S02 36C10F26B0001 Itemized Schedule of Values Cost Breakdown_F.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Fort Sam Houston National Cemetery, Phase 3 Expansion - Additional Road Repairs
Solicitation number
36C10F26B0001
Issued by

About this file

This is an Itemized Schedule of Values cost breakdown template for a federal construction contract solicitation. The document provides a standardized Excel-based pricing template for bidders responding to solicitation 36C10F26B0001 for Phase 3 Expansion & Improvements - Additional Road Repairs at Fort Sam Houston National Cemetery in San Antonio, Texas. The template is structured to accommodate two bid items: BID ITEM I (CLIN 0001) for the Base Bid and BID ITEM II (CLIN 1001) for a Bid Option Additive, allowing the Department of Veterans Affairs to evaluate both the core project scope and optional enhancements.

The cost breakdown template requires bidders to segregate labor and material costs across 27 construction divisions using the MasterFormat classification system, including General Requirements, Concrete, Masonry, Metals, HVAC, Electrical, Earthwork, Exterior Improvements, and Transportation, among others. Bidders must enter division-level labor and material costs, which automatically calculate total divisional costs. The template then computes overhead, profit, and bond percentages as markups applied sequentially to the division subtotals, with the final calculation yielding the Total Base Bid Offer for each item. This is a blank template with all cost fields showing zero values, designed to be completed by offerors as part of their bid response to this Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside solicitation with an estimated project magnitude between $1,000,000 and $2,000,000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offer Breakdown - BID ITEM I

36C10F26B0001 CLIN 0001 - Base Bid Offer Cost Breakdown

Project Number 846-045B Edward L Roy: VA assigned project #

Date
Project TitlePhase 3 Expansion & Improvements Additional Road Repairs

Edward L Roy: VA assigned Project Title

Project LocationFort Sam Houston National Cemetery
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions$ - 0$ - 0$ - 0
Division 3Concrete$ - 0$ - 0$ - 0
Division 4Masonry$ - 0$ - 0$ - 0
Division 5Metals$ - 0$ - 0$ - 0
Division 6Wood and Plastic$ - 0$ - 0$ - 0
Division 7Thermal & Moisture Protect$ - 0$ - 0$ - 0
Division 8Doors and Windows$ - 0$ - 0$ - 0
Division 9Finishes$ - 0$ - 0$ - 0
Division 10Specialties$ - 0$ - 0$ - 0
Division 11Equipment$ - 0$ - 0$ - 0
Division 12Furnishings$ - 0$ - 0$ - 0
Division 13Special Construction$ - 0$ - 0$ - 0
Division 14Conveying Equipment$ - 0$ - 0$ - 0
Division 21Fire Suppression$ - 0$ - 0$ - 0
Division 22Plumbing$ - 0$ - 0$ - 0
Division 23HVAC$ - 0$ - 0$ - 0
Division 26Electrical$ - 0$ - 0$ - 0
Division 27Communications$ - 0$ - 0$ - 0
Division 28Electronic Safety & Security$ - 0$ - 0$ - 0
Division 31Earthwork$ - 0$ - 0$ - 0
Division 32Exterior Improvements$ - 0$ - 0$ - 0
Division 33Utilities$ - 0$ - 0$ - 0
Division 34Transportation Subtotal$ - 0$ - 0$ - 0
Division Subtotals$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

$ - 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).$ - 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

$ - 0
Overhead/Profit Subtotals$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Bid Offer $ - 0 $ - 0 $ - 0

Offer Breakdown - BID ITEM II

36C10F26B0001 CLIN 1001 - Bid Option Additive Offer Cost Breakdown

Project Number 846-045B Edward L Roy: VA assigned project #

Date
Project TitlePhase 3 Expansion & Improvements Additional Road Repairs

Edward L Roy: VA assigned Project Title

Project LocationFort Sam Houston National Cemetery
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions$ - 0$ - 0$ - 0
Division 3Concrete$ - 0$ - 0$ - 0
Division 4Masonry$ - 0$ - 0$ - 0
Division 5Metals$ - 0$ - 0$ - 0
Division 6Wood and Plastic$ - 0$ - 0$ - 0
Division 7Thermal & Moisture Protect$ - 0$ - 0$ - 0
Division 8Doors and Windows$ - 0$ - 0$ - 0
Division 9Finishes$ - 0$ - 0$ - 0
Division 10Specialties$ - 0$ - 0$ - 0
Division 11Equipment$ - 0$ - 0$ - 0
Division 12Furnishings$ - 0$ - 0$ - 0
Division 13Special Construction$ - 0$ - 0$ - 0
Division 14Conveying Equipment$ - 0$ - 0$ - 0
Division 21Fire Suppression$ - 0$ - 0$ - 0
Division 22Plumbing$ - 0$ - 0$ - 0
Division 23HVAC$ - 0$ - 0$ - 0
Division 26Electrical$ - 0$ - 0$ - 0
Division 27Communications$ - 0$ - 0$ - 0
Division 28Electronic Safety & Security$ - 0$ - 0$ - 0
Division 31Earthwork$ - 0$ - 0$ - 0
Division 32Exterior Improvements$ - 0$ - 0$ - 0
Division 33Utilities$ - 0$ - 0$ - 0
Division 34Transportation Subtotal$ - 0$ - 0$ - 0
Division Subtotals$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

$ - 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).$ - 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

$ - 0
Overhead/Profit Subtotals$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Bid Offer $ - 0 $ - 0 $ - 0