S02 - Drawings Part 1.pdf

PDF 16 MB Posted

Attached to
Z1DA--554-20-103 Install Partitions at Check-In Desks
Solicitation number
36C25921R0082
Issued by

About this file

This document outlines a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 to install partitions at check-in desks. The solicitation number is 36C25921R0082 and seeks to award a contract for Z1DA--554-20-103 to install partitions at check-in desks. No other details are provided regarding response dates, pricing terms, set asides, incumbent contractors, or work specifications. The attached file S02 - Drawings Part 1.pdf is noted but its content is not described.

View the file

Other files

File Type Posted
Amend 08 - Drawings for RFI 2 project 554-20-103.pdf PDF
36C25921R0082 0008.docx DOCX document
36C25921R0082 0007.docx DOCX document
36C25921R0082 0006.docx DOCX document
36C25921R0082 0005.docx DOCX document
36C25921R0082 0004.docx DOCX document
Amendment 03 - 36C25921R0082 0003.docx DOCX document
Amendment 02 - 36C25921R0082 0002.docx DOCX document
S04 - 2022-01-28-RFI_No_1-Project_554-20-103_Install_Partitions_at_Check-In_Desks-VEG-20-16.pdf PDF
S04 - Site Visit Attendance.pdf PDF
S06 - Amend 0001 - 36C25921R0082 0001.docx DOCX document
S02 - Drawings Part 4.pdf PDF
S02 - Drawings Part 3.pdf PDF
S02 - Drawings Part 2.pdf PDF
S02 - Specifications.pdf PDF
S02 - Solicitation - 36C25921R0082.docx DOCX document
S02 - ICRA.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N o rt h N o rt h

VICINITY MAP

AREA OF WORK

PROJECT LOCATION

AREA OF

WORK

G (08)

E (09)

A (10)

E 6TH AVE

E COLFAX AVE

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2

-1

C h e c k -I n A

R C

H R c jo h n s to n Y

W

N

.r v t

/5

/2

:0

:5

P

M

GI001

COVER SHEET INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

NA

02/15/2021 TW CJ

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

ROCKY MOUNTAIN REGIONAL VAMC

1700 N WHEELING ST, AURORA, CO 80045

VAMC PROJECT #: 554-20-103

INSTALL PARTITIONS AT CHECK-IN DESKS

SHEET INDEXRENDERED IMAGESAREA OF WORK

SHEET NUMBER SHEET NAME

GENERAL

GI001 COVER SHEET

GI002 GENERAL INFORMATION AND ABBREVIATIONS

INTERIORS

ID101 DEMOLITION PLAN AT BUILDING G (08) LEVEL 1

ID102 DEMOLITION PLAN AT BUILDING G (08) LEVEL 3

ID103 DEMOLITION PLAN AT BUILDING E (09) LEVEL 1

ID104 DEMOLITION PLAN AT BUILDING E (09) LEVEL 2

ID105 DEMOLITION PLAN AT BUILDING E (09) LEVEL 3

ID106 DEMOLITION PLAN AT BUILDING A (10) LEVEL 4

ID111 ENLARGED DEMOLITION FLOOR PLANS

I-111 ENLARGED PLANS AND ELEVATIONS

I-112 ENLARGED PLANS AND ELEVATIONS

I-113 ENLARGED PLANS AND ELEVATIONS

I-114 ENLARGED PLANS AND ELEVATIONS

I-500 MILLWORK DETAILS

I-901 PERSPECTIVES BLDG G LEVEL 1

I-902 PERSPECTIVES BLDG A(10) LEVEL 4

I-903 PERSPECTIVES BLDG G LEVEL 3

ELECTRICAL

E-001 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES

E-002 ELECTRICAL SYMBOLS

ED101 DEMOLITION PLAN AT BUILDING G (08) LEVEL 1

ED102 DEMOLITION PLAN AT BUILDING G (08) LEVEL 3

ED103 DEMOLITION PLAN AT BUILDING E (09) LEVEL 1

ED104 DEMOLITION PLAN AT BUILDING E (09) LEVEL 2

ED105 DEMOLITION PLAN AT BUILDING E (09) LEVEL 3

ED106 DEMOLITION PLAN AT BUILDING A (10) LEVEL 4

ED111 ENLARGED DEMOLITION FLOOR PLANS

EP111 ELECTRICAL POWER PLAN

02/08/2021

A. ALL CONTRACTORS AND THEIR SUPERVISORY PERSONNEL MUST REVIEW THE GENERAL AND

SUPPLEMENTARY CONDITIONS TO THE CONTRACT.

B. ALL WORK MUST CONFORM WITH SPECS.

C. CONTRACTOR MUST BECOME FULLY ACQUAINTED WITH CONDITIONS RELATED TO THE WORK.

D. CONTRACTOR MUST BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF

CONSTRUCTION AND THE SAFETY OF ALL CONSTRUCTION PERSONNEL AND VISITORS.

E. DRAWINGS CONTAINED IN THIS SET MUST NOT BE REPRODUCED FOR SHOP DRAWINGS. COPIES OF THESE DRAWINGS SUBMITTED AS SHOP DRAWINGS WILL BE REJECTED AND RETURNED TO THE CONTRACTOR.

F. EACH INSTALLER MUST EXAMINE SUBSTRATE AND/OR CONDITIONS UNDER WHICH THE WORK WILL BE INSTALLED AND REPORT TO THE CONTRACTOR IN WRITING ANY CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY EXECUTION OF THAT INSTALLER'S WORK. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS ARE CORRECTED. COMMENCING WITH INSTALLATION WILL CONSTITUTE ACCEPTANCE OF THE

SUBSTRATE AND/OR CONDITIONS.

G. DO NOT SCALE DRAWINGS: FOLLOW WRITTEN DIMENSIONS AND NOTES. CONTACT VHA COR FOR

CLARIFICATIONS, IF REQUIRED.

H. DIMENSIONS SHOWN ON THE FLOOR PLAN ARE TO THE FACE OF GYPSUM WALL BOARD (FOG), FACE OF MASONRY (FOM), FACE OF CONCRETE WALLS (FOC) AND COLUMN GRID LINES, UNLESS OTHERWISE NOTED

OR INDICATED.

I. "TYPICAL", AS USED IN THESE DOCUMENTS, MEANS THAT THE CONDITION OR DIMENSION IS

REPRESENTATIVE OF, OR THE SAME, FOR SIMILAR CONDITIONS THROUGHOUT.

J. IF THERE IS A DISCREPANCY BETWEEN SMALL SCALE AND LARGE SCALE DRAWINGS, (PLAN, SECTION, &

DETAIL DRAWINGS, ETC), CONTACT VHA COR FOR CLARIFICATION.

K. IF THERE ARE ANY DISCREPANCIES BETWEEN THE DRAWINGS AND SPECIFICATIONS, CONTACT VHA COR FOR

CLARIFICATION. FOR BIDDING PURPOSES.

L. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL CONDITIONS MUST BE REPORTED TO THE VHA

COR IN WRITING FOR RESOLUTION, PRIOR TO PROCEEDING WITH THE WORK.

M. ANY AND ALL DISCREPANCIES MUST BE REPORTED TO THE VHA COR IN WRITING FOR RESOLUTION, PRIOR TO PROCEEDING WITH THE WORK. IN THESE INSTANCES, NO CHANGE ORDERS OR EXTENSIONS OF TIME WILL BE ALLOWED OR ACCEPTED FOR PROCEEDING WITH THE WORK WITHOUT THE VHA CONTRACTING OFFICER

WRITTEN DIRECTION AND APPROVAL. ALSO, CONTRACTOR MUST REPAIR AND/OR REPLACE ANY

UNAUTHORIZED WORK, AS INDICATED BY THE VHA COR, AT NO ADDITIONAL COST TO THE OWNER.

N. ALL DISSIMILAR METAL MATERIALS MUST BE ISOLATED WITH AN APPROVED, NONMETAL ISOLATION

MATERIAL.

O. PROVIDE SEALANT AND/OR CAULKING BETWEEN DISSIMILAR ADJOINING INTERIOR MATERIALS. (I.E. WINDOW

SILLS TO GWB, ACT CEILINGS TO MASONRY WALLS, ETC.), REFER TO SPEC 079200.

P. GLASS DOORS, ADJACENT PANELS AND ALL GLAZED OPENINGS WITHIN 1'-6" OF THE FLOOR, AND WITHIN A 24" ARC OF EITHER VERTICAL EDGE OF A DOOR, ETC, MUST BE SAFETY GLAZING AS, , AND MUST BE LABELED AS

SUCH. REFER TO SPEC 088000

Q. CONTRACTOR TO INSTALL WOOD BLOCKING AND PLYWOOD AS REQUIRED FOR THE MOUNTING OF ALL TOILET ACCESSORIES, MILLWORK, CASEWORK, AV EQUIPMENT, MEP ITEMS AND RADIOLOGY EQUIPMENT, ETC, REFER TO SPEC 061000.

R. ALL PROPRIETARY PRODUCTS DESCRIBED AND/OR DRAWN IN THE DOCUMENTS (BUT NOT SPECIFIED) ARE TO

MEET THE MANUFACTURER'S STANDARD CRITERIA WHICH IS NOT LIMITED TO THE FOLLOWING:

PERFORMANCE REQUIREMENTS, QUALITY ASSURANCE REQUIREMENTS, APPLICABLE CODES AND INDUSTRY STANDARDS, FABRICATION, ASSEMBLY, HANDLING, DELIVERY, STORAGE, INSTALLATION, OPERATION, ADJUSTMENTS, ETC. PROVIDE THE MANUFACTURER'S STANDARD WARRANTY AND STANDARD FINISH WARRANTY. PROVIDE PRODUCT DATA, SHOP DRAWINGS, SAMPLES AND MAINTENANCE DATA, AS REQUIRED.

REFER TO DIVISION 01 SPECIFICATION SECTIONS WHICH ALSO APPLY, SUCH AS SUBSTITUTION PROCEDURES, SUBMITTAL PROCEDURES, QUALITY REQUIREMENTS, REFERENCES, EXECUTION AND CLOSEOUT PROCEDURES. ANY SUBSTITUTIONS MUST MEET THE DESIGN INTENT, AS WELL AS THE CRITERIA

DESCRIBED ABOVE.

S. REFER TO SPECIFICATIONS FOR ALL REQUIRED TESTING AND INSPECTIONS.

GENERAL NOTES

ACOUSTICAL TILE (SECTION)

GYPSUM BOARD

COVER BOARD

WOOD/HPL

CONT FIRE RETARDANT

WOOD BLOCKING / ROUGH

FRAMING

DISCONTINUOUS FIRE

RETARDANT WOOD

BLOCKING / SHIM

FIRE RETARDANT PLYWOOD

SPANDREL GLASS

MATERIALS LEGEND

SUBSTRATE

PLYWOOD

REMOVE

FLOORING

A

ROOM NAME

SECTION, DETAIL, OR ELEVATION TITLE EXAMPLE

ELEVATION CALLOUT EXAMPLE

DETAIL CALLOUT EXAMPLE

SECTION CALLOUT EXAMPLE

SECTION, DETAIL, OR ELEVATION

SYMBOL IDENTIFIERS

DETAIL NAME

LETTER OR NUMBER

DESIGNATOR

DRAWING

SEQUENCE NUMBER

INDICATES WHERE

TITLE IS LOCATED

ONE OR TWO CHARACTER

DISCIPLINE DESIGNATOR (MAY

NOT BE PRESENT IF CALLOUT

AND TITLE ARE ON DRAWINGS

WITHIN THE SAME DISCIPLINE)

AE101

CENTER LINE

COLUMN

BUBBLE

ROOM TAG

DETAIL NUMBER

ON SHEET

SHEET NUMBER

DETAIL NUMBER

ON SHEET

SHEET NUMBER

NEW LINE TYPE

EXISTING LINE TYPE

DEMO LINE TYPE

View Name

1/8" = 1'-0"

AE101

AE101

A

A101

FLOOR PLAN SYMBOLS LEGEND

AE101

EXTERIOR

INTERIOR

XX KEYNOTE

REVISION TAG1

DRAWING SCALE

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2

-1

C h e c k -I n A

R C

H R c jo h n s to n Y

W

N

.r v t

/5

/2

:0

:0

P

M

GI002

GENERAL INFORMATION AND

ABBREVIATIONS

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

NA

02/15/2021 TW CJ

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

ARCHITECTURAL ABBREVIATIONS

SYM SYMMETRICAL /

SYMBOL

SYS SYSTEM

T

T TREAD

TEL TELEPHONE

TEMP TEMPORARY

TG TONGUE & GROOVE

THK THICK (NESS)

THRU THROUGH

TKBD TACK BOARD

TM TEMPERED

TO TOP OF

TOC TOP OF CURB /

CONCRETE

TOD TOP OF DECK

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOR TOP OF ROOF

TOS TOP OF STEEL

TOW TOP OF WALL

TPO THERMOPLASTIC

POLYOLEFIN

TRANSF TRANSFORMER

TV TELEVISION

TYP TYPICAL

TZ TERRAZZO

U

UH UNIT HEATER

UNFIN UNFINISHED

UNO UNLESS NOTED

OTHERWISE

V

VB VAPOR BARRIER (VPR

BR)

VC GOVERNMENT

FURNISHED/

CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION

TILE

VERT VERTICAL

VEST VESTIBULE

VHA VETERAN HEALTH

ADMINISTRATION

VIF VERIFY IN FIELD

VNR VENEER

VTR VENT THROUGH ROOF

VV GOVERNMENT

FURNISHED/

GOVERNMENT

INSTALLED

VWC VINYL

WALLCOVERING

W

W WEST, WIDTH, WIDE

W/ WITH

W/IN WITHIN

W/O WITHOUT

WB WOOD BASE

WC WATER CLOSET

WD WOOD

WDW WINDOW

WH WALL HYDRANT /

WATER HEATER

WP WATERPROOFING /

WORKING POINT

WR WEATHER RESISTANT

WSF WELDED SEAM SHEET

FLOORING

WT WEIGHT

WWF WELDED WIRE FABRIC

X, Y, Z, MISC

& AND

@ AT

XPS EXTRUDED

POLYSTYRENE

YD YARD

OD OUTSIDE DIAMETER

OH OVERHEAD

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

ORD OVERFLOW ROOF

DRAIN

OZ OUNCE

P

PA PUBLIC ADDRESS

PB PUSH BUTTON

PC PRECAST CONCRETE

PCF POUNDS PER CUBIC

FOOT

PERF PERFORATE (D)

PERM PERMANENT

PERP PERPENDICULAR

PL PLATE / PROPERTY

LINE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLUMB PLUMBING

PLYWD PLYWOOD

PNL PANEL

POLY POLYETHYLENE

PR PAIR

PREFAB PREFABRICATE (D)

PREFIN PREFINISHED

PRELIM PRELIMINARY

PREP PREPARE (D)

PROJ PROJECT

PSF POUNDS PER SQUARE

FOOT

PSI POUNDS PER SQUARE

INCH

PT PAINT / PORCELAIN

TILE

PTN PARTITION

PVC POLYVINYL CHLORIDE

PVG PAVING

Q

QT QUARRY TILE

QTB QUARRY TILE BASE

QTY QUANTITY

R

R RISER / RADIUS

R REUSED EXISTING

EQUIPMNENT

RA RETURN AIR

RB RESILIENT BASE

RCP REFLECTED CEILING

PLAN

RD ROOF DRAIN

RE: REFER TO

REF REFRIGERATOR

REINF REINFORCE (D), (ING)

REPAR REMOVABLE

PARTITION

REQD REQUIRED

REV REVISED/ REVISION

RFG ROOFING

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RP RESIN PANELS

RR RESTROOM

RSF RESILIENT SHEET

FLOORING

RTU ROOF TOP UNIT

S

S SOUTH

SAN SANITARY SEWER

SC SOLID CORE

SCH SCHEDULE

SCRN SCREEN

SECT SECTION

SF SQUARE FOOT (SQFT)

SHT SHEET

SIM SIMILAR

SOG SLAB ON GRADE

SPEC SPECIFICATION (S)

SPKLR SPRINKLE

SPKR SPEAKER

SQ SQUARE

SS SOLID SURFACE

STC SOUND

TRANSMISSION

COEFFICIENT

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURE /

STRUCTURAL

SUSP SUSPENDED

SY SQUARE YARD (SQ

YD)

HDWD HARDWOOD

HK HOOK

HM HOLLOW METAL

HORIZ HORIZONTAL

HPL HIGH PRESSURE

LAMINATE

HR HOUR

HS HIGH STRENGTH

HT HEIGHT

HTG HEATING

HTR HEATER

HVAC HEATING /

VENTILATING / AIR

CONDITIONING

HW HOT WATER

HWH HOT WATER HEATER

HYD HYDRANT

I

IBC INTERNATIONAL

BUILDING CODE

ICRA INFECTION CONTROL

RISK ASSESSMENT

ID INSIDE DIAMETER

ILSM INTERIM LIFE SAFETY

MEASURES

IN INCH

INCL INCLUDE (D), (ING)

INFO INFORMATION

INST INSTALL /

INSTALLATION

INSUL INSULATE /

INSULATION

INT INTERIOR

INV INVERT

J

JAN JANITOR

JB JUNCTION BOX

JST JOIST

JT JOINT

K

KIT KITCHEN

KO KNOCKOUT

KPL KICK PLATE

L

L LONG / LENGTH

LAB LABORATORY

LAM LAMINATE (D)

LAV LAVATORY

LBS POUNDS

LF LINEAR FOOT (FEET)

LH LEFT HAND

LLH LONG LEG

HORIZONTAL

LLV LONG LEG VERTICAL

LPT LOW POINT

LRG LARGE

LT LIGHT

LTG LIGHTING

LVR LOUVER

LVT LUXURY VINYL TILE

LWC LIGHTWEIGHT

CONCRETE

M

MAS MASONRY

MAX MAXIMUM

MBR MEMBER

MDF MEDIUM DENSITY

FIBERBOARD

MECH MECHANICAL

MED MEDIUM

MEMB MEMBRANE

MFG MANUFACTURING

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MOD MODULAR

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

N

N NORTH

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NRC NOISE REDUCTION

COEFFICIENT

NSF NET SQUARE FEET

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DMT DEMOUNTABLE

DN DOWN

DP DECORATIVE PANEL

DR DOOR

DS DOWNSPOUT

DTL DETAIL

DWG DRAWING

E

EA EACH

EF EXHAUST FAN

EJ EXPANSION JOINT

ELAST ELASTOMERIC

ELEC ELECTRICAL

ELEV ELEVATION

EM EMERGENCY

EP ELECTRICAL

PANELBOARD

EQ EQUAL

EQUIP EQUIPMENT

ESC ESCALATOR

EST ESTIMATE

ETR EXISTING TO REMAIN

EW EACH WAY

EWC ELECTRIC WATER

COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION /

EXPOSED

EXT EXTERIOR

F

FA FIRE ALARM

FAB FABRIC

FB FACE BRICK

FBO FURNISHED BY

OWNER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISH FLOOR

FF&E FIXTURES,

FURNITURE &

EQUIPMENT

FFE FINISH FLOOR

ELEVATION

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FIN FINISH / FINISHED

FIXT FIXTURE

FLG FLOORING

FLR FLOOR

FLUOR FLUORESCENT

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOG FACE OF GYPSUM

BOARD / WALL

FOM FACE OF MASONRY

FOS FACE OF STUDS

FR FIRE RATED

FRMG FRAMING

FRP FIBER REINFORCED

PANEL

FS FLOOR SINK

FT FLOOR TILE

FTG FOOTING

FUR FURRING

FUT FUTURE

G

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL

CONTRACTOR

GFRC GLASS FIBER

REINFORCED

CONCRETE

GL GLASS / GLAZING

GOVT GOVERNMENT

GPM GALLON PER MINUTE

GSF GROSS SQUARE FEET

GWB GYPSUM WALL BOARD

GYP GYPSUM

H

H HIGH

HB HOSE BIBB

HC HOLLOW CORE

HD HEAD

HDBD HARDBOARD

HDR HEADER

HDW HARDWARE

A

ABA ARCHITECTURAL

BARRIERS ACT

ABAAS VA BARRIER FREE

DESIGN STANDARD

AC AIR CONDITIONING

ACP ACOUSTICAL CEILING

PANEL

ACST ACOUSTICAL

ACT ACOUSTICAL CEILING

TILE

AD AREA DRAIN

ADJ ADJUSTABLE /

ADJACENT

AFF ABOVE FINISH FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECT /

ARCHITECTURAL

ATTEN ATTENUATION

AUTO AUTOMATIC

AV AUDIO / VISUAL

AVG AVERAGE

AWP ACOUSTICAL WALL

PANEL

B

BD BOARD

BITUM BITUMINOUS

BLDG BUILDING

BLKG BLOCKING

BM BENCH MARK / BEAM

BO BOTTOM OF

BOC BACK OF CURB

BOD BASIS OF DESIGN OR

APPROVED EQUAL

BOT BOTTOM

BRG BEARING

BRK BRICK

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BVL BEVELED

C

CAB CABINET

CAP CAPACITY

CB CATCH BASIN

CC CONTRACTOR

FURNISHED/

CONTRACTOR

INSTALLED

CCTV CLOSED CIRCUIT TV

CF CUBIC FEET

CFM CUBIC FEET PER

MINUTE

CG CORNER GUARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLR CLEAR / CLEARANCE

CMP CORRUGATED METAL

PIPE

CMT CERAMIC MOSAIC

TILE

CMU CONCRETE MASONRY

UNIT

COL COLUMN

COMB COMBINATION

CONC CONCRETE

CONN CONNECTION /

CONNECT

CONST CONSTRUCT /

CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

COR CONTRACTING

OFFICER'S

REPRESENTATIVE

CORR CORRIDOR /

CORRUGATED

CP CONCRETE PIPE

CPT CARPET

CS COUNTERSINK

CSMT CASEMENT

CT CERAMIC TILE

CU CUBIC

CW COLD WATER

D

DBL DOUBLE

DEMO DEMOLISH /

DEMOLITION

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

J

H

G

F

E

D

C

B

08-01-G3-04

AUDIOMETRIC

EXAM 4

08-01-C2-02

PAT TLT 1

08-01-G1-03

AUDIO TECH 3

08-01-H2-02

AUDIOLOGIST 6

08-01-E3-02

GROUP RM

08-01-F3-02

SPEECH 1

08-01-B3-01

MULTIFUNCT

TREAT/WORK

08-01-A3-02

GYM

08-01-C4-01

EXAM/TREATMENT

08-01-A1-01

WAIT

08-01-B3-03

TREAT 1

08-01-E2-01

SOILED UTIL08-01-E2-05

STAFF TLT 1

08-01-B4-05

PUBLIC TLT 1

08-01-B3-02

PUBLIC TLT 2

08-01-B3-04

OTBC TREAT

08-01-E2-02

STAFF TLT 2

08-01-E2-04

STAFF TLT 4

08-01-B2-03

OTBC

ORTHO/SPLINTING

08-01-C2-01

PAT TLT 2

08-01-E2-06

STAFF OFFICE 1

08-01-F2-01

AUDIOLOGIST 8

08-01-C2-04

STAFF OFFICE 3

08-01-H3-01

SINUSODIAL TEST

08-01-H4-01

PUBLIC TLT 3

08-01-B2-01

HAC

08-01-G4-02

WAIT

08-01-G3-03

AUDIOLOGIST 5

08-01-H4-02

CHIEF OFFICE

08-01-H3-07

SOC WORKER 4

08-01-H2-04

CONSULT

08-01-H2-06

OFFICE 6

08-01-H2-05

OFFICE 5

08-01-H2-07

INTERN OFFICE

08-01-H1-01

OFFICE

08-01-H1-02

CHIEF OFFICE

08-01-H1-03

SECR/WAIT

08-01-G1-02

AUDIO TECH 2

08-01-G1-01

AUDIO TECH 1

08-01-F1-05

OFFICE 1

08-01-F1-04

OFFICE 4

08-01-E1-01

STAFF LOUNGE

08-01-G4-01

AUDIOLOGIST 3

08-01-G3-02

AUDIOLOGIST 2

08-01-F4-03

CAT WORK

08-01-F3-03

SPEECH

THERAPY IND

08-01-H2-03

INST CAL/STOR

08-01-G2-03

AUDIOMETRIC

EXAM 3

08-01-G2-02

AUDIOMETRIC

EXAM 1

08-01-G2-01

AUDIOLOGIST 1

08-01-F2-04

HEARING AID FAB

08-01-F2-05

AUDIOLOGIST 7

08-01-F4-02

WAIT

08-01-F2-03

RESIDENT OFFICE

08-01-F2-02

STAFF TLT 3

08-01-C2-03

EXAM/TREATMENT

08-01-B2-04

TELEHEALTH 1

08-01-B2-05

PAT TLT 1

08-01-G3-01

AUDIOMETRIC

EXAM 2

08-01-F3-04

SPEECH

ANALYSIS

08-01-F3-01

SPEECH 2

08-01-E3-03

W.C. REPAIR

08-01-E2-03

OT/PT DME 2

08-01-A3-01

PLATFORM

08-01-F4-01

SPEECH

THERAPY GROUP

08-01-A1-02

RECEPT

08-01-A2-02

O2 STOR

08-01-A2-04

O2 COORD 5

08-01-A2-03

O2 COORD 4

08-01-A2-10

CORRIDOR

08-01-A3-11

ELEV LOBBY

08-01-C3-01

EXAM/TREATMENT

08-01-C3-02

ELECTROMYOGRAPHY

08-01-D2-03

LINEN ALCOVE

08-01-C2-10

CORRIDOR

08-01-C3-11

CORRIDOR

08-01-F3-11

CORRIDOR

08-01-B2-02

SHARED OFFICE

08-01-C3-12

CORRIDOR

08-01-F1-03

OFFICE 3

08-01-F1-06

OFFICE 2

08-01-F1-02

OFFICE 6

08-01-F1-01

OFFICE 5

08-01-E1-03

OFFICE 8

08-01-E1-02

OFFICE 7

08-01-D1-04

CLERICAL 2

08-01-D1-03

CLERICAL 1

08-01-D1-02

PROV CONSULT

08-01-D1-01

CONSULT

08-01-C1-03

OFFICE

08-01-C1-04

OFFICE

08-01-C1-02

PAT RM

08-01-C1-01

BRACE REPAIR

LAB

08-01-B1-02

PUR OFFICE

08-01-B1-01

EQUIP STOR

08-01-H2-01

HAC

08-01-H3-06

SOC WORKER 3

08-01-H3-05

SOC WORKER 2

08-01-H3-04

SOC WORKER 1

08-01-H3-03

SECT AND WAIT 1

08-01-C4-04

EDUCATION/TRAIN

08-01-H3-02

VESTIBULOGRAPHY

08-01-G4-03

AUDIOLOGIST 4

08-01-D2-05

STAFF TLT

08-01-G3-11

CORRIDOR

08-01-H3-11

CORRIDOR

08-01-J3-11

CORRIDOR

08-01-C4-02

WAIT

08-01-A4-11

CORRIDOR

08-01-E3-11

CORRIDOR

08-01-D3-11

CORRIDOR

08-01-C3-03

OTBC GYM

08-01-D3-01

ADL TLT

08-01-E3-10

CORRIDOR

08-01-C3-10

CORRIDOR

08-01-B1-03

WORK AREA

08-01-A4-02

RECEPT

08-01-D3-02

FITNESS ROOM

08-01-D4-01

COMM CTR

08-01-D2-01

CLEAN SUPPLY

08-01-D4-02

RECEPT

08-01-F4-04

RECEPT

08-01-A3-03

WAIT

08-01-F1-07

CORRIDOR

08-01-C2-T1

DEMARC ROOM

08-01-D2-E1

ELEC

08-01-D2-H2

CHUTE

08-01-E2-T2

DATA /

TELECOMM

08-01-G2-E2

ELEC

08-01-H2-T3

DATA /

TELECOMM

08-01-ST2

STAIR

08-01-SE5

ELEV

DN

UP

ID111

ID111

ID111

I-111

I-111

I-111

M

IN

T

Y P

A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF

HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND

EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE

TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.

B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.

C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS

TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.

COORDINATE WITH COR.

E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,

AS NEEDED.

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2

-1

C h e c k -I n A

R C

H R c jo h n s to n Y

W

N

.r v t

/5

/2

:0

:0

P

M

ID101

DEMOLITION PLAN AT BUILDING G

(08) LEVEL 1

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 TW CJ

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING G (08) LEVEL 1

1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS

AND VHA COR, RE: SPEC 010000

H

G

F

E

D

C

B

08-03-E3-09

HAC 3

08-03-E1-06

STAFF TLT

08-03-H2-06

CHIEF OF STAFF 3

08-03-G4-07

PERS ASST 7

08-03-G4-02

PERS ASST 8

08-03-H4-01

WAIT/RECEP

08-03-H2-02

STAFF ASST 4

08-03-B3-10

CORRIDOR

08-03-H2-08

CHIEF OF STAFF

2 08-03-F2-01

CONSULT 1

08-03-H2-07

HSS ASST 3

08-03-H3-01

OFFICE 2

08-03-F2-03

SOC WORK 1

08-03-H2-01

STAFF ASST 3

08-03-G2-02

WORK ALCOVE

08-03-G3-13

CORRIDOR

08-03-E2-06

CORRIDOR

08-03-F3-11

CORRIDOR

08-03-H1-02

MEDICAL CENTER

DIR

08-03-G1-02

CHIEF OF STAFF 1

08-03-F1-01

STAFF LOUNGE

08-03-E1-05

STAFF LOCKERS

08-03-H1-01

STAFF TLT

08-03-G1-04

HSS ASST 4

08-03-G1-03

HSS ASST 5

08-03-G1-01

HSS ASST 6

08-03-G2-01

OFFICE 1

08-03-H2-03

STAFF ASST 7

08-03-H2-05

STAFF ASST 5

08-03-H2-04

STAFF ASST 6

08-03-G4-05

PERS ASST 5

08-03-G4-03

PERS ASST 3

08-03-G4-08

PERS ASST 6

08-03-G4-06

PERS ASST 4

08-03-G4-04

PERS ASST 2

08-03-G3-10

MAN SPEC 1

08-03-G3-07

MAN SPEC 5

08-03-G3-04

MAN SPEC RESP

08-03-G3-11

MAN SPEC 2

08-03-G3-08

MAN SPEC 6

08-03-G3-05

MAN SPEC RES 2

08-03-G3-12

MAN SPEC 3

08-03-G3-09

MAN SPEC 7

08-03-G3-06

WORKSTATION 1

08-03-G2-06

MAN SPEC 4

08-03-G2-05

MAN SPEC 8

08-03-G2-04

MAN SPEC 9

08-03-G4-01

PERS ASST 1

08-03-G3-03

MAN SPEC RES 3

08-03-G3-02

MAN SPEC RES 4

08-03-G3-01

WORKSTATION 2

08-03-F4-03

SEC OFFICE

08-03-F3-04

WORKSTATION 1

08-03-F3-05

WORKSTATION 2

08-03-F3-06

WORKSTATION 3

08-03-F4-02

WAIT

08-03-F4-01

CONF

08-03-E4-03

CHIEF OFFICE

08-03-F3-03

PIV ROOM

08-03-F3-02

WORK

08-03-F3-01

SECURE WORK

08-03-B5-10

CORRIDOR

08-03-E4-04

BIOFEEDBACK

TECH

08-03-E3-06

BIOFEEDBACK

LAB

08-03-E3-07

COMM CTR

08-03-D4-05

PUBLIC TLT 2

08-03-H3-05

HSS ASST 2

08-03-H3-03

CHIEF OF STAFF 4

08-03-H3-04

DEPUTY CHIEF OF

STAFF

08-03-H4-02

HSS ASST 1

08-03-H3-02

CONF

08-03-G2-07

SHARED OFFICE

08-03-G2-08

CHIEF OFFICE

08-03-F2-07

PERS ASST 9

08-03-F2-06

WORKSTATION 5

08-03-E3-08

SEC 1

08-03-E3-01

SHARED OFFICE

08-03-E3-10

PSYCH OFFICE 12

08-03-E3-02

INTERN 1

08-03-E3-03

INTERN 2

08-03-E3-04

INTERN 3

08-03-E3-05

INTERN 4

08-03-D3-07

GROUP TEST

08-03-D3-06

PSYCH OFFICE 11

08-03-D3-05

PSYCH OFFICE 10

08-03-D4-06

PSYCH OFFICE 9

08-03-D3-01

MULTIPURPOSE/CONTROL

08-03-D3-02

CONTROL

08-03-D3-04

PSYCH OFFICE 8

08-03-D4-01

PSYCH OFFICE 7

08-03-D4-02

PUBLIC TLT 2

08-03-C4-05

WAIT

08-03-B4-03

WAIT

08-03-C3-06

EXAM 1

08-03-C3-05

PSYCH OFFICE 6

08-03-C3-04

PSYCH OFFICE 5

08-03-C3-03

PSYCH OFFICE 4

08-03-C4-06

COMM CTR

08-03-C4-04

WORKSTATION 1

08-03-C4-03

WORKSTATION 2

08-03-C3-01

HEALTH PSYCH

08-03-C3-02

PSYCH OFFICE 3

08-03-C4-01

PSYCH OFFICE 2

08-03-C4-02

PSYCH OFFICE 1

08-03-B3-01

VISN OFFICE 1

08-03-B3-02

VISN OFFICE 2

08-03-B3-07

CONSULT 2

08-03-B3-06

CONSULT 1

08-03-B3-05

WORKSTATION 1

08-03-B3-04

WORKSTATION 2

08-03-B4-05

WORKSTATION 3

08-03-B4-04

SCHED

WORKSTATION 1

08-03-B4-06

WORKSTATION 4

08-03-B3-03

EXAM 1

08-03-B4-01

VITAL SIGNS

08-03-A3-04

CONF

08-03-B4-02

PUBLIC TLT 1

08-03-A3-03

CLASSROOM 1 CLASSROOM 2

08-03-B2-06

CRASH CART

ALCOVE

08-03-A2-01

PUBLIC TLT 1

08-03-A2-02

STAFF TLT

08-03-B2-03

STRETCHER/W. C.

ALCOVE

08-03-B2-04

EXAM

08-03-B2-02

MED PREP

08-03-E1-03

RES

WORKSTATION 1

08-03-E1-01

NP PHY 3

08-03-D1-04

CHIEF NURSE 1

08-03-E1-04

NP PHY 2

08-03-E1-02

NP PHY 4

08-03-D1-05

NP PHY 1

08-03-D1-02

ASST DIET 1

08-03-D1-03

SUPP TECH 1

08-03-D1-01

CHIEF OFFICE

08-03-C1-03

ISO BED STATION

08-03-C1-02

DIALYSIS CHAIR 6

08-03-B1-04

DIALYSIS CHAIR 4

08-03-B1-02

DIALYSIS CHAIR 2

08-03-A1-03

RECEPT

08-03-A1-02

WAIT

08-03-A1-01

PAT ED KIOSK

08-03-A2-10

CORRIDOR

08-03-A3-11

ELEV LOBBY

08-03-B2-10

CORRIDOR

08-03-C1-01

DIALYSIS CHAIR 5

08-03-B1-03

DIALYSIS CHAIR 3

08-03-B1-01

DIALYSIS CHAIR 1

08-03-C1-04

ISO PAT TLT

08-03-F2-02

CONSULT 2

08-03-E2-04

EQUIP STOR

08-03-E2-03

STAFF TLT 1

08-03-E2-02

STAFF TLT 1 08-03-D2-03

EQUIP REPAIR

08-03-D2-02

EQUIP PROC

08-03-C2-05

DIALYSATE PREP

08-03-C2-04

WATER TREAT

08-03-C2-03

CLEAN SUPPLY

08-03-B2-01

NURSE STATION

08-03-B2-05

CORRIDOR

08-03-C2-01

HAC 1

08-03-D2-01

CLEAN LINEN

08-03-E2-01

SOILED UTIL

08-03-F2-04

WORKSTATION 4

08-03-E4-01

NEURO VOCA

REHAB

08-03-B3-11

CORRIDOR

08-03-C3-11

CORRIDOR08-03-D3-11

CORRIDOR

08-03-E3-11

CORRIDOR

08-03-H2-10

CORRIDOR

08-03-E4-02

PUBLIC TLT 3

08-03-C2-02

NOURISH

08-03-E2-05

LAB

08-03-E2-10

CORRIDOR

08-03-B5-10

CORRIDOR

08-03-A3-05

WAIT

08-03-H4-03

CORRIDOR

08-03-D4-07

CORRIDOR

08-03-D2-E1

ELEC

08-03-D2-H1

CHUTE

08-03-E2-T1

DATA /

TELECOMM

08-03-G2-E2

ELEC08-03-H2-T2

DATA /

TELECOMM

08-03-ST2

STAIR

08-03-SE5

ELEV

UP

DN

ID111

I-113

M

IN

A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF

HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND

EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE

TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.

B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.

C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS

TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.

COORDINATE WITH COR.

E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,

AS NEEDED.

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2

-1

C h e c k -I n A

R C

H R c jo h n s to n Y

W

N

.r v t

/5

/2

:0

:0

P

M

ID102

DEMOLITION PLAN AT BUILDING G

(08) LEVEL 3

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 TW CJ

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING G (08) LEVEL 3

1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS AND

VHA COR, RE: SPEC 010000

H

G

F

E

D

C

B

09-01-B4-01

OFFICE

09-01-B2-03

TRAVEL

09-01-B2-02

TRAVEL

09-01-B1-02

TRAINER

09-01-A1-01

STRETCHER/W.C.STOR

09-01-A4-03

OFFICE

09-01-B3-03A

OFFICE

09-01-A3-05

OFFICE

09-01-A3-04

OFFICE

09-01-B1-03

OFFICE

09-01-C1-01

OFFICE

09-01-G2-06

PHOTOTHERAPY

TREAT

09-01-G2-05

PHOTOTHERAPY

SHOWER

09-01-H2-02

MED PREP/STOR

09-01-H2-03

TREAT/PROCEDURE

09-01-A1-03

PHONE INTAKE

09-01-A1-02

PHONE INTAKE

09-01-B1-01

PHONE INTAKE

09-01-C2-04

PROCEDURE

09-01-B2-01

HAC

09-01-H4-02

EXAM

09-01-H3-07

EXAM

09-01-H3-06

EXAM

09-01-H3-05

EXAM

09-01-H2-06

EXAM

09-01-H2-05

EXAM

09-01-C3-05

NURSE

STATION/MED

09-01-E2-06

PROCEDURE

09-01-C3-08

WEIGHT STN

09-01-D3-02

WEIGHT STN

09-01-E3-09

WEIGHT STN

09-01-F3-02

WEIGHT STN

09-01-E2-01

SOILED UTIL

09-01-B2-05

CLEAN SUPPLY

09-01-F2-01

CLEAN SUPPLY

09-01-B4-03

WAIT

09-01-G4-02

WAIT

09-01-H3-02

NURSE

STATION/MED

09-01-D2-02

EXAM

09-01-F2-03

CONSULT

09-01-H4-01

CONSULT

09-01-H1-03

OFFICE

09-01-H1-04

OFFICE

09-01-H1-05

OFFICE

09-01-H1-01

OFFICE

09-01-H1-02

OFFICE

09-01-G1-05

OFFICE

09-01-G1-06

OFFICE

09-01-G1-03

OFFICE

09-01-G1-04

OFFICE

09-01-G1-01

OFFICE

09-01-H2-04

DERMATOLOGY

LAB

09-01-F1-02

OFFICE

09-01-F1-03

OFFICE

09-01-D1-02

OFFICE

09-01-D1-01

OFFICE

09-01-D1-04

OFFICE

09-01-D1-05

OFFICE

09-01-D1-06

OFFICE

09-01-C1-05

OFFICE

09-01-C4-03

ONSTAGE AREA

09-01-E4-03

ONSTAGE AREA

09-01-C3-07

PRECEPTOR RM

09-01-F2-02

PRECEPTOR RM

09-01-G3-08

WEIGHT STN

09-01-H3-04

WEIGHT STN

09-01-C1-06

OFFICE

09-01-C1-03

OFFICE

09-01-C1-04

OFFICE

09-01-B1-06

OFFICE

09-01-G2-02

HAC

09-01-E2-04

CONSULT

09-01-G4-03

ONSTAGE AREA

09-01-F1-01

CONF

09-01-E1-02

STAFF TLT

09-01-G2-01

SOILED UTIL

09-01-B2-07

WAIT

09-01-B2-04

TRAVEL

09-01-D4-03

WAIT

09-01-C4-02

WAIT

09-01-B1-05

OFFICE

09-01-B1-04

OFFICE

09-01-E2-05

EQUIP STOR

09-01-A3-06

RECEPT

09-01-E4-02

WAIT

09-01-F4-03

WAIT

09-01-B3-05

CORRIDOR

09-01-C3-06

CORRIDOR

09-01-E3-07

CORRIDOR

09-01-G3-06

CORRIDOR

09-01-H3-03

CORRIDOR

09-01-E1-01

STAFF TLT

09-01-D4-01

PUBLIC TLT09-01-F4-01

PUBLIC TLT

09-01-E1-03

STAFF LOUNGE

09-01-D1-03

SECRETARY

09-01-A2-01

CONSULT

09-01-A1-04

CORRIDOR

09-01-B4-02

EXAM/FITTING

09-01-G3-04

CORRIDOR

09-01-H3-01

STAFF TLT

09-01-G3-05

PAT TLT

09-01-E3-08

PRECEPTOR RM

09-01-G3-07

PRECEPTOR RM

09-01-F3-01

PAT TLT

09-01-E3-05

STAFF TLT

09-01-E3-06

CLEAN SUPPLY

09-01-E3-04

CORRIDOR

09-01-F3-03

CORRIDOR

09-01-E4-04

HAS

09-01-C4-04

HAS

09-01-C3-04

PAT TLT

09-01-D3-01

PAT TLT

09-01-D3-03

CORRIDOR

09-01-C3-09

CORRIDOR

09-01-A3-03

OFFICE

09-01-B3-01

WORK

09-01-B3-04

OFFICE

09-01-A4-05

OFFICE

09-01-A4-04

OFFICE

09-01-C4-01

CONSULT

09-01-B3-09

EXAM

09-01-C3-03

EXAM

09-01-B3-08

EXAM

09-01-C3-02

EXAM

09-01-B3-06

RECEPT

09-01-C3-01

EXAM

09-01-C2-02

EXAM

09-01-B2-06

OFFICE

09-01-C2-01

EXAM09-01-C2-03

STOR

09-01-D2-01

CAST/PODIATRY

09-01-E4-01

EXAM

09-01-D4-02

EXAM

09-01-E3-03

EXAM

09-01-D3-06

EXAM

09-01-E3-02

EXAM

09-01-D3-05

EXAM

09-01-E3-01

EXAM

09-01-D3-04

EXAM

09-01-E2-03

EXAM

09-01-D2-04

EXAM

09-01-E2-02

EXAM

09-01-D2-03

EXAM

09-01-F4-02

EXAM

09-01-G4-01

EXAM

09-01-F3-06

EXAM

09-01-G3-03

EXAM

09-01-F3-05

EXAM

09-01-G3-02

EXAM

09-01-F3-04

EXAM

09-01-G3-01

EXAM

09-01-F2-05

EXAM

09-01-G2-04

EXAM

09-01-F2-04

EXAM

09-01-G2-03

EXAM

09-01-G4-04

HAS

09-01-D1-07

CORRIDOR

09-01-F1-04

CORRIDOR

09-01-A4-06

CLINIC WAITING

09-01-B3-07

RECEPT

09-01-B3-02

OFFICE

09-01-B3-03

OFFICE

09-01-D2-E1

ELEC

09-01-D2-H2

CHUTE

09-01-E2-T1

DATA /

TELECOMM

09-01-G2-E2

ELEC09-01-H2-T2

DATA /

TELECOMM

09-01-ST2

STAIR

09-01-SE6

ELEV

DN

UP

ID111

ID111

ID111

I-112

I-112

I-112

M

IN

T

Y P

A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF

HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND

EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE

TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.

B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.

C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS

TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.

COORDINATE WITH COR.

E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,

AS NEEDED.

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2

-1

C h e c k -I n A

R C

H R c jo h n s to n Y

W

N

.r v t

/5

/2

:0

:0

P

M

ID103

DEMOLITION PLAN AT BUILDING E

(09) LEVEL 1

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 TW CJ

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING E (09) LEVEL 1

1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS AND

H

G

F

E

D

C

B

09-02-E2-04

W.C. ALCOVE

09-02-H3-02

NURSE

STATION/MED

09-02-B2-06

EXAM/SCREEN

09-02-B2-05

EXAM/SCREEN

09-02-B3-03

PRECEPTOR

09-02-E3-02

PRECEPTOR

09-02-F3-06

PRECEPTOR

09-02-B3-06

EXAM

09-02-B3-08

EXAM09-02-G3-06

EXAM

09-02-G2-06

EXAM

09-02-H3-04

EXAM

09-02-B2-02

PROC TLT

09-02-H2-01

EQUIP STOR

09-02-B3-07

EXAM

09-02-H2-04

EXAM

09-02-H2-03

EXAM

09-02-C4-01

OFFICE

09-02-C3-03

EXAM

09-02-C3-02

EXAM

09-02-C2-02

EXAM

09-02-C3-08

EXAM

09-02-D3-05

EXAM

09-02-D2-05

EXAM

09-02-E2-05

EXAM

09-02-H4-03

OFFICE

09-02-F3-04

EXAM

09-02-F2-05

EXAM

09-02-G3-01

EXAM

09-02-G2-04

EXAM

09-02-G4-01

EXAM

09-02-G2-05

EXAM

09-02-F3-02

CLEAN SUPPLY

09-02-B4-01

CONSULT

09-02-A2-03

PROCEDURE

09-02-H4-01

CONSULT

09-02-E2-01

SOILED UTIL

09-02-B2-04

CLEAN SUPPLY

09-02-B2-03

PROCEDURE

09-02-C2-01

EQUIP STOR

09-02-A4-02

HUB

09-02-F4-03

HUB

09-02-G2-01

HAC

09-02-F3-07

WEIGHT STN

09-02-G3-02

WEIGHT STN

09-02-G1-05

OFFICE

09-02-G2-02

CLEAN SUPPLY

09-02-H1-05

OFFICE

09-02-H1-06

OFFICE

09-02-B1-03

OFFICE

09-02-B1-05

OFFICE

09-02-B1-04

OFFICE

09-02-B1-06

OFFICE

09-02-C1-02

OFFICE

09-02-C1-01

OFFICE

09-02-C1-04

OFFICE

09-02-C1-03

OFFICE

09-02-C1-06

OFFICE

09-02-C1-05

OFFICE

09-02-D1-04

OFFICE

09-02-D1-03

OFFICE

09-02-D1-06

OFFICE

09-02-D1-05

OFFICE

09-02-D2-01

LINEN ALCOVE

09-02-F2-03

PROCEDURE

09-02-B3-04

WEIGHT STN

09-02-G1-03

NURSE

09-02-G1-04

NURSE

09-02-G1-01

NURSE

09-02-G1-02

NURSE

09-02-G1-06

NURSE

09-02-F1-03

OFFICE

09-02-F1-02

OFFICE

09-02-D1-02

OFFICE

09-02-H1-02

OFFICE

09-02-H1-01

OFFICE

09-02-H1-04

OFFICE

09-02-H1-03

OFFICE

09-02-D1-01

OFFICE

09-02-A1-02

OFFICE

09-02-A1-01

OFFICE

09-02-A1-04

OFFICE

09-02-A1-03

OFFICE

09-02-B1-02

OFFICE

09-02-B1-01

OFFICE

09-02-F1-01

PAT ED CONF

09-02-H3-03

CRASH CART

ALCOVE

09-02-F2-04

OFFICE

09-02-G2-03

OFFICE

09-02-E1-02

STAFF TLT

09-02-C4-04

CONSULT

09-02-D3-02

NURSE

STATION/MED

09-02-D4-04

HUB

09-02-B3-02

NURSE

STATION/MED

09-02-B4-02

EXAM

09-02-C3-01

EXAM

09-02-A4-03

HAS

09-02-D3-07

WEIGHT STN

09-02-A3-07

WEIGHT STN

09-02-E3-03

WEIGHT STN

09-02-A3-04

CORRIDOR

09-02-A3-06

CORRIDOR

09-02-B3-05

CORRIDOR

09-02-C3-04

CORRIDOR

09-02-D3-04

CORRIDOR

09-02-E3-04

CORRIDOR

09-02-F3-03

CORRIDOR

09-02-G3-05

CORRIDOR

09-02-G3-03

CORRIDOR

09-02-H3-05

CORRIDOR

09-02-D3-03

EXAM

09-02-D4-01

OFFICE

09-02-H3-08

EXAM

09-02-H3-07

EXAM

09-02-H3-06

EXAM

09-02-H2-05

EXAM

09-02-F4-01

PUBLIC TLT

09-02-E1-03

STAFF LOUNGE

09-02-E4-02

WAIT

09-02-F4-02

WAIT

09-02-F2-02

PROC TLT

09-02-E1-01

STAFF TLT

09-02-E2-06

EDUCATION

09-02-E3-07

EDUCATION

09-02-H2-02

OFFICE

09-02-D3-06

CORRIDOR

09-02-D1-07

CORRIDOR

09-02-A2-04

ALCOVE

09-02-F2-06

ALCOVE

09-02-F2-01

OFFICE

09-02-G3-04

PAT TLT

09-02-H3-01

STAFF TLT

09-02-F3-01

PAT TLT

09-02-E3-05

STAFF TLT

09-02-F3-05

CORRIDOR

09-02-E3-06

CORRIDOR

09-02-B3-01

PAT TLT

09-02-A3-05

PAT TLT

09-02-C3-09

CRASH CART

ALCOVE 09-02-C3-06

CORRIDOR

09-02-C3-05

PAT TLT

09-02-D3-01

PAT TLT

09-02-D4-05

HAS

09-02-F4-04

HAS

09-02-E4-01

PUBLIC TLT

09-02-C4-05

WAIT

09-02-D4-02

WAIT

09-02-B4-03

WAIT

09-02-C4-02

WAIT

09-02-G4-02

WAIT

09-02-H4-02

WAIT

09-02-E3-01

EXAM

09-02-E2-03

EXAM

09-02-E2-02

OFFICE

09-02-C2-04

EXAM

09-02-C2-03

OFFICE

09-02-D2-03

EXAM

09-02-D2-02

EXAM

09-02-B2-01

HAC

09-02-F1-04

CORRIDOR

09-02-D2-04

EXAM

09-02-D2-E1

ELEC

09-02-D2-H1

CHUTE

09-02-E3-T1

DATA /

TELECOMM

09-02-G2-E2

ELEC

09-02-H2-T2

DATA /

TELECOMM

09-02-SE6

ELEV

09-02-ST2

STAIR

UP

DN

ID111

ID111

ID111

I-112

I-112

I-112

M

IN

T

Y P

A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF

HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND

EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE

TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.

B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.

C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS

TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.

COORDINATE WITH COR.

E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,

AS NEEDED.

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2

-1

C h e c k -I n A

R C

H R c jo h n s to n Y

W

N

.r v t

/5

/2

:0

:0

P

M

ID104

DEMOLITION PLAN AT BUILDING E

(09) LEVEL 2

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 TW CJ

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING E (09) LEVEL 2

1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS AND

H

G

F

E

D

C

B

09-03-B3-07

VISUAL FIELD

09-03-B3-04

PHOTOGRAPHY

09-03-B4-03

LASER ROOM

09-03-A2-03

PROCEDURE

09-03-A1-01

OFFICE09-03-C1-01

OFFICE09-03-C1-04

WORK

09-03-C1-05

WORK

09-03-C1-03

OFFICE

09-03-C1-02

OFFICE

09-03-B1-05

OFFICE

09-03-A1-02

OFFICE

09-03-B1-06

OFFICE

09-03-B1-03

OFFICE

09-03-B1-04

OFFICE

09-03-B1-01

OFFICE

09-03-B1-02

OFFICE

09-03-B3-06

EXAM/TREATMENT

09-03-B3-05

EXAM/TREATMENT

09-03-B2-03

EXAM/TREATMENT09-03-B2-06

EXAM/TREATMENT

09-03-A3-06

EXAM/TREATMENT

09-03-A4-02

EXAM/TREATMENT

09-03-A2-02

EXAM/TREATMENT

09-03-A1-03

OFFICE

09-03-D4-01

ONSTAGE AREA

09-03-E1-03

STAFF LOUNGE

09-03-E3-05

WEIGHT STN

09-03-H2-03

NOURISH

09-03-F4-01

ONSTAGE AREA

09-03-B2-01

HAC

09-03-G2-01

HAC

09-03-H3-01

ONSTAGE AREA

09-03-A4-03

HAS

09-03-D1-01

OFFICE

09-03-F1-03

OFFICE

09-03-F1-02

OFFICE

09-03-D1-03

OFFICE

09-03-D1-02

OFFICE

09-03-G1-02

OFFICE

09-03-G1-01

OFFICE

09-03-H1-06

OFFICE

09-03-G1-05

OFFICE

09-03-H2-05

CHEMO PREP

09-03-G2-06

PREP

09-03-H2-02

REFERENCE

09-03-H1-01

OFFICE

09-03-H1-02

OFFICE

09-03-B3-03

ULTRASOUND RM

09-03-E2-01

SOILED UTIL

09-03-C2-01

EXAM

09-03-D4-03

EXAM

09-03-D3-06

EXAM

09-03-D3-05

EXAM

09-03-D3-04

EXAM

09-03-D2-04

EXAM

09-03-D2-03

EXAM

09-03-C4-01

EXAM

09-03-C3-03

EXAM

09-03-C3-02

EXAM

09-03-C3-01

EXAM

09-03-E2-03

EXAM

09-03-C4-02

WAIT

09-03-E4-02

WAIT

09-03-B4-04

WAIT

09-03-F4-05

WAIT

09-03-G4-02

WAIT

09-03-D3-02

NURSE

STATION/MED

09-03-D3-01

STAFF TLT

09-03-G1-04

OFFICE

09-03-E1-01

STAFF TLT

09-03-H4-01

FAMILY COUNSEL

09-03-C2-02

EXAM

09-03-D3-03

PRECEPTOR RM

09-03-F1-01

CONF

09-03-F2-03

EXAM

09-03-F3-08

WEIGHT STN

09-03-F3-02

EQUIP STOR

09-03-G2-02

SOILED UTIL

09-03-F2-02

CLEAN SUPPLY

09-03-E2-05

PROCEDURE

09-03-E2-04

PROC TLT

09-03-F2-04

PROCEDURE

09-03-G1-03

OFFICE

09-03-G4-01

EXAM

09-03-G3-03

EXAM

09-03-G3-02

EXAM

09-03-G4-03

HUB

09-03-F3-03

PRECEPTOR RM

09-03-E2-02

EXAM

09-03-F4-04

EXAM

09-03-F3-06

EXAM

09-03-F3-05

EXAM

09-03-F3-04

EXAM

09-03-F2-06

EXAM

09-03-F2-05

EXAM

09-03-G3-01

EXAM

09-03-G2-04

EXAM

09-03-G2-03

EXAM

09-03-B2-02

EXAM/TREATMENT

09-03-H1-05

OFFICE

09-03-D1-05

TECH

09-03-D1-04

TECH

09-03-B4-01

COHERENCE

TOMOGRAPHY

09-03-A3-05

PUBLIC TLT

09-03-B2-04

CLEAN SUPPLY

09-03-A3-04

EQUIP STOR

09-03-H1-04

OFFICE

09-03-H1-03

OFFICE

09-03-B3-02

MED EQUIP

ALCOVE

09-03-G3-05

CHEMO TLT

09-03-H2-01

STOR

09-03-B3-01

W.C. ALCOVE

09-03-G2-07

PREP

09-03-C2-03

WORKROOM

09-03-D2-02

ENDO CLEAN

ROOM 1

09-03-C2-04

PROCEDURE

09-03-D2-01

CYSTO

09-03-D4-04

WAIT

09-03-G2-08

PAT TLT

09-03-G3-06

TLT

09-03-G3-04

EXAM

09-03-E1-02

STAFF TLT

09-03-E3-01

EXAM

09-03-E3-02

EXAM

09-03-E3-03

EXAM

09-03-E4-01

CONSULT/PROCEDURE

09-03-C3-05

WEIGHT STN

09-03-A2-04

CORRIDOR

09-03-A3-07

CORRIDOR

09-03-B2-07

CORRIDOR

09-03-C3-07

CORRIDOR

09-03-D3-07

CORRIDOR

09-03-D3-08

WEIGHT STN

09-03-E2-06

CORRIDOR

09-03-E3-06

CORRIDOR

09-03-G3-07

WEIGHT STN

09-03-H2-06

CORRIDOR

09-03-C3-04

PAT TLT

09-03-D1-07

CORRIDOR

09-03-E3-04

PAT TLT

09-03-F3-01

PAT TLT

09-03-H2-04

NURSE

STATION/MED 09-03-F3-07

CORRIDOR

09-03-C4-03

HAS

09-03-E4-03

HAS

09-03-G4-04

HAS

09-03-F4-02

PUBLIC TLT 09-03-D4-02

PUBLIC TLT

09-03-G3-08

CORRIDOR

09-03-H3-03

CORRIDOR

09-03-C3-06

CORRIDOR

09-03-F1-04

CORRIDOR

09-03-G2-05

60 SF /89 SF

ANTEROOM

09-03-E4-04

WAIT

09-03-F4-03

WAIT

09-03-B2-05

EXAM/TREATMENT

09-03-F2-01

RENAL ALCOVE

09-03-H3-02C

INFUSION

CENTER

09-03-H3-02B

INFUSION

09-03-H3-02A

INFUSION

CENTER

09-03-H3-02D

INFUSION

09-03-C2-E1

ELEC

09-03-D2-H1

CHUTE

09-03-E2-T1

DATA /

TELECOMM

09-03-G2-E2

ELEC

09-03-H2-T2

DATA /

TELECOMM

09-03-SE6

ELEV

09-03-ST2

STAIR

DN

UP

ID111

ID111

ID111

ID111

I-112

I-112

I-112

I-111

M

IN

A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF

HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND

EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE

TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.

B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.

C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS

TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.

COORDINATE WITH COR.

E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,

AS NEEDED.

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2

-1

C h e c k -I n A

R C

H R c jo h n s to n Y

W

N

.r v t

/5

/2

:0

:0

P

M

ID105

DEMOLITION PLAN AT BUILDING E

(09) LEVEL 3

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 TW CJ

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING E (09) LEVEL 3

1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS AND

1.1

2.5

A

A.1

B

B.1

B.5

B.7

C

FEMALE PUBLIC

TLT

10-04-C4-04

CORRIDOR

D

OFFICE

COMPUTER RM

10-04-C5-05 10-04-C5-07

UPS SERVICE DESK

10-04-C5-08

CUSTOMER

PAT

RECORDS

10-04-C8-12

INTAKE/TRIAGE/TEST

10-04-C8-08

10-04-C8-13

COPY/FAX

10-04-C6-05

WAIT

10-04-C5-03

10-04-C5-02

HAC

10-04-C5-04

VEST

10-04-C6-02

ELEC

10-04-C6-04

ELEV 10-04-C7-03

NCOIC MHS

10-04-C7-05

RECEP

10-04-C8-03

CORRIDOR

10-04-C7-06

EYE LANE

10-04-C8-04

EYE LANE

INTAKE/TRIAGE/TEST

10-04-C8-02

CORRIDOR

10-04-C6-03

VEST 10-04-C7-01

CORRIDOR

EQUIP STOR

10-04-C8-07

10-04-B3-15

MAIL

10-04-B2-07

CORRIDOR

10-04-B3-11

CORRIDOR

10-04-B4-10

VEST

10-04-B4-09

CORRIDOR

MALE PUBLIC TLT

10-04-C5-01

10-04-C6-01

ELEV

10-04-C7-02

HAC

VISUAL/FUNDUS

CAMERA

10-04-C7-04

FITTING/DISPENSING

10-04-C8-01

PATIENT TLT

10-04-B8-10

10-04-B8-11

SAT LAB

10-04-C8-06

TELECOM

COMMUNICATIONS

10-04-C8-05

10-04-C9-01

SHAFT

10-04-B8-12

EXAM

10-04-B9-09

EXAM

10-04-B6-02

LOBBY

ISOLATION TLT

10-04-B7-05

10-04-B9-08

CORRIDOR

10-04-B4-03

10-04-B7-02

EXAM

10-04-B7-06

CORRIDOR

10-04-B7-03

EXAM

10-04-B8-07

EXAM

RECEP/OFFICE

10-04-B7-01

10-04-B8-01

OFFICE

10-04-B8-02

MED TECH

10-04-B8-04

OFFICE

10-04-B8-03

MED TECH

10-04-B8-08

EXAM

10-04-B8-09

EXAM

10-04-B8-13

CORRIDOR

10-04-B9-05

10-04-B8-05

OFFICE

10-04-B8-06

OFFICE

10-04-B9-01

E

10-04-B1-02

MDOS/CC1

10-04-B1-03

MDSS/CC1

10-04-B1-04

OFFICE

10-04-B1-05

SGN

10-04-C2-02

CORRIDOR

10-04-B2-08

COPY/FAX

ALCOVE

10-04-B3-12

STAFF TLT

10-04-B2-09

COPY/FAX

10-04-C3-01

TECH

10-04-C3-02

TECH

CLASSROOM

10-04-C2-01 10-04-C2-02

CORRIDOR 10-04-C3-03

COPY/FAX

10-04-C3-04

TELECOM

COMMUNICATIONS

10-04-C3-05

10-04-C3-06

FILE

10-04-C4-02

SHAFT

EQUIP STOR

10-04-C4-03

STAFF LOUNGE

10-04-C3-07

10-04-C4-05

OFFICE

10-04-C3-08

CORRIDOR

A

10-04-C4-06

OFFICE FACILITY MGMT

10-04-C4-08 10-04-C4-10

MEDIA

10-04-C5-06

WORK

10-04-C5-12

OFFICE

10-04-C5-11

10-04-C5-13

OFFICE

POS PHARMACY

10-04-C6-07

FACILITY MGMT

10-04-C4-07

INFO/NCOIC

10-04-C4-09

10-04-C7-08

OFFICE

10-04-C7-09

WAIT

10-04-C7-07

CORRIDOR

10-04-C8-10

RECEPT

10-04-C8-11

OUTREACH

NURSE

10-04-C4-01

EX STAIR 1

10-04-B3-13

STAFF TLT

10-04-B3-14

MAIL

RECORDS STOR

10-04-B4-11

TECH OFFICE

10-04-B5-08

10-04-B5-07

HALL

10-04-B5-09

RECORDS

WINDOW

TECH OFFICE

10-04-B5-12

TECH OFFICE

10-04-B5-11

TECH OFFICE

10-04-B5-13

10-04-B2-05

TECH

10-04-B2-06

TECH

10-04-B3-04

OFFICE

10-04-A2-04

CORRIDOR

10-04-B1-01

STAFF TLT

10-04-B2-01

SECR/WAIT

10-04-B2-02

TECH

10-04-B2-03

TECH

10-04-B2-04

TECH

10-04-B3-03

OFFICE

10-04-B3-06

OFFICE

10-04-B3-10

OFFICE

10-04-B3-09

OFFICE TECH OFFICE

TECH OFFICE

10-04-B4-02

10-04-B4-05

OFFICE

TECH OFFICE

10-04-B4-08

TECH OFFICE

10-04-B5-03

TECH OFFICE

10-04-B4-07

TECH OFFICE

10-04-B5-02

10-04-B5-05

TECH

10-04-B5-06

RECEPT

10-04-B3-01

OFFICE

10-04-B3-02

OFFICE

10-04-B3-05

AUDITOR

10-04-B3-07

GPM1

10-04-B3-08

OFFICE

10-04-B4-01

HCI/UM

10-04-B4-04

HCI/UM

10-04-B4-06

BCAC

10-04-B5-01

MEB

10-04-B5-04

MEB

10-04-B6-01

RECEPT

10-04-A4-04

CORRIDOR

10-04-B5-14

CORRIDOR

10-04-A4-01

OIC TOPA NCOIC TOPA

10-04-A4-02 10-04-A4-03

OFFICE

10-04-A5-01

OFFICE

10-04-A5-02

CONF

NCOIC/RMO/CSS/SUP1

10-04-A2-02

10-04-A1-01

MDG/CC1

10-04-B7-04

EXAM

10-04-A1-02

OFFICE

10-04-A2-01

OFFICE

10-04-A2-03

OIC RMO

10-04-A3-01

CODER

10-04-A3-02

OFFICE 10-04-A3-03

ARMY/NAVY

LIASON

10-04-A3-04

ARMY/NAVY

LIASON

ID111

I-114

TYP

3' - 8" MIN

A. DEMOLITION AND CONSTRUCTION WILL TAKE PLACE DURING HOSPITAL OFF

HOURS - 6PM TO 6AM. REMOVE ALL CONSTRUCTION MATERIALS AND

EQUIPMENT FROM AREA OF WORK, LEAVING AREA OF WORK ACCESSIBLE

TO THE PUBLIC AND STAFF FOR BUSINESS HOURS.

B. PHASING - DEMOLISH AND CONSTRUCT ONE DESK AT A TIME.

C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

D. WITHIN PROJECT AREA, UN-SHIELD DOOR ACTUATORS AND CARD READERS

TO BE ACCESSIBLE TO PUBLIC AND STAFF DURING BUSINESS HOURS.

COORDINATE WITH COR.

E. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE FOR LOCATION(S) OF WORK ,

AS NEEDED.

00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2

-1

C h e c k -I n A

R C

H R c jo h n s to n Y

W

N

.r v t

/5

/2

:0

:0

P

M

ID106

DEMOLITION PLAN AT BUILDING A

(10) LEVEL 4

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

02/15/2021 TW CJ

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

32'16'8'4'2'0'

N o rt h

1/8" = 1'-0"

DEMOLITION PLAN AT BUILDING A (10) LEVEL 4

1. TEMPORARY PARTITION, TYP, COORDINATE W/ ICRA REQUIREMENTS AND

08-03-C4-04

WORKSTATION 1

08-03-C4-03

WORKSTATION 2

10-04-B7-02

EXAM10-04-B5-05 10-04-B5-06

RECEPT

10-04-B6-01

RECEPT

A. REFER TO DEMOLITION PLANS FOR LOCATIONS.

B. REFER TO DEMOLITION PLANS FOR TEMPORARY CONSTRUCTION

PARTITIONS LOCATIONS.

C. REMOVE EXISTING WALL BASE AT TILE LOCATIONS TO BE REMOVED

3' - 0" 15' - 0" 3' - 0"

21' - 0"

VIF

22' - 6"

10' - 6"

V

IF

/2

2' - 0"

21' - 0"

3' - 0" 15' - 0" 3' - 0"

VIF

22' - 6"

24' - 0"

/2

V

IF

/2

VIF

24' - 8" 00KEYNOTES

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2

-1

C h e c k -I n A

R C

H R c jo h n s to n Y

W

N

.r v t

/5

/2

:0

:1

P

M

ID111

ENLARGED DEMOLITION FLOOR

PLANS

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

08,09,10

02/15/2021 TW CJ

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

16'8'4'2'1'0'

N o rt h

1/4" = 1'-0"

TYPICAL ENLARGED DEMOLITION FLOOR PLAN AT BLDG G & E

16'8'4'2'1'0'

N o rt h

1/4" = 1'-0"

ENLARGED DEMOLITION FLOOR PLAN AT BLDG G (08) LEVEL 3

16'8'4'2'1'0'

N o rt h

1/4" = 1'-0"

TYPICAL ENLARGED DEMOLITION FLOOR PLAN AT BLDG E

16'8'4'2'1'0'

N o rt h

1/4" = 1'-0"

ENLARGED DEMOLITION FLOOR PLAN AT BLDG A (10) LEVEL 4

1. REMOVE DESK (COUNTERTOP, CABINETS, AND ASSOCIATED MILLWORK)

2. REMOVE CARD READER, STORE FOR REUSE

3. REMOVE SIGNAGE, STORE FOR REUSE

4. VA TO SALVAGE FURNITURE, FIXTURES, AND EQUIPMENT NOT

IDENTIFIED TO BE REMOVED

5. REMOVE FLOORING TILE AROUND AND UNDER DESK UP TO CHANGE IN

FLOORING TYPE

6. REMOVE FLOORING AROUND AND UNDER DESK, STOP AT NEAREST

JOINT, TYP

7. EXISTING FURRED WALL TO REMAIN

I-111I-111

I-111

2 3

I-111

I-111 I-1117 6

/2 " A

LI

G N

A

LI

G N

7" 4' - 6 1/4" 7" 4' - 6 1/4" 7" 4' - 6 1/4" 7" 4' - 6 1/4" 7"

WALL BELOW

(SHOWN DASHED)

I-500

T Y

P

/4

SS-1

1/2" R, TYP

SS-1

GROMMET , TYP

I-500

ALIGN FINISH FACE OF SS TO EXISTING FURRED WALL

21' - 0" VIF

/4

/4

I-500

I-112

TYP

4"

T Y

P

/2

T Y

P

/2

/4

/4

TURN SS DOWN

FACE, TYP

/4

POST

POST , W/ BASE PLATE,

TYP

POST , WALL MOUNT

POST

POST

WB2WB2 WB2

WB2

WB2

WB2

FT1 FT1

ACOUSTIC PANEL

WB2 WB2

ALIGN, TYP

Level 1 (08)

I-500

20' - 5"

I-500

I-500

RP-1

SS-1

HPL-1

WB1

I-112

5' - 1 1/4" 5' - 1 1/4" 5' - 1 1/4" 5' - 1 1/4"

TYP

EQ

TYP

3/4"

TYP

EQ

TYP

3/4"TYP

EQ

TYP

3/4"

TYP

EQ

TYP

3/4"

I-500

SIGNAGE, VC

Level 1 (08)

HPL-1

HPL-4

2' - 9 1/2" 1' - 3"

RP-1

WB1

/4

DOOR AND THE STOP

32" MIN, CLR

BETWEEN FACE OF

HPL-3

SS-1

TM DP

HALF WALL PARTITION

4' - 0 1/2"

Level 1 (08)

1' - 3" 2' - 9 1/2" 3' - 1 1/2"

7' - 2"

SIGNAGE, VC

SS-1

HPL-4

HPL-1

RP-1

WB1

HALF WALL PARTITION

DP

TM

TM

MOUNTING

PLATES W/

Z-STRIPS

Level 1 (08)

SS-1

RP-1

HPL-1

WB1

HPL-3

4' - 0 1/2"

1' - 3" 2' - 9 1/2"

HPL-4

SS-1

WB2

FILLER

I-500

OPH

TURN SS DOWN

FACE, TYP

TMDP

HALF WALL PARTITION

ACOUSTIC

PANEL

POST

Level 1 (08)

HPL-2

RECESSED METAL

BRACKET, TYP

REMOVABLE

PANELS

I-500

SPEAK THRU, TYP

4' - 0" 4' - 8"

I-500

I-500SIGNAGE, VC

I-112

HPL-4

SS-1

TURN SS DOWN

FACE, TYP

5' - 1 1/4" 5' - 1 1/4" 5' - 1 1/4" 5' - 1 1/4"

20' - 5"

HALF WALL PARTITION

TM TM TM TM

TYP

EQ

TYP

EQ

TYP

EQ

TYP

EQ

EQ

32" MAX

(6) EQUAL SPACINGS EQ

EQEQEQEQ

RECEPTACLE, TYP,

RE: ELECT

RECEPTACLE, TYP,

RE: ELECT

E Q

E Q

TP

TP

WB TRANSITION

AT CENTER OF

END OF WALL

POST

Level 1 (08)

RP-1

HPL-4

WB2 WB1

SS-1

HPL-1

TMTM DP

3' - 1 1/2" 2' - 9 1/2" 1' - 3"

7' - 2"

HPL-4 @ HORIZ AND VERT

REVEALS6

ACOUSTIC PANEL

I-500

TURN SS DOWN

FACE, TYP

POST

A. HALF WALL PARTITION - POSTS AND ACCESSORIES, CLEAR (SATIN)

ANODIZE FINISH.

B. CONCEAL ALL HIGH PRESSURE LAMINATE FASTENERS

C. PROVIDE SLOT COVERS AND TOP CAP FOR ALL POSTS

FINISHES, AND CASEWORK

ACCESSORIES LEGEND

BASIS OF DESIGN OR APPROVED EQUAL

MOCKETT, BG3 - 1-1/2" FLIP-TOP GROMMET SET, INCLUDES

CAP & LINER, PUTTY (93)

RAKKS, EH-INSIDE WALL MOUNT COUNTER SUPPORT

BRACKET, FLUSH MOUNTED, MILL ALUMINUM

EAGLE MOULDING, ALUM Z CLIP 1-1/4" TALL X 3/8" LIFT OFF X

1/4" STANDOFF (MAX), EAM-375-S-2

GROMMET

BRACKET

Z-CLIP

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2

-1

C h e c k -I n A

R C

H R c jo h n s to n Y

W

N

.r v t

/8

/2

:4

:3

P M

I-111

ENLARGED PLANS AND

ELEVATIONS

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

08,09

02/15/2021 TW CJ

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

8'4'2'1'6"0'

N o rt h

1/2" = 1'-0"

TYP DESK FLOOR PLAN AT BLDG G & E

11/2" = 1'-0"

TYP CHECK-IN DESK - SOUTH (PATIENT SIDE)

1/2" = 1'-0"

TYP CHECK-IN DESK - WEST

21/2" = 1'-0"

TYP CHECK-IN DESK - EAST

31/2" = 1'-0"

TYP CHECK-IN DESK - EAST INSIDE

1/2" = 1'-0"

TYP CHECK-IN DESK - NORTH INSIDE (EMPLOYEE SIDE)

1/2" = 1'-0"

TYP CHECK-IN DESK - WEST INSIDE

ACOUSTIC

PANEL

AUDIMUTE, BLEACH-CLEANABLE FABRIC ACOUSTIC PANELS,

1'x1'x1"THK,MIN, BISQUE

DP ETCHED FINISH - TEMPERED GLAZING - FLAT POLISHED ALL

EXPOSED EDGES

FT1 LVT - AMTICO KURA JUNIPER - STONE, BURLAP WW111, 18"X18"

(457.2 X 457.2MM) (2.5MM THK)

HPL-1 REMOVABLE PANEL - PANOLAM, NEVAMAR, WZ0005N RECON OAK

(MG), GRAIN IN VERTICAL DIRECTION. FINISH EXPOSED EDGES,

EDGEBANDING, SEAMLESS BEVELED PROFILE, (PANOLAM,

NEVAMAR, GUNMETAL, S6020)

HPL-2 FORMICA, 463-58 SAIL WHITE

HPL-3 SC GATE - FINISH ALL EXPOSED SURFACES, NEVAMAR, WZ0005

RECON OAK (MG), (2) DOUBLE ACTING SPRINGS HINGES, GRAIN

IN THE VERTICAL DIRECTION

HPL-4 PANOLAM, NEVAMAR, WZ0005N RECON OAK (MG), GRAIN IN

VERTICAL DIRECTION. FINISH EDGES, SEAMLESS BEVELED

PROFILE

RP-1 REMOVABLE PANEL - 3FORM, WHISPER, VARIA, 3/8”, SANDSTONE,

WHITE BACKING, VERTICAL PATTERN DIRECTION, VINYL CORNER

TRIM AROUND ALL EDGES, 3/4", MATCH REVEAL COLOR

RP-2 REMOVABLE PANEL - 3FORM, FOSSIL LEAF SPADE RANDOM,

VARIA ECORESIN 3/8”, PATINA F02, WHITE BACKING, VERTICAL

PATTERN DIRECTION, VINYL CORNER TRIM AROUND ALL EDGES,

3/4", MATCH REVEAL COLOR

SS-1 CORIAN COTTAGE LANE, EASED ALL EDGES, 1/8"R HORIZ EDGES,

1/2"R VERT EDGES

TM TEMPERED GLAZING - FLAT POLISHED ALL EXPOSED EDGES

TP REMOVABLE WRAPPED TACKABLE PANEL - KNOLL, GLISTEN,

#WC10716, 8"x18"x3/4"THK, CITRINE, MATCH EXISTING

WB1 JOHNSONITE/TARKETT, TOELESS, 2 1/2", CHARCOAL 20

WB2 MATCH EXISTING - JOHNSONITE/TARKETT, 4” COVE, BEIGE 49

I-112 3 I-1122

NOTE: REFER TO

FOR ADDITIONAL INFORMATION

/1 I-111

7"

EQ EQ

POST , WALL MOUNT

POST

WALL BELOW

(SHOWN DASHED)

NO WB BETWEEN

FURRED WALLS

WB2 WB2 WB2

WB2

SS-1

HPL-4

WB1

RP-1

HPL-1

TM TM DP

HPL-4

WB1

SS-1

RP-1

HPL-1

SS-1

1' - 3" 2' - 9 1/2" 3' - 1 1/2"

7' - 2"

I-500

DP TM TM

HALF WALL PARTITION

ACOUSTIC

PANEL

TURN SS DOWN

FACE, TYP

POST

FINISHES, AND CASEWORK

ACCESSORIES LEGEND

BASIS OF DESIGN OR APPROVED EQUAL

MOCKETT, BG3 - 1-1/2" FLIP-TOP GROMMET SET, INCLUDES

CAP & LINER, PUTTY (93)

RAKKS, EH-INSIDE WALL MOUNT COUNTER SUPPORT

BRACKET, FLUSH MOUNTED, MILL ALUMINUM

EAGLE MOULDING, ALUM Z CLIP 1-1/4" TALL X 3/8" LIFT OFF X

1/4" STANDOFF (MAX), EAM-375-S-2

GROMMET

BRACKET

Z-CLIP

Level 1 (08)

2' - 10"

SS-1

RP-1

HPL-4

HPL-1

WB1

I-500

1' - 7" 1' - 3"

TM DP

HALF WALL PARTITION

ACOUSTIC

PANEL

A. HALF WALL PARTITION - POSTS AND ACCESSORIES, CLEAR (SATIN)

ANODIZE FINISH.

B. CONCEAL ALL HIGH PRESSURE LAMINATE FASTENERS

C. PROVIDE SLOT COVERS AND TOP CAP FOR ALL POSTS

32'16'8'4'2'0'

N o rt h

1/2" = 1'-0"

TYP DESK FLOOR PLAN AT BLDG E

1/2" = 1'-0"

TYP CHECK-IN DESK - WEST

3 1/2" = 1'-0"

TYP CHECK-IN DESK - WEST INSIDE

KEY PLAN

GENERAL NOTES

North

11 12 08 (G)

(E)

(A)

030405

Key Plan

E C

O L F

A X

A V

E

N WHEELING ST

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C R e v it

\5

-2

-1

C h e c k -I n A

R C

H R c jo h n s to n Y

W

N

.r v t

/5

/2

:0

:0

P

M

I-112

ENLARGED PLANS AND

ELEVATIONS

INSTALL PARTITIONS AT CHECK-IN

DESKS

1700 N WHEELING ST, AURORA, CO 80045

554-20-103

08,09

02/15/2021 TW CJ

100% CONSTRUCTION

DOCUMENTS

VEG 20.17

ACOUSTIC

PANEL

AUDIMUTE, BLEACH-CLEANABLE FABRIC ACOUSTIC PANELS,

1'x1'x1"THK,MIN, BISQUE

DP ETCHED FINISH - TEMPERED GLAZING - FLAT POLISHED ALL

EXPOSED EDGES

FT1 LVT - AMTICO KURA JUNIPER - STONE, BURLAP WW111, 18"X18"

(457.2 X 457.2MM) (2.5MM THK)

HPL-1 REMOVABLE PANEL - PANOLAM, NEVAMAR, WZ0005N RECON OAK

(MG), GRAIN IN VERTICAL DIRECTION. FINISH EXPOSED EDGES,

EDGEBANDING, SEAMLESS BEVELED PROFILE, (PANOLAM,

NEVAMAR, GUNMETAL, S6020)

HPL-2 FORMICA, 463-58 SAIL WHITE

HPL-3 SC GATE - FINISH ALL EXPOSED SURFACES, NEVAMAR, WZ0005

RECON OAK (MG), (2) DOUBLE ACTING SPRINGS HINGES, GRAIN

IN THE VERTICAL DIRECTION

HPL-4 PANOLAM, NEVAMAR, WZ0005N RECON OAK (MG), GRAIN IN

VERTICAL DIRECTION. FINISH EDGES, SEAMLESS BEVELED

PROFILE

RP-1 REMOVABLE PANEL - 3FORM, WHISPER, VARIA, 3/8”, SANDSTONE,

WHITE BACKING, VERTICAL PATTERN DIRECTION, VINYL CORNER

TRIM AROUND ALL EDGES, 3/4", MATCH REVEAL COLOR

RP-2 REMOVABLE PANEL - 3FORM, FOSSIL LEAF SPADE RANDOM,

VARIA ECORESIN 3/8”, PATINA F02, WHITE BACKING, VERTICAL

PATTERN DIRECTION, VINYL CORNER TRIM AROUND ALL EDGES,

3/4", MATCH REVEAL COLOR

SS-1 CORIAN COTTAGE LANE, EASED ALL EDGES, 1/8"R HORIZ EDGES,

1/2"R VERT EDGES

TM TEMPERED GLAZING - FLAT POLISHED ALL EXPOSED EDGES

TP REMOVABLE WRAPPED TACKABLE PANEL - KNOLL, GLISTEN,

#WC10716, 8"x18"x3/4"THK, CITRINE, MATCH EXISTING

WB1 JOHNSONITE/TARKETT, TOELESS, 2 1/2", CHARCOAL 20

WB2 MATCH EXISTING -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .