S02_Attachment 8 - Updated Drawings.pdf
PDF 10 MB Posted
- Solicitation number
- 36C25820B0017
About this file
This solicitation document describes a federal contract opportunity to prepare a site for nuclear medicine support space at the New Mexico VA Health Care System in Albuquerque, New Mexico. The Department of Veterans Affairs, Veterans Health Administration, Regional Procurement Office-West, Network Contracting Office 22G intends to issue a firm-fixed price solicitation on or around July 20, 2020 seeking construction services to completely prepare the project site for operations, including demolition and removal of existing site elements as well as modifications to existing HVAC, plumbing, electrical, IT, and fire suppression systems. Interested vendors will be responsible for downloading the solicitation package and any amendments from the Federal Contract Opportunities website. The contract will be set aside for a 100% Service-Disabled Veteran Owned Small Business and have a period of performance of 272 calendar days from receipt of the notice to proceed, with a magnitude between $100,000 and $250,000. The solicitation will provide instructions for proposal submissions and a virtual public bid opening.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT REVIEW
DATE: APPROVED: DIRECTOR
DATE: APPROVED: ASSOCIATE DIRECTOR
DATE: APPROVED: ASSISTANT DIRECTOR
DATE: APPROVED: CHIEF OF STAFF
DATE: APPROVED: CHIEF ENGINEER
DATE: APPROVED: ASSOCIATE DIRECTOR, PATIENT CARE SERVICES
DATE: APPROVED:
DATE: APPROVED:
ALBUQUERQUE
INTERNATIONAL
AIRPORT
GIBSON BLVD SE
CENTRAL AVE SE
RAYMOND G. MURPHY
VA MEDICAL CENTER
W Y
O M
IN
G
B L V
D S
E
CENTRAL AVE SE
I-25
I-25
I-40
S A
N M
A T
E O
B L V
D S
E
Y A
L E
B L V
D S
E
SUNPORT
BLVD
ALBUQUERQUE
INTERNATIONAL
AIRPORT
GIBSON BLVD SE
RAYMOND G. MURPHY
VA MEDICAL CENTERI-25
S A
N M
A T
E O
B L V
D S
E
Y A
L E
B L V
D S
E
SUNPORT BLVD *
PROJECT
LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
C U s e rs
\K e v in
\D o w n lo a d s \5
-C
S I-
N u c le a r
M e d ic in e \0
W o rk in g F ile s \0
R e v it F ile s \V
A -A
B Q
-B ld g -N u k e M e d -A
R C
H .c o m d e ta c h e d .r v t
/6
/2
:0
:2
A
M
G-000
COVER SHEET
TRIPLE C The A/E Group
1839 S. Alma School Rd., Ste. 300
Mesa, AZ 85210
307-460-2054
Mat Perkins
PREPARE SITE FOR NUCLEAR
MEDICINE SUPPORT SPACE - B41
1501 San Pedro Dr. SE, Albuquerque, NM 87108
501-CSI-108
April 06, 2020 M. PERKINS D. YOUNG
ISSUED FOR
CONSTRUCTION
NEW MEXICO VA HEALTH CARE SYSTEM
(NMVAHCS)
PREPARE SITE FOR NUCLEAR MEDICINE SUPPORT SPACE
BUILDING 41
CLIENT:
George F. Ballesteros
Contract Specialist: Construction Branch Network Contracting Office (NCO) 18 (SAVAHCS)
3601 S 6th Ave, Tucson, AZ 85723
(520) 792-1450 x4387 (P)
(520) 629-1817 (F)
Warren Battiste Contracting Officer's Representative New Mexico VA Health Care System
1501 San Pedro Drive Southeast Albuquerque, NM 87108
(505) 265-1711 x2895 (O)
(505) 274-0182 (C)
ISSUED FOR CONSTRUCTION
SUBMITTAL
April 06, 2020
VA CSI PROJECT NO : 501-CSI-108
501-CSI-108 – Medicine support space associated with PET-CT equipment install. This support space is required to support the actual equipment installation work approved in a contract through the National Acquisition Center (NAC).
The Contractor shall provide all modifications to the HVAC, plumbing, electrical, IT, security, CCTV and fire suppression systems and shall renovate the space per the architectural design, including: built-in counters, cabinetry, floor plan modifications, lead shielding and new finishes as shown on the drawings and in accordance with the specifications.
Contractor Scope of Work to complete Nuclear Medicine support space includes the summarized work described below 9see drawings and specifications for complete scope of work):
• The Overall Project will be performed within the following existing rooms/ located on the first floor of the VA Medical Center: Building 41.
• Contractor shall follow provide new lead shielding as shown on the drawings based on Physicist report.
• All construction is to be performed in one phase during normal working hours. Off-hours premium time is included for noise abatement and utility shutdowns only. Any item(s) to be salvaged by the owner are to be removed by the owner from the site before construction begins.
• Contractor shall provide dumpsters for disposal of construction debris and materials. The construction contractor will be required to submit construction waste debris reports to include weight of construction waste, weight of any recycled materials and the cost for removing construction waste.
• The contractor shall comply with all OSHA requirements and guidance provided in the contract specifications and drawings. The construction contractor shall comply with VA and Medical Center guidance to ensure infection controls during the construction. Contractor maintain shall at least -0.03 "w.g. negative air pressure at all times and shall submit ICRA coordination drawings for approval prior to beginning any work.
• All new floor, wall, and ceiling penetrations associated with the Nuclear Medicine support space will be properly sealed per NEC, NFPA, and facility specifications. Existing penetrations in the area of work shall also be properly sealed so that the entire Area of Work is compliant.
• Contractor shall provide new doors and an automatic door operator for the existing door to the Nuclear Medicine Reception Area.
• Provide material and equipment to install new curtain track and curtain.
• Provide new partitions, flooring and ceiling per the architectural drawings and new finishes per the Room Finish plans and schedule.
• Provide new casework, furnishings and signage as shown on the drawings.
• For fire suppression, contractor shall provide materials, install, commission and certify to reconfigure the existing automatic sprinkler system to accommodate the new layout. All drops to sprinklers shall be hard piped, no flexible connections are allowed.
• For plumbing, provide new isolation valves at existing system points of connection and provide materials, install, commission and certify new and existing medical gas systems. Provide new station standard outlets.
• Heat, Ventilating, and Air Conditioning, remove existing HVAC systems as required and provide materials, install, commission and integrate new HVAC equipment, devices and ductwork as required to reconfigure the existing system. Contractor shall perform Testing and Balancing the HVAC for the new space configuration. Further, contractor shall provide new controls and commission existing mechanical equipment serving the Nuclear Medicine spaces, including fan coil units, terminal units, humidifier and air handling units. All devices shall be addressable and controllable via the existing ALC Bacnet control system. All existing HVAC systems impacted by the modifications shall be tested with a pre-construction TAB report and returned to original values at post-construction TAB.
• For Electrical, remove existing electrical systems as required and provide materials, install, commission and integrate new electrical equipment, devices and wire/conduit as required to reconfigure the existing system and to serve the new renovation. Provide new lighting, devices, receptacles and door push plates, etc. within the area of work .
• For communications and security systems, remove existing systems as required and provide materials, install, commission and integrate new communications and electrical equipment, devices and wire/conduit as required to reconfigure the existing system and to serve the new renovation. This also includes providing new controls for all HVAC devices serving the existing Nuclear Medicine space. Final termination of network cabling shall be coordinated with VA IT staff. Provide for material to install Nurse Call system to accommodate the nuclear medicine support spaces. For Electronic Safety and Security, relocate and reconfigure existing fire alarm devices, security and CCTV to accommodate the Nuclear Medicine support space.
• Any connections into existing systems such as utility or communications must be verified to ensure compatibility with the systems overall. Any existing systems or utilities that must be moved to accommodate this new work is part of the Contractor's scope of work.
• Contractor will be required to submit complete coordination drawings for all new and existing systems for this project for approval prior to beginning any work. See specifications for additional details.
VICINITY MAP
NORTH
LOCATION MAP
NORTH
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
_____________________________SIGNATURE ________________DATE
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING
AND WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL CONTRACTOR).
CONTRACTOR SHALL EMPLOY THIRD PARTY INSPECTION CONSULTANTS TO PERFORM
ALL INSPECTIONS REQUIRED BY THIS CONTRACT. THE VA HAS NO INSPECTION
CAPABILITY. ANY REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY
INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS SHALL BE SUPPLIED
TO THE VA/AE AS REQUIRED BY THIS CONTRACT. ALL INSPECTIONS, TESTING,
CERTIFICATIONS, AND PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR.
THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS. VA
INSPECTIONS ARE FOR VA USE ONLY, WHEN PERFORMED, AND DO NOT REDUCE THE
INSPECTION BURDEN ON THE CONTRACTOR.
SCOPE OF WORK
THIS PROJECT MUST BE "STAND-ALONE". THE PROJECT CANNOT DEPEND ON
ANOTHER PROJECT OR OTHER FUNDING SOURCE TO MAKE FINAL RESULT
COMPLETE AND USABLE.
Revisions: Date:
ADDENDUM 2 03/31/2020
Expires 6.30.16Expires: 6/30/1821
4/6 /20
04/06/2020
ARCHITECTURAL SYMBOLS
COLUMN GRID LINE
(EXISTING)
EXISTING TO REMAIN
EXISTING TO BE
REMOVED
EXISTING TO REMAIN
NEW CONSTRUCTION
ROOM TAG
ROOM NAME
ROOM NUMBER
DOOR NUMBER
SYMBOL AND MINIMUM
CLEARANCES
WALL LEGEND
AREA OR VOLUME
DETAIL - SECTION
POSITION ON SHEET
SHEET NUMBER
DETAIL - PLAN/ RCP
POSITION ON SHEET
SHEET NUMBER
BUILDING SECTION
POSITION ON SHEET
SHEET NUMBER
WALL SECTION
POSITION ON SHEET
SHEET NUMBER
EXTERIOR ELEVATION
POSITION ON SHEET
SHEET NUMBER
INTERIOR ELEVATION
POSITION ON SHEET
SHEET NUMBER
WALL TYPE TAG
FRAME TYPE -
EXTERIOR & LOUVER
CURTAIN PANEL TYPE
DRAWING NUMBER
DRAWING SCALE
DRAWING NUMBER
DRAWING SCALE
SHEET NUMBER
REFERENCING
SHEET NUMBER
VIEW TITLE
VIEW TITLE WITH REFERENCE
KEYNOTE
DRAWING REVISION
LEVEL DATUM
LEVEL NAME
LEVEL ELEVATION
NORTH ARROW
FRAME TYPE - INTERIOR
GRAPHIC SCALE
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
18" MIN.
12" MIN. 4" MIN.
7'-0" R 3'-11"
99.917°
DIMENSION TO FACE OF
FINISH, FACE OF CONCRETE,
COLUMN CENTERLINE, OR
AS NOTED.
CENTERLINE
COLUMN GRID LINE
(NEW)
MATCHLINE
FOR CONTINUATION SEE: ?/?
MATCHLINE
FOR CONTINUATION SEE: ?/?
VIEW REFERENCE FOR
ADDITIONAL INFORMATION
REFERENCE TO AREA
MATCHLINE AND VIEW REFERENCE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
C U s e rs
\K e v in
\D o w n lo a d s \5
-C
S I-
N u c le a r
M e d ic in e \0
W o rk in g F ile s \0
R e v it F ile s \V
A -A
B Q
-B ld g -N u k e M e d -A
R C
H .c o m d e ta c h e d .r v t
/6
/2
:0
:3
A
M
G-001
DRAWING INDEX, ABBREVIATIONS
& SYMBOLS
TRIPLE C The A/E Group
1839 S. Alma School Rd., Ste. 300
Mesa, AZ 85210
307-460-2054
Mat Perkins
PREPARE SITE FOR NUCLEAR
MEDICINE SUPPORT SPACE - B41
1501 San Pedro Dr. SE, Albuquerque, NM 87108
501-CSI-108
April 06, 2020 MRP NMB
ISSUED FOR
CONSTRUCTION
Drawing Sheet List Sheet
Number Sheet Name 65%
Submittal 95%
Submittal 100%
Submittal
IFC
Submittal
GENERAL
G-000 COVER SHEET YES YES YES YES
G-001 DRAWING INDEX, ABBREVIATIONS & SYMBOLS YES YES YES YES
G-002 GENERAL NOTES YES YES YES YES
G-101 GENERAL CODE DATA & LIFE SAFETY PLAN YES YES
G-400 GENERAL TYPICAL FIXTURE AND SIGNAGE MOUNTING HEIGHTS YES
ARCHITECTURAL
AD101 ARCHITECTURAL ENLARGED DEMOLITION PLAN YES YES YES YES
A-100 ARCHITECTURAL COMPOSITE FLOOR PLAN YES YES YES YES
A-101 ARCHITECTURAL ENLARGED PLAN YES YES YES YES
AC101 ARCHITECTURAL REFLECTED CEILING PLAN YES YES YES YES
A-401 ENLARGED VIEWS YES YES YES YES
A-501 ARCHITECTURAL INTERIOR WALL TYPES YES YES YES YES
A-521 ARCHITECTURAL PARTITION AND FRAMING DETAILS YES YES YES YES
A-530 CASEWORK AND INTERIOR DETAILS NO YES YES YES
A-531 ARCHITECTURAL CEILING DETAILS YES YES YES YES
A-610 ARCHITECTURAL DOOR AND FRAME TYPES YES YES YES YES
SIGNAGE
AW100 ARCHITECTURAL SIGNAGE PLAN, DETAIL, NOTES AND SCHEDULE YES
INTERIORS
IF101 INTERIOR FINISH PLAN YES YES YES YES
IF602 ARCHITECTURAL ROOM FINISH SCHEDULE YES YES YES YES
FIRE PROTECTION
FP101 FIRE PROTECTION ENLARGED FLOOR PLAN YES YES
PLUMBING
P-001 PLUMBING LEGEND YES YES YES YES
P-101 PLUMBING PLAN - MEDICAL GAS YES YES YES YES
P-601 PLUMBING DETAILS AND DIAGRAMS NO YES YES YES
MECHANICAL
M-001 MECHANICAL LEGEND YES YES YES YES
MH100 MECHANICAL HVAC PLAN - DEMO YES YES YES YES
MH101 MECHANICAL HVAC PLAN - NEW YES YES YES YES
M-501 MECHANICAL DETAILS AND DIAGRAMS YES YES YES YES
ELECTRICAL
E-001 ELECTRICAL SYMBOL LEGEND AND ABBREVIATIONS YES YES YES YES
ED101 ELECTRICAL DEMOLITION PLAN YES YES YES YES
EL101 LIGHTING ENLARGED PLAN YES YES YES YES
EP101 ELECTRICAL ENLARGED PLAN YES YES YES YES
AB ANCHOR BOLT, AUGER BORING
ABS AIR BREAK SWITCH
AC AIR CONDITIONING, ASBESTOS CEMENT,
ACRES
A/C ASPHALTIC CONCRETE
ACB AIR CIRCUIT BREAKER
ACSR ALUMINUM CONDUCTOR STEEL REINFORCED
ACST ACOUSTIC
AD AREA DRAIN, ACCESS DOOR
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
AL ALUMINUM
AM ACOUSTIC MATERIAL
AMP,A AMPERE
AP ACCESS PANEL APPROX APPROXIMATE
ARCH ARCHITECTURAL
ARR ARRESTOR
ASPH ASPHALT
SYMBOLS AND ABBREVIATIONS
B BASELINE
BO BOARD
BEJ BRICK EXPANSION JOINT
BLDG BUILDING
BLK BLOCK
BM BEAM
B BOTTOM
BRG BEARING
BR BOTTOM REGISTER
BSMT BASEMENT
C CELSIUS
CAP CAPACITY
CB CIRCUIT BREAKER
CD CEILING DIFFUSER
CEM CEMENT
CG CORNER GUARD
C&G CURB AND GUTTER
CH CHILLER
CI CAST IRON, COURTYARD INLET
CIP CAST IRON PIPE, CAST IN PLACE
CIR CIRCULATING
CJ CONTROL JOINT
CKT CIRCUIT
CLG CEILING
C CENTERLINE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMPA CORRUGATED METAL PIPE ARCH
CMU CONCRETE MASONRY UNITS
CND,C CONDUIT
CNDS CONDENSATE
CO CLEANOUT
CODP CLEANOUT W/ DECK PLUG
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
COND CONDUCTOR
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONV CONVERTER
COP,CU COPPER
CP NON-REINFORCED CONCRETE PIPE
CR CHAIR, CRASH RAIL
CRS STAINLESS STEEL
CS CONCRETE SEALER/SURFACE
CSK COUNTERSUNK
CT CERAMIC TILE, CURRENT TRANSFORMER, COOLING TOWER
CTR CENTER, COOLING TOWER RETURN
CTS COOLING TOWER SUPPLY
CW COLD WATER
CWB CAPILLARY WATER BARRIER
CONTR CONTRACTION
CPT CARPET
D DEPTH, DEEP, DEGREE OF CURVATURE
DB DRY BULB, DECIBEL, DIRECT BURIAL
DD DIVERSION DIKE
DET DETAIL
DH DRILL HOLE
DI DUCTILE IRON
DIA DIAMETER
DIM DIMENSION
DL DEAD LOAD
DMPR DAMPER
DN DOWN
DP DISTRIBUTION PANEL
DS DOWNSPOUT, STORM DRAINAGE STRUCTURE
DW DOMESTIC WATER
DWG DRAWING
DWD DRINKING WATER DISPENSER
E EAST
EA EACH
EAN EXCEPT AS NOTED
EAT ENTERING AIR TEMPERATURE
EC EMPTY CONDUIT
EF EACH FACE, EXHAUST FAN
EG EXHAUST GRILLE
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EMT ELECTRICAL METALLIC TUBING
EMER EMERGENCY
E/P EDGE OF PAVEMENT
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
EVAP EVAPORATIVE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
(E), EXIST EXISTING
EXP EXPANSION, EXPOSED
EXP JT EXPANSION JOINT
EXT EXTERIOR
F FIRE, FUSE, FILTER
FA FIRE ALARM FABX FIRE ALARM BOX
FD FLOOR DRAIN, FIRE DAMPER
FDN FOUNDATION
FDR FEEDER
FE FIRE EXTINGUISHER
FFE FINISHED FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FL FLOOR, FLASHING, FLOW LINE
FLUOR FLUORESCENT
4 WAY FOUR WAY
FPH FROST PROOF HYDRANT
FR FRAME
FS FULL SIZE
FTG FOOTING
FJ FELT JOINT
FW FIRE WATER
FXTR FIXTURE
G GROUND, GAS LINE,GRAM
GA GAGE
GAL GALVANIZED
GC GLAZED COATING
GFI GROUND FAULT INTERRUPT
GFMU GROUND FACE MASONRY UNIT
GL GLASS
GR GRADE
GRD GROUND
GSU GLAZED STRUCTURAL UNIT
GW GROUND WATER
GWB GYPSUM WALL BOARD GYP GYPSUM
HGT,H HEIGHT, HUMIDIFIER
HB HOSE BIBB
HC HANDICAPPED
HD HARD DRAWN
HDW HARDWARE
HGSW HORN GAP SWITCH
HID HIGH INTENSITY DISCHARGE
HORIZ HORIZONTAL
HP HIGH POINT
HPS HIGH PRESSURE SODIUM
HR HOUR
HS HIGH STRENGTH
HW HOT WATER, HEADWALL
HWL HIGH WATER LEVEL
HVY HEAVY
HZ HERTZ
ID INSIDE DIAMETER, INSIDE DIMENSION
IE INVERT ELEVATION
IMC INTERMEDIATE METAL CONDUIT
INT INTERIOR
INSUL INSULATION, INSULATED
INV INVERT
INTX INTERSECTION
IP INLET PROTECTION
IRBF INDUSTRIAL RESIN BASE FLOORING
JB JUNCTION BOX
JC JANITOR CLOSET
JCT JUNCTION
JT JOINT
JST JOIST
K KILO
KIAC THOUSAND AMP INTERRUPT CAPACITY
KCP KEENE'S CEMENT PLASTER
KG KILOGRAM
KN KILONEWTON
KO KNOCK OUT
KV KILOVOLT
KVA KILOVOLT-AMPERE
KW KILOWATT
L/S LITERS PER SECOND
L LOUVER, LENGTH, LENGTH OF CURVE
LA LIGHTNING ARRESTOR
LC LEAD COVERED
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT LIGHT
LAV LAVATORY VERTICAL
LVC LENGTH OF VERTICAL CURVE
M/S METERS PER SECOND
M METER, MEGA
MACH MACHINE
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
ECH MECHANICAL
MET METAL
MH MANHOLE
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MLO MAIN LUG ONLY
MM,mm MILLIMETER
MO MOTOR OPERATED, MASONRY OPENING, MIDDLE ORDINATE
MP MEDIUM PRESSURE
MTD MOUNTED
MTG MOUNTING
MMP MEMBRANE WATERPROOFING
MULL MULLION
(N) NEW
N NORTH
NA NOT APPLICABLE
NC NON CORROSIVE
NE NORTHEAST
NDC NOSE DOWN CURB
NEC NATIONAL ELECTRIC CODE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NTS NOT TO SCALE
NW NORTHWEST
OA OUTSIDE AIR
OC ON CENTER
OCB OIL CIRCUIT BREAKER
OD OUTSIDE DIAMETER OPNG OPENING
OPP OPPOSITE
OSD OPEN SITE DRAIN
OVHD,OH OVERHEAD
Pa PASCALES
P PIPE, POLE
PB PULL BOX
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PJF PREFORMED JOINT FILLER
PL PLATE
PLAS PLASTER
PLNJ PAPER AND LEAD NEOPRENE JACKET
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
PRELIM PRELIMINARY
PRESS PRESSURE
PRIM PRIMARY
PRV PRESSURE RELIEF VALVE
PS PULL SWITCH
PT POINT, POINT OF TANGENT
PTN PARTITION
PVC POINT OF VERTICAL CURVE, POLY VINYL CHLORIDE .
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENT PVMT PAVEMENT
QT QUARRY TILE
R RADIUS, RISER, RUBBER SHEATH
RA RETURN AIR
RAD RADIUS
RB RESILIENT VINYL BASE
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN, ROAD
RECP RECEPTACLE
RED REDUCING
REINF REINFORCEMENT
REG REGULATOR, REGISTER
REQD REQUIRED
REV REVISION
RF ROOF, RETURN FAN
RHC REHEAT COIL
RI RUBBER INSULATED
RGS RIGID GALVANIZED STEEL
RL RAIN LEADER
RM ROOM
RPM REVOLUTIONS PER MINUTE
RVT RESILIENT VINYL TILE
S SECOND, SOUTH, SANITARY, SEWER, STRUCTURE
SAN SANITARY SEWER
SATC SUSPENDED ACOUSTICAL TILE CEILING
SCH SCHEDULE
SD SPLITTER DAMPER, STORM DRAIN
SE SOUTHEAST
SECT SECTION SERV SERVICE SF SILT FENCE
SG SUPPLY GRILLE
SH SHEET
SIM SIMILAR
1 PH SINGLE PHASE
SKCP SUSPENDED KEENE'S CEMENT PLASTER
SL SLOPE
SMH SANITARY MODULE
SP STATIC PRESSURE, SINGLE POLE
SPC SUSPENDED PLASTER CEILING
SPDT SINGLE POLE, DOUBLE THROW
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SQ SQUARE
SR SUPPLY REGISTER
SS SANITARY SEWER
ST STEAM, SINGLE THROW, STREET
STA STATION STD STANDARD
STL STEEL SUP SUPPORT
SUSP SUSPENDED
SV SHEET VINYL
SW SWITCH, SIDEWALK
SWBD SWITCHBOARD SWGR SWITCHGEAR
T TILE,TOP,TANGENT
T&B TOP AND BOTTOM
TC TOP OF CURB
TEL TELEPHONE
TEMP TEMPERATURE, TEMPORARY
TERM TERMINAL
3/C THREE CONDUCTOR
3/P THREE POLE
3 WAY THREE WAY
TH TOTAL HEAD (PUMPS)
THRSLD THRESHOLD
TO TOP OF
TP TEST PIT
TR TOP REGISTER
TRANS TRANSITION
TS TOP OF STEEL, TOP OF STONE, TOP OF SLAB
TV TELEVISION
TW TOP OF WALL
TYP TYPICAL
UG UNDERGROUND
UCR UNDER COUNTER REFRIGERATOR
UGE UNDERGROUND ELECTRIC
UGT UNDERGROUND TELEPHONE
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
V VENT,VOLT,VALVE
VA VOLT AMPRE
VAC VACUUM
VCT VINYL COMPOSITION TILE
V ASB VINYL ASBESTOS
VC VARNISH CAMBRIC, VITRIFIED CLAY
VCP VITRIFIED CLAY PIPE
VENT VENTILATING
VERT VERTICAL
VEST VESTIBULE
VPI VERTICAL POINT OF INTERSECTION
VPOC VERTICAL POINT OF CURVE
VPOT VERTICAL POINT OF TANGENT
VS VENT STACK
VTR VENT THRU ROOF
VWC VINYL WALL COVERING
W WIDTH,WASTE,WATER,WATT,WEST
W WIRE, WATER LINE STRUCTURE
WA WATT
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER CLOSET
WD WIDTH, WINDOW DIMENSION
WOM WALK OFF MATT
WL WATER LEVEL WP WATERPROOF, WEATHERPROOF
WS WASTE STACK, WATER SURFACE, WATERSTOP
WT WEIGHT
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
X-STR UNIT HEATER
2:1 SL 2 HORIZONTAL TO 1 VERTICAL SLOPE
1 ON 2 1 VERTICAL ON 2 HORIZONTAL SLOPE
DEFLECTION ANGLE
Ø DIAMETER, PHASE
Revisions: Date: Expires 6.30.16Expires: 6/30/1821
4/6
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY
CODE, ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S)
PRIOR TO FABRICATION AND CONSTRUCTION. ANY DISCREPANCIES BETWEEN EXISTING
CONDITIONS AND THESE DRAWINGS, WHICH AFFECT THE SCOPE AND INTENT OF THE WORK
DESCRIBED IN CONSTRUCTION DOCUMENTS, SHALL BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT AND COR IMMEDIATELY.
4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT
SIZES AND LOCATIONS.
5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL
KNOWLEDGE.
6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH
OTHER AND PLUMB.
7. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY
AND IS NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL
SCOPE OF WORK.
8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. ALL
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR.
9. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR
SHALL VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT
DOCUMENTS. REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR
PERFORMING WORK RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.
10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR
MATERIAL CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION PRIOR
TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY
TIME, METHOD, SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.
11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS "NIC" IS NOT IN THE
CONTRACT. HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK
INDICATED AS NIC.
12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH OWNER, INCLUDING
STAGING AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY
OPERATIONS, INTERRUPTION OF UTILITIES, ETC. SEE SPECIFICATIONS.
13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH
TRADE'S WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR
FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS
THROUGH FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE SPECIFICATIONS.
14. PROVIDE GALVANIC SEPARATION MATERIAL, ACCEPTABLE TO ARCHITECT AND COR,
BETWEEN DISSIMILAR METALS. SEE SPECIFICATIONS.
15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE
SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE
OR MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER
MATERIAL AS APPROVED BY ARCHITECT AND COR.
16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES,
MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR,
MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL ELEVATION COORDINATION.
17. ANY CUTTING/WELDING WILL REQUIRE DAILY BURN PERMITS TO BE COORDINATED WITH
COR. SUBMIT CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
FIRE LIFE SAFETY NOTES
1. IF ENCOUNTERED, FIRE RATED ASSEMBLIES, INCLUDING FIREPROOFING, DAMAGED DURING
CONSTRUCTION MUST BE RESTORED TO THEIR ORIGINAL CONDITION.
2. FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION, AND THE MEANS OF
EGRESS MUST BE MAINTAINED AT ALL TIMES. WHEN IT IS NOT POSSIBLE TO MAINTAIN FIRE-
RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION AND/OR MEANS OF EGRESS,
TEMPORARY CONSTRUCTION BARRIERS AND/OR A FIRE WATCH MUST BE PROVIDED.
FIRE SAFETY DURING CONSTRUCTION, ALTERATIONS AND DEMOLITION
1. FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED AT ALL
TIMES PER LOCAL FIRE DEPARTMENT.
2. FIRE DEPARTMENT WATER MAINS AND FIRE HYDRANTS SHALL BE OPERATIONAL AT ALL
TIMES AND SHALL BE IN ACCORDANCE WITH LOCAL FIRE DEPARTMENT.
3. FIRE EXTINGUISHERS SHALL BE PROVIDED FOR BUILDINGS UNDER CONSTRUCTION. THE
NUMBER AND TYPE OF EXTINGUISHERS SHALL BE AS REQUIRED BY THE STATE FIRE
MARSHAL OR LOCAL FIRE DEPARTMENT.
4. COMBUSTIBLE DEBRIS SHALL NOT ACCUMULATE WITHIN BUILDINGS.
5. CUTTING AND WELDING OPERATIONS SHALL BE IN ACCORDANCE WITH LOCAL FIRE
CODES.
6. FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES PER
LOCAL FIRE CODES.
7. REQUIRED MEANS OF EGRESS COMPONENTS SHALL BE MAINTAINED AT ALL TIMES.
TEMPORARY EXITING SHALL BE APPROVED BY THE STATE FIRE MARSHAL OR BY THE LOCAL
FIRE DEPARTMENT.
8. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED.
9. PLASTIC FILM (VISQUEEN) WHEN USED FOR DUST PROTECTION, SHALL BE FLAME-
RETARDANT.
10. SMOKE DETECTORS SHALL BE COVERED OR REMOVED DURING ALTERATIONS. WHEN
REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT, HEAT DETECTORS
MAY BE SUBSTITUTED FOR SMOKE DETECTORS DURING ALTERATIONS.
11. ALL FIRE HYDRANTS, WATER SUPPLY TO FIRE HYDRANTS, AND FIRE DEPARTMENT
VEHICLE ACCESS ROADWAYS SHALL BE INSTALLED, TESTED AND PLACED IN SERVICE
PRIOR TO AND DURING THE TIME OF CONSTRUCTION. INSTALLATION MUST BE COORDINATED
WITH LOCAL FIRE DEPARTMENT IN THE FIELD.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF THERE IS A DIMENSIONAL VARIANCE BETWEEN DISCIPLINES OR SIGNIFICANT OMISSION OR CONFLICT WITHIN A DISCIPLINE, CONTACT ARCHITECT AND COR PRIOR TO BID. IF DISCREPANCIES ARE DISCOVERED AFTER THE BID, CONTRACTOR SHALL CONFIRM DIMENSIONS
WITH ARCHITECT AND COR PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE THOSE
ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND SHOP DRAWINGS
CONTRACTOR SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS
REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS AND EXTERIOR
ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND ELECTRICAL
DRAWINGS. MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN DIMENSIONAL
INFORMATION RELATED TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD MASONRY
CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
FLOOR PLAN DIMENSIONS
1. THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE
FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM OUTSIDE
GRIDLINE TO OUTSIDE GRIDLINE) AS SHOWN.
2. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF
MASONRY WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.
3. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").
4. DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR MAKES
THE PLACEMENT CLEARER, THE DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.
5. DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH" OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE HEAD/SILL DIMENSIONS.
6. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS (2.5"-DOOR
HANDLE PLUS 1" -WALL STOP PLUS 1/2" GWB=4.0")
7. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTED "CLR" OR "CLEAR" AND ARE SHOWN TO THE
FACES OF FINISHES.
8. DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION
REQUIRED.
VERTICAL DIMENSIONS
1. UNLESS NOTED OTHERWISE, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).
2. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF
DECKING OR SHEATING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.
3. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-
BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS). HEIGHT
REFERENCES SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION
4. LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UNO. EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL PENETRATIONS, UNO.
5. SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION (FFE)
NEXT TO IT.
1 HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE OWNER RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY
OF THE WALL AND/OR ROOF.
5. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.
FIRE ALARM
1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH CLASS "a" PROTECTION
OF THE INTERNATIONAL BUILDING CODE.
2. SUBMITTAL SHALL INCLUDE FM LISTING NUMBER FOR ALL COMPONENTS, A SINGLE-LINE DIAGRAM SHOWING PRIMARY POWER, EMERGENCY POWER RISER DIAGRAM, DETAILS OF TROUBLE SUPERVISION &
POWER LIMITED/NON POWER LIMITED CIRCUITRY, FLOOR PLANS SHOWING LOCATION OF ALL
COMPONENTS AND METHOD OF ALARM TRANSMISSION TO STATE FIRE MARSHAL OR LOCAL FIRE
DEPARTMENT.
3. THE FIRE ALARM SYSTEM SHALL CONFORM TO IFC 2012 STANDARDS AND APPLICABLE NFPA
STANDARDS. FIRE ALARM SHOP DRAWINGS SHALL BE SUBMITTED TO STATE MARSHAL FOR APPROVAL PRIOR TO INSTALLATION. UPON COMPLETION OF THE INSTALLATION OF THE FIRE ALARM SYSTEM, A
SATISFACTORY TEST OF THE ENTIRE SYSTEM WILL BE PERFORMED IN THE PRESENCE OF THE
ENFORCING AGENCY.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE
EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH
EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL
EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.
2. PERMANENT - EXISTING PERMANENT FIRE EXTINGUISHERS ARE TO BE MAINTAINED.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRINKLER SYSTEMS ARE TO BE MAINTAINED.
FIRE & SMOKE DAMPERS
1. EXISTING FIRE AND SMOKE DAMPERS ARE TO BE MAINTAINED.
EXIT AND EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE
DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW THE THRESHOLD.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE LOCAL AND CURRENT NEC GUIDELINES.
RATED DOOR AND WINDOW ASSEMBLIES
1. BUILDING 41 (MEDICAL CENTER) IS EQUIPPED WITH RATED DOOR ASSEMBLIES AND THEY ARE NOT AFFECTED WITH THIS PROJECT. EXISTING RATINGS ARE TO BE MAINTAINED. NEW RATED DOORS SHALL
CLEARLY LABEL DOOR AND FRAME RATING, DO NOT PAINT.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME-PROOFED IN AN APPROVED
MANNER.
2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING INSULATION, FACING MATERIALS, TAPES AND ADHESIVES
NORMALLY APPLIED.
3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE DENSITY
NOT TO EXCEED 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84.
4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE HARDWARE, PANIC BARS, PUSH- PULL PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE LATCH, MEASURED FROM THE LEADING EDGE OF
THE DOOR.
5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED:
A. INTERIOR DOORS - 5 lbs.
B. EXTERIOR DOORS - 8.5 lbs.
C. FIRE DOORS - 15 lbs.
6. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED
WITH A UL APPROVED METHOD AND MATERIAL APPROVED BY BUILDING.
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION MANUAL
FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK.
2. PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR
SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING,
SURFACE TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND
REMOVAL OF OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER
TYPES OF PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT
INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT
PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED
TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND FITTINGS
(INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE SEALED,
UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING SCOPE
ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND PAINTING GENERAL
NOTES. THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY EXCLUSIVE.
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND
EXTERIOR EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED
METAL SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND
ELECTRICAL WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND
MECHANICAL WORK IN ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED
OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF PIPING FOR MECHANICAL AND
PLUMBING WORK IS COVERED IN THE MECHANICAL OR PLUMBING SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF
MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE
INTENDED OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT
TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE
SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE
MATCHED, THE ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED
FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT
PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET
PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT AN ITEM
OR SURFACE, CONTACT THE ARCHITECT FOR INSTRUCTIONS PRIOR TO PAINTING.
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL
SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER,
BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS
WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING FURRED
AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION PROPERLY IF
PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.
12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT.
1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP LOCATIONS. PROPER
PRIMING MUST BE USED WITH SEALANTS.
2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS
ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING SHOULD BE USED, CONTACT THE
ARCHITECT.
3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND
VERTICAL CONCRETE JOINTS AND AS NOTED.
4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED, SHALL BE
USED AT MASONRY AND CONCRETE CONTROL JOINTS.
5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE
PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN SEALANT
UNLESS NOTED OTHERWISE.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.
7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED EQUIPMENT
FRAMES AND EXPOSED SUPPORTS.
8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL MATERIALS
(TILE TO BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-LAM, ETC).
9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OR 1/16TH INCH OR MORE.
10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.
11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE
ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.
12. USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
C U s e rs
\K e v in
\D o w n lo a d s \5
-C
S I-
N u c le a r
M e d ic in e \0
W o rk in g F ile s \0
R e v it F ile s \V
A -A
B Q
-B ld g -N u k e M e d -A
R C
H .c o m d e ta c h e d .r v t
/6
/2
:0
:3
A
M
G-002
GENERAL NOTES
TRIPLE C The A/E Group
1839 S. Alma School Rd., Ste. 300
Mesa, AZ 85210
307-460-2054
Mat Perkins
PREPARE SITE FOR NUCLEAR
MEDICINE SUPPORT SPACE - B41
1501 San Pedro Dr. SE, Albuquerque, NM 87108
501-CSI-108
April 06, 2020 M. PERKINS D. YOUNG
ISSUED FOR
CONSTRUCTION
GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES
GENERAL SEALANT / CAULKING NOTES
GENERAL DEMOLITION AND PHASING NOTES
Revisions: Date: Expires 6.30.16Expires: 6/30/1821
T
T
T
T
E
7 8 9 10 118.8
CORRIDOR
C1-21C1-21
CORRIDOR
C1-22C1-22
NUC
MED
READING
1B-1611B-161
NUC
MED
PHARMACY
1B-1621B-162
EQUIP
STORAGE
1B-1631B-163
RADIO
WASTE
1B-162A1B-162A
SCANNER
RM
1C-160
723 SF
CONTROL
RM
1C-160E1C-160E
EQUIP
RM
1C-160K1C-160K
NEW
VESTIBULE
1C-1121C-112
PATIENT
WAITING
ROOM
1C-1841C-184
INPATIENT
PET
1C-1031C-103
NEW
WAITING
1C-1061C-106
TOILET
1C-160H1C-160H
UP
TAKER
1C-160D1C-160D
BATH
RM
1C-160C1C-160C
NEW
HALL
1C-1081C-108NEW
WAITING
1C-1071C-107
NEW
OFFICE
1C-1091C-109
READING
ROOM
1C-160A1C-160A
BUILDING
MAIN
CLOSET
1B-1041B-104
RECEPTION
1C-100A1C-100A
READING
RM
1C-1261C-126
CORRIDOR
C1-25C1-25
FEMALE
TOILET
1B-1021B-102
CORRIDOR
C1-19C1-19
CORRIDOR
XX
ROOM
#1
1B-1131B-113
NUCLEAR
MEDICINE
1B-1051B-105
ROOM
#2
1B-1201B-120
CONTROL
ROOM#2
1C-1311C-131
CONTROL
ROOM#1
1C-1321C-132
ROOM
#3
1B-1301B-130
ROOM
#4
1B-1231B-123
LOCKER
1B-1581B-158
WORK
AREA
1B-1401B-140
UTILITY
1B-169A1B-169A
NURSE
1B-1691B-169
OFFICE/
MEETING
1B-1391B-139
CORRIDOR
C1-18C1-18
ALL EXISTING FIRE
EXTINGUISHERS TO REMAIN
(MISSION CRITICAL CONSTRUCTION)
(MISSION CRITICAL CONSTRUCTION)
349 SF
AMBULATORY
HEALTHCARE
502 SF
AMBULATORY
HEALTHCARE
284 SF
BUSINESS
EXISTING AMBULATORY
HEALTH CARE
EXISTING AMBULATORY
HEALTH CARE
301 SF
BUSINESS
Building Area Legend
AMBULATORY HEALTHCARE
BUSINESS
120 SF
BUSINESS
5 OCC
2 OCC
1 OCC
1 OCC
8 OCC
3 OCC
9 OCC
2 OCC
1 OCC
>200'-0" TO
BLDG EXIT
>225'-0" TO
BLDG EXIT
FIRE EXIT
30'-0" +/-
>10'-0" TO
FIRE EXIT
PROPOSED PLAN DOES NOT INCREASE
OCCUPANCIES, PATHS OR CALCULATIONS.
NO CHANGE
GENERAL NOTES
KEY PLAN
LEGEND
PROJECT BOUNDARY
A. ALL INTERIOR WALLS TO BE 3-5/8" METAL STUDS UNLESS NOTED OR DIMENSIONED
OTHERWISE. ALL "CLEAR" OR "MIN." DIMENSIONS ARE DIMENSIONED FROM FACE OF
FINISH. TYPICALLY, ALL DIMENSIONS ARE FACE OF STUD OR CMU.
APPLICABLE BUILDING CODES
• 2018 NFPA 101, LIFE SAFETY CODE
• 2016 NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE & NFPA 13
STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS
• 2014 NFPA 70 NATIONAL ELECTRICAL CODE
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2017 NATIONAL ELECTRICAL CODE (NEC)
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN
CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF
STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW
FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS
AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:
MEMORANDUM OF UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL,
ENERGY, AND TRANSPORTATION MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE
GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1-
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 –
• ENERGY STANDARD FOR BUILDINGS-ASHRAE 90.1-2013
• 2018 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED BY VA STANDARDS
• 2018 INTERNATIONAL MECHANICAL CODE (IMC)WHERE DIRECTED BY VA
STANDARDS
• 2018 INTERNATIONAL PLUMBING CODE (IPC) WHERE DIRECTED BY VA
STANDARDS
APPLICABLE BUILDING GUIDES
• VA FIRE PROTECTION DESIGN GUIDE, 7TH EDITION (2015)
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:
STRUCTURAL FRAME - 2 HOURS
NON-BEARING WALLS - 0 HOURS
BEARING WALLS - 2 HOURS
FLOORS - 2 HOURS
ROOF - 1 HOURS
PROTECTED STEEL WITHIN MECHANICAL ROOMS AND SUPPORTING INTERSTITIAL
DECK. UNPROTECTED HORIZONTAL STEEL WITHIN INTERSTITIAL FLOORS. FIRE
DAMPERS OMITTED AT INTERSTITIAL DECK PENETRATIONS 225 SQ INCHES OR LESS.
CLASSIFICATION OF OCCUPANCY:
NFPA 101 - New Ambulatory Health Care Occupancy per Chapter 20 Multiple 20.1.1.4.1.1 Additions shall be separated from any existing structure not conforming to the provisions within Chapter 21 by a fire barrier having not less than a 2-hour fire resistance rating and constructed of materials as required for the addition. (See 4.6.5 and 4.6.7.)
NFPA 101 - Existing Ambulatory Health Care Occupancy per Chapter 21
21.1.1.4.1.1 Additions shall be separated from any existing structure not conforming to the provisions within Chapter 21 by a fire barrier having not less than a 2-hour fire resistance rating and constructed of materials as required for the addition. (See 4.6.5 and 4.6.7.)
OCCUPANCY TYPE (Multiple):
6.1.14.1 Multiple Occupancies. (2) Separated Occupancies
6.1.14.1.2 Where exit access from occupancy traverses another occupancy the multiple occupancy shall be treated as a mixed occupancy.
6.1.14.1.3 Where incidental to another occupancy, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the code that apply to the predominate occupancy. (1) Mercantile, business, industrial, or storage use
6.1.14.4 Seperated Occupancies.
20.1.3.3 Sections of ambulatory health care facilities shall be permitted to be classified as other occupancies, provided that they meet the following conditions:
(1) They are not intended to serve ambulatory health care occupants for purposes of treatment or customary access by patients incapable of self-preservation.
(2) They are separated from areas of ambulatory health care occupancies by construction having a minimum 1-hour fire resistance rating.
PRIMARY BUILDING OCCUPANCY TYPE:
6.1.6 AMBULATORY HEALTH CARE OCCUPANCY.
PROJECT AREA OCCUPANCY TYPE:
6.1.14.2.3 Separated Occupancy. A multiple occupancy where the occupancies are separated by fire resistance-rated assemblies.
6.1.10 MERCANTILE. See Chapter 36; New Mercantile Occupancies
6.1.10.1 Definition - Mercantile Occupancy. An occupancy used for the display and sale of merchandise.
6.1.11 BUSINESS - For requirements, see Chapter 38; New Business Occupancies 6.1.11.1* Definition — Business Occupancy. An occupancy used for the transaction of business other than mercantile.
EXIT ACCESS TRAVEL DISTANCE:
36.2.6.2 Travel Distance to Exits. In mercantile occupancies classified as ordinary hazard in buildings protected by an approved, supervised automatic spinkler system in accordance with 9.7.1.1, travel distance shall not exceed 250 ft.
MERCANTILE OCCUPANCY; PROTECTED = 250'-0"
38.2.6.3 Travel Distance to Exits. Travel distance shall not exceed 300 ft (91 m) in business occupancies protected throughout by an approved, supervised automatic sprinkler system in accordance with Section 9.7.
BUSINESS OCCUPANCY; PROTECTED = 300'-0"
7.1.3.1 Exit Access Corridors. Corridors used as exit access and serving an area having an occupant load exceeding 30 shall be separated from other parts of the building by walls having not less than a 1-hour fire resistance rating in accordance with Section 8.3, unless otherwise permitted by one of the following:
(1)This requirement shall not apply to existing buildings, provided that the occupancy classification does not change.
(2)This requirement shall not apply where otherwise provided in Chapters 11 through 43.
OCCUPANT LOAD:
36.1.7* Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
38.1.7* Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors that are characteristic of the use of the space or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
PROTECTION OF VERTICAL OPENINGS:
40.3.1 Protection of Vertical Openings. Any vertical opening shall be protected in accordance with Section 8.6, unless otherwise permitted by:
(3) Approved, existing, unprotected vertical openings in buildings with low- or ordinary-hazard contents that are protected throughout by an approved automatic sprinkler system in accordance with 9.7.1.1(1) shall be permitted, provided that the following conditions exist:
(a) The vertical opening does not serve as a required exit.
(b) All required exits consist of outside stairs in accordance with 7.2.2, smokeproof enclosures in accordance with 7.2.3, or horizontal exits in accordance with 7.2.4.
PATH OF TRAVEL (DISTANCE)
EXIT LIGHTING
XXX
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHERS
FIRE HOSE CABINETS
DIRECTION OF EGRESS & NUMBER OF OCCUPANTS
50 OCC
50'-0"
MEANS OF EGRESS:
36.2.3 Capacity of Means of Egress.
36.2.3.1 The capacity of means of egress shall be in accordance with Section 7.3.
36.2.3.2 Not Applicable
38.2.3 Capacity of Means of Egress.
38.2.3.1 The capacity of means of egress shall be in accordance with Section 7.3.
38.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall be not less than 44 in. (1120 mm).
38.2.4.3 A single exit shall be permitted for a room or area with a total occupant load of less than 100 persons, provided that all of the following criteria are met:
(1)The exit shall discharge directly to the outside at the level of exit discharge for the building.
(2)The total distance of travel from any point, including travel within the exit, shall not exceed 100 ft (30 m).
(3) Not applicable
INTERSTITIAL DECK - 2 HOURS
MECH ROOMS ON
OCCUPIED LEVELS - 2 HOURSGENERAL NOTES CONTINUED
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PRIORITY
1 HIGHEST
4 LOWEST
Project Number
Bu…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .