT WEIGHT
WWF WELDED WIRE FABRIC
X, Y, Z, MISC
& AND
@ AT
XPS EXTRUDED
POLYSTYRENE
YD YARD
OD OUTSIDE DIAMETER
OH OVERHEAD
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF
DRAIN
OZ OUNCE
P
PA PUBLIC ADDRESS
PB PUSH BUTTON
PC PRECAST CONCRETE
PCF POUNDS PER CUBIC
FOOT
PERF PERFORATE (D)
PERM PERMANENT
PERP PERPENDICULAR
PL PLATE / PROPERTY
LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
POLY POLYETHYLENE
PR PAIR
PREFAB PREFABRICATE (D)
PREFIN PREFINISHED
PRELIM PRELIMINARY
PREP PREPARE (D)
PROJ PROJECT
PSF POUNDS PER SQUARE
FOOT
PSI POUNDS PER SQUARE
INCH
PT PAINT / PORCELAIN
TILE
PTN PARTITION
PVC POLYVINYL CHLORIDE
PVG PAVING
Q
QT QUARRY TILE
QTB QUARRY TILE BASE
QTY QUANTITY
R
R RISER / RADIUS
R REUSED EXISTING
EQUIPMNENT
RA RETURN AIR
RB RESILIENT BASE
RCP REFLECTED CEILING
PLAN
RD ROOF DRAIN
RE: REFER TO
REF REFRIGERATOR
REINF REINFORCE (D), (ING)
REPAR REMOVABLE
PARTITION
REQD REQUIRED
REV REVISED/ REVISION
RFG ROOFING
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RP RESIN PANELS
RR RESTROOM
RSF RESILIENT SHEET
FLOORING
RTU ROOF TOP UNIT
S
S SOUTH
SAN SANITARY SEWER
SC SOLID CORE
SCH SCHEDULE
SCRN SCREEN
SECT SECTION
SF SQUARE FOOT (SQFT)
SHT SHEET
SIM SIMILAR
SOG SLAB ON GRADE
SPEC SPECIFICATION (S)
SPKLR SPRINKLE
SPKR SPEAKER
SQ SQUARE
SS SOLID SURFACE
STC SOUND
TRANSMISSION
COEFFICIENT
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURE /
STRUCTURAL
SUSP SUSPENDED
SY SQUARE YARD (SQ
YD)
HDWD HARDWOOD
HK HOOK
HM HOLLOW METAL
HORIZ HORIZONTAL
HPL HIGH PRESSURE
LAMINATE
HR HOUR
HS HIGH STRENGTH
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING /
VENTILATING / AIR
CONDITIONING
HW HOT WATER
HWH HOT WATER HEATER
HYD HYDRANT
I
IBC INTERNATIONAL
BUILDING CODE
ICRA INFECTION CONTROL
RISK ASSESSMENT
ID INSIDE DIAMETER
ILSM INTERIM LIFE SAFETY
MEASURES
IN INCH
INCL INCLUDE (D), (ING)
INFO INFORMATION
INST INSTALL /
INSTALLATION
INSUL INSULATE /
INSULATION
INT INTERIOR
INV INVERT
J
JAN JANITOR
JB JUNCTION BOX
JST JOIST
JT JOINT
K
KIT KITCHEN
KO KNOCKOUT
KPL KICK PLATE
L
L LONG / LENGTH
LAB LABORATORY
LAM LAMINATE (D)
LAV LAVATORY
LBS POUNDS
LF LINEAR FOOT (FEET)
LH LEFT HAND
LLH LONG LEG
HORIZONTAL
LLV LONG LEG VERTICAL
LPT LOW POINT
LRG LARGE
LT LIGHT
LTG LIGHTING
LVR LOUVER
LVT LUXURY VINYL TILE
LWC LIGHTWEIGHT
CONCRETE
M
MAS MASONRY
MAX MAXIMUM
MBR MEMBER
MDF MEDIUM DENSITY
FIBERBOARD
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFG MANUFACTURING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODULAR
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
N
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION
COEFFICIENT
NSF NET SQUARE FEET
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DMT DEMOUNTABLE
DN DOWN
DP DECORATIVE PANEL
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
E
EA EACH
EF EXHAUST FAN
EJ EXPANSION JOINT
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATION
EM EMERGENCY
EP ELECTRICAL
PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
ESC ESCALATOR
EST ESTIMATE
ETR EXISTING TO REMAIN
EW EACH WAY
EWC ELECTRIC WATER
COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION /
EXPOSED
EXT EXTERIOR
F
FA FIRE ALARM
FAB FABRIC
FB FACE BRICK
FBO FURNISHED BY
OWNER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FLOOR
FF&E FIXTURES,
FURNITURE &
EQUIPMENT
FFE FINISH FLOOR
ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH / FINISHED
FIXT FIXTURE
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOG FACE OF GYPSUM
BOARD / WALL
FOM FACE OF MASONRY
FOS FACE OF STUDS
FR FIRE RATED
FRMG FRAMING
FRP FIBER REINFORCED
PANEL
FS FLOOR SINK
FT FLOOR TILE
FTG FOOTING
FUR FURRING
FUT FUTURE
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL
CONTRACTOR
GFRC GLASS FIBER
REINFORCED
CONCRETE
GL GLASS / GLAZING
GOVT GOVERNMENT
GPM GALLON PER MINUTE
GSF GROSS SQUARE FEET
GWB GYPSUM WALL BOARD
GYP GYPSUM
H
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDBD HARDBOARD
HDR HEADER
HDW HARDWARE
A
ABA ARCHITECTURAL
BARRIERS ACT
ABAAS VA BARRIER FREE
DESIGN STANDARD
AC AIR CONDITIONING
ACP ACOUSTICAL CEILING
PANEL
ACST ACOUSTICAL
ACT ACOUSTICAL CEILING
TILE
AD AREA DRAIN
ADJ ADJUSTABLE /
ADJACENT
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECT /
ARCHITECTURAL
ATTEN ATTENUATION
AUTO AUTOMATIC
AV AUDIO / VISUAL
AVG AVERAGE
AWP ACOUSTICAL WALL
PANEL
B
BD BOARD
BITUM BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BM BENCH MARK / BEAM
BO BOTTOM OF
BOC BACK OF CURB
BOD BASIS OF DESIGN OR
APPROVED EQUAL
BOT BOTTOM
BRG BEARING
BRK BRICK
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BVL BEVELED
C
CAB CABINET
CAP CAPACITY
CB CATCH BASIN
CC CONTRACTOR
FURNISHED/
CONTRACTOR
INSTALLED
CCTV CLOSED CIRCUIT TV
CF CUBIC FEET
CFM CUBIC FEET PER
MINUTE
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR / CLEARANCE
CMP CORRUGATED METAL
PIPE
CMT CERAMIC MOSAIC
TILE
CMU CONCRETE MASONRY
UNIT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONN CONNECTION /
CONNECT
CONST CONSTRUCT /
CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING
OFFICER'S
REPRESENTATIVE
CORR CORRIDOR /
CORRUGATED
CP CONCRETE PIPE
CPT CARPET
CS COUNTERSINK
CSMT CASEMENT
CT CERAMIC TILE
CU CUBIC
CW COLD WATER
D
DBL DOUBLE
DEMO DEMOLISH /
DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
J
H
G
F
E
D
C
B
08-01-G3-04
AUDIOMETRIC
EXAM 4
08-01-C2-02
PAT TLT 1
08-01-G1-03
AUDIO TECH 3
08-01-H2-02
AUDIOLOGIST 6
08-01-E3-02
GROUP RM
08-01-F3-02
SPEECH 1
08-01-B3-01
MULTIFUNCT
TREAT/WORK
08-01-A3-02
GYM
08-01-C4-01
EXAM/TREATMENT
08-01-A1-01
WAIT
08-01-B3-03
TREAT 1
08-01-E2-01
SOILED UTIL08-01-E2-05
STAFF TLT 1
08-01-B4-05
PUBLIC TLT 1
08-01-B3-02
PUBLIC TLT 2
08-01-B3-04
OTBC TREAT
08-01-E2-02
STAFF TLT 2
08-01-E2-04
STAFF TLT 4
08-01-B2-03
OTBC
ORTHO/SPLINTING
08-01-C2-01
PAT TLT 2
08-01-E2-06
STAFF OFFICE 1
08-01-F2-01
AUDIOLOGIST 8
08-01-C2-04
STAFF OFFICE 3
08-01-H3-01
SINUSODIAL TEST
08-01-H4-01
PUBLIC TLT 3
08-01-B2-01
HAC
08-01-G4-02
WAIT
08-01-G3-03
AUDIOLOGIST 5
08-01-H4-02
CHIEF OFFICE
08-01-H3-07
SOC WORKER 4
08-01-H2-04
CONSULT
08-01-H2-06
OFFICE 6
08-01-H2-05
OFFICE 5
08-01-H2-07
INTERN OFFICE
08-01-H1-01
OFFICE
08-01-H1-02
CHIEF OFFICE
08-01-H1-03
SECR/WAIT
08-01-G1-02
AUDIO TECH 2
08-01-G1-01
AUDIO TECH 1
08-01-F1-05
OFFICE 1
08-01-F1-04
OFFICE 4
08-01-E1-01
STAFF LOUNGE
08-01-G4-01
AUDIOLOGIST 3
08-01-G3-02
AUDIOLOGIST 2
08-01-F4-03
CAT WORK
08-01-F3-03
SPEECH
THERAPY IND
08-01-H2-03
INST CAL/STOR
08-01-G2-03
AUDIOMETRIC
EXAM 3
08-01-G2-02
AUDIOMETRIC
EXAM 1
08-01-G2-01
AUDIOLOGIST 1
08-01-F2-04
HEARING AID FAB
08-01-F2-05
AUDIOLOGIST 7
08-01-F4-02
WAIT
08-01-F2-03
RESIDENT OFFICE
08-01-F2-02
STAFF TLT 3
08-01-C2-03
EXAM/TREATMENT
08-01-B2-04
TELEHEALTH 1
08-01-B2-05
PAT TLT 1
08-01-G3-01
AUDIOMETRIC
EXAM 2
08-01-F3-04
SPEECH
ANALYSIS
08-01-F3-01
SPEECH 2
08-01-E3-03
W.C. REPAIR
08-01-E2-03
OT/PT DME 2
08-01-A3-01
PLATFORM
08-01-F4-01
SPEECH
THERAPY GROUP
08-01-A1-02
RECEPT
08-01-A2-02
O2 STOR
08-01-A2-04
O2 COORD 5
08-01-A2-03
O2 COORD 4
08-01-A2-10
CORRIDOR
08-01-A3-11
ELEV LOBBY
08-01-C3-01
EXAM/TREATMENT
08-01-C3-02
ELECTROMYOGRAPHY
08-01-D2-03
LINEN ALCOVE
08-01-C2-10
CORRIDOR
08-01-C3-11
CORRIDOR
08-01-F3-11
CORRIDOR
08-01-B2-02
SHARED OFFICE
08-01-C3-12
CORRIDOR
08-01-F1-03
OFFICE 3
08-01-F1-06
OFFICE 2
08-01-F1-02
OFFICE 6
08-01-F1-01
OFFICE 5
08-01-E1-03
OFFICE 8
08-01-E1-02
OFFICE 7
08-01-D1-04
CLERICAL 2
08-01-D1-03
CLERICAL 1
08-01-D1-02
PROV CONSULT
08-01-D1-01
CONSULT
08-01-C1-03
OFFICE
08-01-C1-04
OFFICE
08-01-C1-02
PAT RM
08-01-C1-01
BRACE REPAIR
LAB
08-01-B1-02
PUR OFFICE
08-01-B1-01
EQUIP STOR
08-01-H2-01
HAC
08-01-H3-06
SOC WORKER 3
08-01-H3-05
SOC WORKER 2
08-01-H3-04
SOC WORKER 1
08-01-H3-03
SECT AND WAIT 1
08-01-C4-04
EDUCATION/TRAIN
08-01-H3-02
VESTIBULOGRAPHY
08-01-G4-03
AUDIOLOGIST 4
08-01-D2-05
STAFF TLT
08-01-G3-11
CORRIDOR
08-01-H3-11
CORRIDOR
08-01-J3-11
CORRIDOR
08-01-C4-02
WAIT
08-01-A4-11
CORRIDOR
08-01-E3-11
CORRIDOR
08-01-D3-11
CORRIDOR
08-01-C3-03
OTBC GYM
08-01-D3-01
ADL TLT
08-01-E3-10
CORRIDOR
08-01-C3-10
CORRIDOR
08-01-B1-03
WORK AREA
08-01-A4-02
RECEPT
08-01-D3-02
FITNESS ROOM
08-01-D4-01
COMM CTR
08-01-D2-01
CLEAN SUPPLY
08-01-D4-02
RECEPT
08-01-F4-04
RECEPT
08-01-A3-03
WAIT
08-01-F1-07
CORRIDOR
08-01-C2-T1
DEMARC ROOM
08-01-D2-E1
ELEC
08-01-D2-H2
CHUTE
08-01-E2-T2
DATA /
TELECOMM
08-01-G2-E2
ELEC
08-01-H2-T3
DATA /
TELECOMM
08-01-ST2
STAIR
08-01-SE5
ELEV
DN
UP
ID111
ID111
ID111
I-111
I-111
I-111
M
IN
T
Y P
A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF
HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND
EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE
TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.
B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.
C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS
TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.
COORDINATE WITH COR.
E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,
AS NEEDED.
00KEYNOTES
KEY PLAN
GENERAL NOTES
North
11 12 08 (G)
(E)
(A)
030405
Key Plan
E C
O L F
A X
A V
E
N WHEELING ST
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C R e v it
\5
-2
-1
C h e c k -I n A
R C
H R c jo h n s to n Y
W
N
.r v t
/5
/2
:0
:0
P
M
ID101
DEMOLITION PLAN AT BUILDING G
(08) LEVEL 1
INSTALL PARTITIONS AT CHECK-IN
DESKS
1700 N WHEELING ST, AURORA, CO 80045
554-20-103
02/15/2021 TW CJ
100% CONSTRUCTION
DOCUMENTS
VEG 20.17
32'16'8'4'2'0'
N o rt h
1/8" = 1'-0"
DEMOLITION PLAN AT BUILDING G (08) LEVEL 1
1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS
AND VHA COR, RE: SPEC 010000
H
G
F
E
D
C
B
08-03-E3-09
HAC 3
08-03-E1-06
STAFF TLT
08-03-H2-06
CHIEF OF STAFF 3
08-03-G4-07
PERS ASST 7
08-03-G4-02
PERS ASST 8
08-03-H4-01
WAIT/RECEP
08-03-H2-02
STAFF ASST 4
08-03-B3-10
CORRIDOR
08-03-H2-08
CHIEF OF STAFF
2 08-03-F2-01
CONSULT 1
08-03-H2-07
HSS ASST 3
08-03-H3-01
OFFICE 2
08-03-F2-03
SOC WORK 1
08-03-H2-01
STAFF ASST 3
08-03-G2-02
WORK ALCOVE
08-03-G3-13
CORRIDOR
08-03-E2-06
CORRIDOR
08-03-F3-11
CORRIDOR
08-03-H1-02
MEDICAL CENTER
DIR
08-03-G1-02
CHIEF OF STAFF 1
08-03-F1-01
STAFF LOUNGE
08-03-E1-05
STAFF LOCKERS
08-03-H1-01
STAFF TLT
08-03-G1-04
HSS ASST 4
08-03-G1-03
HSS ASST 5
08-03-G1-01
HSS ASST 6
08-03-G2-01
OFFICE 1
08-03-H2-03
STAFF ASST 7
08-03-H2-05
STAFF ASST 5
08-03-H2-04
STAFF ASST 6
08-03-G4-05
PERS ASST 5
08-03-G4-03
PERS ASST 3
08-03-G4-08
PERS ASST 6
08-03-G4-06
PERS ASST 4
08-03-G4-04
PERS ASST 2
08-03-G3-10
MAN SPEC 1
08-03-G3-07
MAN SPEC 5
08-03-G3-04
MAN SPEC RESP
08-03-G3-11
MAN SPEC 2
08-03-G3-08
MAN SPEC 6
08-03-G3-05
MAN SPEC RES 2
08-03-G3-12
MAN SPEC 3
08-03-G3-09
MAN SPEC 7
08-03-G3-06
WORKSTATION 1
08-03-G2-06
MAN SPEC 4
08-03-G2-05
MAN SPEC 8
08-03-G2-04
MAN SPEC 9
08-03-G4-01
PERS ASST 1
08-03-G3-03
MAN SPEC RES 3
08-03-G3-02
MAN SPEC RES 4
08-03-G3-01
WORKSTATION 2
08-03-F4-03
SEC OFFICE
08-03-F3-04
WORKSTATION 1
08-03-F3-05
WORKSTATION 2
08-03-F3-06
WORKSTATION 3
08-03-F4-02
WAIT
08-03-F4-01
CONF
08-03-E4-03
CHIEF OFFICE
08-03-F3-03
PIV ROOM
08-03-F3-02
WORK
08-03-F3-01
SECURE WORK
08-03-B5-10
CORRIDOR
08-03-E4-04
BIOFEEDBACK
TECH
08-03-E3-06
BIOFEEDBACK
LAB
08-03-E3-07
COMM CTR
08-03-D4-05
PUBLIC TLT 2
08-03-H3-05
HSS ASST 2
08-03-H3-03
CHIEF OF STAFF 4
08-03-H3-04
DEPUTY CHIEF OF
STAFF
08-03-H4-02
HSS ASST 1
08-03-H3-02
CONF
08-03-G2-07
SHARED OFFICE
08-03-G2-08
CHIEF OFFICE
08-03-F2-07
PERS ASST 9
08-03-F2-06
WORKSTATION 5
08-03-E3-08
SEC 1
08-03-E3-01
SHARED OFFICE
08-03-E3-10
PSYCH OFFICE 12
08-03-E3-02
INTERN 1
08-03-E3-03
INTERN 2
08-03-E3-04
INTERN 3
08-03-E3-05
INTERN 4
08-03-D3-07
GROUP TEST
08-03-D3-06
PSYCH OFFICE 11
08-03-D3-05
PSYCH OFFICE 10
08-03-D4-06
PSYCH OFFICE 9
08-03-D3-01
MULTIPURPOSE/CONTROL
08-03-D3-02
CONTROL
08-03-D3-04
PSYCH OFFICE 8
08-03-D4-01
PSYCH OFFICE 7
08-03-D4-02
PUBLIC TLT 2
08-03-C4-05
WAIT
08-03-B4-03
WAIT
08-03-C3-06
EXAM 1
08-03-C3-05
PSYCH OFFICE 6
08-03-C3-04
PSYCH OFFICE 5
08-03-C3-03
PSYCH OFFICE 4
08-03-C4-06
COMM CTR
08-03-C4-04
WORKSTATION 1
08-03-C4-03
WORKSTATION 2
08-03-C3-01
HEALTH PSYCH
08-03-C3-02
PSYCH OFFICE 3
08-03-C4-01
PSYCH OFFICE 2
08-03-C4-02
PSYCH OFFICE 1
08-03-B3-01
VISN OFFICE 1
08-03-B3-02
VISN OFFICE 2
08-03-B3-07
CONSULT 2
08-03-B3-06
CONSULT 1
08-03-B3-05
WORKSTATION 1
08-03-B3-04
WORKSTATION 2
08-03-B4-05
WORKSTATION 3
08-03-B4-04
SCHED
WORKSTATION 1
08-03-B4-06
WORKSTATION 4
08-03-B3-03
EXAM 1
08-03-B4-01
VITAL SIGNS
08-03-A3-04
CONF
08-03-B4-02
PUBLIC TLT 1
08-03-A3-03
CLASSROOM 1 CLASSROOM 2
08-03-B2-06
CRASH CART
ALCOVE
08-03-A2-01
PUBLIC TLT 1
08-03-A2-02
STAFF TLT
08-03-B2-03
STRETCHER/W. C.
ALCOVE
08-03-B2-04
EXAM
08-03-B2-02
MED PREP
08-03-E1-03
RES
WORKSTATION 1
08-03-E1-01
NP PHY 3
08-03-D1-04
CHIEF NURSE 1
08-03-E1-04
NP PHY 2
08-03-E1-02
NP PHY 4
08-03-D1-05
NP PHY 1
08-03-D1-02
ASST DIET 1
08-03-D1-03
SUPP TECH 1
08-03-D1-01
CHIEF OFFICE
08-03-C1-03
ISO BED STATION
08-03-C1-02
DIALYSIS CHAIR 6
08-03-B1-04
DIALYSIS CHAIR 4
08-03-B1-02
DIALYSIS CHAIR 2
08-03-A1-03
RECEPT
08-03-A1-02
WAIT
08-03-A1-01
PAT ED KIOSK
08-03-A2-10
CORRIDOR
08-03-A3-11
ELEV LOBBY
08-03-B2-10
CORRIDOR
08-03-C1-01
DIALYSIS CHAIR 5
08-03-B1-03
DIALYSIS CHAIR 3
08-03-B1-01
DIALYSIS CHAIR 1
08-03-C1-04
ISO PAT TLT
08-03-F2-02
CONSULT 2
08-03-E2-04
EQUIP STOR
08-03-E2-03
STAFF TLT 1
08-03-E2-02
STAFF TLT 1 08-03-D2-03
EQUIP REPAIR
08-03-D2-02
EQUIP PROC
08-03-C2-05
DIALYSATE PREP
08-03-C2-04
WATER TREAT
08-03-C2-03
CLEAN SUPPLY
08-03-B2-01
NURSE STATION
08-03-B2-05
CORRIDOR
08-03-C2-01
HAC 1
08-03-D2-01
CLEAN LINEN
08-03-E2-01
SOILED UTIL
08-03-F2-04
WORKSTATION 4
08-03-E4-01
NEURO VOCA
REHAB
08-03-B3-11
CORRIDOR
08-03-C3-11
CORRIDOR08-03-D3-11
CORRIDOR
08-03-E3-11
CORRIDOR
08-03-H2-10
CORRIDOR
08-03-E4-02
PUBLIC TLT 3
08-03-C2-02
NOURISH
08-03-E2-05
LAB
08-03-E2-10
CORRIDOR
08-03-B5-10
CORRIDOR
08-03-A3-05
WAIT
08-03-H4-03
CORRIDOR
08-03-D4-07
CORRIDOR
08-03-D2-E1
ELEC
08-03-D2-H1
CHUTE
08-03-E2-T1
DATA /
TELECOMM
08-03-G2-E2
ELEC08-03-H2-T2
DATA /
TELECOMM
08-03-ST2
STAIR
08-03-SE5
ELEV
UP
DN
ID111
I-113
M
IN
A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF
HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND
EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE
TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.
B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.
C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS
TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.
COORDINATE WITH COR.
E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,
AS NEEDED.
00KEYNOTES
KEY PLAN
GENERAL NOTES
North
11 12 08 (G)
(E)
(A)
030405
Key Plan
E C
O L F
A X
A V
E
N WHEELING ST
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C R e v it
\5
-2
-1
C h e c k -I n A
R C
H R c jo h n s to n Y
W
N
.r v t
/5
/2
:0
:0
P
M
ID102
DEMOLITION PLAN AT BUILDING G
(08) LEVEL 3
INSTALL PARTITIONS AT CHECK-IN
DESKS
1700 N WHEELING ST, AURORA, CO 80045
554-20-103
02/15/2021 TW CJ
100% CONSTRUCTION
DOCUMENTS
VEG 20.17
32'16'8'4'2'0'
N o rt h
1/8" = 1'-0"
DEMOLITION PLAN AT BUILDING G (08) LEVEL 3
1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS AND
VHA COR, RE: SPEC 010000
H
G
F
E
D
C
B
09-01-B4-01
OFFICE
09-01-B2-03
TRAVEL
09-01-B2-02
TRAVEL
09-01-B1-02
TRAINER
09-01-A1-01
STRETCHER/W.C.STOR
09-01-A4-03
OFFICE
09-01-B3-03A
OFFICE
09-01-A3-05
OFFICE
09-01-A3-04
OFFICE
09-01-B1-03
OFFICE
09-01-C1-01
OFFICE
09-01-G2-06
PHOTOTHERAPY
TREAT
09-01-G2-05
PHOTOTHERAPY
SHOWER
09-01-H2-02
MED PREP/STOR
09-01-H2-03
TREAT/PROCEDURE
09-01-A1-03
PHONE INTAKE
09-01-A1-02
PHONE INTAKE
09-01-B1-01
PHONE INTAKE
09-01-C2-04
PROCEDURE
09-01-B2-01
HAC
09-01-H4-02
EXAM
09-01-H3-07
EXAM
09-01-H3-06
EXAM
09-01-H3-05
EXAM
09-01-H2-06
EXAM
09-01-H2-05
EXAM
09-01-C3-05
NURSE
STATION/MED
09-01-E2-06
PROCEDURE
09-01-C3-08
WEIGHT STN
09-01-D3-02
WEIGHT STN
09-01-E3-09
WEIGHT STN
09-01-F3-02
WEIGHT STN
09-01-E2-01
SOILED UTIL
09-01-B2-05
CLEAN SUPPLY
09-01-F2-01
CLEAN SUPPLY
09-01-B4-03
WAIT
09-01-G4-02
WAIT
09-01-H3-02
NURSE
STATION/MED
09-01-D2-02
EXAM
09-01-F2-03
CONSULT
09-01-H4-01
CONSULT
09-01-H1-03
OFFICE
09-01-H1-04
OFFICE
09-01-H1-05
OFFICE
09-01-H1-01
OFFICE
09-01-H1-02
OFFICE
09-01-G1-05
OFFICE
09-01-G1-06
OFFICE
09-01-G1-03
OFFICE
09-01-G1-04
OFFICE
09-01-G1-01
OFFICE
09-01-H2-04
DERMATOLOGY
LAB
09-01-F1-02
OFFICE
09-01-F1-03
OFFICE
09-01-D1-02
OFFICE
09-01-D1-01
OFFICE
09-01-D1-04
OFFICE
09-01-D1-05
OFFICE
09-01-D1-06
OFFICE
09-01-C1-05
OFFICE
09-01-C4-03
ONSTAGE AREA
09-01-E4-03
ONSTAGE AREA
09-01-C3-07
PRECEPTOR RM
09-01-F2-02
PRECEPTOR RM
09-01-G3-08
WEIGHT STN
09-01-H3-04
WEIGHT STN
09-01-C1-06
OFFICE
09-01-C1-03
OFFICE
09-01-C1-04
OFFICE
09-01-B1-06
OFFICE
09-01-G2-02
HAC
09-01-E2-04
CONSULT
09-01-G4-03
ONSTAGE AREA
09-01-F1-01
CONF
09-01-E1-02
STAFF TLT
09-01-G2-01
SOILED UTIL
09-01-B2-07
WAIT
09-01-B2-04
TRAVEL
09-01-D4-03
WAIT
09-01-C4-02
WAIT
09-01-B1-05
OFFICE
09-01-B1-04
OFFICE
09-01-E2-05
EQUIP STOR
09-01-A3-06
RECEPT
09-01-E4-02
WAIT
09-01-F4-03
WAIT
09-01-B3-05
CORRIDOR
09-01-C3-06
CORRIDOR
09-01-E3-07
CORRIDOR
09-01-G3-06
CORRIDOR
09-01-H3-03
CORRIDOR
09-01-E1-01
STAFF TLT
09-01-D4-01
PUBLIC TLT09-01-F4-01
PUBLIC TLT
09-01-E1-03
STAFF LOUNGE
09-01-D1-03
SECRETARY
09-01-A2-01
CONSULT
09-01-A1-04
CORRIDOR
09-01-B4-02
EXAM/FITTING
09-01-G3-04
CORRIDOR
09-01-H3-01
STAFF TLT
09-01-G3-05
PAT TLT
09-01-E3-08
PRECEPTOR RM
09-01-G3-07
PRECEPTOR RM
09-01-F3-01
PAT TLT
09-01-E3-05
STAFF TLT
09-01-E3-06
CLEAN SUPPLY
09-01-E3-04
CORRIDOR
09-01-F3-03
CORRIDOR
09-01-E4-04
HAS
09-01-C4-04
HAS
09-01-C3-04
PAT TLT
09-01-D3-01
PAT TLT
09-01-D3-03
CORRIDOR
09-01-C3-09
CORRIDOR
09-01-A3-03
OFFICE
09-01-B3-01
WORK
09-01-B3-04
OFFICE
09-01-A4-05
OFFICE
09-01-A4-04
OFFICE
09-01-C4-01
CONSULT
09-01-B3-09
EXAM
09-01-C3-03
EXAM
09-01-B3-08
EXAM
09-01-C3-02
EXAM
09-01-B3-06
RECEPT
09-01-C3-01
EXAM
09-01-C2-02
EXAM
09-01-B2-06
OFFICE
09-01-C2-01
EXAM09-01-C2-03
STOR
09-01-D2-01
CAST/PODIATRY
09-01-E4-01
EXAM
09-01-D4-02
EXAM
09-01-E3-03
EXAM
09-01-D3-06
EXAM
09-01-E3-02
EXAM
09-01-D3-05
EXAM
09-01-E3-01
EXAM
09-01-D3-04
EXAM
09-01-E2-03
EXAM
09-01-D2-04
EXAM
09-01-E2-02
EXAM
09-01-D2-03
EXAM
09-01-F4-02
EXAM
09-01-G4-01
EXAM
09-01-F3-06
EXAM
09-01-G3-03
EXAM
09-01-F3-05
EXAM
09-01-G3-02
EXAM
09-01-F3-04
EXAM
09-01-G3-01
EXAM
09-01-F2-05
EXAM
09-01-G2-04
EXAM
09-01-F2-04
EXAM
09-01-G2-03
EXAM
09-01-G4-04
HAS
09-01-D1-07
CORRIDOR
09-01-F1-04
CORRIDOR
09-01-A4-06
CLINIC WAITING
09-01-B3-07
RECEPT
09-01-B3-02
OFFICE
09-01-B3-03
OFFICE
09-01-D2-E1
ELEC
09-01-D2-H2
CHUTE
09-01-E2-T1
DATA /
TELECOMM
09-01-G2-E2
ELEC09-01-H2-T2
DATA /
TELECOMM
09-01-ST2
STAIR
09-01-SE6
ELEV
DN
UP
ID111
ID111
ID111
I-112
I-112
I-112
M
IN
T
Y P
A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF
HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND
EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE
TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.
B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.
C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS
TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.
COORDINATE WITH COR.
E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,
AS NEEDED.
00KEYNOTES
KEY PLAN
GENERAL NOTES
North
11 12 08 (G)
(E)
(A)
030405
Key Plan
E C
O L F
A X
A V
E
N WHEELING ST
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C R e v it
\5
-2
-1
C h e c k -I n A
R C
H R c jo h n s to n Y
W
N
.r v t
/5
/2
:0
:0
P
M
ID103
DEMOLITION PLAN AT BUILDING E
(09) LEVEL 1
INSTALL PARTITIONS AT CHECK-IN
DESKS
1700 N WHEELING ST, AURORA, CO 80045
554-20-103
02/15/2021 TW CJ
100% CONSTRUCTION
DOCUMENTS
VEG 20.17
32'16'8'4'2'0'
N o rt h
1/8" = 1'-0"
DEMOLITION PLAN AT BUILDING E (09) LEVEL 1
1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS AND
H
G
F
E
D
C
B
09-02-E2-04
W.C. ALCOVE
09-02-H3-02
NURSE
STATION/MED
09-02-B2-06
EXAM/SCREEN
09-02-B2-05
EXAM/SCREEN
09-02-B3-03
PRECEPTOR
09-02-E3-02
PRECEPTOR
09-02-F3-06
PRECEPTOR
09-02-B3-06
EXAM
09-02-B3-08
EXAM09-02-G3-06
EXAM
09-02-G2-06
EXAM
09-02-H3-04
EXAM
09-02-B2-02
PROC TLT
09-02-H2-01
EQUIP STOR
09-02-B3-07
EXAM
09-02-H2-04
EXAM
09-02-H2-03
EXAM
09-02-C4-01
OFFICE
09-02-C3-03
EXAM
09-02-C3-02
EXAM
09-02-C2-02
EXAM
09-02-C3-08
EXAM
09-02-D3-05
EXAM
09-02-D2-05
EXAM
09-02-E2-05
EXAM
09-02-H4-03
OFFICE
09-02-F3-04
EXAM
09-02-F2-05
EXAM
09-02-G3-01
EXAM
09-02-G2-04
EXAM
09-02-G4-01
EXAM
09-02-G2-05
EXAM
09-02-F3-02
CLEAN SUPPLY
09-02-B4-01
CONSULT
09-02-A2-03
PROCEDURE
09-02-H4-01
CONSULT
09-02-E2-01
SOILED UTIL
09-02-B2-04
CLEAN SUPPLY
09-02-B2-03
PROCEDURE
09-02-C2-01
EQUIP STOR
09-02-A4-02
HUB
09-02-F4-03
HUB
09-02-G2-01
HAC
09-02-F3-07
WEIGHT STN
09-02-G3-02
WEIGHT STN
09-02-G1-05
OFFICE
09-02-G2-02
CLEAN SUPPLY
09-02-H1-05
OFFICE
09-02-H1-06
OFFICE
09-02-B1-03
OFFICE
09-02-B1-05
OFFICE
09-02-B1-04
OFFICE
09-02-B1-06
OFFICE
09-02-C1-02
OFFICE
09-02-C1-01
OFFICE
09-02-C1-04
OFFICE
09-02-C1-03
OFFICE
09-02-C1-06
OFFICE
09-02-C1-05
OFFICE
09-02-D1-04
OFFICE
09-02-D1-03
OFFICE
09-02-D1-06
OFFICE
09-02-D1-05
OFFICE
09-02-D2-01
LINEN ALCOVE
09-02-F2-03
PROCEDURE
09-02-B3-04
WEIGHT STN
09-02-G1-03
NURSE
09-02-G1-04
NURSE
09-02-G1-01
NURSE
09-02-G1-02
NURSE
09-02-G1-06
NURSE
09-02-F1-03
OFFICE
09-02-F1-02
OFFICE
09-02-D1-02
OFFICE
09-02-H1-02
OFFICE
09-02-H1-01
OFFICE
09-02-H1-04
OFFICE
09-02-H1-03
OFFICE
09-02-D1-01
OFFICE
09-02-A1-02
OFFICE
09-02-A1-01
OFFICE
09-02-A1-04
OFFICE
09-02-A1-03
OFFICE
09-02-B1-02
OFFICE
09-02-B1-01
OFFICE
09-02-F1-01
PAT ED CONF
09-02-H3-03
CRASH CART
ALCOVE
09-02-F2-04
OFFICE
09-02-G2-03
OFFICE
09-02-E1-02
STAFF TLT
09-02-C4-04
CONSULT
09-02-D3-02
NURSE
STATION/MED
09-02-D4-04
HUB
09-02-B3-02
NURSE
STATION/MED
09-02-B4-02
EXAM
09-02-C3-01
EXAM
09-02-A4-03
HAS
09-02-D3-07
WEIGHT STN
09-02-A3-07
WEIGHT STN
09-02-E3-03
WEIGHT STN
09-02-A3-04
CORRIDOR
09-02-A3-06
CORRIDOR
09-02-B3-05
CORRIDOR
09-02-C3-04
CORRIDOR
09-02-D3-04
CORRIDOR
09-02-E3-04
CORRIDOR
09-02-F3-03
CORRIDOR
09-02-G3-05
CORRIDOR
09-02-G3-03
CORRIDOR
09-02-H3-05
CORRIDOR
09-02-D3-03
EXAM
09-02-D4-01
OFFICE
09-02-H3-08
EXAM
09-02-H3-07
EXAM
09-02-H3-06
EXAM
09-02-H2-05
EXAM
09-02-F4-01
PUBLIC TLT
09-02-E1-03
STAFF LOUNGE
09-02-E4-02
WAIT
09-02-F4-02
WAIT
09-02-F2-02
PROC TLT
09-02-E1-01
STAFF TLT
09-02-E2-06
EDUCATION
09-02-E3-07
EDUCATION
09-02-H2-02
OFFICE
09-02-D3-06
CORRIDOR
09-02-D1-07
CORRIDOR
09-02-A2-04
ALCOVE
09-02-F2-06
ALCOVE
09-02-F2-01
OFFICE
09-02-G3-04
PAT TLT
09-02-H3-01
STAFF TLT
09-02-F3-01
PAT TLT
09-02-E3-05
STAFF TLT
09-02-F3-05
CORRIDOR
09-02-E3-06
CORRIDOR
09-02-B3-01
PAT TLT
09-02-A3-05
PAT TLT
09-02-C3-09
CRASH CART
ALCOVE 09-02-C3-06
CORRIDOR
09-02-C3-05
PAT TLT
09-02-D3-01
PAT TLT
09-02-D4-05
HAS
09-02-F4-04
HAS
09-02-E4-01
PUBLIC TLT
09-02-C4-05
WAIT
09-02-D4-02
WAIT
09-02-B4-03
WAIT
09-02-C4-02
WAIT
09-02-G4-02
WAIT
09-02-H4-02
WAIT
09-02-E3-01
EXAM
09-02-E2-03
EXAM
09-02-E2-02
OFFICE
09-02-C2-04
EXAM
09-02-C2-03
OFFICE
09-02-D2-03
EXAM
09-02-D2-02
EXAM
09-02-B2-01
HAC
09-02-F1-04
CORRIDOR
09-02-D2-04
EXAM
09-02-D2-E1
ELEC
09-02-D2-H1
CHUTE
09-02-E3-T1
DATA /
TELECOMM
09-02-G2-E2
ELEC
09-02-H2-T2
DATA /
TELECOMM
09-02-SE6
ELEV
09-02-ST2
STAIR
UP
DN
ID111
ID111
ID111
I-112
I-112
I-112
M
IN
T
Y P
A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF
HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND
EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE
TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.
B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.
C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS
TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.
COORDINATE WITH COR.
E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,
AS NEEDED.
00KEYNOTES
KEY PLAN
GENERAL NOTES
North
11 12 08 (G)
(E)
(A)
030405
Key Plan
E C
O L F
A X
A V
E
N WHEELING ST
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C R e v it
\5
-2
-1
C h e c k -I n A
R C
H R c jo h n s to n Y
W
N
.r v t
/5
/2
:0
:0
P
M
ID104
DEMOLITION PLAN AT BUILDING E
(09) LEVEL 2
INSTALL PARTITIONS AT CHECK-IN
DESKS
1700 N WHEELING ST, AURORA, CO 80045
554-20-103
02/15/2021 TW CJ
100% CONSTRUCTION
DOCUMENTS
VEG 20.17
32'16'8'4'2'0'
N o rt h
1/8" = 1'-0"
DEMOLITION PLAN AT BUILDING E (09) LEVEL 2
1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS AND
H
G
F
E
D
C
B
09-03-B3-07
VISUAL FIELD
09-03-B3-04
PHOTOGRAPHY
09-03-B4-03
LASER ROOM
09-03-A2-03
PROCEDURE
09-03-A1-01
OFFICE09-03-C1-01
OFFICE09-03-C1-04
WORK
09-03-C1-05
WORK
09-03-C1-03
OFFICE
09-03-C1-02
OFFICE
09-03-B1-05
OFFICE
09-03-A1-02
OFFICE
09-03-B1-06
OFFICE
09-03-B1-03
OFFICE
09-03-B1-04
OFFICE
09-03-B1-01
OFFICE
09-03-B1-02
OFFICE
09-03-B3-06
EXAM/TREATMENT
09-03-B3-05
EXAM/TREATMENT
09-03-B2-03
EXAM/TREATMENT09-03-B2-06
EXAM/TREATMENT
09-03-A3-06
EXAM/TREATMENT
09-03-A4-02
EXAM/TREATMENT
09-03-A2-02
EXAM/TREATMENT
09-03-A1-03
OFFICE
09-03-D4-01
ONSTAGE AREA
09-03-E1-03
STAFF LOUNGE
09-03-E3-05
WEIGHT STN
09-03-H2-03
NOURISH
09-03-F4-01
ONSTAGE AREA
09-03-B2-01
HAC
09-03-G2-01
HAC
09-03-H3-01
ONSTAGE AREA
09-03-A4-03
HAS
09-03-D1-01
OFFICE
09-03-F1-03
OFFICE
09-03-F1-02
OFFICE
09-03-D1-03
OFFICE
09-03-D1-02
OFFICE
09-03-G1-02
OFFICE
09-03-G1-01
OFFICE
09-03-H1-06
OFFICE
09-03-G1-05
OFFICE
09-03-H2-05
CHEMO PREP
09-03-G2-06
PREP
09-03-H2-02
REFERENCE
09-03-H1-01
OFFICE
09-03-H1-02
OFFICE
09-03-B3-03
ULTRASOUND RM
09-03-E2-01
SOILED UTIL
09-03-C2-01
EXAM
09-03-D4-03
EXAM
09-03-D3-06
EXAM
09-03-D3-05
EXAM
09-03-D3-04
EXAM
09-03-D2-04
EXAM
09-03-D2-03
EXAM
09-03-C4-01
EXAM
09-03-C3-03
EXAM
09-03-C3-02
EXAM
09-03-C3-01
EXAM
09-03-E2-03
EXAM
09-03-C4-02
WAIT
09-03-E4-02
WAIT
09-03-B4-04
WAIT
09-03-F4-05
WAIT
09-03-G4-02
WAIT
09-03-D3-02
NURSE
STATION/MED
09-03-D3-01
STAFF TLT
09-03-G1-04
OFFICE
09-03-E1-01
STAFF TLT
09-03-H4-01
FAMILY COUNSEL
09-03-C2-02
EXAM
09-03-D3-03
PRECEPTOR RM
09-03-F1-01
CONF
09-03-F2-03
EXAM
09-03-F3-08
WEIGHT STN
09-03-F3-02
EQUIP STOR
09-03-G2-02
SOILED UTIL
09-03-F2-02
CLEAN SUPPLY
09-03-E2-05
PROCEDURE
09-03-E2-04
PROC TLT
09-03-F2-04
PROCEDURE
09-03-G1-03
OFFICE
09-03-G4-01
EXAM
09-03-G3-03
EXAM
09-03-G3-02
EXAM
09-03-G4-03
HUB
09-03-F3-03
PRECEPTOR RM
09-03-E2-02
EXAM
09-03-F4-04
EXAM
09-03-F3-06
EXAM
09-03-F3-05
EXAM
09-03-F3-04
EXAM
09-03-F2-06
EXAM
09-03-F2-05
EXAM
09-03-G3-01
EXAM
09-03-G2-04
EXAM
09-03-G2-03
EXAM
09-03-B2-02
EXAM/TREATMENT
09-03-H1-05
OFFICE
09-03-D1-05
TECH
09-03-D1-04
TECH
09-03-B4-01
COHERENCE
TOMOGRAPHY
09-03-A3-05
PUBLIC TLT
09-03-B2-04
CLEAN SUPPLY
09-03-A3-04
EQUIP STOR
09-03-H1-04
OFFICE
09-03-H1-03
OFFICE
09-03-B3-02
MED EQUIP
ALCOVE
09-03-G3-05
CHEMO TLT
09-03-H2-01
STOR
09-03-B3-01
W.C. ALCOVE
09-03-G2-07
PREP
09-03-C2-03
WORKROOM
09-03-D2-02
ENDO CLEAN
ROOM 1
09-03-C2-04
PROCEDURE
09-03-D2-01
CYSTO
09-03-D4-04
WAIT
09-03-G2-08
PAT TLT
09-03-G3-06
TLT
09-03-G3-04
EXAM
09-03-E1-02
STAFF TLT
09-03-E3-01
EXAM
09-03-E3-02
EXAM
09-03-E3-03
EXAM
09-03-E4-01
CONSULT/PROCEDURE
09-03-C3-05
WEIGHT STN
09-03-A2-04
CORRIDOR
09-03-A3-07
CORRIDOR
09-03-B2-07
CORRIDOR
09-03-C3-07
CORRIDOR
09-03-D3-07
CORRIDOR
09-03-D3-08
WEIGHT STN
09-03-E2-06
CORRIDOR
09-03-E3-06
CORRIDOR
09-03-G3-07
WEIGHT STN
09-03-H2-06
CORRIDOR
09-03-C3-04
PAT TLT
09-03-D1-07
CORRIDOR
09-03-E3-04
PAT TLT
09-03-F3-01
PAT TLT
09-03-H2-04
NURSE
STATION/MED 09-03-F3-07
CORRIDOR
09-03-C4-03
HAS
09-03-E4-03
HAS
09-03-G4-04
HAS
09-03-F4-02
PUBLIC TLT 09-03-D4-02
PUBLIC TLT
09-03-G3-08
CORRIDOR
09-03-H3-03
CORRIDOR
09-03-C3-06
CORRIDOR
09-03-F1-04
CORRIDOR
09-03-G2-05
60 SF /89 SF
ANTEROOM
09-03-E4-04
WAIT
09-03-F4-03
WAIT
09-03-B2-05
EXAM/TREATMENT
09-03-F2-01
RENAL ALCOVE
09-03-H3-02C
INFUSION
CENTER
09-03-H3-02B
INFUSION
09-03-H3-02A
INFUSION
CENTER
09-03-H3-02D
INFUSION
09-03-C2-E1
ELEC
09-03-D2-H1
CHUTE
09-03-E2-T1
DATA /
TELECOMM
09-03-G2-E2
ELEC
09-03-H2-T2
DATA /
TELECOMM
09-03-SE6
ELEV
09-03-ST2
STAIR
DN
UP
ID111
ID111
ID111
ID111
I-112
I-112
I-112
I-111
M
IN
A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF
HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND
EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE
TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.
B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.
C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS
TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.
COORDINATE WITH COR.
E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,
AS NEEDED.
00KEYNOTES
KEY PLAN
GENERAL NOTES
North
11 12 08 (G)
(E)
(A)
030405
Key Plan
E C
O L F
A X
A V
E
N WHEELING ST
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C R e v it
\5
-2
-1
C h e c k -I n A
R C
H R c jo h n s to n Y
W
N
.r v t
/5
/2
:0
:0
P
M
ID105
DEMOLITION PLAN AT BUILDING E
(09) LEVEL 3
INSTALL PARTITIONS AT CHECK-IN
DESKS
1700 N WHEELING ST, AURORA, CO 80045
554-20-103
02/15/2021 TW CJ
100% CONSTRUCTION
DOCUMENTS
VEG 20.17
32'16'8'4'2'0'
N o rt h
1/8" = 1'-0"
DEMOLITION PLAN AT BUILDING E (09) LEVEL 3
1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS AND
1.1
2.5
A
A.1
B
B.1
B.5
B.7
C
FEMALE PUBLIC
TLT
10-04-C4-04
CORRIDOR
D
OFFICE
COMPUTER RM
10-04-C5-05 10-04-C5-07
UPS SERVICE DESK
10-04-C5-08
CUSTOMER
PAT
RECORDS
10-04-C8-12
INTAKE/TRIAGE/TEST
10-04-C8-08
10-04-C8-13
COPY/FAX
10-04-C6-05
WAIT
10-04-C5-03
10-04-C5-02
HAC
10-04-C5-04
VEST
10-04-C6-02
ELEC
10-04-C6-04
ELEV 10-04-C7-03
NCOIC MHS
10-04-C7-05
RECEP
10-04-C8-03
CORRIDOR
10-04-C7-06
EYE LANE
10-04-C8-04
EYE LANE
INTAKE/TRIAGE/TEST
10-04-C8-02
CORRIDOR
10-04-C6-03
VEST 10-04-C7-01
CORRIDOR
EQUIP STOR
10-04-C8-07
10-04-B3-15
10-04-B2-07
CORRIDOR
10-04-B3-11
CORRIDOR
10-04-B4-10
VEST
10-04-B4-09
CORRIDOR
MALE PUBLIC TLT
10-04-C5-01
10-04-C6-01
ELEV
10-04-C7-02
HAC
VISUAL/FUNDUS
CAMERA
10-04-C7-04
FITTING/DISPENSING
10-04-C8-01
PATIENT TLT
10-04-B8-10
10-04-B8-11
SAT LAB
10-04-C8-06
TELECOM
COMMUNICATIONS
10-04-C8-05
10-04-C9-01
SHAFT
10-04-B8-12
EXAM
10-04-B9-09
EXAM
10-04-B6-02
LOBBY
ISOLATION TLT
10-04-B7-05
10-04-B9-08
CORRIDOR
10-04-B4-03
10-04-B7-02
EXAM
10-04-B7-06
CORRIDOR
10-04-B7-03
EXAM
10-04-B8-07
EXAM
RECEP/OFFICE
10-04-B7-01
10-04-B8-01
OFFICE
10-04-B8-02
MED TECH
10-04-B8-04
OFFICE
10-04-B8-03
MED TECH
10-04-B8-08
EXAM
10-04-B8-09
EXAM
10-04-B8-13
CORRIDOR
10-04-B9-05
10-04-B8-05
OFFICE
10-04-B8-06
OFFICE
10-04-B9-01
E
10-04-B1-02
MDOS/CC1
10-04-B1-03
MDSS/CC1
10-04-B1-04
OFFICE
10-04-B1-05
SGN
10-04-C2-02
CORRIDOR
10-04-B2-08
COPY/FAX
ALCOVE
10-04-B3-12
STAFF TLT
10-04-B2-09
COPY/FAX
10-04-C3-01
TECH
10-04-C3-02
TECH
CLASSROOM
10-04-C2-01 10-04-C2-02
CORRIDOR 10-04-C3-03
COPY/FAX
10-04-C3-04
TELECOM
COMMUNICATIONS
10-04-C3-05
10-04-C3-06
FILE
10-04-C4-02
SHAFT
EQUIP STOR
10-04-C4-03
STAFF LOUNGE
10-04-C3-07
10-04-C4-05
OFFICE
10-04-C3-08
CORRIDOR
A
10-04-C4-06
OFFICE FACILITY MGMT
10-04-C4-08 10-04-C4-10
MEDIA
10-04-C5-06
WORK
10-04-C5-12
OFFICE
10-04-C5-11
10-04-C5-13
OFFICE
POS PHARMACY
10-04-C6-07
FACILITY MGMT
10-04-C4-07
INFO/NCOIC
10-04-C4-09
10-04-C7-08
OFFICE
10-04-C7-09
WAIT
10-04-C7-07
CORRIDOR
10-04-C8-10
RECEPT
10-04-C8-11
OUTREACH
NURSE
10-04-C4-01
EX STAIR 1
10-04-B3-13
STAFF TLT
10-04-B3-14
RECORDS STOR
10-04-B4-11
TECH OFFICE
10-04-B5-08
10-04-B5-07
HALL
10-04-B5-09
RECORDS
WINDOW
TECH OFFICE
10-04-B5-12
TECH OFFICE
10-04-B5-11
TECH OFFICE
10-04-B5-13
10-04-B2-05
TECH
10-04-B2-06
TECH
10-04-B3-04
OFFICE
10-04-A2-04
CORRIDOR
10-04-B1-01
STAFF TLT
10-04-B2-01
SECR/WAIT
10-04-B2-02
TECH
10-04-B2-03
TECH
10-04-B2-04
TECH
10-04-B3-03
OFFICE
10-04-B3-06
OFFICE
10-04-B3-10
OFFICE
10-04-B3-09
OFFICE TECH OFFICE
TECH OFFICE
10-04-B4-02
10-04-B4-05
OFFICE
TECH OFFICE
10-04-B4-08
TECH OFFICE
10-04-B5-03
TECH OFFICE
10-04-B4-07
TECH OFFICE
10-04-B5-02
10-04-B5-05
TECH
10-04-B5-06
RECEPT
10-04-B3-01
OFFICE
10-04-B3-02
OFFICE
10-04-B3-05
AUDITOR
10-04-B3-07
GPM1
10-04-B3-08
OFFICE
10-04-B4-01
HCI/UM
10-04-B4-04
HCI/UM
10-04-B4-06
BCAC
10-04-B5-01
MEB
10-04-B5-04
MEB
10-04-B6-01
RECEPT
10-04-A4-04
CORRIDOR
10-04-B5-14
CORRIDOR
10-04-A4-01
OIC TOPA NCOIC TOPA
10-04-A4-02 10-04-A4-03
OFFICE
10-04-A5-01
OFFICE
10-04-A5-02
CONF
NCOIC/RMO/CSS/SUP1
10-04-A2-02
10-04-A1-01
MDG/CC1
10-04-B7-04
EXAM
10-04-A1-02
OFFICE
10-04-A2-01
OFFICE
10-04-A2-03
OIC RMO
10-04-A3-01
CODER
10-04-A3-02
OFFICE 10-04-A3-03
ARMY/NAVY
LIASON
10-04-A3-04
ARMY/NAVY
LIASON
ID111
I-114
TYP
3' - 8" MIN
A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF
HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND
EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE
TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.
B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.
C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS
TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.
COORDINATE WITH COR.
E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,
AS NEEDED.
00KEYNOTES
KEY PLAN
GENERAL NOTES
North
11 12 08 (G)
(E)
(A)
030405
Key Plan
E C
O L F
A X
A V
E
N WHEELING ST
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C R e v it
\5
-2
-1
C h e c k -I n A
R C
H R c jo h n s to n Y
W
N
.r v t
/5
/2
:0
:0
P
M
ID106
DEMOLITION PLAN AT BUILDING A
(10) LEVEL 4
INSTALL PARTITIONS AT CHECK-IN
DESKS
1700 N WHEELING ST, AURORA, CO 80045
554-20-103
02/15/2021 TW CJ
100% CONSTRUCTION
DOCUMENTS
VEG 20.17
32'16'8'4'2'0'
N o rt h
1/8" = 1'-0"
DEMOLITION PLAN AT BUILDING A (10) LEVEL 4
1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS AND
08-03-C4-04
WORKSTATION 1
08-03-C4-03
WORKSTATION 2
10-04-B7-02
EXAM10-04-B5-05 10-04-B5-06
RECEPT
10-04-B6-01
RECEPT
A. REFER TO DEMOLITION PLANS FOR LOCATIONS.
B. REFER TO DEMOLITION PLANS FOR TEMPORARY CONSTRUCTION
PARTITIONS LOCATIONS.
C. REMOVE EXISTING WALL BASE AT TILE LOCATIONS TO BE REMOVED
3' - 0" 15' - 0" 3' - 0"
21' - 0"
VIF
22' - 6"
10' - 6"
V
IF
/2
2' - 0"
21' - 0"
3' - 0" 15' - 0" 3' - 0"
VIF
22' - 6"
24' - 0"
/2
V
IF
/2
VIF
24' - 8" 00KEYNOTES
KEY PLAN
GENERAL NOTES
North
11 12 08 (G)
(E)
(A)
030405
Key Plan
E C
O L F
A X
A V
E
N WHEELING ST
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C R e v it
\5
-2
-1
C h e c k -I n A
R C
H R c jo h n s to n Y
W
N
.r v t
/5
/2
:0
:1
P
M
ID111
ENLARGED DEMOLITION FLOOR
PLANS
INSTALL PARTITIONS AT CHECK-IN
DESKS
1700 N WHEELING ST, AURORA, CO 80045
554-20-103
08,09,10
02/15/2021 TW CJ
100% CONSTRUCTION
DOCUMENTS
VEG 20.17
16'8'4'2'1'0'
N o rt h
1/4" = 1'-0"
TYPICAL ENLARGED DEMOLITION FLOOR PLAN AT BLDG G & E
16'8'4'2'1'0'
N o rt h
1/4" = 1'-0"
ENLARGED DEMOLITION FLOOR PLAN AT BLDG G (08) LEVEL 3
16'8'4'2'1'0'
N o rt h
1/4" = 1'-0"
TYPICAL ENLARGED DEMOLITION FLOOR PLAN AT BLDG E
16'8'4'2'1'0'
N o rt h
1/4" = 1'-0"
ENLARGED DEMOLITION FLOOR PLAN AT BLDG A (10) LEVEL 4
1. REMOVE DESK (COUNTERTOP, CABINETS, AND ASSOCIATED MILLWORK)
2. REMOVE CARD READER, STORE FOR REUSE
3. REMOVE SIGNAGE, STORE FOR REUSE
4. VA TO SALVAGE FURNITURE, FIXTURES, AND EQUIPMENT NOT
IDENTIFIED TO BE REMOVED
5. REMOVE FLOORING TILE AROUND AND UNDER DESK UP TO CHANGE IN
FLOORING TYPE
6. REMOVE FLOORING AROUND AND UNDER DESK, STOP AT NEAREST
JOINT, TYP
7. EXISTING FURRED WALL TO REMAIN
I-111I-111
I-111
2 3
I-111
I-111 I-1117 6
/2 " A
LI
G N
A
LI
G N
7" 4' - 6 1/4" 7" 4' - 6 1/4" 7" 4' - 6 1/4" 7" 4' - 6 1/4" 7"
WALL BELOW
(SHOWN DASHED)
I-500
T Y
P
/4
SS-1
1/2" R, TYP
SS-1
GROMMET , TYP
I-500
ALIGN FINISH FACE OF SS TO EXISTING FURRED WALL
21' - 0" VIF
/4
/4
I-500
I-112
TYP
4"
T Y
P
/2
T Y
P
/2
/4
/4
TURN SS DOWN
FACE, TYP
/4
POST
POST , W/ BASE PLATE,
TYP
POST , WALL MOUNT
POST
POST
WB2WB2 WB2
WB2
WB2
WB2
FT1 FT1
ACOUSTIC PANEL
WB2 WB2
ALIGN, TYP
Level 1 (08)
I-500
20' - 5"
I-500
I-500
RP-1
SS-1
HPL-1
WB1
I-112
5' - 1 1/4" 5' - 1 1/4" 5' - 1 1/4" 5' - 1 1/4"
TYP
EQ
TYP
3/4"
TYP
EQ
TYP
3/4"TYP
EQ
TYP
3/4"
TYP
EQ
TYP
3/4"
I-500
SIGNAGE, VC
Level 1 (08)
HPL-1
HPL-4
2' - 9 1/2" 1' - 3"
RP-1
WB1
/4
DOOR AND THE STOP
32" MIN, CLR
BETWEEN FACE OF
HPL-3
SS-1
TM DP
HALF WALL PARTITION
4' - 0 1/2"
Level 1 (08)
1' - 3" 2' - 9 1/2" 3' - 1 1/2"
7' - 2"
SIGNAGE, VC
SS-1
HPL-4
HPL-1
RP-1
WB1
HALF WALL PARTITION
DP
TM
TM
MOUNTING
PLATES W/
Z-STRIPS
Level 1 (08)
SS-1
RP-1
HPL-1
WB1
HPL-3
4' - 0 1/2"
1' - 3" 2' - 9 1/2"
HPL-4
SS-1
WB2
FILLER
I-500
OPH
TURN SS DOWN
FACE, TYP
TMDP
HALF WALL PARTITION
ACOUSTIC
PANEL
POST
Level 1 (08)
HPL-2
RECESSED METAL
BRACKET, TYP
REMOVABLE
PANELS
I-500
SPEAK THRU, TYP
4' - 0" 4' - 8"
I-500
I-500SIGNAGE, VC
I-112
HPL-4
SS-1
TURN SS DOWN
FACE, TYP
5' - 1 1/4" 5' - 1 1/4" 5' - 1 1/4" 5' - 1 1/4"
20' - 5"
HALF WALL PARTITION
TM TM TM TM
TYP
EQ
TYP
EQ
TYP
EQ
TYP
EQ
EQ
32" MAX
(6) EQUAL SPACINGS EQ
EQEQEQEQ
RECEPTACLE, TYP,
RE: ELECT
RECEPTACLE, TYP,
RE: ELECT
E Q
E Q
TP
TP
WB TRANSITION
AT CENTER OF
END OF WALL
POST
Level 1 (08)
RP-1
HPL-4
WB2 WB1
SS-1
HPL-1
TMTM DP
3' - 1 1/2" 2' - 9 1/2" 1' - 3"
7' - 2"
HPL-4 @ HORIZ AND VERT
REVEALS6
ACOUSTIC PANEL
I-500
TURN SS DOWN
FACE, TYP
POST
A. HALF WALL PARTITION - POSTS AND ACCESSORIES, CLEAR (SATIN)
ANODIZE FINISH.
B. CONCEAL ALL HIGH PRESSURE LAMINATE FASTENERS
C. PROVIDE SLOT COVERS AND TOP CAP FOR ALL POSTS
FINISHES, AND CASEWORK
ACCESSORIES LEGEND
BASIS OF DESIGN OR APPROVED EQUAL
MOCKETT, BG3 - 1-1/2" FLIP-TOP GROMMET SET, INCLUDES
CAP & LINER, PUTTY (93)
RAKKS, EH-INSIDE WALL MOUNT COUNTER SUPPORT
BRACKET, FLUSH MOUNTED, MILL ALUMINUM
EAGLE MOULDING, ALUM Z CLIP 1-1/4" TALL X 3/8" LIFT OFF X
1/4" STANDOFF (MAX), EAM-375-S-2
GROMMET
BRACKET
Z-CLIP
KEY PLAN
GENERAL NOTES
North
11 12 08 (G)
(E)
(A)
030405
Key Plan
E C
O L F
A X
A V
E
N WHEELING ST
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C R e v it
\5
-2
-1
C h e c k -I n A
R C
H R c jo h n s to n Y
W
N
.r v t
/8
/2
:4
:3
P M
I-111
ENLARGED PLANS AND
ELEVATIONS
INSTALL PARTITIONS AT CHECK-IN
DESKS
1700 N WHEELING ST, AURORA, CO 80045
554-20-103
08,09
02/15/2021 TW CJ
100% CONSTRUCTION
DOCUMENTS
VEG 20.17
8'4'2'1'6"0'
N o rt h
1/2" = 1'-0"
TYP DESK FLOOR PLAN AT BLDG G & E
11/2" = 1'-0"
TYP CHECK-IN DESK - SOUTH (PATIENT SIDE)
1/2" = 1'-0"
TYP CHECK-IN DESK - WEST
21/2" = 1'-0"
TYP CHECK-IN DESK - EAST
31/2" = 1'-0"
TYP CHECK-IN DESK - EAST INSIDE
1/2" = 1'-0"
TYP CHECK-IN DESK - NORTH INSIDE (EMPLOYEE SIDE)
1/2" = 1'-0"
TYP CHECK-IN DESK - WEST INSIDE
ACOUSTIC
PANEL
AUDIMUTE, BLEACH-CLEANABLE FABRIC ACOUSTIC PANELS,
1'x1'x1"THK,MIN, BISQUE
DP ETCHED FINISH - TEMPERED GLAZING - FLAT POLISHED ALL
EXPOSED EDGES
FT1 LVT - AMTICO KURA JUNIPER - STONE, BURLAP WW111, 18"X18"
(457.2 X 457.2MM) (2.5MM THK)
HPL-1 REMOVABLE PANEL - PANOLAM, NEVAMAR, WZ0005N RECON OAK
(MG), GRAIN IN VERTICAL DIRECTION. FINISH EXPOSED EDGES,
EDGEBANDING, SEAMLESS BEVELED PROFILE, (PANOLAM,
NEVAMAR, GUNMETAL, S6020)
HPL-2 FORMICA, 463-58 SAIL WHITE
HPL-3 SC GATE - FINISH ALL EXPOSED SURFACES, NEVAMAR, WZ0005
RECON OAK (MG), (2) DOUBLE ACTING SPRINGS HINGES, GRAIN
IN THE VERTICAL DIRECTION
HPL-4 PANOLAM, NEVAMAR, WZ0005N RECON OAK (MG), GRAIN IN
VERTICAL DIRECTION. FINISH EDGES, SEAMLESS BEVELED
PROFILE
RP-1 REMOVABLE PANEL - 3FORM, WHISPER, VARIA, 3/8”, SANDSTONE,
WHITE BACKING, VERTICAL PATTERN DIRECTION, VINYL CORNER
TRIM AROUND ALL EDGES, 3/4", MATCH REVEAL COLOR
RP-2 REMOVABLE PANEL - 3FORM, FOSSIL LEAF SPADE RANDOM,
VARIA ECORESIN 3/8”, PATINA F02, WHITE BACKING, VERTICAL
PATTERN DIRECTION, VINYL CORNER TRIM AROUND ALL EDGES,
3/4", MATCH REVEAL COLOR
SS-1 CORIAN COTTAGE LANE, EASED ALL EDGES, 1/8"R HORIZ EDGES,
1/2"R VERT EDGES
TM TEMPERED GLAZING - FLAT POLISHED ALL EXPOSED EDGES
TP REMOVABLE WRAPPED TACKABLE PANEL - KNOLL, GLISTEN,
#WC10716, 8"x18"x3/4"THK, CITRINE, MATCH EXISTING
WB1 JOHNSONITE/TARKETT, TOELESS, 2 1/2", CHARCOAL 20
WB2 MATCH EXISTING - JOHNSONITE/TARKETT, 4” COVE, BEIGE 49
I-112 3 I-1122
NOTE: REFER TO
FOR ADDITIONAL INFORMATION
/1 I-111
7"
EQ EQ
POST , WALL MOUNT
POST
WALL BELOW
(SHOWN DASHED)
NO WB BETWEEN
FURRED WALLS
WB2 WB2 WB2
WB2
SS-1
HPL-4
WB1
RP-1
HPL-1
TM TM DP
HPL-4
WB1
SS-1
RP-1
HPL-1
SS-1
1' - 3" 2' - 9 1/2" 3' - 1 1/2"
7' - 2"
I-500
DP TM TM
HALF WALL PARTITION
ACOUSTIC
PANEL
TURN SS DOWN
FACE, TYP
POST
FINISHES, AND CASEWORK
ACCESSORIES LEGEND
BASIS OF DESIGN OR APPROVED EQUAL
MOCKETT, BG3 - 1-1/2" FLIP-TOP GROMMET SET, INCLUDES
CAP & LINER, PUTTY (93)
RAKKS, EH-INSIDE WALL MOUNT COUNTER SUPPORT
BRACKET, FLUSH MOUNTED, MILL ALUMINUM
EAGLE MOULDING, ALUM Z CLIP 1-1/4" TALL X 3/8" LIFT OFF X
1/4" STANDOFF (MAX), EAM-375-S-2
GROMMET
BRACKET
Z-CLIP
Level 1 (08)
2' - 10"
SS-1
RP-1
HPL-4
HPL-1
WB1
I-500
1' - 7" 1' - 3"
TM DP
HALF WALL PARTITION
ACOUSTIC
PANEL
A. HALF WALL PARTITION - POSTS AND ACCESSORIES, CLEAR (SATIN)
ANODIZE FINISH.
B. CONCEAL ALL HIGH PRESSURE LAMINATE FASTENERS
C. PROVIDE SLOT COVERS AND TOP CAP FOR ALL POSTS
32'16'8'4'2'0'
N o rt h
1/2" = 1'-0"
TYP DESK FLOOR PLAN AT BLDG E
1/2" = 1'-0"
TYP CHECK-IN DESK - WEST
3 1/2" = 1'-0"
TYP CHECK-IN DESK - WEST INSIDE
KEY PLAN
GENERAL NOTES
North
11 12 08 (G)
(E)
(A)
030405
Key Plan
E C
O L F
A X
A V
E
N WHEELING ST
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C R e v it
\5
-2
-1
C h e c k -I n A
R C
H R c jo h n s to n Y
W
N
.r v t
/5
/2
:0
:0
P
M
I-112
ENLARGED PLANS AND
ELEVATIONS
INSTALL PARTITIONS AT CHECK-IN
DESKS
1700 N WHEELING ST, AURORA, CO 80045
554-20-103
08,09
02/15/2021 TW CJ
100% CONSTRUCTION
DOCUMENTS
VEG 20.17
ACOUSTIC
PANEL
AUDIMUTE, BLEACH-CLEANABLE FABRIC ACOUSTIC PANELS,
1'x1'x1"THK,MIN, BISQUE
DP ETCHED FINISH - TEMPERED GLAZING - FLAT POLISHED ALL
EXPOSED EDGES
FT1 LVT - AMTICO KURA JUNIPER - STONE, BURLAP WW111, 18"X18"
(457.2 X 457.2MM) (2.5MM THK)
HPL-1 REMOVABLE PANEL - PANOLAM, NEVAMAR, WZ0005N RECON OAK
(MG), GRAIN IN VERTICAL DIRECTION. FINISH EXPOSED EDGES,
EDGEBANDING, SEAMLESS BEVELED PROFILE, (PANOLAM,
NEVAMAR, GUNMETAL, S6020)
HPL-2 FORMICA, 463-58 SAIL WHITE
HPL-3 SC GATE - FINISH ALL EXPOSED SURFACES, NEVAMAR, WZ0005
RECON OAK (MG), (2) DOUBLE ACTING SPRINGS HINGES, GRAIN
IN THE VERTICAL DIRECTION
HPL-4 PANOLAM, NEVAMAR, WZ0005N RECON OAK (MG), GRAIN IN
VERTICAL DIRECTION. FINISH EDGES, SEAMLESS BEVELED
PROFILE
RP-1 REMOVABLE PANEL - 3FORM, WHISPER, VARIA, 3/8”, SANDSTONE,
WHITE BACKING, VERTICAL PATTERN DIRECTION, VINYL CORNER
TRIM AROUND ALL EDGES, 3/4", MATCH REVEAL COLOR
RP-2 REMOVABLE PANEL - 3FORM, FOSSIL LEAF SPADE RANDOM,
VARIA ECORESIN 3/8”, PATINA F02, WHITE BACKING, VERTICAL
PATTERN DIRECTION, VINYL CORNER TRIM AROUND ALL EDGES,
3/4", MATCH REVEAL COLOR
SS-1 CORIAN COTTAGE LANE, EASED ALL EDGES, 1/8"R HORIZ EDGES,
1/2"R VERT EDGES
TM TEMPERED GLAZING - FLAT POLISHED ALL EXPOSED EDGES
TP REMOVABLE WRAPPED TACKABLE PANEL - KNOLL, GLISTEN,
#WC10716, 8"x18"x3/4"THK, CITRINE, MATCH EXISTING
WB1 JOHNSONITE/TARKETT, TOELESS, 2 1/2", CHARCOAL 20
WB2 MATCH EXISTING -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .