S07 36C10F26B0001_Optional Form 1419 (Abstract of Offers - Construction)_Signed.pdf

PDF 427 KB Posted

Attached to
Fort Sam Houston National Cemetery, Phase 3 Expansion - Additional Road Repairs
Solicitation number
36C10F26B0001
Issued by

About this file

This is an Abstract of Offers for a construction project issued by the Department of Veterans Affairs, Office of Construction and Facilities Management.

The solicitation (36C10F26B0001) was issued on May 28, 2026, and opened on July 9, 2026, for Fort Sam Houston National Cemetery (FSHNC) Phase 3 Expansion & Improvements—Additional Road Repairs (Project Number 846-045B). The project comprises two contract line items: Bid Item I (Base Bid CLIN 0001) and Bid Item II (Option CLIN 1001), both measured in job orders (JB). Thirteen offers were received from contractors including A 2 Z Provision, AmeriTech Contracting, CHP Solutions, DAX Contracting, DBS Construction, Digg Construction, E&L Construction, Holtz/Adams Construction, Laubacker Enterprises, Monument Construction, Texas Velocity, Venergy Group, and Design Build Consortium. Bid security requirements ranged from 20% to 20% or $3 million depending on the offeror. All offerors acknowledged the amendments issued. The lowest bid totaled $606,840.05 (CHP Solutions), while the highest bid totaled $2,240,058.35 (Design Build Consortium). Most contractors submitted bids substantially above $1 million for the combined line items, reflecting the complexity and scope of the cemetery road repair project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO.: 1 NO.: 2

A. OFFEROR

A 2 Z Provision

B. BID SECURITY (Type and amount) Yes 20%

C. AMENDMENTS ACKNOWLEDGED

Yes

A. OFFEROR

AmeriTech Contracting

B. BID SECURITY (Type and amount) Yes 20% or $3M

C. AMENDMENTS ACKNOWLEDGED

Yes

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

Department of Veterans Affairs Office of Construction and Facilities Management (003C4B) 10300 Spotsylvania Avenue, Suite 400 Fredericksburg VA 22409

Fort Sam Houston National Cemetery (FSHNC) Project Title: Phase 3 Expansion & Improvements - Additional Road Repairs Project Number: 846-045B

1 436C10F26B0001 05-28-2026 07-09-2026

Catalin Parfenti, Contracting Officer

0001 Bid Item I (Base Bid CLIN 0001) 1 JB - -

1001 Bid Item II (Option CLIN 1001) 1 JB - -

07-09-2026

GRAND TOTAL - - - -

$1,130,338.25

$185,281.55

$1,315,619.80

$1,754,599.00

$483,599.00

$2,238,198.00

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: 3 NO.: 4 NO.: 5 NO.: 6

A. OFFEROR

CHP Solutions

A. OFFEROR

DAX Contracting

A. OFFEROR

DBS Construction

A. OFFEROR

Digg Construction

B. BID SECURITY (Type and amount) No

B. BID SECURITY (Type and amount) Yes 20%

B. BID SECURITY (Type and amount) Yes 20%

B. BID SECURITY (Type and amount) Yes 20%

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED

Yes

C. AMENDMENTS ACKNOWLEDGED

Yes

C. AMENDMENTS ACKNOWLEDGED

Yes

C. AMENDMENTS ACKNOWLEDGED

Yes

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

Fort Sam Houston National Cemetery

(FSHNC)

Project Title: Phase 3 Expansion & Improvements - Additional Road Repairs Project Number: 846-045B

2 436C10F26B0001

GRAND

TOTAL - -

0001 1 JB

1001 1 JB

$253,000.00

$353,840.00

$1,480,644.99

$196,032.00

$810,267.10

$186,308.18

$1,252,518.79

$201,171.50

$606,840.05 $1,676,676.99 $996,575.28 $1,453,690.29

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: 7 NO.: 8 NO.: 9 NO.: 10

A. OFFEROR

E&L Construction

A. OFFEROR

Holtz/Adams Construction

A. OFFEROR

Laubacker Enterprises

A. OFFEROR

Monument Construction

B. BID SECURITY (Type and amount) Yes 20% or $3M

B. BID SECURITY (Type and amount) Yes 20% or $3M

B. BID SECURITY (Type and amount) Yes 20% or $3M

B. BID SECURITY (Type and amount) Yes 20%

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED

Yes

C. AMENDMENTS ACKNOWLEDGED

Yes

C. AMENDMENTS ACKNOWLEDGED

Yes

C. AMENDMENTS ACKNOWLEDGED

Yes

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

Fort Sam Houston National Cemetery

(FSHNC)

Project Title: Phase 3 Expansion & Improvements - Additional Road Repairs Project Number: 846-045B

3 436C10F26B0001

0001 1 JB

1001 1 JB

GRAND

TOTAL - -

$1,041,327.64

$234,243.75

$1,275,571.39

$792,946.71

$188,371.29

$981,318.00

$965,648.90

$212,803.39

$1,178,452.29

$1,117,187.00

$201,513.00

$1,318,700.00

VACOParfeC Highlight

VACOParfeC Highlight

VACOParfeC Highlight

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: 11 NO.: 12 NO.: 13 NO.: 14

A. OFFEROR

Texas Velocity

A. OFFEROR

Venergy Group

A. OFFEROR

Design Build Consortium

A. OFFEROR

B. BID SECURITY (Type and amount) Yes 20%

B. BID SECURITY (Type and amount) Yes 20%

B. BID SECURITY (Type and amount) Yes 20% or $1.5M

B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED

Yes

C. AMENDMENTS ACKNOWLEDGED

Yes

C. AMENDMENTS ACKNOWLEDGED

Yes

C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

Fort Sam Houston National Cemetery

(FSHNC)

Project Title: Phase 3 Expansion & Improvements - Additional Road Repairs Project Number: 846-045B

4 436C10F26B0001

0001 1 JB

1001 1 JB

GRAND

TOTAL - -

$1,249,631.44

$439,458.74

$1,689,090.18

$1,413,727.76

$233,500.30

$1,647,228.06

$1,930,058.35

$310,000.00

$2,240,058.35

2026-07-09T16:36:49-0400
CATALIN PARFENTI

File details come from the government source that posted it. Updated .