S02 Drawings Ft. Sam Houston - Additional Road Repairs_F.pdf
PDF 6 MB Posted
- Solicitation number
- 36C10F26B0001
About this file
This is a set of bid documents for a federal construction project at Fort Sam Houston National Cemetery in San Antonio, Texas. The project, identified as VA Project No. 846CM2045, involves Phase 3 Expansion & Improvements with a focus on additional road repairs at the cemetery located at 1520 Harry Wurzbach Road, San Antonio, TX 78209. The bid documents were issued on August 1, 2025, and consist of 17 detailed engineering drawings prepared by Anderson Engineering of Minnesota, LLC.
The project encompasses two bid components: a Base Bid and Bid Option 1. The Base Bid includes full-depth road repairs and reconstruction of three primary roadways: Austin Loop (Stations 0+00 to 9+75), Austin Circle (Stations 0+00 to 4+69), and Medina Loop (Stations 0+00 to 6+60). Bid Option 1 covers additional repairs to San Antonio Boulevard (Stations -0+10 to 4+80). Work includes demolition of existing asphalt pavement and concrete curb & gutter, installation of new asphalt pavement with concrete curb & gutter, and reinstatement of drainage systems. The project requires compliance with a Texas Pollutant Discharge Elimination System (TPDES) Construction General Permit due to the 1.14-acre total disturbed area. Contractors must implement comprehensive erosion and sediment control measures, including silt fencing, biorolls, catch basin inlet protection, and stabilized construction entrances. Environmental commitments include tree protection provisions, migratory bird nesting season considerations, and coordination with the Texas Historical Commission for archaeological monitoring. Supporting documents include survey enlargements, demolition plans, plan and profile sheets with vertical design data, Stormwater Pollution Prevention Plan (SWPPP) narratives, site detail specifications for pavement sections and curb configurations, and an Environmental Permits, Issues, and Commitments (EPIC) matrix addressing cultural resources, vegetation, threatened and endangered species, and hazardous materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_g i_ co ve r_ cp s.
dw g ed it:
jd ob ia s sa ve d:
8/
/2
:5
AM
p ub lis he d:
et ha n rin pr in te d:
4/
/2
2:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
DEPARTMENT OF VETERANS AFFAIRS
FORT SAM HOUSTON NATIONAL CEMETERY
PHASE 3 EXPANSION & IMPROVEMENTS: VA PROJECT NO. 846CM2045
PROJECT: ADDITIONAL ROAD REPAIRS
CONSULTANTS
ANDERSON ENGINEERING OF MN, LLC
CIVIL ENGINEERING, LAND SURVEY
13605 1ST AVENUE NORTH, SUITE 100
PLYMOUTH, MN 55441
CONTACT: ERIC SAUTBINE, PROJECT MANAGER
PHONE: (763) 412-4000
SITE DATA
FORT SAM HOUSTON NATIONAL CEMETERY
STREET ADDRESS: 1520 HARRY WURZBACH RD,
SAN ANTONIO, TX 78209
COUNTY: BEXAR
PHASE 3
LOCATION MAP: N.T.S.
N
GI100
COVER SHEET
WINANS ROAD
HA
RR
Y W
UR
ZB
AC
H
RD
NURSERY RD
SHEET INDEX
PROJECT AREAS:
1"=150'
N
SCALE:
SHEET # TITLE PAGE #
GENERAL
GI100 COVER SHEET 1
GC100 EXISTING ROADS - SITE MAP 2
BASE BID
VF101 SURVEY ENLARGEMENT 1 - WEST CEMETARY 3
VF102 SURVEY ENLARGEMENT 2 - WEST CEMETARY 4
VF103 SURVEY ENLARGEMENT 3 - WEST CEMETARY 5
CD101 DEMOLITION PLAN - AUSTIN LOOP 6
CD102 DEMOLITION PLAN - AUSTIN CIRCLE 7
CD103 DEMOLITION PLAN - MEDINA LOOP 8
CP101 PLAN & PROFILE - AUSTIN LOOP (STA. 0+00-9+75) 9
CP102 PLAN & PROFILE - AUSTIN CIRCLE (STA. 0+00-4+69) 10
CP103 PLAN & PROFILE - MEDINA LOOP (STA. 0+00-6+60) 11
CE101 SWPPP NARRATIVE - 1 12
CE102 SWPPP NARRATIVE - 2 13
CE103 EPIC - ENVIRONMENTAL PERMITS, ISSUES, AND
COMMITMENTS 14
CS501 SITE DETAILS 15
BID OPTION 1
CD101 DEMOLITION PLAN - SAN ANTONIO BLVD 16
CG101 PLAN & PROFILE - SAN ANTONIO BLVD (STA. -0+10-4+80) 17
SAN ANTONIO BLVD
AUSTIN CIRCLE
& MEDINA LOOP
1"=50'
N
SCALE:
Xref ..\..\..\_05 Arch\_01 CAD files\_02 xRefs\Building Out Line.dwg
BURIAL
SECTION 2S
BURIAL
SECTION AA
BURIAL
SECTION AB
BURIAL
SECTION PB
BURIAL
SECTION AC
BURIAL
SECTION PA
BURIAL
SECTION PC
BURIAL
SECTION AD
BURIAL
SECTION AG
BURIAL
SECTION AH
BURIAL
SECTION AH
BURIAL
SECTION AJ
BURIAL
SECTION AJ
BURIAL
SECTION 22
BURIAL
SECTION 21
BURIAL
SECTION 1
BURIAL
SECTION 2
BURIAL
SECTION 3
BURIAL
SECTION 4
BURIAL
SECTION 18
BURIAL
SECTION 20
BURIAL
SECTION 19
BURIAL
SECTION 6
BURIAL
SECTION 5
BURIAL
SECTION 7
BURIAL
SECTION V
BURIAL
SECTION W
BURIAL
SECTION 2A
BURIAL
SECTION Z
BURIAL
SECTION X
BURIAL
SECTION 2B
BURIAL
SECTION 2C
BURIAL
SECTION Y
BURIAL
SECTION MA
BURIAL
SECTION C
BURIAL
SECTION B
BURIAL
SECTION A BURIAL
SECTION D
BURIAL
SECTION G
BURIAL
SECTION J
BURIAL
SECTION P
BURIAL
SECTION F
BURIAL
SECTION E
BURIAL
SECTION ZA
BURIAL
SECTION 2D
BURIAL
SECTION PF
BURIAL
SECTION PE
BURIAL
SECTION PD
BURIAL
SECTION PI
BURIAL
SECTION PH
BURIAL
SECTION PG
BURIAL
SECTION I
BURIAL
SECTION H
BURIAL
SECTION O
BURIAL
SECTION N
BURIAL
SECTION K
BURIAL
SECTION L
BURIAL
SECTION M
BURIAL
SECTION Q
BURIAL
SECTION R
BURIAL
SECTION S
BURIAL
SECTION T
BURIAL
SECTION U
BURIAL
SECTION 8
BURIAL
SECTION 8A
BURIAL
SECTION 13
BURIAL
SECTION AI
BURIAL
SECTION 1
BURIAL
SECTION 21
BURIAL
SECTION MA2
HA
RR
Y W
UR
ZB
AC
H
RD
WINANS RD
NURSERY RD
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
NEW CONCRETE C&G
NEW ASPHALT
PAVEMENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_c s_ ro ad re pa ir_ cp s.
dw jd ob ia d:
7/
/2
:3 ub lis he d:
et ha n rin te d:
4/
/2
2:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date
KEY MAP N.T.S.
Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
GC100
EXISTING ROADS - SITE MAP
N 0 100' 200'
SCALE:1
EXISTING ROADS - SITE MAP
1" = 100'
SA
M
HOUSTON CIRCLE
SAN ANTIONO BLVD
M
AC
O D
O N
IA
S
T
SA
N
M
AR
C O
S T
N
EW
B R
AU
N
FE
LS
S T
SA
M
H O
U
ST
O N
C
IR
C
LE
AUSTIN LOOP
AU
ST
IN
C
IR
C
LE
MEDINA LOOP
ALAMO LOOP
MEDINA LOOP
SAM HOUSTON CIRCLE
NOTES
1. SAWCUT ALL EXTENTS PERPENDICULAR TO
ROAD.
2. REMOVE ALL CURB & GUTTER WITHIN
PAVEMENT REMOVAL AREA.
3. REINSTALL PAVEMENT SECTION PER DETAILS
ON SHEET CS501.
4. REINSTALL CURB & GUTTER PER DETAILS ON
SHEET CS501.
CP-101
1CP-102
CP103
KEY NOTES:
1 WHERE FULL-DEPTH REPLACEMENT
CONNECTS TO ADJACENT PAVEMENT MILL AND
OVERLAY 2' OF ADJACENT PAVEMENT AT A
DEPTH OF 2" TO COMPLETE TIE IN
CG101
1 1
BASE BID
BID OPTION 1
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_v -1
_c ps .d w jd ob ia d:
7/
/2
3:
P M ub lis he d:
et ha n rin te d:
4/
/2
2:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date
KEY MAP N.T.S.
Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
VF101
JLNH
SURVEY ENLARGEMENT 1 - WEST
CEMETARY
M
AT
C H
L
IN
E V
F1
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_v -1
_c ps .d w er in d:
6/
/2
:5 ub lis he d:
et ha n rin te d:
4/
/2
2:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date
KEY MAP N.T.S.
Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
VF102
JLNH
SURVEY ENLARGEMENT 2 - WEST
CEMETARY
MATCH LINE VF103
M
AT
C H
L
IN
E V
F1
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_v -1
_c ps .d w jd ob ia d:
6/
/2
:5 ub lis he d:
et ha n rin te d:
4/
/2
2:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date
KEY MAP N.T.S.
Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
VF103
JLNH
SURVEY ENLARGEMENT 3 - WEST
CEMETARY
MATCH LINE VF102
SECTION AH
BURIAL
SECTION B
BURIAL
SECTION A BURIAL
SECTION D
BURIAL
SECTION E
BURIAL
SECTION AI
N=13721065.26 E=2148590.23
N=13720873.46 E=2148603.18
N=13720815.80 E=2148984.25
N=13720817.55 E=2149332.76
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_d em o_
2_ cp s
.d w er in d:
4/
/2
:0 ub lis he d:
et ha n rin te d:
4/
/2
2:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date
KEY MAP N.T.S.
Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
CD101
DEMOLITION PLAN - AUSTIN LOOP
PROTECT TREE (TYP.)
(4/CS-501)
SEE SHEET CP103
(SEE SHEET CP-102)
1 DEMOLITION PLAN - AUSTIN LOOP
SCALE: 1" = 30'
N
0 30' 60'
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLET
REMOVE EXISTING ASPHALT
PAVEMENT
REMOVE EXISTING CONCRETE
C&G
PROTECT EXISTING TREE.
PROTECT EXISTING CATCH BASIN INLET
NA
REMOVE & REPLACE EXISTING CURB & GUTTER
KEY NOTES
N=13720873.46 E=2148603.18
CD102
DEMOLITION PLAN - AUSTIN CIRCLE
SEE SHEET CP-101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_d em o_
2_ cp s
.d w er in d:
4/
/2
:0 ub lis he d:
et ha n rin te d:
4/
/2
2:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date
KEY MAP N.T.S.
Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
1 DEMOLITION PLAN - AUSTIN CIRCLE
SCALE: 1" = 30'
N
0 30' 60'
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLET
REMOVE EXISTING ASPHALT
PAVEMENT
REMOVE EXISTING CONCRETE
C&G
PROTECT EXISTING TREE.
PROTECT EXISTING CATCH BASIN INLET
REMOVE & REPLACE EXISTING CURB AND GUTTER
KEY NOTES
SECTION AJ
BURIAL
SECTION 2
BURIAL
SECTION A
N=13720815.80 E=2148984.25
N=13720937.20 E=2148983.34
N=13720489.28 E=2149305.33
CD103
DEMOLITION PLAN - MEDINA LOOP
SEE SHEET CD10
SEE SHEET CD10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_d em o_ m ed in a lo op _c ps .d w er in d:
4/
/2
:0 ub lis he d:
et ha n rin te d:
4/
/2
2:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date
KEY MAP N.T.S.
Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
N
0 30' 60'
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING FENCE
EXISTING GAS MAIN
EXISTING OVERHEAD WIRES
EXISTING TELEPHONE
EXISTING UNDERGROUND
ELECTRIC
EXISTING HYDRANT AND GV
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLET
REMOVE EXISTING ASPHALT
PAVEMENT
REMOVE EXISTING CONCRETE
C&G
PROTECT EXISTING TREE.
PROTECT EXISTING CATCH BASIN INLET
NA
REMOVE & REPLACE EXISTING CURB & GUTTER
KEY NOTES
1 DEMOLITION PLAN - MEDINA LOOP
SCALE: 1" = 30'
4+
5+
6+
0+00
1+00
2+00 3+00 4+00 5+00
0+
1+
0+
1+
2+
3+00 4+00 5+00 6+00 7+00 8+00 9+00 9+75
0+00
0+00
1+00
2+
0+
1+
1+
BURIAL
SECTION AH
BURIAL
SECTION B
BURIAL
SECTION A BURIAL
SECTION D
BURIAL
SECTION E
BURIAL
SECTION AI
N=13721065.26 E=2148590.23
N=13720873.46 E=2148603.18
N=13720815.80 E=2148984.25
N=13720817.55 E=2149332.76
1.
0+00
0.
0.
9.
8.
1+00
8.
7.
7.
7.
2+00
7.
7.
9.
9.
3+00
0.
1.
2.
2.
4+00
4.
4.
5.
6.
5+00
7.
7.
7.
7.
6+00
7.
7.
6.
6.
7+00
5.
5.
4.
4.
8+00
3.
3.
1.
1.
9+00
9.
9.
9.
9+75
-2.09%
3.38%
1.67% -1.86%
-4.00%
-2.47%
PV
IS
: 0 +3
0.
PV
IE
: 7
.5
PV
IS
: 9 +7
4.
PV
IE
: 7
.1
PVI STA = 5+20.00
PVI ELEV = 716.50
A.D. = -1.71% K = 35.05
60.00' VC
BV
C
S:
+9 0.
BV
C E:
.4
EV
C
S:
+5 0.
EV
C E:
.0
PVI STA = 6+10.00
PVI ELEV = 718.00
A.D. = -3.53% K = 17.01
60.00' VC
BV
C
S:
+8 0.
BV
C E:
.5
EV
C
S:
+4 0.
EV
C E:
.4
HIGH PT. STA = 6+08.35
HIGH PT ELEV = 717.74
PVI STA = 8+25.00
PVI ELEV = 714.00
A.D. = -2.14% K = 28.04
60.00' VC
BV
C
S:
+9 5.
BV
C E:
.5
EV
C
S:
+5 5.
EV
C E:
.8
PVI STA = 2+24.00
PVI ELEV = 706.50
A.D. = 5.47% K = 10.98
60.00' VC
BV
C
S:
+9 4.
BV
C E:
.1
EV
C
S:
+5 4.
EV
C E:
.5
LOW PT. STA = 2+16.92
LOW PT ELEV = 706.89
PVI STA = 9+00.00
PVI ELEV = 711.00
A.D. = 1.53% K = 39.34
60.00' VC
BV
C
S:
+7 0.
BV
C E:
.2
EV
C
S:
+3 0.
EV
C E:
.2
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
NEW CONCRETE CURB & GUTTER
NEW ASPHALT PAVEMENT
LEGEND
CP101
PLAN & PROFILE - AUSTIN LOOP
(STA. 0+00-9+75)
MATCH-IN LINE
(STA. 0+30)
NEW CONC.
CURB & GUTTER
CENTERLINE
EX. CENTERLINE
PROFILE
C L-
C L
ST
A.
+2
17' (B-B, TYP.)
VERIFY
C L-
C L
ST
A.
+2
PROTECT TREE (TYP.)
(4/CE-502)
M
AT
C H
-IN
C B
ST
A.
+3
NEW
CENTERLINE
PROFILE
SEE SHEET CP103
(SEE SHEET CP-102)
2 PLAN VIEW AUSTIN LOOP STA. 0+00 - 9+75
SCALE: HORIZONTAL 1" = 30' VERTICAL 1" = 5'
1 PLAN VIEW AUSTIN LOOP STA. 0+00 - 9+75
SCALE: 1" = 30'
N
0 30' 60'
1. ROAD AREAS TO BE REMOVED ARE INTENDED TO BE
REPLACED TO THE EXISTING VERTICAL DESIGN. VERTICAL
DESIGN DATA HAS BEEN ADDED FOR CONSTRUCTION
PURPOSES TO SHOW THE INTENT OF PROPER DRAINAGE. THE
CONTRACTOR SHALL USE THE PROPOSED CENTER LINES AND
MAY ADJUST AS NECESSARY TO IMPROVE DRAINAGE. VERIFY
EXISTING CATCH BASIN INLET TIE-INS MATCH THE PROPOSED
PROFILES. THE CONTRACTOR SHALL NOTIFY THE S.R.E. OF
ANY VARIATION FROM EXISTING THAT MAY ADVERSELY
AFFECT DRAINAGE OR IMPACT ADJACENT AREAS. THE S.R.E.
AND ENGINEER WILL REVIEW AND MAKE FIELD ADJUSTMENTS
IN THOSE AREAS AS NEEDED PRIOR TO CONSTRUCTION OF
NEW PAVEMENTS. DISTURBANCE OF GRAVE SITES ARE
PROHIBITED.
2. TAPER NEW ROAD EDGE OVER 10' MIN DISTANCE TO MATCH
EXISTING ROAD.
3. CONFIRM LOCATION OF EXIST. UTILITIES PRIOR TO
CONSTRUCTION OR CONNECTION.
4. SOME MATCH-IN LOCATIONS AND PROJECT LIMITS SHOWN,
ARE UNVERIFIED. ACTUAL PROJECT LIMITS MUST BE VERIFIED
BY CONTRACTOR. NOTIFY RE IMMEDIATELY IN THE EVENT OF
DISCREPANCY.
5. NEW ROADWAY WIDTHS & CURB RADII, SHALL MATCH
EXISTING CONDITIONS.
6. ALL PAVEMENT MARKINGS SHALL MATCH EXISTING
CEMETERY OPERATIONS.
7. ALL DAMAGED TURF ALONG THE BACK OF CURB SHALL BE
REPLACED BY THE CONTRACTOR WITH SOD. CONTRACTOR
TO WATER SOD UNTIL ACCEPTABLE ESTABLISHMENT.
1. ALL NEW ROADWAY TO BE INSTALLED WITH CONCRETE CURB
& GUTTER UNLESS OTHERWISE NOTED. REMOVE & REPLACE
IN-KIND CONCRETE SPILL WAY INTO CATCH BASINS AS
NECESSARY.
2. BENCHMARK, SEE TOPOGRAPHIC SURVEY.
3. FULL-DEPTH PAVEMENT & CURB REMOVAL SHALL OCCUR IN
ALL AREAS SHOWN AS RECEIVING NEW PAVEMENT.
4. REMOVE ANY TREE ROOTS TO 2' BEYOND BACK OF CURB.
MATCH EXISTING GRADE AT EXISTING CATCH BASIN INLET.
MATCH-IN LINE IS SHOWN IN APPROXIMATE LOCATION. ACTUAL
LOCATION MAY VARY UPON FIELD VERIFICATION AND OWNER
COORDINATION.
NA
INSTALL & MAINTAIN SILT FENCE PERIMETER SEDIMENT
PROTECTION IN GRASSED AREAS. USE BIO-ROLLS IN PAVED
AREAS.
INSTALL & MAINTAIN INLET SEDIMENT PROTECTION.
INSPECT STREET FOR SEDIMENT TRACKING DAILY
GENERAL NOTES
CONTRACTOR NOTES
KEY NOTES
EXISTING PROPOSED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_c p_
2_ cp s.
dw er in d:
4/
/2
:0 ub lis he d:
et ha n rin te d:
4/
/2
2:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date
KEY MAP N.T.S.
Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
BIOROLL
SILT FENCE
INLET SEDIMENT PROTECTION
EROSION CONTROL NOTES
1. THE TOTAL DISTURBED AREA IS EQUAL TO 1.14 ACRES. A
TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM (TPDES)
TXR150000: STORM WATER DISCHARGE PERMIT OR
CONSTRUCTION GENERAL PERMIT (CGP) IS REQUIRED SINCE
THE PROJECT HAS MORE THAN ONE ACRE OF DISTURBED
SOIL. GENERAL EROSION & SEDIMENT CONTROL PRACTICES
MUST BE IMPLEMENTED TO CONTAIN ANY DISTURBED SOILS.
2. THE LOCATION OF EROSION CONTROL DEVICES SHALL BE AS
SHOWN ON THESE PLANS. ADDITIONAL EROSION CONTROL
MEASURES AND/OR ADJUSTMENT OF LOCATIONS FOR
EROSION CONTROL MEASURES MAY OCCUR AT SRE
DIRECTION, OR AS REQUIRED TO ADDRESS SITE CONDITIONS.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL
EROSION CONTROL DEVICES. CONTRACTOR SHALL REMOVE
AND REPLACE EROSION CONTROL MEASURES AS NEEDED.
ALL EROSION CONTROL MEASURES MUST BE IN PLACE AT
THE END OF EACH DAY.
4. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO USE
WHATEVER MEANS ARE NECESSARY TO CONTROL AND LIMIT
SILT AND SEDIMENT LEAVING THE SITE. SPECIFICALLY, THE
CONTRACTOR SHALL PROTECT ALL STREETS, STREAMS,
STORM DRAIN SYSTEMS, AND INLETS FROM EROSION
DEPOSITS.
5. CONTRACTOR SHALL SWEEP ALL ROADWAYS UTILIZED BY
CONSTRUCTION ACTIVITY DAILY.
6. A TEMPORARY ROCK CONSTRUCTION ENTRANCE SHALL BE
INSTALLED PRIOR TO ROAD REPAIRS. CONSTRUCTION
ENTRANCE SHALL BE MAINTAINED THROUGHOUT THE ENTIRE
CONSTRUCTION PROCESS.
2+00
3+
0+00
1+00 2+00
3+00
4+00
4+69
N=13720873.46 E=2148603.18
7.
7.
0+00
5.
5.
4.
4.
1+00
3.
3.
2.
2.
2+00
1.
1.
9.
8.
3+00
6.
6.
8.
8.
4+00
0.
1.
1.
4+69
-2.34%
-5.89% 5.92%
2.80%
PVI STA = 2+68.05
PVI ELEV = 700.88
A.D. = -3.55% K = 16.90
60.00' VC
BV
C
S:
+3 8.
BV
C E:
.5
EV
C
S:
+9 8.
EV
C E:
.1
PVI STA = 4+35.00
PVI ELEV = 700.38
A.D. = -3.12% K = 19.25
60.00' VC
BV
C
S:
+0 5.
BV
C E:
.6
EV
C
S:
+6 5.
EV
C E:
.2
PVI STA = 3+55.97
PVI ELEV = 695.70
A.D. = 11.80% K = 5.08
60.00' VC
BV
C
S:
+2 5.
BV
C E:
.4
EV
C
S:
+8 5.
EV
C E:
.4
LOW PT. STA = 3+55.89
LOW PT ELEV = 696.59
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
NEW CONCRETE CURB & GUTTER
NEW ASPHALT PAVEMENT
LEGEND
CP-102
PLAN & PROFILE - AUSTIN CIRCLE
(STA. 0+00-4+69)
NEW CONC.
CURB & GUTTER
EX. CENTERLINE
PROFILE
SEE SHEET CP-101
CENTERLINE
17' (B-B, TYP.)
VERIFY
NEW CENTERLINE
PROFILE
C B
ST
A.
+5
2 PLAN VIEW AUSTIN CIRCLE STA. 0+00 - 4+69
SCALE: HORIZONTAL 1" = 30' VERTICAL 1" = 5'
1 PLAN VIEW AUSTIN CIRCLE STA. 0+00 - 4+69
SCALE: 1" = 30'
N
0 30' 60'
1. ROAD AREAS TO BE REMOVED ARE INTENDED TO BE
REPLACED TO THE EXISTING VERTICAL DESIGN. VERTICAL
DESIGN DATA HAS BEEN ADDED FOR CONSTRUCTION
PURPOSES TO SHOW THE INTENT OF PROPER DRAINAGE. THE
CONTRACTOR SHALL USE THE PROPOSED CENTER LINES AND
MAY ADJUST AS NECESSARY TO IMPROVE DRAINAGE. VERIFY
EXISTING CATCH BASIN INLET TIE-INS MATCH THE PROPOSED
PROFILES. THE CONTRACTOR SHALL NOTIFY THE S.R.E. OF
ANY VARIATION FROM EXISTING THAT MAY ADVERSELY
AFFECT DRAINAGE OR IMPACT ADJACENT AREAS. THE S.R.E.
AND ENGINEER WILL REVIEW AND MAKE FIELD ADJUSTMENTS
IN THOSE AREAS AS NEEDED PRIOR TO CONSTRUCTION OF
NEW PAVEMENTS. DISTURBANCE OF GRAVE SITES ARE
PROHIBITED.
2. TAPER NEW ROAD EDGE OVER 10' MIN DISTANCE TO MATCH
EXISTING ROAD.
3. CONFIRM LOCATION OF EXIST. UTILITIES PRIOR TO
CONSTRUCTION OR CONNECTION.
4. SOME MATCH-IN LOCATIONS AND PROJECT LIMITS SHOWN,
ARE UNVERIFIED. ACTUAL PROJECT LIMITS MUST BE VERIFIED
BY CONTRACTOR. NOTIFY RE IMMEDIATELY IN THE EVENT OF
DISCREPANCY.
5. NEW ROADWAY WIDTHS & CURB RADII, SHALL MATCH EXISTING
CONDITIONS.
6. ALL PAVEMENT MARKINGS SHALL MATCH EXISTING CEMETERY
OPERATIONS.
7. ALL DAMAGED TURF ALONG THE BACK OF CURB SHALL BE
REPLACED BY THE CONTRACTOR WITH SOD. CONTRACTOR TO
WATER SOD UNTIL ACCEPTABLE ESTABLISHMENT.
1. ALL NEW ROADWAY TO BE INSTALLED WITH CONCRETE CURB &
GUTTER UNLESS OTHERWISE NOTED. REMOVE & REPLACE
IN-KIND CONCRETE SPILL WAY INTO CATCH BASINS AS
NECESSARY.
2. BENCHMARK, SEE TOPOGRAPHIC SURVEY.
3. FULL-DEPTH PAVEMENT & CURB REMOVAL SHALL OCCUR IN
ALL AREAS SHOWN AS RECEIVING NEW PAVEMENT.
4. REMOVE ANY TREE ROOTS TO 2' BEYOND BACK OF CURB.
GENERAL NOTES
CONTRACTOR NOTES
KEY NOTES
C B
ST
A.
+3
EXISTING PROPOSED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_c p_
2_ cp s.
dw er in d:
4/
/2
:0 ub lis he d:
et ha n rin te d:
4/
/2
2:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date
KEY MAP N.T.S.
Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
MATCH EXISTING GRADE AT EXISTING CATCH BASIN INLET.
MATCH-IN LINE IS SHOWN IN APPROXIMATE LOCATION. ACTUAL
LOCATION MAY VARY UPON FIELD VERIFICATION AND OWNER
COORDINATION.
N/A
INSTALL & MAINTAIN SILT FENCE PERIMETER SEDIMENT
PROTECTION IN GRASSED AREAS. USE BIO-ROLLS IN PAVED
AREAS.
INSTALL & MAINTAIN INLET SEDIMENT PROTECTION.
BIOROLL
SILT FENCE
INLET SEDIMENT PROTECTION
EROSION CONTROL NOTES
1. THE TOTAL DISTURBED AREA IS EQUAL TO 1.14 ACRES. A
TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM (TPDES)
TXR150000: STORM WATER DISCHARGE PERMIT OR
CONSTRUCTION GENERAL PERMIT (CGP) IS REQUIRED SINCE
THE PROJECT HAS MORE THAN ONE ACRE OF DISTURBED
SOIL. GENERAL EROSION & SEDIMENT CONTROL PRACTICES
MUST BE IMPLEMENTED TO CONTAIN ANY DISTURBED SOILS.
2. THE LOCATION OF EROSION CONTROL DEVICES SHALL BE AS
SHOWN ON THESE PLANS. ADDITIONAL EROSION CONTROL
MEASURES AND/OR ADJUSTMENT OF LOCATIONS FOR
EROSION CONTROL MEASURES MAY OCCUR AT SRE
DIRECTION, OR AS REQUIRED TO ADDRESS SITE CONDITIONS.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL
EROSION CONTROL DEVICES. CONTRACTOR SHALL REMOVE
AND REPLACE EROSION CONTROL MEASURES AS NEEDED.
ALL EROSION CONTROL MEASURES MUST BE IN PLACE AT
THE END OF EACH DAY.
4. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO USE
WHATEVER MEANS ARE NECESSARY TO CONTROL AND LIMIT
SILT AND SEDIMENT LEAVING THE SITE. SPECIFICALLY, THE
CONTRACTOR SHALL PROTECT ALL STREETS, STREAMS,
STORM DRAIN SYSTEMS, AND INLETS FROM EROSION
DEPOSITS.
5. CONTRACTOR SHALL SWEEP ALL ROADWAYS UTILIZED BY
CONSTRUCTION ACTIVITY DAILY.
6. A TEMPORARY ROCK CONSTRUCTION ENTRANCE SHALL BE
INSTALLED PRIOR TO ROAD REPAIRS. CONSTRUCTION
ENTRANCE SHALL BE MAINTAINED THROUGHOUT THE ENTIRE
0+00
1+00
2+00
2+
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00 0+00
5+
6+
7+
8+
0+
BURIAL
SECTION AJ
BURIAL
SECTION 2
BURIAL
SECTION A
N=13720489.28 E=2149305.33
N=13720815.80 E=2148984.25
N=13720937.20 E=2148983.34
2.
2.
0+00
0.
0.
8.
8.
1+00
6.
6.
4.
4.
2+00
2.
2.
0.
0.
3+00
9.
9.
7.
7.
4+00
5.
5.
4.
4.
5+00
2.
2.
1.
1.
6+00
0.
0.
8.
8.
7+00
-4.00%
-3.68%
-2.47%
PV
IS
: 0 +1
0.
PV
IE
: 7
.2
PV
IS
: 6 +8
9.
PV
IE
: 6
.3
PVI STA = 2+00.00
PVI ELEV = 714.60
A.D. = 0.32% K = 189.75
60.00' VC
BV
C
S:
+7 0.
BV
C E:
.8
EV
C
S:
+3 0.
EV
C E:
.4
PVI STA = 4+62.77
PVI ELEV = 704.92
A.D. = 1.21% K = 49.48
60.00' VC
BV
C
S:
+3 2.
BV
C E:
.0
EV
C
S:
+9 2.
EV
C E:
.1
PROPERTY LIMITS
CONSTRUCTION LIMITS
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
NEW CONCRETE CURB & GUTTER
NEW ASPHALT PAVEMENT
LEGEND
CP103
N
MATCH-IN LINE
(STA. 6+60)
NEW CONC. CURB & GUTTER
CENTERLINE
EX. CENTERLINE
PROFILE
C L-
C L
ST
A.
+2
21' (B-B, TYP.)
VERIFY
PROTECT TREE (TYP.)
NEW
CENTERLINE
PROFILE
PLAN & PROFILE - MEDINA LOOP
(STA. 0+00-6+60)
SCALE:1
PLAN VIEW MEDINA LOOP STA. 0+00 - 6+60
HORIZONTAL 1" = 30'
SCALE:2
PROFILE VIEW MEDINA LOOP STA. 0+00 - 6+60
HORIZONTAL 1" = 30' VERICAL 1" = 5'
SEE SHEET CP-10
SEE SHEET CP-10
SEE SHEET CP-10
0 30' 60'
1. ROAD AREAS TO BE REMOVED ARE INTENDED TO BE
REPLACED TO THE EXISTING VERTICAL DESIGN. VERTICAL
DESIGN DATA HAS BEEN ADDED FOR CONSTRUCTION
PURPOSES TO SHOW THE INTENT OF PROPER DRAINAGE. THE
CONTRACTOR SHALL USE THE PROPOSED CENTER LINES AND
MAY ADJUST AS NECESSARY TO IMPROVE DRAINAGE. VERIFY
EXISTING CATCH BASIN INLET TIE-INS MATCH THE PROPOSED
PROFILES. THE CONTRACTOR SHALL NOTIFY THE S.R.E. OF
ANY VARIATION FROM EXISTING THAT MAY ADVERSELY
AFFECT DRAINAGE OR IMPACT ADJACENT AREAS. THE S.R.E.
AND ENGINEER WILL REVIEW AND MAKE FIELD ADJUSTMENTS
IN THOSE AREAS AS NEEDED PRIOR TO CONSTRUCTION OF
NEW PAVEMENTS. DISTURBANCE OF GRAVE SITES ARE
PROHIBITED.
2. TAPER NEW ROAD EDGE OVER 10' MIN DISTANCE TO MATCH
EXISTING ROAD.
3. CONFIRM LOCATION OF EXIST. UTILITIES PRIOR TO
CONSTRUCTION OR CONNECTION.
4. SOME MATCH-IN LOCATIONS AND PROJECT LIMITS SHOWN,
ARE UNVERIFIED. ACTUAL PROJECT LIMITS MUST BE VERIFIED
BY CONTRACTOR. NOTIFY RE IMMEDIATELY IN THE EVENT OF
DISCREPANCY.
5. NEW ROADWAY WIDTHS & CURB RADII, SHALL MATCH
EXISTING CONDITIONS.
6. ALL PAVEMENT MARKINGS SHALL MATCH EXISTING
CEMETERY OPERATIONS.
7. ALL DAMAGED TURF ALONG THE BACK OF CURB SHALL BE
REPLACED BY THE CONTRACTOR WITH SOD. CONTRACTOR
TO WATER SOD UNTIL ACCEPTABLE ESTABLISHMENT.
1. ALL NEW ROADWAY TO BE INSTALLED WITH CONCRETE CURB &
GUTTER UNLESS OTHERWISE NOTED. REMOVE & REPLACE
IN-KIND CONCRETE SPILL WAY INTO CATCH BASINS AS
NECESSARY.
2. BENCHMARK, SEE TOPOGRAPHIC SURVEY.
3. FULL-DEPTH PAVEMENT & CURB REMOVAL SHALL OCCUR IN
ALL AREAS SHOWN AS RECEIVING NEW PAVEMENT.
4. REMOVE ANY TREE ROOTS TO 2' BEYOND BACK OF CURB.
MATCH EXISTING GRADE AT EXISTING CATCH BASIN INLET.
MATCH-IN LINE IS SHOWN IN APPROXIMATE LOCATION.
ACTUAL LOCATION MAY VARY UPON FIELD VERIFICATION AND
OWNER COORDINATION.
NA
INSTALL & MAINTAIN SILT FENCE PERIMETER SEDIMENT
PROTECTION IN GRASSED AREAS. USE BIO-ROLLS IN PAVED
AREAS.
INSTALL & MAINTAIN INLET SEDIMENT PROTECTION.
INSPECT STREET FOR SEDIMENT TRACKING DAILY
GENERAL NOTES
CONTRACTOR NOTES
KEY NOTES
C B
ST
A.
+2
EXISTING PROPOSED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_c p_ m ed in a lo op
_c ps
.d w er in d:
4/
/2
:0 ub lis he d:
et ha n rin te d:
4/
/2
2:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date
KEY MAP N.T.S.
Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
BIOROLL
SILT FENCE
INLET SEDIMENT PROTECTION
EROSION CONTROL NOTES
1. THE TOTAL DISTURBED AREA IS EQUAL TO 1.14 ACRES. A
TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM (TPDES)
TXR150000: STORM WATER DISCHARGE PERMIT OR
CONSTRUCTION GENERAL PERMIT (CGP) IS REQUIRED SINCE
THE PROJECT HAS MORE THAN ONE ACRE OF DISTURBED
SOIL. GENERAL EROSION & SEDIMENT CONTROL PRACTICES
MUST BE IMPLEMENTED TO CONTAIN ANY DISTURBED SOILS.
2. THE LOCATION OF EROSION CONTROL DEVICES SHALL BE AS
SHOWN ON THESE PLANS. ADDITIONAL EROSION CONTROL
MEASURES AND/OR ADJUSTMENT OF LOCATIONS FOR
EROSION CONTROL MEASURES MAY OCCUR AT SRE
DIRECTION, OR AS REQUIRED TO ADDRESS SITE CONDITIONS.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL
EROSION CONTROL DEVICES. CONTRACTOR SHALL REMOVE
AND REPLACE EROSION CONTROL MEASURES AS NEEDED.
ALL EROSION CONTROL MEASURES MUST BE IN PLACE AT
THE END OF EACH DAY.
4. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO USE
WHATEVER MEANS ARE NECESSARY TO CONTROL AND LIMIT
SILT AND SEDIMENT LEAVING THE SITE. SPECIFICALLY, THE
CONTRACTOR SHALL PROTECT ALL STREETS, STREAMS,
STORM DRAIN SYSTEMS, AND INLETS FROM EROSION
DEPOSITS.
5. CONTRACTOR SHALL SWEEP ALL ROADWAYS UTILIZED BY
CONSTRUCTION ACTIVITY DAILY.
6. A TEMPORARY ROCK CONSTRUCTION ENTRANCE SHALL BE
INSTALLED PRIOR TO ROAD REPAIRS. CONSTRUCTION
ENTRANCE SHALL BE MAINTAINED THROUGHOUT THE ENTIRE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_c e_ na rra tiv e_ cp s.
dw jd ob ia d:
8/
/2
:4 ub lis he d:
et ha n rin te d:
4/
/2
2:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
CE101
SWPPP NARRATIVE - 1
JDES 12
3. PROJECT DESCRIPTION:
2. CONTACT AND PHONE NO.:
6. MAJOR SOIL DISTURBING ACTIVITIES:
MAINTENANCE:
ALL EROSION AND SEDIMENT CONTROLS WILL BE MAINTAINED IN GOOD WORKING ORDER. IF A REPAIR IS NECESSARY, IT WILL BE DONE AT THE EARLIEST DATE POSSIBLE, BUT NO LATER THAN 7 CALENDAR DAYS AFTER THE SURROUNDING EXPOSED GROUND HAS DRIED SUFFICIENTLY TO PREVENT FURTHER DAMAGE FROM HEAVY EQUIPMENT. THE AREAS ADJACENT TO CREEKS AND DRAINAGE WAYS SHALL HAVE PRIORITY, FOLLOWED BY DEVICES PROTECTING STORM SEWER INLETS.
INSPECTION:
AN INSPECTION WILL BE PERFORMED BY THE CONTRACTOR EVERY 14 DAYS AS WELL AS AFTER EVERY 1/2" OR MORE OF RAIN (RECORDED ON A NON-FREEZING RAIN GAUGE TO BE LOCATED AT THE PROJECT SITE). AN INSPECTION AND MAINTENANCE REPORT WILL BE MADE PER INSPECTION. BASED ON THE INSPECTION RESULTS, THE CONTROLS SHALL BE CORRECTED
BEFORE THE NEXT SCHEDULED INSPECTION.
WASTE MATERIALS:
ALL WASTE MATERIALS WILL BE COLLECTED AND STORED IN A SECURELY LIDDED METAL DUMPSTER. THE DUMPSTER WILL MEET ALL STATE AND LOCAL CITY SOLID WASTE MANAGEMENT REGULATIONS. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE WILL BE DEPOSITED IN THE DUMPSTER. THE DUMPSTER WILL BE EMPTIED AS NECESSARY OR AS REQUIRED BY LOCAL REGULATION AND THE TRASH WILL BE HAULED TO A LOCAL DUMP. NO CONSTRUCTION MATERIALS WILL BE BURIED ON SITE.
HAZARDOUS WASTE (INCLUDING SPILL REPORTING):
AT A MINIMUM, ANY PRODUCTS IN THE FOLLOWING CATEGORIES ARE CONSIDERED TO BE HAZARDOUS: PAINTS, ACIDS FOR CLEANING MASONRY SURFACES, GASOLINE, MOTOR OIL, CLEANING SOLVENTS, ASPHALT PRODUCTS, CHEMICAL ADDITIVES FOR SOIL STABILIZATION OR CONCRETE CURING COMPOUNDS AND ADDITIVES. IN THE EVENT OF A SPILL WHICH MAY BE HAZARDOUS AND MEETS REPORTING REQUIREMENTS, THE NATIONAL RESPONSE CENTER SHOULD BE CONTACTED AT 800-424-8802, AND ANY REQUIRED CHANGES MADE TO THE SWPPP. IN THE EVENT OF A LIFE THREATENING SPILL THE SAN ANTONIO FIRE DEPARTMENT SHOULD BE NOTIFIED AS WELL AS THE APPROPRIATE CITY INSPECTORS.
REMARKS:
DISPOSAL AREAS, STOCKPILES AND HAUL ROADS SHALL BE CONSTRUCTED IN A MANNER THAT WILL MINIMIZE AND CONTROL THE AMOUNT OF SEDIMENT THAT ENTERS RECEIVING WATERS. DISPOSAL AREAS SHALL NOT BE LOCATED IN ANY WETLAND, BODY OF WATER, STREAMBED OR FLOODPLAIN CONSTRUCTION STAGING AREAS AND VEHICLE MAINTENANCE AREAS SHALL BE CONSTRUCTED BY THE CONTRACTOR IN A MANNER TO MINIMIZE THE RUNOFF OF POLLUTANTS. ALL WATERWAYS SHALL BE CLEARED AS SOON AS POSSIBLE OF TEMPORARY EMBANKMENT, TEMPORARY BRIDGES, MATTING, FALSE WORK, PILING DEBRIS OR OTHER OBSTRUCTION PLACED DURING CONSTRUCTION OPERATIONS THAT ARE NOT PART OF THE FINISHED
WORK.
3. NARRATIVE - SEQUENCE OF CONSTRUCTION (STORMWATER MANAGEMENT) ACTIVITIES:
4. A DESCRIPTION OF MAINTENANCE PROCEDURES
FOR CONTROL MEASURES USED:
5. STORMWATER MANAGEMENT:
6. A DESCRIPTION OF PERMANENT STORM WATER
MANAGEMENT CONTROLS:
7. WEIGHTED RUNOFF COEFFICIENT:
(AFTER CONSTRUCTION)
8. EXISTING CONDITION OF SOIL, VEGETATIVE
COVER AND % OF VEGETATIVE COVER:
9. DESCRIPTION OF WATER DISCHARGED
NOT ASSOCIATED WITH CONSTRUCTION:
10. NAMES AND SEGMENT NUMBERS OF RECIEVING WATERS THAT
WILL RECEIVE DISCHARGES FROM DISTURBED AREAS OF PROJECT:
11. IDENTIFY STORMWATER DISCHARGE POINTS:
12. A DESCRIPTION AND TIME FRAME FOR INSTALLATION OF
STABILIZATION PRACTICES IN CONJUNCTION WITH CONSTRUCTION:
1. PROJECT NAME AND LOCATION: 1. SOIL STABILIZATION PRACTICES:
OTHER:
2. STRUCTURAL PRACTICES:
OTHER:
THE ORDER OF ACTIVITIES WILL BE AS FOLLOWS:
9. SANITARY WASTE:
10. OFFSITE EXCAVATION SOURCE LOCATION:
11. OFFSITE FILL SOURCE LOCATION:
12. OFFSITE VEHICLE TRACKING:
HAUL ROADS DAMPENED FOR DUST CONTROL.
LOADED HAUL TRUCKS TO BE COVERED WITH TARPAULIN
EXCESS DIRT ON ROAD TO BE REMOVED DAILY
STABILIZED CONSTRUCTION ENTRANCE.
13. OTHER:
CERTIFICATION THAT SITE DISTURBANCE AND/OR DISCHARGES WILL NOT
EFFECT LISTED ENDANGERED SPECIES AND THEIR HABITAT. WHAT METHOD IS
USED TO SATISFY THE ENDANGERED SPECIES REQUIREMENTS?
SILT FENCES
HAY BALES
GRAVEL FILTRATION BAGS
ROCK BERMS
DIVERSION, INTERCEPTOR OR PERIMETER DIKES
DIVERSION, INTERCEPTOR OR PERIMETER SWALES
DIVERSION, DIKE AND SWALE COMBINATIONS
PAVED FLUMES
ROCK BEDDING AT CONSTRUCTION EXIT (STABILIZED
ENTRANCE)
TIMBER MATTING AT CONSTRUCTION EXIT (STABILIZED
ENTRANCE)
HYDROMULCHING
TEMPORARY SEEDING
PERMANENT PLANTING, SODDING OR SEEDING
MULCHING
SOIL RETENTION BLANKET
BUFFER ZONES
8. OTHER EROSION AND SEDIMENTATION CONTROLS
4. LINEAR ROW OR X NON LINEAR ROW
5. POTENTIAL POLLUTANT SOURCES AT THE CONSTRUCTION PROJECT MAY INCLUDE (CHECK ALL THAT APPLY):
DUST
VEHICLE FLUIDS
OIL AND GREASE
LITTER/TRASH
AGGREGATE, BASE, SAND
SAND SPOILS
CONTAMINATED SOILS
FERTILIZERS/HERBICIDES
OTHER CHEMICALS (DESCRIBE)
TOTAL PROJECT AREA (ACRES):
TOTAL AREA TO BE DISTURBED:
MATERIAL STORAGE AREAS (ACRES):
SUPPORTING CONCRETE BATCH PLANT:
LAYDOWN YARDS:
SUPPORTING ASPHALT PLANT:
SUPPORTING BARROW PIT:
OTHER:
PRESERVATION OF NATURAL RESOURCES
FLEXIBLE CHANNEL LINER
RIGID CHANNEL LINER
COMPOST MANUFACTURED TOPSOIL
BIO LOGS
OTHER
CHANNEL LINERS
SEDIMENT TRAPS
SEDIMENT BASINS
STORM INLET SEDIMENT TRAP
STONE OUTLET SEDIMENT STRUCTURES
CURBS AND GUTTERS
STORM SEWERS
VELOCITY CONTROL STRUCTURES
GEOTEXTILES
7. THE FOLLOWING ITEMS SHOULD BE UPDATED AS NECESSARY AND BE INCLUDED AS PART OF THE WEEKLY INSPECTION REPORTS:
SCHEDULE OF CONSTRUCTION ACTIVITIES IS MAINTAINED BY AND CAN BE ACCESSED BY
CONTRACTING (NAME) AT (PHONE).
INSTALLATION OF STORMWATER CONTROL MEASURES (INSTALL DATE, OPERATIONAL DATE, DEVIATION FROM MANUFACTURE SPEC.)
COMMENCEMENT AND DURATION OF EARTHWORK, FINAL GRADING, CREATION
OF SOIL AND VEGETATION STOCKPILES REQUIRING STABILIZATION:
CESSATION OF CONSTRUCTION ACTIVITIES WITHIN A PORTION OF THE SITE (TEMPORARY AND PERMANENT:
FINAL AND TEMPORARY STABILIZATION AREAS OF EXPOSED SOILS:
FINAL AND TEMPORARY STABILIZATION AREAS OF EXPOSED SOILS:
REMOVAL OF TEMPORARY STORMWATER CHANNELS, CONTROL MEASURES, CONSTRUCTION EQUIPMENT AND VEHICLES, AND
CESSATION OF ANY POLLUTANT - GENERATING ACTIVITIES:
NOTE:
SW3P NARRATIVE TO ACCOMPANY SITE MAP AND PROJECT DESIGN SHEETS THAT INCLUDE IDENTIFYING EARTH DISTURBING ACTIVITIES. EXISTING AND PROPOSED SLOPES OF GRADING ACTIVITIES, CONSTRUCTION AND SOIL STOCKPILE LOCATIONS, SURFACE WATER CROSSINGS, DESIGNATED EXIST POINTS, STRUCTURES AND IMPERVIOUS SURFACES TO BE CONSTRUCTED, CONSTRUCTION SUPPORT ACTIVITY AREAS, LOCATION OF ALL SURFACE WATERS IN VICINITY, BOUNDARIES OF NATURAL BUFFERS, AREAS OF FEDERALLY LISTED CRITICAL HABITAT, TOPOGRAPHY, VEGETATIVE COVER AND DRAINAGE PATTERNS OF FLOWS ONTO, OVER AND FROM THE PROJECT SITE, STORMWATER AND ALLOWABLE NON STORMWATER DISCHARGE LOCATIONS. ALL STORM INLETS ON AND IN VICINITY OF THE SITE, LOCATION OF ALL POTENTIAL POLLUTANT GENERATING ACTIVITIES, LOCATION OF STORMWATER CONTROL MEASURES, AND LOCATIONS WHERE POLYMERS, FLOCCULANTS, AND
OTHER CHEMICALS WILL BE USED AND STORED.
FORT SAM HOUSTON NATIONAL CEMETERY
PHASE 3 EXPANSION & IMPROVEMENTS - ADDITIONAL ROAD REPAIRS
1520 HARRY WURZBACH RD
SAN ANTONIO, TX 78209
PHASE 3 EXPANSION & IMPROVEMENTS INCLUDE THE DEVELOPMENT OF 43 ACRES OF LAND FOR GRAVESITES
THAT WILL INCLUDE A NEW ACCESS ROAD ALONG THE NORTH EAST PORTION OF THE CEMETERY ALONG WITH
THE CONSTRUCTION OF AN HONOR GUARD BUILDING, MATERIAL STORAGE BUILDING AND EQUIPMENT STORAGE
BUILDING. THE PROJECT WILL ALSO EXPAND THE ADMINISTRATION BUILDING AND RENOVATE THE PUBLIC
INFORMATION CENTER AND RETROFIT EXISTING BUILDINGS TO ACCOMMODATE PRINCIPLES FOR HIGH
PERFORMANCE AND SUSTAINABLE BUILDINGS MOU AND RENEWABLE ENERGY INITIATIVES.
X X X X
X X X
MEDICAL WASTE
ROAD REPAIRS
1.14
1.14
THE PROJECT AREA IS BITUMINOUS PAVEMENT.
WATER DISCHARGED FOR THE PROPOSED ROAD REPAIRS FLOWS INTO THE EXISTING
STORM SEWER SYSTEM.
STORM WATER WILL DISCHARGE INTO THE STORMWATER POND TO THE SOUTH AND SHEET
FLOW INTO SALADO CREEK, DRAIN INTO EXISTING STORM NETWORK AND OUT TO SALADO
CREEK, EXPANSION DRAINS NORTH TO GRADED REACH THEN TO SALADO CREEK.
STABILIZATION MEASURES MUST BE INITIATED IMMEDIATELY IN
PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY CEASED AND WILL NOT RESUME FOR A PERIOD EXCEEDING
14 CALENDAR DAYS. THIS WILL BE ACCOMPLISHED THROUGH EROSION CONTROL MATS IN AREAS ON THE SITE WHERE THE SLOPES EXCEED 4:1.
X
X
X
X
X
X
X
X
1: INSTALL SEDIMENT BMP'S BEFORE EARTH DISTURBING ACTIVITIES
2: FINAL GRADING AND STABILIZATION
ALL PROTECTIVE MEASURES MUST BE MAINTAINED IN EFFECTIVE OPERATING CONDITION.
IF, THROUGH INSPECTIONS OR OTHER MEANS, AS SOON AS THE BMP'S ARE NOT OPERATING EFFECTIVELY, THEN MAINTENANCE SHALL BE
PERFORMED AS NECESSARY TO MAINTAIN THE CONTINUED EFFECTIVENESS OF STORMWATER CONTROLS, AND PRIOR TO THE NEXT RAIN
EVENT IF FEASIBLE. IF INSPECTIONS INDICATE THAT A CONTROL HAS BEEN USED INCORRECTLY, IS NOT PERFORMING CORRECTLY, OR HAS
BEEN DAMAGED, IT SHALL BE REPLACED OR MODIFIED AS SOON AS PRACTICAL. SEDIMENT MUST BE REMOVED FROM SEDIMENTS TRAPS AND
SEDIMENTATION PONDS NO LATER THAN THE TIME THAT DESIGN CAPACITY HAS BEEN REDUCED BY 50%. FOR PERIMETER CONTROLS SUCH
AS SILT FENCES, THE TRAPPED SEDIMENT MUST BE REMOVED BEFORE IT REACHES 50% OF THE ABOVE-GROUND HEIGHT.
STORMWATER MANAGEMENT WILL BE ACCOMPLISHED THROUGH TEMPORARY BMPS.
DURING CONSTRUCTION, BMP'S SHOWN IN ITEMS 1 & 2 WILL BE UTILIZED TO CONTROL STORMWATER.
NA
X
CONSTRUCTION OUTSIDE OF NESTING PERIODS
OR PERFORMING A BIRD SURVEY PRIOR TO CONSTRUCTION, IF CONSTRUCTION IS PERFORMED INSIDE NESTING DATES.
X
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h:
y
:\1
\1 fo rt sa m h ou st on n c cp s\
_1 cp s ph as e\ _0 m an ho le ro ad re pa ir\ _0 ci vi l\_ c ad fi le s\
_0 sh ee ts \1
_c e_ na rra tiv e_ cp s.
dw jd ob ia d:
8/
/2
:4 ub lis he d:
et ha n rin te d:
4/
/2
2:
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS -
ADDITIONAL ROAD REPAIRS
846CM2045
08/01/2025
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date Dwg. of 17
BID DOCUMENTS
COMISSIONING:
ENVIROS
220 RAMSEY ST
HASTINGS MN, 55033
651-319-6599
SCOTT SINCLAIR
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
OCMI
3851 RESEARCH DR
IRVINE, CA 92618
469-431-0571
KYLE VEATER
LAND SURVEY:
ANDERSON
ENGINEERING
13605 1ST AVE N STE 100
PLYMOUTH, MN 55441
763-421-4000
ERIC SAUTBINE
MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
214-485-6433
MARIO ARREDONDO
No. JDES
CE102
SWPPP NARRATIVE - 2
JDES 13
1. IDENTIFY PROCEDURES FOR STOPPING, CONTAINING, AND CLEANING UP SPILLS, LEAKS AND OTHER RELEASE:
NATURAL BUFFER SECTION:1.
GENERAL REQUIREMENTS:2.
50 FOOT (OR MORE) BUFFER ZONE
LESS THAN 50 FOOT BUFFER ZONE
LINEAR CONSTRUCTION PROJECT, DOES NOT REQUIRE 50 FOOT BUFFER ZONE
1. INSTALL PERIMETER CONTROLS TO RETAIN SEDIMENT ON-SITE TO THE EXTENT PRACTICABLE WITH CONSIDERATION
FOR LOCAL TOPOGRAPHY, SOIL TYPE, AND RAINFALL
2. MINIMIZE SEDIMENT TRACK OUT ONTO OFF-SITE STREETS, OR OTHER PAVED AREAS AND SIDEWALKS, RESTRICT VEHICLE USE TO PROPERTY THROUGH DESIGNATED ACCESS POINTS, USE APPROPRIATE STABILIZATION MEASURES.
REMOVE SEDIMENT FROM TIRES, WHEN PRACTICABLE.
3. CONTROL DISCHARGES FROM STOCKPILED SEDIMENT BY:
1) LOCATING PILES OUTSIDE OF NATURAL BUFFERS AND PHYSICALLY SEPARATING PILES FROM OTHER
STORMWATER CONTROLS
2) USE A TEMPORARY PERIMETER SEDIMENT BARRIER
3) PROVIDE COVER OR TEMPORARY STABILIZATION, WHERE PRACTICABLE
4) USE DRY CLEAN UP METHODS TO REMOVE ACCUMULATED SEDIMENT FROM PAVED AREAS
5) PROTECT FROM WIND WHERE FEASIBLE
6) MINIMIZE DUST THROUGH THE APPROPRIATE APPLICATION OF WATER
7) MINIMIZE SLOPES STEEPNESS OF EXPOSED SOILS THROUGH PHASED DISTURBANCE AND IMPLEMENTATION
OF BMP'S.
8) MINIMIZE SOIL COMPACTION IN AREAS WHERE RE-VEGETATION IS PLANNED BY RESTRICTING VEHICLE USE
AND CONDITION SOIL PRIOR TO RE-VEGETATION.
9) PROTECT STORM DRAIN INLETS PRIOR TO LAND DISTURBANCE.
SEDIMENTATION BASINS:3.
SEDIMENTATION BASINS (CHECK ALL THAT APPLY)
DRAINAGE AREA > 10 ACRES (SEDIMENTATION BASIN DESIGN ON SHEET )
DRAINAGE AREA > 10 ACRES (SEDIMENTATION BASIN INFEASIBLE - ALTERNATE
EQUIVALENT CONTROL DESIGN ON SHEET )
DRAINAGE AREA < 10 ACRES (SEDIMENT TRAPS AND BASINS)
DRAINAGE AREA < 10 ACRES (PERIMETER CONTROLS)
DEWATERING PRACTICES:4.
1. DO NOT DISCHARGE VISIBLE FLOATING SOLIDS OR FOAM; USE AN OIL-WATER SEPARATOR OR SUITABLE FILTRATION
DEVICE THAT IS DESIGNED TO REMOVE OIL, GREASE, OR OTHER PRODUCTS IF DEWATERING WATER IS FOUND TO
CONTAIN THESE MATERIALS.
2. UTILIZE VEGETATED UPLAND AREAS OF THE SITE TO INFILTRATE DEWATERING WATER BEFORE DISCHARGE, WHERE
FEASIBLE.
3. DISCHARGE DEWATERING WATER ONTO A VELOCITY DISSIPATION DEVICE.
4. MANAGE BACKWASH WATER AS A WASTE OR RETURN IT TO THE BEGINNING OF THE TREATMENT PROCESS.
5. REPLACE AND CLEAN FILTER MEDIA USED IN DEWATERING DEVICE ACCORDING TO MANUFACTURE'S SPECIFICATIONS.
6. DO NOT USE TREATMENT CHEMICALS WITHOUT PRIOR WRITTEN CONSENT FROM SRE, A WRITTEN MANAGEMENT PLAN IS
REQUIRED FOR USE OF TREATMENT CHEMICALS.
NON STORMWATER DISCHARGES:5.
THE FOLLOWING NON-STORMWATER DISCHARGES ARE AUTHORIZED FOR DISCHARGE BY THE GENERAL PERMIT. PROJECT SITE MAPS MUST REFLECT THE LOCATIONS OF ANY NON-STORMWATER DISCHARGES. NON-STORMWATER DISCHARGES MUST
BE MANAGED BY STORMWATER BMP'S TO PROTECT RECEIVING WATER QUALITY.
1. DISCHARGES FROM FIRE FIGHTING ACTIVITIES AND/OR FIRE HYDRANT FLUSHING.
2. VEHICLE, EXTERNAL BUILDING, AND PAVEMENT WASH WATER WHERE DETERGENTS AND SOAPS ARE NOT USED AND
WHERE SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE NOT OCCURRED (UNLESS ALL SPILLED MATERIAL
HAS BEEN REMOVED).
3. PLAIN WATER USED TO CONTROL DUST.
4. PLAIN WATER ORIGINATING FROM POTABLE WATER SOURCES.
5. UNCONTAMINATED GROUNDWATER, SPRING WATER, OR ACCUMULATED STORMWATER.
6. FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS SUCH AS
SOLVENTS.
7. UNCONTAMINATED AIR CONDITIONING CONDENSATE.
8. LAWN WATERING OR SIMILAR DRAINAGE.
9. OTHER:
PROHIBITED STORMWATER DISCHARGES:6.
1. WASTEWATER FROM WASHOUT OF CONCRETE TRUCKS.
2. WASTEWATER FROM WAS OUT AND CLEAN OUT OF STUCCO, PAINT, FORM RELEASE OILS, CUTTING COMPOUNDS, AND
OTHER CONSTRUCTION MATERIALS.
3. FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATIONS AND MAINTENANCE.
4. SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.
NOTE: DO NOT USE TREATMENT CHEMICALS WITHOUT PRIOR WRITTEN CONSENT FROM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .